Volumn 130, Issue 2, 2004, Pages 168-176

Applying a genetic algorithm-based multiobjective approach for time-cost optimization

Author keywords

Algorithms; Cost control; Optimization; Project management; Time factors

Indexed keywords

COMPUTER SIMULATION; COSTS; DECISION MAKING; DECISION SUPPORT SYSTEMS; GENETIC ALGORITHMS; MATHEMATICAL MODELS; OPTIMIZATION;

EID: 2342615793     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2004)130:2(168)     Document Type: Article
Times cited : (215)

References (28)
  • 2
    • 0000893055 scopus 로고    scopus 로고
    • Construction delay analysis techniques
    • Alkass, S., Mazerolle, M., Harris, F. (1996). "Construction delay analysis techniques." Constr. Manage. Econ., 14(5), 375-394.
    • (1996) Constr. Manage. Econ. , vol.14 , Issue.5 , pp. 375-394
    • Alkass, S.1    Mazerolle, M.2    Harris, F.3
  • 3
    • 4544318435 scopus 로고    scopus 로고
    • The LP/IP hybrid method for construction time-cost trade-off analysis
    • Burns, S. A., Liu, L., and Feng, C. W. (1996). "The LP/IP hybrid method for construction time-cost trade-off analysis." Constr. Manage. Econ., 14(3), 265-276.
    • (1996) Constr. Manage. Econ. , vol.14 , Issue.3 , pp. 265-276
    • Burns, S.A.1    Liu, L.2    Feng, C.W.3
  • 4
    • 0000626184 scopus 로고    scopus 로고
    • An updated survey of GA-based multiobjective optimization techniques
    • Coello, C. C. (2000). "An updated survey of GA-based multiobjective optimization techniques." ACM Comput. Surv., 32(2), 109-143.
    • (2000) ACM Comput. Surv. , vol.32 , Issue.2 , pp. 109-143
    • Coello, C.C.1
  • 5
    • 0031185451 scopus 로고    scopus 로고
    • Using genetic algorithms to solve construction time-cost trade-off problems
    • Feng, C., Liu, L., and Burns, S. (1997). "Using genetic algorithms to solve construction time-cost trade-off problems." J. Comput. Civ. Eng., 11(3), 184-189.
    • (1997) J. Comput. Civ. Eng. , vol.11 , Issue.3 , pp. 184-189
    • Feng, C.1    Liu, L.2    Burns, S.3
  • 6
    • 0038909957 scopus 로고
    • A non-computer approach to the critical path method for the construction industry
    • The Construction Institute, Department of Civil Engineering, Stanford University, Stanford, Calif.
    • Fondahl, J. W. (1961). "A Non-Computer Approach to the Critical Path Method for the Construction Industry." Technical Rep. No. 9, The Construction Institute, Department of Civil Engineering, Stanford University, Stanford, Calif.
    • (1961) Technical Rep. No. 9 , vol.9
    • Fondahl, J.W.1
  • 8
    • 0033497302 scopus 로고    scopus 로고
    • Optimization of construction time-cost trade-off analysis using genetic algorithms
    • Hegazy, T. (1999). "Optimization of construction time-cost trade-off analysis using genetic algorithms." Can. J. Civ. Eng., 26, 685-697.
    • (1999) Can. J. Civ. Eng. , vol.26 , pp. 685-697
    • Hegazy, T.1
  • 11
    • 0039502581 scopus 로고
    • Critical path planning and scheduling: Mathematical basis
    • Kelly, J. E. (1961). "Critical path planning and scheduling: mathematical basis." Oper. Res., 9(3), 167-179.
    • (1961) Oper. Res. , vol.9 , Issue.3 , pp. 167-179
    • Kelly, J.E.1
  • 12
    • 84931320658 scopus 로고    scopus 로고
    • Reducing local optima in single-objective problems by multi-objectivization
    • E. Zitzler et al., eds., LNCS 1993
    • Knowles, J. D., Watson, R. A., and Corne, D. W. (2001). "Reducing local optima in single-objective problems by multi-objectivization." EMO 2001, E. Zitzler et al., eds., LNCS 1993, 269-283.
    • (2001) EMO 2001 , pp. 269-283
    • Knowles, J.D.1    Watson, R.A.2    Corne, D.W.3
  • 13
    • 0031336918 scopus 로고    scopus 로고
    • Planning and estimating in practice and the use of integrated computer models
    • Laptali, E., Bouchlagham, N., and Wild, S. (1997). "Planning and estimating in practice and the use of integrated computer models." Autom. Constr., 7(1), 71-76.
    • (1997) Autom. Constr. , vol.7 , Issue.1 , pp. 71-76
