-
1
-
-
0013115080
-
-
Balkema, Rotterdam, The Netherlands
-
Alarcon, L., ed. (1997). Lean construction. Balkema, Rotterdam, The Netherlands.
-
(1997)
Lean Construction
-
-
Alarcon, L.1
-
2
-
-
0345040904
-
Construction management game - Deterministic model
-
Au, T., Bostleman, R., and Parti, E. (1969). "Construction management game - Deterministic model." J. Constr. Div., ASCE, 95(1), 25-38.
-
(1969)
J. Constr. Div., ASCE
, vol.95
, Issue.1
, pp. 25-38
-
-
Au, T.1
Bostleman, R.2
Parti, E.3
-
3
-
-
0344178277
-
Building construction games - General descriptions
-
Au, T., and Parti, E. (1969). "Building construction games - General descriptions." J. Constr. Div., ASCE, 95(1), 1-9.
-
(1969)
J. Constr. Div., ASCE
, vol.95
, Issue.1
, pp. 1-9
-
-
Au, T.1
Parti, E.2
-
4
-
-
0345471764
-
-
Ballard, G., Conte, A. S. I., Howell, G., and Tommelein, I. D. (Eds.). (1998). Proc., 6th Annu. Conf. Int. Group for Lean Constr. (IGLC-6). available at 〈http://www.ce.berkeley,edu/~tommelein/IGLC-6/〉.
-
(1998)
Proc., 6th Annu. Conf. Int. Group for Lean Constr. (IGLC-6)
-
-
Ballard, G.1
Conte, A.S.I.2
Howell, G.3
Tommelein, I.D.4
-
5
-
-
11644288742
-
Shielding production: Essential step in production control
-
Ballard, G., and Howell, G. (1998). "Shielding production: Essential step in production control." J. Constr. Engrg. and Mgmt., ASCE, 124(1), 11-17.
-
(1998)
J. Constr. Engrg. and Mgmt., ASCE
, vol.124
, Issue.1
, pp. 11-17
-
-
Ballard, G.1
Howell, G.2
-
6
-
-
84930137851
-
-
PhD dissertation, College of Architecture and Urban Planning, University of Michigan, Ann Arbor, Mich.
-
Birrell, G. S. (1978). "The criteria by which construction prime and sub-contractors evaluate the management performance of each other." PhD dissertation, College of Architecture and Urban Planning, University of Michigan, Ann Arbor, Mich., Vols. 1 and 2.
-
(1978)
The Criteria by Which Construction Prime and Sub-contractors Evaluate the Management Performance of Each Other
, vol.1-2
-
-
Birrell, G.S.1
-
8
-
-
0022130479
-
General contractor's management: How subs evaluate it
-
Birrell, G. S. (1985). "General contractor's management: How subs evaluate it." J. Constr. Engrg. and Mgmt., ASCE, 111(3), 244-259.
-
(1985)
J. Constr. Engrg. and Mgmt., ASCE
, vol.111
, Issue.3
, pp. 244-259
-
-
Birrell, G.S.1
-
9
-
-
0344609567
-
Parade game
-
Constr. Engrg. and Mgmt. Program, Civ. and Envir. Engrg. Dept., University of Calif., Berkeley, Calif.
-
Choo, H. J., and Tommelein, I. D. (1999). "Parade game." Tech. Rep. 99-1, Constr. Engrg. and Mgmt. Program, Civ. and Envir. Engrg. Dept., University of Calif., Berkeley, Calif.
-
(1999)
Tech. Rep. 99-1
-
-
Choo, H.J.1
Tommelein, I.D.2
-
11
-
-
0004244248
-
-
North River Press, Crotonon-Hudson, N.Y.
-
Goldratt, E. M., and Cox, J. (1986). The goal. North River Press, Crotonon-Hudson, N.Y.
-
(1986)
The Goal
-
-
Goldratt, E.M.1
Cox, J.2
-
12
-
-
84959948615
-
Intelligent' construction and cost analysis
-
E & FN Spon, London
-
Gray, C. (1986). "'Intelligent' construction and cost analysis." Constr. Mgmt. and Econ., E & FN Spon, London, Vol. 4, 135-150.
-
(1986)
Constr. Mgmt. and Econ.
