메뉴 건너뛰기




Volumn 135, Issue 1, 2009, Pages 2-11

Study of factors influencing the efficient management and downtime consequences of highway construction equipment in thailand

Author keywords

Construction equipment; Construction industry; Construction management; Contractors; Maintenance; Thailand

Indexed keywords

COMPUTER NETWORKS; CONSTRUCTION INDUSTRY; CONTRACTORS; CONTRACTS; EQUIPMENT; HIGHWAY ADMINISTRATION; HIGHWAY ENGINEERING; HIGHWAY PLANNING; HIGHWAY SYSTEMS; INDUSTRIAL MANAGEMENT; LIFE CYCLE; MACHINERY; MAINTENANCE; PROJECT MANAGEMENT; SURVEYS;

EID: 58149233753     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2009)135:1(2)     Document Type: Article
Times cited : (9)

References (46)
  • 1
    • 84970378038 scopus 로고
    • Practical issues in structural modeling
    • Bentler, P., and Chou, C. (1987). " Practical issues in structural modeling.." Sociolog. Methods Res., 16 (1), 78-117.
    • (1987) Sociolog. Methods Res. , vol.16 , Issue.1 , pp. 78-117
    • Bentler, P.1    Chou, C.2
  • 2
    • 58149219735 scopus 로고    scopus 로고
    • Renting equipment remains a double-edged sword
    • Bonnecaze, R. (2005). " Renting equipment remains a double-edged sword.." Louisiana Contr., 54 (4), 48.
    • (2005) Louisiana Contr. , vol.54 , Issue.4 , pp. 48
    • Bonnecaze, R.1
  • 3
    • 33746385747 scopus 로고    scopus 로고
    • Maintenance skills training of UK construction plant operatives: A pilot survey
    • Cabahug, R. R., and Edwards, D. J. (2002). " Maintenance skills training of UK construction plant operatives: A pilot survey.." Struct Surv., 20 (1), 22-30.
    • (2002) Struct Surv. , vol.20 , Issue.1 , pp. 22-30
    • Cabahug, R.R.1    Edwards, D.J.2
  • 4
    • 58149274473 scopus 로고    scopus 로고
    • Shovel maintenance gains from improved designs, tools, and techniques
    • Carter, R. A. (2001). " Shovel maintenance gains from improved designs, tools, and techniques.." Concr. Prod., 104 (8), U7-U11.
    • (2001) Concr. Prod. , vol.104 , Issue.8
    • Carter, R.A.1
  • 5
    • 84986076242 scopus 로고    scopus 로고
    • SEM being more effective than multiple regression in parsimonious model testing for management development research
    • Cheng, E. W. L. (2001). " SEM being more effective than multiple regression in parsimonious model testing for management development research.." J. Manage. Dev., 20 (7), 650-667.
    • (2001) J. Manage. Dev. , vol.20 , Issue.7 , pp. 650-667
    • Cheng, E.W.L.1
  • 6
    • 58149227892 scopus 로고    scopus 로고
    • Multivariate analysis: An overview
    • 8th Ed., McGraw-Hill, New York.
    • Cooper, D. R., and Schindler, P. S. (2003). " Multivariate analysis: An overview.." Business research method, 8th Ed., McGraw-Hill, New York, 623-630.
    • (2003) Business research method , pp. 623-630
    • Cooper, D.R.1    Schindler, P.S.2
  • 8
    • 58149276878 scopus 로고    scopus 로고
    • Department of Highways of Thailand (DOH).. "." 〈〉 (Dec. 9, 2005).
    • Department of Highways of Thailand (DOH). (2004). " Highway contractor records and registration.." 〈 http://www.doh.go.th/dohweb/ bidding/std/sarub-quality.pdf 〉 (Dec. 9, 2005).
    • (2004) Highway contractor records and registration
  • 9
    • 58149221354 scopus 로고
    • Maintenance management
    • McGraw-Hill, New York.
    • Douglas, J. (1975). " Maintenance management.." Construction equipment policy, McGraw-Hill, New York, 192-219.
    • (1975) Construction equipment policy , pp. 192-219
    • Douglas, J.1
  • 10
    • 0036813520 scopus 로고    scopus 로고
    • The factors influencing bid mark-up decisions of large- and medium-size contractors in Singapore
    • Dulaimi, M. F., and Shan, H. G. (2002). " The factors influencing bid mark-up decisions of large- and medium-size contractors in Singapore.." Constr. Manage. Econom., 20 (7), 601-610.
