Implications of even flow production methodology for U.S. housing industry
-
".
-
Bashford, H. H., Sawhney, A., Walsh, K. D., and Kot, K. (2003). " Implications of even flow production methodology for U.S. housing industry.." J. Constr. Eng. Manage., 129 (3), 330-337.
-
(2003)
J. Constr. Eng. Manage.
, vol.129
, Issue.3
, pp. 330-337
-
-
Bashford, H.H.1
Sawhney, A.2
Walsh, K.D.3
Kot, K.4
-
4
-
-
27644586562
-
Residential construction and the influence of inspections on cycle time
-
", ASCE, Reston, Va..
-
Bashford, H. H., Sawhney, A., Walsh, K. D., and Thompson, J. (2005a). " Residential construction and the influence of inspections on cycle time.." Proc., 2005 Construction Research Congress, ASCE, Reston, Va., 73-76.
-
(2005)
Proc., 2005 Construction Research Congress
, pp. 73-76
-
-
Bashford, H.H.1
Sawhney, A.2
Walsh, K.D.3
Thompson, J.4
-
5
-
-
12344273517
-
Production system loading-Cycle time relationship in residential construction
-
".
-
Bashford, H. H., Walsh, K. D., and Sawhney, A. (2005b). " Production system loading-Cycle time relationship in residential construction.." J. Constr. Eng. Manage., 131 (1), 15-22.
-
(2005)
J. Constr. Eng. Manage.
, vol.131
, Issue.1
, pp. 15-22
-
-
Bashford, H.H.1
Walsh, K.D.2
Sawhney, A.3
-
8
-
-
0004244246
-
-
North River Press, Croton-on-Hudson, N.Y.
-
Goldratt, E. M., and Cox, J. (1986). The goal, North River Press, Croton-on-Hudson, N.Y.
-
(1986)
The Goal
-
-
Goldratt, E.M.1
Cox, J.2
-
9
-
-
0033315084
-
Simphony: An environment for building special purpose construction simulation tools
-
IEEE, Piscataway, N.J..
-
Hajjar, D., and Abourizk, S. M. (1999). " Simphony: An environment for building special purpose construction simulation tools.." Proc., 1999 Winter Simulation Conf., IEEE, Piscataway, N.J., 998-1006.
-
(1999)
Proc., 1999 Winter Simulation Conf.
, pp. 998-1006
-
-
Hajjar, D.1
Abourizk, S.M.2
-
11
-
-
84866135998
-
Using buffers to manage production: A case study of the Pentagon renovation project
-
" (CD-ROM).
-
Horman, M. J., Messner, J. I., Riley, D. R., and Pulaski, M. H. (2003). " Using buffers to manage production: A case study of the Pentagon renovation project.." Proc., 11th Annual Conf. of the Int. Group for Lean Construction (IGLC-11) (CD-ROM).
-
(2003)
Proc., 11th Annual Conf. of the Int. Group for Lean Construction (IGLC-11)
-
-
Horman, M.J.1
Messner, J.I.2
Riley, D.R.3
Pulaski, M.H.4
-
12
-
-
23044488934
-
Role of inventory buffers in construction labor performance
-
Horman, M. J., and Thomas, H. R. (2005). " Role of inventory buffers in construction labor performance.." J. Constr. Eng. Manage., 131 (7), 834-843.
-
(2005)
J. Constr. Eng. Manage.
, vol.131
, Issue.7
, pp. 834-843
-
-
Horman, M.J.1
Thomas, H.R.2
-
13
-
-
0012303148
-
-
RR47-13, Construction Industry Institute, Univ. of Texas, Austin, Tex.
-
Howell, G., and Ballard, G. (1996). " Managing uncertainty in the piping process.." RR47-13, Construction Industry Institute, Univ. of Texas, Austin, Tex.
-
(1996)
Managing Uncertainty in the Piping Process
-
-
Howell, G.1
Ballard, G.2
-
14
-
-
0027805668
-
Interaction between sub cycles: One key to improved methods
-
".
