-
1
-
-
2342418968
-
Implementing lean construction: Stabilizing work flow
-
Santiago, Chile
-
Ballard, G., and Ho well, G. (1994). "Implementing lean construction: stabilizing work flow." Proc., 2nd Annual Conf. of the Int. Group for Lean Construction, Santiago, Chile.
-
(1994)
Proc., 2nd Annual Conf. of the Int. Group for Lean Construction
-
-
Ballard, G.1
Ho Well, G.2
-
2
-
-
1642563373
-
Towards construction JIT
-
Association of Researchers in Construction Management, Reading, U.K.
-
Ballard, G., and Howell, G. (1995). "Towards construction JIT." Proc., 11th Annual ARCOM Conf., Association of Researchers in Construction Management, Reading, U.K., 338-346.
-
(1995)
Proc., 11th Annual ARCOM Conf.
, pp. 338-346
-
-
Ballard, G.1
Howell, G.2
-
3
-
-
11644288742
-
Shielding production: An essential step in production control
-
Ballard, G., and Howell, G. (1998). "Shielding production: an essential step in production control," J. Constr. Eng. Manage., 124(1), 11-17.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.1
, pp. 11-17
-
-
Ballard, G.1
Howell, G.2
-
4
-
-
0020767205
-
Downgrading construction incidents
-
Handa, V. K., and Rivers, D. (1983). "Downgrading construction incidents." J. Constr. Eng. Manage., 109(2), 190-205.
-
(1983)
J. Constr. Eng. Manage.
, vol.109
, Issue.2
, pp. 190-205
-
-
Handa, V.K.1
Rivers, D.2
-
6
-
-
13944271969
-
Process dynamics: Identifying a strategy for the deployment of buffers in building projects
-
Horman, M. J., and Kenley, R. (1998). "Process dynamics: identifying a strategy for the deployment of buffers in building projects." Int. J. Logistics: Res. Appl., 1(3), 221-237.
-
(1998)
Int. J. Logistics: Res. Appl.
, vol.1
, Issue.3
, pp. 221-237
-
-
Horman, M.J.1
Kenley, R.2
-
7
-
-
0004029585
-
-
The Chartered Institute of Building, London
-
Horner, R. M. W., and Talhouni, B. T. (1998). Effects of accelerated working, delays and disruption on labour productivity, The Chartered Institute of Building, London.
-
(1998)
Effects of Accelerated Working, Delays and Disruption on Labour Productivity
-
-
Horner, R.M.W.1
Talhouni, B.T.2
-
8
-
-
0027805668
-
Interaction between subcycles: One key to improved methods
-
Howell, G., Laufer, A., and Ballard, G. (1993). "Interaction between subcycles: one key to improved methods." J. Constr. Eng. Manage., 119(4), 714-728.
-
(1993)
J. Constr. Eng. Manage.
, vol.119
, Issue.4
, pp. 714-728
-
-
Howell, G.1
Laufer, A.2
Ballard, G.3
-
9
-
-
13944266409
-
Implementing lean construction: Reducing inflow variation
-
Santiago, Chile
-
Howell, G., and Ballard, G. (1994). "Implementing lean construction: reducing inflow variation." Proc., 2nd Annual Conf. of the Int. Group for Lean Construction, Santiago, Chile.
-
(1994)
Proc., 2nd Annual Conf. of the Int. Group for Lean Construction
-
-
Howell, G.1
Ballard, G.2
-
10
-
-
0003656231
-
Application of the new production philosophy to construction
-
Center for Integrated Facility Engineering, Stanford Univ., Stanford, Calif.
-
Koskela, L. (1992). "Application of the new production philosophy to construction." Tech. Rep. No. 72, Center for Integrated Facility Engineering, Stanford Univ., Stanford, Calif.
-
(1992)
Tech. Rep. No. 72
, vol.72
-
-
Koskela, L.1
-
12
-
-
0026382438
-
Factors affecting masonry-labor productivity
-
Sanders, S. R., and Thomas, H. R. (1991). "Factors affecting masonry-labor productivity." J. Constr. Eng. Manage., 117(4), 626-644.
-
(1991)
J. Constr. Eng. Manage.
, vol.117
, Issue.4
, pp. 626-644
-
-
Sanders, S.R.1
Thomas, H.R.2
-
14
-
-
0026220131
-
Labor productivity and work sampling: The bottom line
-
Thomas, H. R. (1991). "Labor productivity and work sampling: the bottom line." J. Constr. Eng. Manage., 117(3), 423-444.