    • (2002) Constr. Manage. Econom. , vol.20 , Issue.7 , pp. 601-610
    • Dulaimi, M.F.1    Shan, H.G.2
  • 11
    • 0036379959 scopus 로고    scopus 로고
    • An artificial intelligence approach for improving plant operator maintenance proficiency
    • Edwards, D. J., and Holt, G. D. (2002). " An artificial intelligence approach for improving plant operator maintenance proficiency.." J. Qual. Maint. Eng., 8 (3), 239-252.
    • (2002) J. Qual. Maint. Eng. , vol.8 , Issue.3 , pp. 239-252
    • Edwards, D.J.1    Holt, G.D.2
  • 12
    • 0031654333 scopus 로고    scopus 로고
    • Predictive maintenance techniques and their relevant to construction plant
    • ".
    • Edwards, D. J., Holt, G. D., and Harris, F. C. (1998). " Predictive maintenance techniques and their relevant to construction plant.." J. Qual. Maint. Eng., 4 (1), 25-37.
    • (1998) J. Qual. Maint. Eng. , vol.4 , Issue.1 , pp. 25-37
    • Edwards, D.J.1    Holt, G.D.2    Harris, F.C.3
  • 13
    • 0036812375 scopus 로고    scopus 로고
    • Predicting downtime costs of tracked hydraulic excavators operating in the UK opencast mining industry
    • ".
    • Edwards, D. J., Holt, G. D., and Harris, F. C. (2002). " Predicting downtime costs of tracked hydraulic excavators operating in the UK opencast mining industry.." Constr. Manage. Econom., 20 (7), 581-591.
    • (2002) Constr. Manage. Econom. , vol.20 , Issue.7 , pp. 581-591
    • Edwards, D.J.1    Holt, G.D.2    Harris, F.C.3
  • 14
    • 1142287836 scopus 로고    scopus 로고
    • Evaluating the performance of construction equipment operations in Egypt
    • Elazouni, A. M., and Basha, I. M. (1996). " Evaluating the performance of construction equipment operations in Egypt.." J. Constr. Eng. Manage., 122 (2), 109-114.
    • (1996) J. Constr. Eng. Manage. , vol.122 , Issue.2 , pp. 109-114
    • Elazouni, A.M.1    Basha, I.M.2
  • 15
    • 0018719756 scopus 로고
    • Business practices in the construction industry: A survey
    • Garies, R. (1979). " Business practices in the construction industry: A survey.." J. Constr. Div., 105 (4), 317-329.
    • (1979) J. Constr. Div. , vol.105 , Issue.4 , pp. 317-329
    • Garies, R.1
  • 16
    • 58149271824 scopus 로고    scopus 로고
    • The ins and outs of hydraulic cylinders
    • Green, L. (1999). " The ins and outs of hydraulic cylinders.." Constr. Equip., 99 (3), 76-79.
    • (1999) Constr. Equip. , vol.99 , Issue.3 , pp. 76-79
    • Green, L.1
  • 18
    • 0018514875 scopus 로고
    • Current equipment policies of utility contractors
    • Hinze, J., and Ashton, W. B. (1979). " Current equipment policies of utility contractors.." J. Constr. Div., 105 (3), 225-237.
    • (1979) J. Constr. Div. , vol.105 , Issue.3 , pp. 225-237
    • Hinze, J.1    Ashton, W.B.2
  • 19
    • 15744362051 scopus 로고    scopus 로고
    • Structural equation model of project planning effectiveness
    • Islam, M. D. M., and Faniran, O. O. (2005). " Structural equation model of project planning effectiveness.." Constr. Manage. Econom., 23 (2), 215-223.
    • (2005) Constr. Manage. Econom. , vol.23 , Issue.2 , pp. 215-223
    • Islam, M.D.M.1    Faniran, O.O.2
  • 20
    • 58149245966 scopus 로고    scopus 로고
    • LISREL 8.5, Scientific Software International, Inc., Lincolnwood, Ill.
    • Joreskog, K., and Sorbom, D. (2001). LISREL 8.5, Scientific Software International, Inc., Lincolnwood, Ill.
    • (2001)
    • Joreskog, K.1    Sorbom, D.2
  • 23
    • 33746190774 scopus 로고    scopus 로고
    • Critical factors affecting schedule performance: Evidence from Indian construction projects
    • Lyer, K. C., and Jha, K. N. (2006). " Critical factors affecting schedule performance: Evidence from Indian construction projects.." J. Constr. Eng. Manage., 132 (8), 871-881.
