메뉴 건너뛰기




Volumn 19, Issue 2, 2010, Pages 148-159

An evaluation of the applicability of 4D CAD on construction projects

Author keywords

4D CAD; Benefits; Commercial projects; Constructability; Infrastructure projects; Project progress review; Visualization

Indexed keywords

3D-ELEMENTS; CAD MODELS; COMMERCIAL PROJECTS; CONSTRUCTABILITY; CONSTRUCTION PHASE; CONSTRUCTION PLAN; CONSTRUCTION PROCESS; CONSTRUCTION PROFESSIONALS; CONSTRUCTION PROJECTS; CONSTRUCTION SITES; CONSTRUCTION STAGES; DESIGN DECISIONS; INFRASTRUCTURE PROJECT; OPERATIONAL EFFICIENCIES; ORGANIZATIONAL LEVELS; PLANNING STAGES; PROJECT PARTICIPANTS; PROJECT PLANNING; PROJECT PLANNING AND CONTROL; SOFTWARE DEVELOPMENT; STATISTICAL ANALYSIS; UPPER MANAGEMENT; VISUAL TOOLS;

EID: 76549114928     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2009.11.015     Document Type: Article
Times cited : (123)

References (25)
  • 4
    • 0002604591 scopus 로고
    • Four dimensional modelling in design and construction
    • CIFE Stanford University, CA
    • Collier E., and Fischer M. Four dimensional modelling in design and construction. CIFE Technical Report No. 101 (1995), CIFE Stanford University, CA
    • (1995) CIFE Technical Report No. 101
    • Collier, E.1    Fischer, M.2
  • 5
    • 33645149548 scopus 로고    scopus 로고
    • The scope and role of information technology in construction
    • CIFE Stanford University, CA
    • Fischer M., and Kunz J. The scope and role of information technology in construction. CIFE Technical Report No. 156 (2004), CIFE Stanford University, CA
    • (2004) CIFE Technical Report No. 156
    • Fischer, M.1    Kunz, J.2
  • 6
    • 21344441909 scopus 로고    scopus 로고
    • VISCON: computer visualization support for constructability
    • Ganah A.A., Bouchlaghem N.B., and Anumba C.J. VISCON: computer visualization support for constructability. ITCon 10 (2005) 69-73
    • (2005) ITCon , vol.10 , pp. 69-73
    • Ganah, A.A.1    Bouchlaghem, N.B.2    Anumba, C.J.3
  • 8
    • 33751501800 scopus 로고    scopus 로고
    • Supporting the constructability review with 3D/4D models
    • Hartmann T., and Fischer M. Supporting the constructability review with 3D/4D models. Building Research and Information. 35 1 (2007) 70-80
    • (2007) Building Research and Information. , vol.35 , Issue.1 , pp. 70-80
    • Hartmann, T.1    Fischer, M.2
  • 9
    • 33751384135 scopus 로고    scopus 로고
    • Challenges and benefits of 4D modelling on the Walt Disney Concert Hall project
    • CIFE, Stanford, CA
    • Haymaker J., and Fischer M. Challenges and benefits of 4D modelling on the Walt Disney Concert Hall project. CIFE Working Paper No. 64 (2001), CIFE, Stanford, CA
    • (2001) CIFE Working Paper No. 64
    • Haymaker, J.1    Fischer, M.2
  • 10
    • 1842832075 scopus 로고    scopus 로고
    • Trends of 4D CAD applications for construction planning
    • Heesom D., and Mahdjoubi L. Trends of 4D CAD applications for construction planning. Construction Management and Economics 22 2 (2002) 171-182
    • (2002) Construction Management and Economics , vol.22 , Issue.2 , pp. 171-182
    • Heesom, D.1    Mahdjoubi, L.2
  • 15
    • 76549085284 scopus 로고    scopus 로고
    • 3D and 4D modeling for design and construction coordination: issues and lessons learned
    • Khanzode A., and Staub-French S. 3D and 4D modeling for design and construction coordination: issues and lessons learned. ITcon 12 (2006) 382-407
    • (2006) ITcon , vol.12 , pp. 382-407
    • Khanzode, A.1    Staub-French, S.2
  • 17
    • 84936824160 scopus 로고
    • A dual methodology for case studies: synergistic use of a longitudinal single site with replicated multiple sites
    • Leonard-Barton D. A dual methodology for case studies: synergistic use of a longitudinal single site with replicated multiple sites. Organization Science 1 3 (1990) 248-266
    • (1990) Organization Science , vol.1 , Issue.3 , pp. 248-266
    • Leonard-Barton, D.1
  • 20
    • 36249022572 scopus 로고    scopus 로고
    • Antecedents of successful three-dimensional computer-aided design implementation in design and construction networks
    • Taylor J.E. Antecedents of successful three-dimensional computer-aided design implementation in design and construction networks. ASCE Journal of Construction Engineering and Management 133 12 (2007) 993-1002
    • (2007) ASCE Journal of Construction Engineering and Management , vol.133 , Issue.12 , pp. 993-1002
    • Taylor, J.E.1
  • 21
    • 51849141102 scopus 로고    scopus 로고
    • Innovation alignment and project network dynamics: an integrative model for change
    • Taylor J.E., and Levitt R.E. Innovation alignment and project network dynamics: an integrative model for change. Project Management Journal 38 3 (2007) 22-35
    • (2007) Project Management Journal , vol.38 , Issue.3 , pp. 22-35
    • Taylor, J.E.1    Levitt, R.E.2
  • 22
    • 0029700064 scopus 로고    scopus 로고
    • 3D and 4D CAD modelling on commercial design-build projects
    • Vanegas J., and Chinowsky P. (Eds)
    • Vaugn F. 3D and 4D CAD modelling on commercial design-build projects. In: Vanegas J., and Chinowsky P. (Eds). Computing in Civil Engineering Congress 3, Anaheim, California. June (1996) 390-396
    • (1996) Computing in Civil Engineering Congress 3, Anaheim, California. June , pp. 390-396
    • Vaugn, F.1
  • 23


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.