메뉴 건너뛰기




Volumn 135, Issue 1, 2009, Pages 56-71

Quantifying qualitative information on risks: Development of the QQIR method

Author keywords

Construction management; Financial management; Fuzzy sets; Information management; Probability distribution; Risk management; Uncertainty principles

Indexed keywords

ADMINISTRATIVE DATA PROCESSING; FUZZY SETS; INFORMATION MANAGEMENT; MANAGEMENT; MANAGEMENT INFORMATION SYSTEMS; PROBABILITY; PROBABILITY DISTRIBUTIONS; PROJECT MANAGEMENT; RANDOM PROCESSES; RISK ANALYSIS; RISK ASSESSMENT; RISK MANAGEMENT; RISKS; ROBOT LEARNING; SET THEORY;

EID: 58149232226     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2009)135:1(56)     Document Type: Article
Times cited : (22)

References (33)
  • 1
    • 0017323751 scopus 로고
    • Rating and ranking of multiple-aspect alternatives using fuzzy sets
    • Baas, S. M., and Kwakernaak, H. (1977). " Rating and ranking of multiple-aspect alternatives using fuzzy sets.." Automatica, 13, 47-58.
    • (1977) Automatica , vol.13 , pp. 47-58
    • Baas, S.M.1    Kwakernaak, H.2
  • 2
    • 0030231260 scopus 로고    scopus 로고
    • New methods for subjective mental workload assessment and fuzzy risk analysis
    • Chen, S.-M. (1996). " New methods for subjective mental workload assessment and fuzzy risk analysis.." Cybern. Syst., 27, 449-472.
    • (1996) Cybern. Syst. , vol.27 , pp. 449-472
    • Chen, S.-M.1
  • 3
    • 0028500315 scopus 로고
    • Fuzzy cash flow analysis using present worth criterion
    • Chiu, C.-Y., and Park, C.-S. (1994). " Fuzzy cash flow analysis using present worth criterion.." Eng. Econ., 39 (2), 113-138.
    • (1994) Eng. Econ. , vol.39 , Issue.2 , pp. 113-138
    • Chiu, C.-Y.1    Park, C.-S.2
  • 4
    • 0001038342 scopus 로고
    • Fuzzy real algebra: Some results
    • Dubois, D., and Prade, H. (1979). " Fuzzy real algebra: Some results.." Fuzzy Sets Syst., 2, 327-348.
    • (1979) Fuzzy Sets Syst. , vol.2 , pp. 327-348
    • Dubois, D.1    Prade, H.2
  • 7
    • 34250836481 scopus 로고
    • Construction risk assessment by linguistics
    • Kangari, R., and Riggs, L. S. (1989). " Construction risk assessment by linguistics.." IEEE Trans. Eng. Manage., 36 (2), 126-131.
    • (1989) IEEE Trans. Eng. Manage. , vol.36 , Issue.2 , pp. 126-131
    • Kangari, R.1    Riggs, L.S.2
  • 13
    • 58149256054 scopus 로고
    • Expert systems for personal computers
    • Konopasek, M., and Jayaraman, S. (1984). " Expert systems for personal computers.." BYTE 137-154.
    • (1984) BYTE , pp. 137-154
    • Konopasek, M.1    Jayaraman, S.2
  • 14
    • 2442558733 scopus 로고
    • Ranking fuzzy numbers with integral value
    • Liou, T.-S., and Wang, M.-J. (1992a). " Ranking fuzzy numbers with integral value.." Fuzzy Sets Syst., 50, 247-255.
    • (1992) Fuzzy Sets Syst. , vol.50 , pp. 247-255
    • Liou, T.-S.1    Wang, M.-J.2
  • 15
    • 0026900521 scopus 로고
    • Fuzzy weighted average: An improved algorithm
    • Liou, T.-S., and Wang, M.-J. (1992b). " Fuzzy weighted average: An improved algorithm.." Fuzzy Sets Syst., 49, 307-315.
    • (1992) Fuzzy Sets Syst. , vol.49 , pp. 307-315
    • Liou, T.-S.1    Wang, M.-J.2
  • 16
    • 38149146451 scopus 로고
    • Subjective assessment of mental workload-A fuzzy linguistic multi-criteria approach
    • Liou, T.-S., and Wang, M.-J. (1994). " Subjective assessment of mental workload-A fuzzy linguistic multi-criteria approach.." Fuzzy Sets Syst., 62, 155-165.
    • (1994) Fuzzy Sets Syst. , vol.62 , pp. 155-165
    • Liou, T.-S.1    Wang, M.-J.2
  • 17
    • 33748504072 scopus 로고
    • Volumen und Oberfläche
    • Minkowski, H. (1903). " Volumen und Oberfläche.." Math. Annal., 57 (4), 447-495.
    • (1903) Math. Annal. , vol.57 , Issue.4 , pp. 447-495
    • Minkowski, H.1
  • 18
    • 49449122896 scopus 로고
    • A scaling method for priorities in hierarchical structures
    • Saaty, T. L. (1977). " A scaling method for priorities in hierarchical structures.." J. Math. Psychol., 15 (3), 234-281.
    • (1977) J. Math. Psychol. , vol.15 , Issue.3 , pp. 234-281
    • Saaty, T.L.1
  • 19
    • 58149222696 scopus 로고    scopus 로고