-
Howell, G., Laufer, A., and Ballard, G. (1993). " Interaction between sub cycles: One key to improved methods.." J. Constr. Eng. Manage., 119 (4), 714-728.
-
(1993)
J. Constr. Eng. Manage.
, vol.119
, Issue.4
, pp. 714-728
-
-
Howell, G.1
Laufer, A.2
Ballard, G.3
-
15
-
-
0003656231
-
-
Tech. Re No. 72, Center for Integrated Facility Engineering, Stanford Univ., Stanford, Calif.
-
Koskela, L. (1992). " Application of the new production philosophy to construction.." Tech. Rep. No. 72, Center for Integrated Facility Engineering, Stanford Univ., Stanford, Calif.
-
(1992)
Application of the New Production Philosophy to Construction
-
-
Koskela, L.1
-
17
-
-
13944282078
-
Impact of labor factors on work flow
-
".
-
Lee, H. S., Yu, J. H., and Kim, S. K. (2004). " Impact of labor factors on work flow.." J. Constr. Eng. Manage., 130 (6), 918-923.
-
(2004)
J. Constr. Eng. Manage.
, vol.130
, Issue.6
, pp. 918-923
-
-
Lee, H.S.1
Yu, J.H.2
Kim, S.K.3
-
18
-
-
13944273831
-
Even flow construction: The wave of the future
-
National Association of Home Builders (NAHB) Research Center.. ".".
-
National Association of Home Builders (NAHB) Research Center. (2000). " Even flow construction: The wave of the future.." Toolbase News, 5 (1), 4.
-
(2000)
Toolbase News
, vol.5
, Issue.1
, pp. 4
-
-
-
19
-
-
46149084930
-
Application of DEVS framework in construction simulation
-
", IEEE, Piscataway, N.J..
-
Palaniappan, S., Sawhney, A., and Sarjoughian, H. S. (2006). " Application of DEVS framework in construction simulation.." Proc., 2006 Winter Simulation Conf., IEEE, Piscataway, N.J., 2077-2086.
-
(2006)
Proc., 2006 Winter Simulation Conf.
, pp. 2077-2086
-
-
Palaniappan, S.1
Sawhney, A.2
Sarjoughian, H.S.3
-
20
-
-
13944281790
-
Reliability buffering for construction projects
-
Park, M., and Pea-Mora, F. (2004). " Reliability buffering for construction projects.." J. Constr. Eng. Manage., 130 (5), 626-637.
-
(2004)
J. Constr. Eng. Manage.
, vol.130
, Issue.5
, pp. 626-637
-
-
Park, M.1
Pea-Mora, F.2
-
21
-
-
33748139457
-
An economic game theory model of subcontractor resource allocation behaviour
-
Sacks, R., and Harel, M. (2006). " An economic game theory model of subcontractor resource allocation behaviour.." Constr. Manage. Econom., 24 (8), 869-881.
-
(2006)
Constr. Manage. Econom.
, vol.24
, Issue.8
, pp. 869-881
-
-
Sacks, R.1
Harel, M.2
-
22
-
-
27144464137
-
A discrete event simulation model to analyze the residential construction and inspection process
-
" (CD-ROM), ASCE, Reston, Va.
-
Sawhney, A., Bashford, H. H., Palaniappan, S., Walsh, K. D., and Thompson, J. (2005). " A discrete event simulation model to analyze the residential construction and inspection process.." Proc., 2005 Int. Conf. on Computing in Civil Engineering (CD-ROM), ASCE, Reston, Va.
-
(2005)
Proc., 2005 Int. Conf. on Computing in Civil Engineering
-
-
Sawhney, A.1
Bashford, H.H.2
Palaniappan, S.3
Walsh, K.D.4
Thompson, J.5
-
23
-
-
13944249179
-
Symbiotic crew relationships and labor flow
-
".
-
Thomas, H. R., Horman, M. J., and Lemes de Souza, U. E. (2004). " Symbiotic crew relationships and labor flow.." J. Constr. Eng. Manage., 130 (6), 908-917.
