메뉴 건너뛰기




Volumn 31, Issue 2, 2001, Pages 189-198

A heuristic genetic algorithm for subcontractor selection in a global manufacturing environment

Author keywords

Agile manufacturing; Fuzzy logic; Genetic algorithm (GA); Partner selection; Project management; Soft computing; Virtual enterprise

Indexed keywords

AGILE MANUFACTURING SYSTEMS; DECISION THEORY; ELECTRIC POWER PLANTS; FUZZY SETS; HEURISTIC METHODS; MATHEMATICAL MODELS; MATHEMATICAL PROGRAMMING; PROJECT MANAGEMENT; SCHEDULING; VIRTUAL CORPORATION;

EID: 0035325544     PISSN: 10946977     EISSN: None     Source Type: Journal    
DOI: 10.1109/5326.941842     Document Type: Article
Times cited : (123)

References (23)
  • 1
    • 0032736579 scopus 로고    scopus 로고
    • Resource-constrained project scheduling: Notation, classification, models, and methods
    • (1999) Euro. J. Oper. Res. , vol.112 , pp. 3-41
    • Brucker, P.1
  • 11
    • 0003154963 scopus 로고    scopus 로고
    • A project scheduling embedded branch and bound algorithm for partner selection in global manufacturing environment
    • Hong Kong Polytechnic Univ., Hung Hom, Hong Kong, Tech. Rep., MF-99
    • (1999)
    • Ip, W.H.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.