    • Risk exposure and recovery assessment under a guarantee in a water project
    • Sachs, T., Bellinger, C., and Tiong, R. (2008a). " Risk exposure and recovery assessment under a guarantee in a water project.." J. Struct. Finance.
    • (2008) J. Struct. Finance
    • Sachs, T.1    Bellinger, C.2    Tiong, R.3
  • 20
    • 58149271463 scopus 로고    scopus 로고
    • Impact quantification of political risks on demand and pricing in a power project-A case study
    • Sachs, T., Rosa, A., and Tiong, R. (2008b). " Impact quantification of political risks on demand and pricing in a power project-A case study.." J. Struct. Finance.
    • (2008) J. Struct. Finance
    • Sachs, T.1    Rosa, A.2    Tiong, R.3
  • 21
    • 84993103099 scopus 로고    scopus 로고
    • A risky business quantified: Political risks in publich private partnerships
    • ", December.
    • Sachs, T., Tiong, R., and Wagner, D. (2006) " A risky business quantified: Political risks in publich private partnerships.." ifr Asia, December, 29-32.
    • (2006) ifr Asia , pp. 29-32
    • Sachs, T.1    Tiong, R.2    Wagner, D.3
  • 22
    • 58149244688 scopus 로고    scopus 로고
    • The Quantification and Financial impact of political risk perceptions on infrastructure projects in Asia
    • Sachs, T., Tiong, R., and Wagner, D. (2008c). " The Quantification and Financial impact of political risk perceptions on infrastructure projects in Asia.." J. Structured Finance, 80-104.
    • (2008) J. Structured Finance , pp. 80-104
    • Sachs, T.1    Tiong, R.2    Wagner, D.3
  • 24
    • 11344290197 scopus 로고    scopus 로고
    • Fuzzy financial profitability analysis of demand side management alternatives from participant perspective
    • Sheen, J. N. (2005). " Fuzzy financial profitability analysis of demand side management alternatives from participant perspective.." Inf. Sci. (N.Y.), 169, 329-264.
    • (2005) Inf. Sci. (N.Y.) , vol.169 , pp. 329-264
    • Sheen, J.N.1
  • 25
    • 12344271940 scopus 로고    scopus 로고
    • A fuzzy decision framework for contractor selection
    • Singh, D., and Tiong, R. L. K. (2005). " A fuzzy decision framework for contractor selection.." J. Const. Eng. Manage., 131 (1), 62-70.
    • (2005) J. Const. Eng. Manage. , vol.131 , Issue.1 , pp. 62-70
    • Singh, D.1    Tiong, R.L.K.2
  • 26
    • 38249003915 scopus 로고
    • Contractor project risk contingency allocation using linguistic approximation
    • ".
    • Tah, J. H. M., Thorpe, A., and McCafer, R. (1993). " Contractor project risk contingency allocation using linguistic approximation.." Comput. Syst. Eng., 4 (2-3), 281-293.
    • (1993) Comput. Syst. Eng. , vol.4 , Issue.23 , pp. 281-293
    • Tah, J.H.M.1    Thorpe, A.2    Mccafer, R.3
  • 27
    • 38149147082 scopus 로고
    • Generalization of an invertible mapping between probability and possibility
    • Wonneberger, S. (1994). " Generalization of an invertible mapping between probability and possibility.." Fuzzy Sets Syst., 64, 229-240.
    • (1994) Fuzzy Sets Syst. , vol.64 , pp. 229-240
    • Wonneberger, S.1
  • 28
    • 34248666540 scopus 로고
    • Fuzzy Sets
    • Zadeh, L. A. (1965). " Fuzzy Sets.." Inf. Control., 8, 338-353.
    • (1965) Inf. Control. , vol.8 , pp. 338-353
    • Zadeh, L.A.1
  • 29
    • 0015558134 scopus 로고
    • Outline of a new approach to an analysis of complex systems and decision processes
    • Zadeh, L. A. (1973). " Outline of a new approach to an analysis of complex systems and decision processes.." IEEE Trans. Syst. Man Cybern., 1, 28-44.
    • (1973) IEEE Trans. Syst. Man Cybern. , vol.1 , pp. 28-44
    • Zadeh, L.A.1
  • 30
    • 49349133217 scopus 로고
    • Fuzzy sets as a basis for a theory of possibility
    • Zadeh, L. A. (1978). " Fuzzy sets as a basis for a theory of possibility.." Fuzzy Sets Syst., 1, 3-28.
    • (1978) Fuzzy Sets Syst. , vol.1 , pp. 3-28
    • Zadeh, L.A.1
  • 31
    • 0030142764 scopus 로고    scopus 로고
    • Fuzzy logic=computing with words
    • Zadeh, L. A. (1996). " Fuzzy logic=computing with words.." IEEE Trans. Fuzzy Syst., 4 (2), 103-111.
    • (1996) IEEE Trans. Fuzzy Syst. , vol.4 , Issue.2 , pp. 103-111
    • Zadeh, L.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.