메뉴 건너뛰기




Volumn 26, Issue 4, 2013, Pages 592-601

Scheduling lot switching operations for cluster tools

Author keywords

Cluster tools; Deadlock prevention; Lot switching; Petri net; Scheduling

Indexed keywords

CLUSTER TOOL; COMPUTATIONAL EXPERIMENT; DEADLOCK PREVENTION; LOT SWITCHING; MIXED INTEGER PROGRAMMING MODEL; SCHEDULING COMPLEXITY; SCHEDULING STRATEGIES; SEMICONDUCTOR INDUSTRY;

EID: 84887923282     PISSN: 08946507     EISSN: None     Source Type: Journal    
DOI: 10.1109/TSM.2013.2281083     Document Type: Article
Times cited : (65)

References (44)
  • 1
    • 33646717079 scopus 로고    scopus 로고
    • Scheduling single-armed cluster tools with reentrant wafer flows
    • May
    • H.-Y. Lee and T.-E. Lee, "Scheduling single-armed cluster tools with reentrant wafer flows," IEEE Trans. Semicond. Manuf., vol. 19, no. 2, pp. 226-240, May 2006.
    • (2006) IEEE Trans. Semicond. Manuf. , vol.19 , Issue.2 , pp. 226-240
    • Lee, H.-Y.1    Lee, T.-E.2
  • 7
    • 0031276238 scopus 로고    scopus 로고
    • A steady-state throughput analysis of cluster tools: Dual-blade versus single-blade robots
    • PII S0894650797075519
    • S. Venkatesh, R. Davenport, P. Foxhoven, and J. Nulman, "A steadystate throughput analysis of cluster tools: Dual-blade versus single-blade robots," IEEE Trans. Semicond. Manuf., vol. 10, no. 4, pp. 418-424, Nov. 1997. (Pubitemid 127763010)
    • (1997) IEEE Transactions on Semiconductor Manufacturing , vol.10 , Issue.4 , pp. 418-424
    • Venkatesh, S.1    Davenport, R.2    Foxhoven, P.3    Nulman, J.4
  • 8
    • 60749114750 scopus 로고    scopus 로고
    • A review of scheduling theory and methods for semiconductor manufacturing cluster tools
    • T.-E. Lee, "A review of scheduling theory and methods for semiconductor manufacturing cluster tools," in Proc. Winter Simulation Conf., 2008, pp. 2127-2135.
    • (2008) Proc. Winter Simulation Conf. , pp. 2127-2135
    • Lee, T.-E.1
  • 9
    • 23944522312 scopus 로고    scopus 로고
    • Sequencing and scheduling in robotic cells: Recent developments
    • DOI 10.1007/s10951-005-2861-9
    • M. Dawande, H. N. Geismar, S. P. Sethi, and C. Sriskandarajah, "Sequencing and scheduling in robotic cells: Recent developments," J. Scheduling, vol. 8, no. 5, pp. 387-426, 2005. (Pubitemid 41202890)
    • (2005) Journal of Scheduling , vol.8 , Issue.5 , pp. 387-426
    • Dawande, M.1    Geismar, H.N.2    Sethi, S.P.3    Sriskandarajah, C.4
  • 11
    • 0035334186 scopus 로고    scopus 로고
    • Modeling and implementing a real-time scheduler for dual-armed cluster tools
    • DOI 10.1016/S0166-3615(01)00078-1, PII S0166361501000781
    • Y.-H. Shin, T.-E. Lee, J.-H. Kim, and H.-Y. Lee, "Modeling and implementing a real-time scheduler for dual-armed cluster tools," Comput. Ind., vol. 45, no. 1, pp. 13-27, 2001. (Pubitemid 32518331)
    • (2001) Computers in Industry , vol.45 , Issue.1 , pp. 13-27
    • Shin, Y.-H.1    Lee, T.-E.2    Kim, J.-H.3    Lee, H.-Y.4
  • 12
    • 0035357074 scopus 로고    scopus 로고
    • Scheduling in dual gripper robotic cells for productivity gains
    • DOI 10.1109/70.938389, PII S1042296X01067295
    • S. P. Sethi, J. B. Sidney, and C. Sriskandarajah, "Scheduling in dual gripper robotic cells for productivity gains," IEEE Trans. Robot. Autom., vol. 17, no. 3, pp. 324-341, Jun. 2001. (Pubitemid 32829739)
    • (2001) IEEE Transactions on Robotics and Automation , vol.17 , Issue.3 , pp. 324-341