-
(2004)
J. Constr. Eng. Manage.
, vol.130
, Issue.6
, pp. 908-917
-
-
Thomas, H.R.1
Horman, M.J.2
Lemes De Souza, U.E.3
-
24
-
-
13944264322
-
Reducing variability to improve performance as a lean construction principle
-
".
-
Thomas, H. R., Horman, M. J., Lemes de Souza, U. E., and Zavrski, I. (2002). " Reducing variability to improve performance as a lean construction principle.." J. Constr. Eng. Manage., 128 (2), 144-154.
-
(2002)
J. Constr. Eng. Manage.
, vol.128
, Issue.2
, pp. 144-154
-
-
Thomas, H.R.1
Horman, M.J.2
Lemes De Souza, U.E.3
Zavrski, I.4
-
25
-
-
12344327099
-
Improving labor flow reliability for better productivity as lean construction principle
-
".
-
Thomas, H. R., Horman, M. J., Minchin, R. E., and Chen, D. (2003). " Improving labor flow reliability for better productivity as lean construction principle.." J. Constr. Eng. Manage., 129 (3), 251-261.
-
(2003)
J. Constr. Eng. Manage.
, vol.129
, Issue.3
, pp. 251-261
-
-
Thomas, H.R.1
Horman, M.J.2
Minchin, R.E.3
Chen, D.4
-
26
-
-
0000012732
-
Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique
-
Tommelein, I. D. (1998). " Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique.." J. Constr. Eng. Manage., 124 (4), 279-288.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.4
, pp. 279-288
-
-
Tommelein, I.D.1
-
27
-
-
2342419514
-
Impact of variability and uncertainty on product and process development
-
ASCE, Reston, Va..
-
Tommelein, I. D. (2000). " Impact of variability and uncertainty on product and process development.." Proc., of Construction Congress VI, ASCE, Reston, Va., 969-976.
-
(2000)
Proc., of Construction Congress VI
, pp. 969-976
-
-
Tommelein, I.D.1
-
28
-
-
0032645520
-
Parade game: Impact of work flow variability on trade performance
-
".
-
Tommelein, I. D., Riley, D., and Howell, G. A. (1999). " Parade game: Impact of work flow variability on trade performance.." J. Constr. Eng. Manage., 125 (5), 304-310.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.5
, pp. 304-310
-
-
Tommelein, I.D.1
Riley, D.2
Howell, G.A.3
-
29
-
-
27144450471
-
-
" Technical Report No. RR 172-11, Construction Industry Institute, Univ. of Texas, Austin, Tex.
-
Tommelein, I. D., Walsh, K. D., and Hershauer, J. (2003). " Improving capital projects supply chain performance.." Technical Report No. RR 172-11, Construction Industry Institute, Univ. of Texas, Austin, Tex.
-
(2003)
Improving Capital Projects Supply Chain Performance
-
-
Tommelein, I.D.1
Walsh, K.D.2
Hershauer, J.3
-
30
-
-
62549118130
-
Cycle-time contributions of hyper-specialization and time-gating strategies in U.S. residential construction
-
Walsh, K. D., Sawhney, A., and Bashford, H. H. (2003). " Cycle-time contributions of hyper-specialization and time-gating strategies in U.S. residential construction.." Proc., 11th Annual Conf. of the Int. Group for Lean Construction, 390-397.
-
(2003)
Proc., 11th Annual Conf. of the Int. Group for Lean Construction
, pp. 390-397
-
-
Walsh, K.D.1
Sawhney, A.2
Bashford, H.H.3
-
31
-
-
33847109286
-
Production equations for unsteady-state construction processes
-
".
-
Walsh, K. D., Sawhney, A., and Bashford, H. H. (2007). " Production equations for unsteady-state construction processes.." J. Constr. Eng. Manage., 133 (3), 254-261.
-
(2007)
J. Constr. Eng. Manage.
, vol.133
, Issue.3
, pp. 254-261
-
-
Walsh, K.D.1
Sawhney, A.2
Bashford, H.H.3
|