메뉴 건너뛰기




Volumn 20, Issue 4, 2005, Pages 242-264

Mobile construction supply chain management using PDA and Bar Codes

Author keywords

[No Author keywords available]

Indexed keywords

BAR CODES; CONSTRUCTION; DATA ACQUISITION; PROJECT MANAGEMENT; REAL TIME SYSTEMS;

EID: 18444388567     PISSN: 10939687     EISSN: None     Source Type: Journal    
DOI: 10.1111/j.1467-8667.2005.00391     Document Type: Article
Times cited : (55)

References (33)
  • 2
    • 0013267361 scopus 로고    scopus 로고
    • Alternative supply-chain configurations for engineered or catalogued made-to-order components: Case study on pipe supports used in power plants
    • Gramado Brazil
    • Arbulu, R. J. & Tommelein, I. D. (2000), Alternative supply-chain configurations for engineered or catalogued made-to-order components: Case study on pipe supports used in power plants, in Proceedings of IGLC-10, Gramado, Brazil.
    • (2000) Proceedings of IGLC-10
    • Arbulu, R.J.1    Tommelein, I.D.2
  • 3
    • 0028549814 scopus 로고
    • Improved material management through bar-code: Results and implications of a feasibility study
    • Baldwin, A. N., Thorpe, A. & Alkaabi, J. A. (1994), Improved material management through bar-code: Results and implications of a feasibility study, Proceedings of the Institution of Civil Engineers, 102 (6), 156-62.
    • (1994) Proceedings of the Institution of Civil Engineers , vol.102 , Issue.6 , pp. 156-162
    • Baldwin, A.N.1    Thorpe, A.2    Alkaabi, J.A.3
  • 6
    • 0025491242 scopus 로고
    • Bar code: Prescription for precision, performance, and productivity
    • Blakey, L. H. (1990), Bar code: Prescription for precision, performance, and productivity, Journal of Construction Engineering and Management, ASCE, 116(3), 468-79.
    • (1990) Journal of Construction Engineering and Management, ASCE , vol.116 , Issue.3 , pp. 468-479
    • Blakey, L.H.1
  • 11
    • 0031645125 scopus 로고    scopus 로고
    • Implementation of automated site data collection with a medium-size contractor
    • Boston, MA
    • Fayek, A., AbouRizk, S. & Boyd, B. (1998), Implementation of automated site data collection with a medium-size contractor, in Proceedings of ASCE Computing in Civil Engineering, Boston, MA, 454-6.
    • (1998) Proceedings of ASCE Computing in Civil Engineering , pp. 454-456
    • Fayek, A.1    AbouRizk, S.2    Boyd, B.3
  • 17
    • 0031380657 scopus 로고    scopus 로고
    • Automating field data collection in construction organizations
    • Minneapolis, MN
    • McCulloch, B. G. (1997), Automating field data collection in construction organizations, in Proceedings of the ASCE Construction Congress V, Minneapolis, MN, 957-63.
    • (1997) Proceedings of the ASCE Construction Congress V , pp. 957-963
    • McCulloch, B.G.1
  • 20
    • 0036165688 scopus 로고    scopus 로고
    • Multiple device collaborative and real time analysis system for project management in civil engineering
    • Pena-Mora, F. & Dwivedi, G. D. (2002), Multiple device collaborative and real time analysis system for project management in civil engineering, Journal of Computing in Civil Engineering, ASCE, 16(1), 23-38.
    • (2002) Journal of Computing in Civil Engineering, ASCE , vol.16 , Issue.1 , pp. 23-38
    • Pena-Mora, F.1    Dwivedi, G.D.2
  • 21
    • 0024639652 scopus 로고
    • Bar codes on the job site
    • Rasdorf, W. J. & Herbert, M. J. (1989), Bar codes on the job site, ID System, 9(3), 32-36.
    • (1989) ID System , vol.9 , Issue.3 , pp. 32-36
    • Rasdorf, W.J.1    Herbert, M.J.2
  • 24
    • 0003958050 scopus 로고
    • Productivity Press, Portland, OR
    • Shingo, S. (1988), Non-Stock Production, Productivity Press, Portland, OR.
    • (1988) Non-Stock Production
    • Shingo, S.1
  • 28
    • 16444372124 scopus 로고    scopus 로고
    • Java inspection framework: Developing field inspection support system for civil systems inspection
    • Sunkpho, J. & Garrett, J. H., Jr. (2003), Java inspection framework: Developing field inspection support system for civil systems inspection, Journal of Computing in Civil Engineering, ASCE, 17(4), 209-18.
    • (2003) Journal of Computing in Civil Engineering, ASCE , vol.17 , Issue.4 , pp. 209-218
    • Sunkpho, J.1    Garrett Jr., J.H.2
  • 30
    • 0036028123 scopus 로고    scopus 로고
    • An accelerated subcontracting and procuring (ASAP) model for construction projects
    • Tserng, H. P. & Lin, P. H. (2002), An accelerated subcontracting and procuring (ASAP) model for construction projects, International Journal of Automation in Construction, 11(1), 105-25.
    • (2002) International Journal of Automation in Construction , vol.11 , Issue.1 , pp. 105-125
    • Tserng, H.P.1    Lin, P.H.2
  • 31
    • 0037208776 scopus 로고    scopus 로고
    • Developing an electronic acquisition model for project scheduling (e-AMPS) using XML-based information standard
    • Tserng, H. P, & Lin, W. Y. (2003), Developing an electronic acquisition model for project scheduling (e-AMPS) using XML-based information standard, International Journal of Automation in Construction, 12(1), 67-95.
    • (2003) International Journal of Automation in Construction , vol.12 , Issue.1 , pp. 67-95
    • Tserng, H.P.1    Lin, W.Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.