    • Sethi, S.P.1    Sidney, J.B.2    Sriskandarajah, C.3
  • 13
    • 33747443542 scopus 로고    scopus 로고
    • Multicluster tools scheduling: An integrated event graph and network model approach
    • DOI 10.1109/TSM.2006.879414, 1668233
    • S. Ding, J. Yi, and M. T. Zhang, "Multicluster tools scheduling: An integrated event graph and network model approach," IEEE Trans. Semicond. Manuf., vol. 19, no. 3, pp. 339-351, Aug. 2006. (Pubitemid 44249890)
    • (2006) IEEE Transactions on Semiconductor Manufacturing , vol.19 , Issue.3 , pp. 339-351
    • Ding, S.1    Yi, J.2    Zhang, M.T.3
  • 14
    • 78651098378 scopus 로고    scopus 로고
    • Optimal scheduling of multicluster tools with constant robot moving times, part I: Two-cluster analysis
    • Jan
    • W. K. V. Chan, J. Yi, and S. Ding, "Optimal scheduling of multicluster tools with constant robot moving times, part I: Two-cluster analysis," IEEE Trans. Autom. Sci. Eng., vol. 8, no. 1, pp. 5-16, Jan. 2011.
    • (2011) IEEE Trans. Autom. Sci. Eng. , vol.8 , Issue.1 , pp. 5-16
    • Chan, W.K.V.1    Yi, J.2    Ding, S.3
  • 15
    • 78651094962 scopus 로고    scopus 로고
    • Optimal scheduling of multicluster tools with constant robot moving times, part II: Tree-like topology configurations
    • Jan
    • W. K. V. Chan, S. Ding, J. Yi, and D. Song, "Optimal scheduling of multicluster tools with constant robot moving times, part II: Tree-like topology configurations," IEEE Trans. Autom. Sci. Eng., vol. 8, no. 1, pp. 17-28, Jan. 2011.
    • (2011) IEEE Trans. Autom. Sci. Eng. , vol.8 , Issue.1 , pp. 17-28
    • Chan, W.K.V.1    Ding, S.2    Yi, J.3    Song, D.4
  • 16
    • 54949132214 scopus 로고    scopus 로고
    • Optimal scheduling of dual-armed cluster tools without swap restriction
    • in Aug
    • J.-H. Paek and T.-E. Lee, "Optimal scheduling of dual-armed cluster tools without swap restriction," in Proc. IEEE Int. Conf. Autom. Sci. Eng., Aug. 2008, pp. 103-108.
    • (2008) Proc. IEEE Int. Conf. Autom. Sci. Eng. , pp. 103-108
    • Paek, J.-H.1    Lee, T.-E.2
  • 17
    • 84860664318 scopus 로고    scopus 로고
    • An efficient mixed integer programming model based on timed Petri nets for diverse complex cluster tool scheduling problems
    • May
    • C. Jung and T.-E. Lee, "An efficient mixed integer programming model based on timed Petri nets for diverse complex cluster tool scheduling problems," IEEE Trans. Semicond. Manuf., vol. 25, no. 2, pp. 186-199, May 2012.
    • (2012) IEEE Trans. Semicond. Manuf. , vol.25 , Issue.2 , pp. 186-199
    • Jung, C.1    Lee, T.-E.2
  • 19
    • 0035485501 scopus 로고    scopus 로고
    • An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints
    • DOI 10.1109/70.964662, PII S1042296X01094666
    • S. Rostami, B. Hamidzadeh, and D. Camporese, "An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints," IEEE Trans. Robot. Autom., vol. 17, no. 5, pp. 609-618, Oct. 2001. (Pubitemid 33137777)
    • (2001) IEEE Transactions on Robotics and Automation , vol.17 , Issue.5 , pp. 609-618
    • Rostami, S.1    Hamidzadeh, B.2    Camporese, D.3
  • 20
    • 77950864273 scopus 로고    scopus 로고
    • A closed-form solution for schedulability and optimal scheduling of dual-arm cluster tools with wafer residency time constraint based on steady schedule analysis
    • Apr