, vol.4
, pp. 135-150
-
-
Gray, C.1
-
14
-
-
0017539377
-
Road construction - Simulation game for site managers
-
Harris, F. C., and Evans, J. B. (1977). "Road construction - Simulation game for site managers." J. Constr. Div., ASCE, 103(3), 405-414.
-
(1977)
J. Constr. Div., ASCE
, vol.103
, Issue.3
, pp. 405-414
-
-
Harris, F.C.1
Evans, J.B.2
-
15
-
-
0012303148
-
Managing uncertainty in the piping process
-
Constr. Industry Inst., University of Texas, Austin, Tex
-
Howell, G., and Ballard, G. (1996). "Managing uncertainty in the piping process." RR47-13, Constr. Industry Inst., University of Texas, Austin, Tex.
-
(1996)
RR47-13
-
-
Howell, G.1
Ballard, G.2
-
16
-
-
0027805668
-
Interaction between sub-cycles: One key to improved methods
-
Howell, G., Laufer, A., and Ballard, G. (1993). "Interaction between sub-cycles: One key to improved methods." J. Constr. Engrg. and Mgmt., ASCE, 119(4), 714-728.
-
(1993)
J. Constr. Engrg. and Mgmt., ASCE
, vol.119
, Issue.4
, pp. 714-728
-
-
Howell, G.1
Laufer, A.2
Ballard, G.3
-
17
-
-
0003656231
-
Application of the new production philosophy to construction
-
CIFE, Stanford Univ., Stanford, Calif.
-
Koskela, L. (1992). "Application of the new production philosophy to construction." Tech. Rep. 72, CIFE, Stanford Univ., Stanford, Calif.
-
(1992)
Tech. Rep. 72
-
-
Koskela, L.1
-
18
-
-
0004007948
-
-
PhD dissertation, Civ. and Envir. Engrg., University of Michigan, Ann Arbor, Mich.
-
Martinez, J. C. (1996). "STROBOSCOPE state and resource based simulation of construction processes." PhD dissertation, Civ. and Envir. Engrg., University of Michigan, Ann Arbor, Mich., available at 〈http:/ /www.strobos.ce.vt.edu/〉.
-
(1996)
STROBOSCOPE State and Resource Based Simulation of Construction Processes
-
-
Martinez, J.C.1
-
19
-
-
0029470095
-
Patterns of construction-space use in multistory buildings
-
Riley, D. R., and Sanvido, V. E. (1995). "Patterns of construction-space use in multistory buildings." J. Constr. Engrg. and Mgmt., ASCE, 121(4), 464-473.
-
(1995)
J. Constr. Engrg. and Mgmt., ASCE
, vol.121
, Issue.4
, pp. 464-473
-
-
Riley, D.R.1
Sanvido, V.E.2
-
20
-
-
0031362303
-
Space planning for mechanical, electrical, plumbing, and fire protection trades in multi-story building construction
-
S. Anderson, ed., ASCE, New York
-
Riley, D., and Sanvido, V. (1997). "Space planning for mechanical, electrical, plumbing, and fire protection trades in multi-story building construction." Proc., Constr. Congr. V, S. Anderson, ed., ASCE, New York, 102-109.
-
(1997)
Proc., Constr. Congr. V
, pp. 102-109
-
-
Riley, D.1
Sanvido, V.2
-
21
-
-
0000012732
-
Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique
-
Tommelein, I. D. (1998). "Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique." J. Constr. Engrg. and Mgmt., ASCE, 124(4), 279-288.
-
(1998)
J. Constr. Engrg. and Mgmt., ASCE
, vol.124
, Issue.4
, pp. 279-288
-
-
Tommelein, I.D.1
-
22
-
-
0006802258
-
Coordinating specialists
-
Constr. Engrg. and Mgmt. Program, Civ. and Envir. Engrg. Dept., University of Calif., Berkeley, Calif.
-
Tommelein, I. D., and Ballard, G. (1997). "Coordinating specialists." Tech. Rep. 97-8, Constr. Engrg. and Mgmt. Program, Civ. and Envir. Engrg. Dept., University of Calif., Berkeley, Calif.
-
(1997)
Tech. Rep. 97-8
-
-
Tommelein, I.D.1
Ballard, G.2
|