    • (2006) J. Constr. Eng. Manage. , vol.132 , Issue.8 , pp. 871-881
    • Lyer, K.C.1    Jha, K.N.2
  • 24
    • 58149271823 scopus 로고    scopus 로고
    • Optimal inspection frequency: A tool for maintenance planning/forecasting
    • Mathew, S. (2004). " Optimal inspection frequency: A tool for maintenance planning/forecasting.." Int. J. Qual. Reliab. Manage., 21 (7), 763-771.
    • (2004) Int. J. Qual. Reliab. Manage. , vol.21 , Issue.7 , pp. 763-771
    • Mathew, S.1
  • 25
    • 0034225610 scopus 로고    scopus 로고
    • Structural equation model of construction contract dispute potential
    • ".
    • Molenaar, K., Washington, S., and Diekmann, J. (2000). " Structural equation model of construction contract dispute potential.." J. Constr. Eng. Manage., 126 (4), 268-277.
    • (2000) J. Constr. Eng. Manage. , vol.126 , Issue.4 , pp. 268-277
    • Molenaar, K.1    Washington, S.2    Diekmann, J.3
  • 26
    • 2542487153 scopus 로고
    • Equipment replacement and optimum size of a civil engineering fleet
    • Navon, R., and Maor, D. (1995). " Equipment replacement and optimum size of a civil engineering fleet.." Constr. Manage. Econom., 13 (2), 173-183.
    • (1995) Constr. Manage. Econom. , vol.13 , Issue.2 , pp. 173-183
    • Navon, R.1    Maor, D.2
  • 27
    • 2542421869 scopus 로고    scopus 로고
    • Downtime model development for construction equipment management
    • Nepal, M. P., and Park, M. (2004). " Downtime model development for construction equipment management.." Eng., Constr., Archit. Manage., 11 (3), 199-210.
    • (2004) Eng., Constr., Archit. Manage. , vol.11 , Issue.3 , pp. 199-210
    • Nepal, M.P.1    Park, M.2
  • 28
    • 2542494787 scopus 로고
    • Construction equipment downtime costs
    • Pathmanathan, V. (1980). " Construction equipment downtime costs.." J. Constr. Div., 106 (4), 604-607.
    • (1980) J. Constr. Div. , vol.106 , Issue.4 , pp. 604-607
    • Pathmanathan, V.1
  • 29
    • 11544297849 scopus 로고    scopus 로고
    • Fleet managers balance bulldozers with benefits and the bottom line; seasonal work, labor shortages and theft make it tough
    • Phair, M., and Angelo, W. J. (1998). " Fleet managers balance bulldozers with benefits and the bottom line; seasonal work, labor shortages and theft make it tough.." ENR, 241 (9), 32.
    • (1998) ENR , vol.241 , Issue.9 , pp. 32
    • Phair, M.1    Angelo, W.J.2
  • 30
    • 58149254733 scopus 로고
    • Replacing fixed assets in the construction industry
    • ".
    • Poe, C. D., Dillon, G. J., and Day, K. (1988). " Replacing fixed assets in the construction industry.." Manage. Account., 70 (2), 39-43.
    • (1988) Manage. Account. , vol.70 , Issue.2 , pp. 39-43
    • Poe, C.D.1    Dillon, G.J.2    Day, K.3
  • 31
    • 0033028925 scopus 로고    scopus 로고
    • Structural equation modeling with Lisrel: Application in tourism
    • Reisinger, Y., and Turner, L. (1999). " Structural equation modeling with Lisrel: Application in tourism.." Tourism Manage., 20 (1), 71-88.
    • (1999) Tourism Manage. , vol.20 , Issue.1 , pp. 71-88
    • Reisinger, Y.1    Turner, L.2
  • 32
    • 0019659652 scopus 로고
    • Contractor equipment-management practices
    • Schexnayder, C. J., Jr., and Hancher, D. E. (1981). " Contractor equipment-management practices.." J. Constr. Div., 107 (4), 619-626.
    • (1981) J. Constr. Div. , vol.107 , Issue.4 , pp. 619-626
    • Schexnayder Jr., C.J.1    Hancher, D.E.2
  • 33
    • 58149248905 scopus 로고    scopus 로고
    • Cure concrete paver downtime
    • Schultz, B. (2005). " Cure concrete paver downtime.." Equip. Today, 41 (1), 28-32.
    • (2005) Equip. Today , vol.41 , Issue.1 , pp. 28-32
    • Schultz, B.1
  • 35
    • 58149227893 scopus 로고    scopus 로고
    • Renting equipment reduces costs and downtime for SCR retrofit