-
(1991)
J. Constr. Eng. Manage.
, vol.117
, Issue.3
, pp. 423-444
-
-
Thomas, H.R.1
-
16
-
-
0025694102
-
Modeling construction labor productivity
-
Thomas, H. R., Maloney, W. F., Horner, R. M. W., Smith, G. R., Handa, V. K., and Sanders, S. R. (1990). "Modeling construction labor productivity." J. Constr. Eng. Manage., 116(4), 705-726.
-
(1990)
J. Constr. Eng. Manage.
, vol.116
, Issue.4
, pp. 705-726
-
-
Thomas, H.R.1
Maloney, W.F.2
Horner, R.M.W.3
Smith, G.R.4
Handa, V.K.5
Sanders, S.R.6
-
17
-
-
0032673945
-
Loss of labor productivity due to delivery methods and weather
-
Thomas, H. R., Riley, D. R., and Sanvido, V. E. (1999). "Loss of labor productivity due to delivery methods and weather." J. Constr. Eng. Manage., 125(1), 39-46.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.1
, pp. 39-46
-
-
Thomas, H.R.1
Riley, D.R.2
Sanvido, V.E.3
-
18
-
-
0034271740
-
Role of the fabricator in labor productivity
-
Thomas, H. R., and Sanvido, V. E. (2000). "Role of the fabricator in labor productivity." J. Constr. Eng. Manage., 126(5), 358-365.
-
(2000)
J. Constr. Eng. Manage.
, vol.126
, Issue.5
, pp. 358-365
-
-
Thomas, H.R.1
Sanvido, V.E.2
-
19
-
-
0000603336
-
Impact of material management on productivity - A case study
-
Thomas, H. R., Sanvido, V. E., and Sanders, S. R. (1989). "Impact of material management on productivity - a case study." J. Constr. Eng. Manage., 115(3), 370-384.
-
(1989)
J. Constr. Eng. Manage.
, vol.115
, Issue.3
, pp. 370-384
-
-
Thomas, H.R.1
Sanvido, V.E.2
Sanders, S.R.3
-
20
-
-
0342515142
-
-
Rep. No. 9019, Pennsylvania Transportation Institute, University Park, Pa.
-
Thomas, H. R., and Smith, G. R. (1990). "Loss of construction labor productivity due to inefficiencies and disruptions: the weight of expert opinion." Rep. No. 9019, Pennsylvania Transportation Institute, University Park, Pa.
-
(1990)
Loss of Construction Labor Productivity Due to Inefficiencies and Disruptions: The Weight of Expert Opinion
-
-
Thomas, H.R.1
Smith, G.R.2
-
21
-
-
12344317610
-
-
Rep. No. 9913, Pennsylvania Transportation Institute, University Park, Pa.
-
Thomas, H. R., and Zavřski, I. (1998). "Theoretical model for international benchmarking of labor productivity." Rep. No. 9913, Pennsyl vania Transportation Institute, University Park, Pa.
-
(1998)
Theoretical Model for International Benchmarking of Labor Productivity
-
-
Thomas, H.R.1
Zavřski, I.2
-
22
-
-
0344240116
-
Construction baseline productivity: Theory and practice
-
Thomas, H. R., and Zavřski, I. (1999). "Construction baseline productivity: theory and practice." J. Constr. Eng. Manage., 125(5), 295-303.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.5
, pp. 295-303
-
-
Thomas, H.R.1
Zavřski, I.2
-
23
-
-
0000012732
-
Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique
-
Tommelein, I. D. (1998). "Pull-driven scheduling for pipe-spool installation: simulation of lean construction technique." J. Constr. Eng. Manage., 124(4), 279-288.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.4
, pp. 279-288
-
-
Tommelein, I.D.1
-
24
-
-
0032645520
-
Parade game: Impact of work flow variability on trade performance
-
Tommelein, I. D., Riley, D. R., and Howell, G. A. (1999). "Parade game: impact of work flow variability on trade performance." J. Constr. Eng. Manage., 125(5), 304-310.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.5
, pp. 304-310
-
-
Tommelein, I.D.1
Riley, D.R.2
Howell, G.A.3
|