1
-
-
33847137581
-
Guidelines for managing physical flows in construction sites
-
Alves, T. C. L., and Formoso, C. T. (2005). " Guidelines for managing physical flows in construction sites.. " Proc., 8th Annual Conf. of the Int. Group for Lean Construction (IGLC-8), Brighton, U.K., 〈 http://www.iglc.net/conferences/2000/Papers/AlvesFormoso.pdf 〉 (Dec. 12, 2005).
-
(2005)
Proc., 8th Annual Conf. of the Int. Group for Lean Construction (IGLC-8)
-
-
Alves, T.C.L.1
Formoso, C.T.2
-
3
-
-
12344273517
-
Production system loading-cycle time relationship in residential construction
-
Bashford, H. H., Walsh, K. D., and Sawhney, A. (2005). " Production system loading-cycle time relationship in residential construction.. " J. Constr. Eng. Manage., 131 (1), 15-22.
-
(2005)
J. Constr. Eng. Manage.
, vol.131
, Issue.1
, pp. 15-22
-
-
Bashford, H.H.1
Walsh, K.D.2
Sawhney, A.3
-
4
-
-
0003849209
-
-
2nd Ed., Irwin/McGraw-Hill, New York.
-
Hopp, W. J., and Spearmann, M. L. (2001). Factory physics: Foundations of manufacturing management, 2nd Ed., Irwin/McGraw-Hill, New York.
-
(2001)
Factory Physics: Foundations of Manufacturing Management
-
-
Hopp, W.J.1
Spearmann, M.L.2
-
5
-
-
23044488934
-
Role of inventory buffers in construction labor performance
-
Horman, M. J., and Thomas, H. R. (2005). " Role of inventory buffers in construction labor performance.. " J. Constr. Eng. Manage., 131 (7), 834-843.
-
(2005)
J. Constr. Eng. Manage.
, vol.131
, Issue.7
, pp. 834-843
-
-
Horman, M.J.1
Thomas, H.R.2
-
6
-
-
0012303148
-
-
47-13, Construction Industry Institute, Austin, Tex.
-
Howell, G. A., and Ballard, H. G. (1996). " Managing uncertainty in the piping process.. " Research Rep. No. 47-13, Construction Industry Institute, Austin, Tex.
-
(1996)
Managing Uncertainty in the Piping Process
-
-
Howell, G.A.1
Ballard, H.G.2
-
7
-
-
0042913183
-
A mesoscopic approach to the simulation of semiconductor supply chains
-
Marthaler, D., Armbruster, D., and Ringhofer, C. (2003). " A mesoscopic approach to the simulation of semiconductor supply chains.. " Simulation, 79 (3), 157-162.
-
(2003)
Simulation
, vol.79
, Issue.3
, pp. 157-162
-
-
Marthaler, D.1
Armbruster, D.2
Ringhofer, C.3
-
8
-
-
13944264322
-
Reducing variability to improve performance as a lean construction principle
-
Thomas, H. R., Horman, M. J., de Souza, U. E. L., and Zavrski, I. (2002). " Reducing variability to improve performance as a lean construction principle.. " J. Constr. Eng. Manage., 128 (2), 144-154.
-
(2002)
J. Constr. Eng. Manage.
, vol.128
, Issue.2
, pp. 144-154
-
-
Thomas, H.R.1
Horman, M.J.2
De Souza, U.E.L.3
Zavrski, I.4
-
9
-
-
12344327099
-
Improving labor flow reliability for better productivity as a lean construction principle
-
Thomas, H. R., Horman, M. J., Minchin, R. E., Jr., and Chen, D. (2003). " Improving labor flow reliability for better productivity as a lean construction principle.. " J. Constr. Eng. Manage., 129 (3), 251-261.
-
(2003)
J. Constr. Eng. Manage.
, vol.129
, Issue.3
, pp. 251-261
-
-
Thomas, H.R.1
Horman, M.J.2
Minchin Jr., R.E.3
Chen, D.4
-
10
-
-
0032673945
-
Loss of labor productivity due to delivery methods and weather
-
Thomas, H. R., Riley, D. R., and Sanvido, V. E. (1999). " Loss of labor productivity due to delivery methods and weather.. " J. Constr. Eng. Manage., 125 (1), 39-46.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.1
, pp. 39-46
-
-
Thomas, H.R.1
Riley, D.R.2
Sanvido, V.E.3
-
11
-
-
0034271740
-
Role of the fabricator in labor productivity
-
Thomas, H. R., and Sanvido, V. E. (2000). " Role of the fabricator in labor productivity.. " J. Constr. Eng. Manage., 126 (5), 358-365.
-
(2000)
J. Constr. Eng. Manage.
, vol.126
, Issue.5
, pp. 358-365
-
-
Thomas, H.R.1
Sanvido, V.E.2
-
12
-
-
0000012732
-
Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique
-
Tommelein, I. D. (1998). " Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique.. " J. Constr. Eng. Manage., 124 (4), 279-288.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.4
, pp. 279-288
-
-
Tommelein, I.D.1
-
13
-
-
0032645520
-
Parade game: Impact of work flow variability on trade performance
-
Tommelein, I. D., Riley, D., and Howell, G. A. (1999). " Parade game: Impact of work flow variability on trade performance.. " J. Constr. Eng. Manage., 125 (5), 304-310.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.5
, pp. 304-310
-
-
Tommelein, I.D.1
Riley, D.2
Howell, G.A.3
|