    • Smith, D. J. (2003). " Renting equipment reduces costs and downtime for SCR retrofit.." Power Eng. J., 107 (11), 162.
    • (2003) Power Eng. J. , vol.107 , Issue.11 , pp. 162
    • Smith, D.J.1
  • 36
    • 34249023371 scopus 로고    scopus 로고
    • Monthly morning meetings enlist operators' maintenance support
    • Stewart, L. (1998). " Monthly morning meetings enlist operators' maintenance support.." Constr. Equip., 98 (5), 35.
    • (1998) Constr. Equip. , vol.98 , Issue.5 , pp. 35
    • Stewart, L.1
  • 37
    • 58149275771 scopus 로고    scopus 로고
    • Buying fewer brands cuts maintenance costs by 10%
    • Stewart, L. (1999). " Buying fewer brands cuts maintenance costs by 10%.." Constr. Equip., 100 (5), 37.
    • (1999) Constr. Equip. , vol.100 , Issue.5 , pp. 37
    • Stewart, L.1
  • 38
    • 34249007541 scopus 로고    scopus 로고
    • Buyers juggle more rental and leasing
    • Stewart, L. (2002). " Buyers juggle more rental and leasing.." Constr. Equip., 105 (7), 44.
    • (2002) Constr. Equip. , vol.105 , Issue.7 , pp. 44
    • Stewart, L.1
  • 39
    • 58149248906 scopus 로고    scopus 로고
    • Component life sketches machine economic life
    • Stewart, L. (2004). " Component life sketches machine economic life.." Constr. Equip., 106 (7), 43.
    • (2004) Constr. Equip. , vol.106 , Issue.7 , pp. 43
    • Stewart, L.1
  • 40
    • 3342935888 scopus 로고
    • Equipment policy of top 400 contractors: A survey
    • ".
    • Tavakoli, A., Taye, E. D., and Erktin, M. (1989). " Equipment policy of top 400 contractors: A survey.." J. Constr. Eng. Manage., 115 (2), 317-329.
    • (1989) J. Constr. Eng. Manage. , vol.115 , Issue.2 , pp. 317-329
    • Tavakoli, A.1    Taye, E.D.2    Erktin, M.3
  • 41
    • 0028499853 scopus 로고
    • Equipment management through operational failure costs
    • Tsimberdonis, A. I., and Murphree, E. L., Jr. (1994). " Equipment management through operational failure costs.." J. Constr. Eng. Manage., 120 (4), 522-535.
    • (1994) J. Constr. Eng. Manage. , vol.120 , Issue.4 , pp. 522-535
    • Tsimberdonis, A.I.1    Murphree Jr., E.L.2
  • 42
    • 58149221353 scopus 로고    scopus 로고
    • How to benchmark repair costs
    • Vorster, M. C. (2004). " How to benchmark repair costs.." Constr. Equip., 107 (4), 77-78.
    • (2004) Constr. Equip. , vol.107 , Issue.4 , pp. 77-78
    • Vorster, M.C.1
  • 43
    • 34249022710 scopus 로고    scopus 로고
    • A machine-replacement strategy
    • Vorster, M. C. (2005). " A machine-replacement strategy.." Constr. Equip., 108 (7), 51-52.
    • (2005) Constr. Equip. , vol.108 , Issue.7 , pp. 51-52
    • Vorster, M.C.1
  • 44
    • 0025625710 scopus 로고
    • Consequential equipment costs associated with lack of availability and downtime
    • Vorster, M. C., and De La Garza, J. M. (1990). " Consequential equipment costs associated with lack of availability and downtime.." J. Constr. Eng. Manage., 116 (4), 656-669.
    • (1990) J. Constr. Eng. Manage. , vol.116 , Issue.4 , pp. 656-669
    • Vorster, M.C.1    De La Garza, J.M.2
  • 45
    • 15944372664 scopus 로고    scopus 로고
    • Structural equation model of trust and partnering success
    • Wong, P. S. P., and Cheung, S. O. (2005). " Structural equation model of trust and partnering success.." J. Manage. Eng., 21 (2), 70-80.
    • (2005) J. Manage. Eng. , vol.21 , Issue.2 , pp. 70-80
    • Wong, P.S.P.1    Cheung, S.O.2
  • 46
    • 28044449162 scopus 로고    scopus 로고
    • Managing uncertainty in major equipment procurement in engineering project
    • Yeo, K. T., and Ning, J. H. (2006). " Managing uncertainty in major equipment procurement in engineering project.." Eur. J. Oper. Res., 171 (1), 123-134.
    • (2006) Eur. J. Oper. Res. , vol.171 , Issue.1 , pp. 123-134
    • Yeo, K.T.1    Ning, J.H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.