    • Laptali, E.1    Bouchlagham, N.2    Wild, S.3
  • 14
    • 0033312040 scopus 로고    scopus 로고
    • GA-based multicriteria optimal model for construction scheduling
    • Leu, S. S., and Yang, C. H. (1999). "GA-based multicriteria optimal model for construction scheduling." J. Constr. Eng. Manage., 125(6), 420-427.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.6 , pp. 420-427
    • Leu, S.S.1    Yang, C.H.2
  • 15
    • 5244262334 scopus 로고    scopus 로고
    • Using improved genetic algorithms to facilitate time-cost optimization
    • Li, H. and Love, P. E. (1997). "Using improved genetic algorithms to facilitate time-cost optimization." J. Constr. Eng. Manage., 123(3), 233-237.
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.3 , pp. 233-237
    • Li, H.1    Love, P.E.2
  • 16
    • 0029470313 scopus 로고
    • Construction time-cost trade-off analysis using LP/IP hybrid method
    • Liu, L., Burns, S., and Feng, C. (1995). "Construction time-cost trade-off analysis using LP/IP hybrid method." J. Constr. Eng. Manage., 121(4), 446-454.
    • (1995) J. Constr. Eng. Manage. , vol.121 , Issue.4 , pp. 446-454
    • Liu, L.1    Burns, S.2    Feng, C.3
  • 17
    • 0042416399 scopus 로고
    • Extensions of the Critical Path Method through the Application of Integer Programming
    • Univ. of Illinois, Urbana
    • Meyer, W. L. and Shaffer, L. R. (1963). "Extensions of the Critical Path Method through the Application of Integer Programming." Civil Engineering and Construction Research, Series 2, Univ. of Illinois, Urbana, III.
    • (1963) Civil Engineering and Construction Research, Series 2
    • Meyer, W.L.1    Shaffer, L.R.2
  • 18
    • 0027545671 scopus 로고
    • Schedule compression using the direct stiffness method
    • Moselhi, O. (1993). "Schedule compression using the direct stiffness method." Can. J. Civ. Eng., Ottawa, 20(1), 65-72.
    • (1993) Can. J. Civ. Eng., Ottawa , vol.20 , Issue.1 , pp. 65-72
    • Moselhi, O.1
  • 19
    • 12344311786 scopus 로고    scopus 로고
    • A conceptual case-based decision model for mitigating construction delays
    • Ng, S. T., Deng, M. Z. M., Skitmore, R. M., and Lam, K. C. (2000). "A conceptual case-based decision model for mitigating construction delays." Int. J. Constr. Inf. Technol., 8(2), 1-20.
    • (2000) Int. J. Constr. Inf. Technol. , vol.8 , Issue.2 , pp. 1-20
    • Ng, S.T.1    Deng, M.Z.M.2    Skitmore, R.M.3    Lam, K.C.4
  • 20
    • 0031268894 scopus 로고    scopus 로고
    • Resources scheduling decision support system for concurrent project management
    • Nkasu, M. M., and Leung, K. H. (1997). "Resources scheduling decision support system for concurrent project management." Int. J. Prod. Res., 35(11), 3107-3132.
    • (1997) Int. J. Prod. Res. , vol.35 , Issue.11 , pp. 3107-3132
    • Nkasu, M.M.1    Leung, K.H.2
  • 24
    • 0342275420 scopus 로고
    • A structured method of computing project cost polygons
    • Prager, W. (1963). "A structured method of computing project cost polygons." Manage. Sci. 9(3), 394-404.
    • (1963) Manage. Sci. , vol.9 , Issue.3 , pp. 394-404
    • Prager, W.1
  • 25
    • 19244376018 scopus 로고
    • A simple CPM time-cost trade-off algorithm
    • Siemens, N. (1971). "A simple CPM time-cost trade-off algorithm." Manage. Sci., 17(6), 354-363.
    • (1971) Manage. Sci. , vol.17 , Issue.6 , pp. 354-363
    • Siemens, N.1
  • 27
    • 0031703509 scopus 로고    scopus 로고
    • Optimization model for construction project durations using a multistage decision process
    • Wang, C. H., and Huang, Y. C. (1998). "Optimization model for construction project durations using a multistage decision process." Eng. Optimiz., 30(2), 155-173.
    • (1998) Eng. Optimiz. , vol.30 , Issue.2 , pp. 155-173
    • Wang, C.H.1    Huang, Y.C.2
  • 28
    • 34248666540 scopus 로고
    • Fuzzy sets
    • Zadeh, L. A. (1965). "Fuzzy sets." Inf. Control, 8, 338-353.
    • (1965) Inf. Control , vol.8 , pp. 338-353
    • Zadeh, L.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.