Volumn 128, Issue 2, 2002, Pages 144-154

Reducing variability to improve performance as a lean construction principle

Author keywords

Construction projects; Personnel management; Project management; Variability

Indexed keywords

CONSTRUCTION PROJECTS; PERSONNEL MANAGEMENT; SYSTEM PERFORMANCE; VARIABILITY;

EID: 13944264322     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2002)128:2(144)     Document Type: Article
Times cited : (160)

References (25)
  • 2
    • 1642563373 scopus 로고
    • Towards construction JIT
    • Association of Researchers in Construction Management, Reading, U.K.
    • Ballard, G., and Howell, G. (1995). "Towards construction JIT." Proc., 11th Annual ARCOM Conf., Association of Researchers in Construction Management, Reading, U.K., 338-346.
    • (1995) Proc., 11th Annual ARCOM Conf. , pp. 338-346
    • Ballard, G.1    Howell, G.2
  • 3
    • 11644288742 scopus 로고    scopus 로고
    • Shielding production: An essential step in production control
    • Ballard, G., and Howell, G. (1998). "Shielding production: an essential step in production control," J. Constr. Eng. Manage., 124(1), 11-17.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.1 , pp. 11-17
    • Ballard, G.1    Howell, G.2
  • 4
    • 0020767205 scopus 로고
    • Downgrading construction incidents
    • Handa, V. K., and Rivers, D. (1983). "Downgrading construction incidents." J. Constr. Eng. Manage., 109(2), 190-205.
    • (1983) J. Constr. Eng. Manage. , vol.109 , Issue.2 , pp. 190-205
    • Handa, V.K.1    Rivers, D.2
  • 6
    • 13944271969 scopus 로고    scopus 로고
    • Process dynamics: Identifying a strategy for the deployment of buffers in building projects
    • Horman, M. J., and Kenley, R. (1998). "Process dynamics: identifying a strategy for the deployment of buffers in building projects." Int. J. Logistics: Res. Appl., 1(3), 221-237.
    • (1998) Int. J. Logistics: Res. Appl. , vol.1 , Issue.3 , pp. 221-237
    • Horman, M.J.1    Kenley, R.2
  • 8
    • 0027805668 scopus 로고
    • Interaction between subcycles: One key to improved methods
    • Howell, G., Laufer, A., and Ballard, G. (1993). "Interaction between subcycles: one key to improved methods." J. Constr. Eng. Manage., 119(4), 714-728.
    • (1993) J. Constr. Eng. Manage. , vol.119 , Issue.4 , pp. 714-728
    • Howell, G.1    Laufer, A.2    Ballard, G.3
  • 10
    • 0003656231 scopus 로고
    • Application of the new production philosophy to construction
    • Center for Integrated Facility Engineering, Stanford Univ., Stanford, Calif.
    • Koskela, L. (1992). "Application of the new production philosophy to construction." Tech. Rep. No. 72, Center for Integrated Facility Engineering, Stanford Univ., Stanford, Calif.
    • (1992) Tech. Rep. No. 72 , vol.72
    • Koskela, L.1
  • 12
    • 0026382438 scopus 로고
    • Factors affecting masonry-labor productivity
    • Sanders, S. R., and Thomas, H. R. (1991). "Factors affecting masonry-labor productivity." J. Constr. Eng. Manage., 117(4), 626-644.
    • (1991) J. Constr. Eng. Manage. , vol.117 , Issue.4 , pp. 626-644
    • Sanders, S.R.1    Thomas, H.R.2
  • 14
    • 0026220131 scopus 로고
    • Labor productivity and work sampling: The bottom line
    • Thomas, H. R. (1991). "Labor productivity and work sampling: the bottom line." J. Constr. Eng. Manage., 117(3), 423-444.
    • (1991) J. Constr. Eng. Manage. , vol.117 , Issue.3 , pp. 423-444
    • Thomas, H.R.1
  • 17
    • 0032673945 scopus 로고    scopus 로고
    • Loss of labor productivity due to delivery methods and weather
    • Thomas, H. R., Riley, D. R., and Sanvido, V. E. (1999). "Loss of labor productivity due to delivery methods and weather." J. Constr. Eng. Manage., 125(1), 39-46.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.1 , pp. 39-46
    • Thomas, H.R.1    Riley, D.R.2    Sanvido, V.E.3
  • 18
    • 0034271740 scopus 로고    scopus 로고
    • Role of the fabricator in labor productivity
    • Thomas, H. R., and Sanvido, V. E. (2000). "Role of the fabricator in labor productivity." J. Constr. Eng. Manage., 126(5), 358-365.
    • (2000) J. Constr. Eng. Manage. , vol.126 , Issue.5 , pp. 358-365
    • Thomas, H.R.1    Sanvido, V.E.2
  • 19
    • 0000603336 scopus 로고
    • Impact of material management on productivity - A case study
    • Thomas, H. R., Sanvido, V. E., and Sanders, S. R. (1989). "Impact of material management on productivity - a case study." J. Constr. Eng. Manage., 115(3), 370-384.
    • (1989) J. Constr. Eng. Manage. , vol.115 , Issue.3 , pp. 370-384
    • Thomas, H.R.1    Sanvido, V.E.2    Sanders, S.R.3
  • 22
    • 0344240116 scopus 로고    scopus 로고
    • Construction baseline productivity: Theory and practice
    • Thomas, H. R., and Zavřski, I. (1999). "Construction baseline productivity: theory and practice." J. Constr. Eng. Manage., 125(5), 295-303.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.5 , pp. 295-303
    • Thomas, H.R.1    Zavřski, I.2
  • 23
    • 0000012732 scopus 로고    scopus 로고
    • Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique
    • Tommelein, I. D. (1998). "Pull-driven scheduling for pipe-spool installation: simulation of lean construction technique." J. Constr. Eng. Manage., 124(4), 279-288.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.4 , pp. 279-288
    • Tommelein, I.D.1
  • 24
    • 0032645520 scopus 로고    scopus 로고
    • Parade game: Impact of work flow variability on trade performance
    • Tommelein, I. D., Riley, D. R., and Howell, G. A. (1999). "Parade game: impact of work flow variability on trade performance." J. Constr. Eng. Manage., 125(5), 304-310.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.5 , pp. 304-310
    • Tommelein, I.D.1    Riley, D.R.2    Howell, G.A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.