Volumn 133, Issue 3, 2007, Pages 254-261

Production equations for unsteady-state construction processes

Author keywords

Lean construction; Mathematical models; Project management; Resource management

Indexed keywords

CYCLE TIME; LEAN CONSTRUCTION; PRODUCTION EQUATIONS;

EID: 33847109286     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2007)133:3(254)     Document Type: Article
Times cited : (23)

References (13)
  • 3
    • 12344273517 scopus 로고    scopus 로고
    • Production system loading-cycle time relationship in residential construction
    • Bashford, H. H., Walsh, K. D., and Sawhney, A. (2005). " Production system loading-cycle time relationship in residential construction.. " J. Constr. Eng. Manage., 131 (1), 15-22.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.1 , pp. 15-22
    • Bashford, H.H.1    Walsh, K.D.2    Sawhney, A.3
  • 5
    • 23044488934 scopus 로고    scopus 로고
    • Role of inventory buffers in construction labor performance
    • Horman, M. J., and Thomas, H. R. (2005). " Role of inventory buffers in construction labor performance.. " J. Constr. Eng. Manage., 131 (7), 834-843.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.7 , pp. 834-843
    • Horman, M.J.1    Thomas, H.R.2
  • 7
    • 0042913183 scopus 로고    scopus 로고
    • A mesoscopic approach to the simulation of semiconductor supply chains
    • Marthaler, D., Armbruster, D., and Ringhofer, C. (2003). " A mesoscopic approach to the simulation of semiconductor supply chains.. " Simulation, 79 (3), 157-162.
    • (2003) Simulation , vol.79 , Issue.3 , pp. 157-162
    • Marthaler, D.1    Armbruster, D.2    Ringhofer, C.3
  • 8
    • 13944264322 scopus 로고    scopus 로고
    • Reducing variability to improve performance as a lean construction principle
    • Thomas, H. R., Horman, M. J., de Souza, U. E. L., and Zavrski, I. (2002). " Reducing variability to improve performance as a lean construction principle.. " J. Constr. Eng. Manage., 128 (2), 144-154.
    • (2002) J. Constr. Eng. Manage. , vol.128 , Issue.2 , pp. 144-154
    • Thomas, H.R.1    Horman, M.J.2    De Souza, U.E.L.3    Zavrski, I.4
  • 9
    • 12344327099 scopus 로고    scopus 로고
    • Improving labor flow reliability for better productivity as a lean construction principle
    • Thomas, H. R., Horman, M. J., Minchin, R. E., Jr., and Chen, D. (2003). " Improving labor flow reliability for better productivity as a lean construction principle.. " J. Constr. Eng. Manage., 129 (3), 251-261.
    • (2003) J. Constr. Eng. Manage. , vol.129 , Issue.3 , pp. 251-261
    • Thomas, H.R.1    Horman, M.J.2    Minchin Jr., R.E.3    Chen, D.4
  • 10
    • 0032673945 scopus 로고    scopus 로고
    • Loss of labor productivity due to delivery methods and weather
    • Thomas, H. R., Riley, D. R., and Sanvido, V. E. (1999). " Loss of labor productivity due to delivery methods and weather.. " J. Constr. Eng. Manage., 125 (1), 39-46.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.1 , pp. 39-46
    • Thomas, H.R.1    Riley, D.R.2    Sanvido, V.E.3
  • 11
    • 0034271740 scopus 로고    scopus 로고
    • Role of the fabricator in labor productivity
    • Thomas, H. R., and Sanvido, V. E. (2000). " Role of the fabricator in labor productivity.. " J. Constr. Eng. Manage., 126 (5), 358-365.
    • (2000) J. Constr. Eng. Manage. , vol.126 , Issue.5 , pp. 358-365
    • Thomas, H.R.1    Sanvido, V.E.2
  • 12
    • 0000012732 scopus 로고    scopus 로고
    • Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique
    • Tommelein, I. D. (1998). " Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique.. " J. Constr. Eng. Manage., 124 (4), 279-288.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.4 , pp. 279-288
    • Tommelein, I.D.1
  • 13
    • 0032645520 scopus 로고    scopus 로고
    • Parade game: Impact of work flow variability on trade performance
    • Tommelein, I. D., Riley, D., and Howell, G. A. (1999). " Parade game: Impact of work flow variability on trade performance.. " J. Constr. Eng. Manage., 125 (5), 304-310.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.5 , pp. 304-310
    • Tommelein, I.D.1    Riley, D.2    Howell, G.A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.