    • N. Wu and M. Zhou, "A closed-form solution for schedulability and optimal scheduling of dual-arm cluster tools with wafer residency time constraint based on steady schedule analysis," IEEE Trans. Autom. Sci. Eng., vol. 7, no. 2, pp. 303-315, Apr. 2010.
    • (2010) IEEE Trans. Autom. Sci. Eng. , vol.7 , Issue.2 , pp. 303-315
    • Wu, N.1    Zhou, M.2
  • 21
    • 77955321056 scopus 로고    scopus 로고
    • Colored timed Petri nets for modeling and analysis of cluster tools
    • N. Wu and M. Zhou, "Colored timed Petri nets for modeling and analysis of cluster tools," Asian J. Control, vol. 12, no. 3, pp. 253-266, 2010.
    • (2010) Asian J. Control , vol.12 , Issue.3 , pp. 253-266
    • Wu, N.1    Zhou, M.2
  • 22
    • 76849088211 scopus 로고    scopus 로고
    • Analysis of wafer sojourn time in dual-arm cluster tools with residency time constraint and activity time variation
    • Feb
    • N. Wu and M. Zhou, "Analysis of wafer sojourn time in dual-arm cluster tools with residency time constraint and activity time variation," IEEE Trans. Semicond. Manuf., vol. 23, no. 1, pp. 53-64, Feb. 2010.
    • (2010) IEEE Trans. Semicond. Manuf. , vol.23 , Issue.1 , pp. 53-64
    • Wu, N.1    Zhou, M.2
  • 23
    • 84855355646 scopus 로고    scopus 로고
    • Schedulability analysis and optimal scheduling of dual-arm cluster tools with residency time constraint and activity time variation
    • Jan
    • N. Wu and M. Zhou, "Schedulability analysis and optimal scheduling of dual-arm cluster tools with residency time constraint and activity time variation," IEEE Trans. Autom. Sci. Eng., vol. 9, no. 1, pp. 655-661, Jan. 2012.
    • (2012) IEEE Trans. Autom. Sci. Eng. , vol.9 , Issue.1 , pp. 655-661
    • Wu, N.1    Zhou, M.2
  • 24
    • 84859753478 scopus 로고    scopus 로고
    • Modeling, analysis and control of dual-arm cluster tools with residency time constraint and activity time variation based on Petri nets
    • Apr
    • N. Wu and M. Zhou, "Modeling, analysis and control of dual-arm cluster tools with residency time constraint and activity time variation based on Petri nets," IEEE Trans. Autom. Sci. Eng., vol. 9, no. 2, pp. 446-454, Apr. 2012.
    • (2012) IEEE Trans. Autom. Sci. Eng. , vol.9 , Issue.2 , pp. 446-454
    • Wu, N.1    Zhou, M.2
  • 25
    • 84863456306 scopus 로고    scopus 로고
    • Real-time scheduling of single-arm cluster tools subject to residency time constraints and bounded activity time variation
    • Jul
    • Y. Qiao, N. Wu, and M. Zhou, "Real-time scheduling of single-arm cluster tools subject to residency time constraints and bounded activity time variation," IEEE Trans. Autom. Sci. Eng., vol. 9, no. 3, pp. 564-577, Jul. 2012.
    • (2012) IEEE Trans. Autom. Sci. Eng. , vol.9 , Issue.3 , pp. 564-577
    • Qiao, Y.1    Wu, N.2    Zhou, M.3
  • 26
    • 27644434964 scopus 로고    scopus 로고
    • An extended event graph with negative places and tokens for time window constraints
    • DOI 10.1109/TASE.2005.851236
    • T.-E. Lee and S.-H. Park, "An extended event graph with negative places and tokens for time window constraints," IEEE Trans. Autom. Sci. Eng., vol. 2, no. 4, pp. 319-332, Oct. 2005. (Pubitemid 41560387)
    • (2005) IEEE Transactions on Automation Science and Engineering , vol.2 , Issue.4 , pp. 319-332
    • Lee, T.-E.1    Park, S.-H.2
  • 27
    • 0041384559 scopus 로고    scopus 로고
    • Scheduling analysis of time-constrained dual-armed cluster tools
    • Aug
    • J.-H. Kim, T.-E. Lee, H.-Y. Lee, and D.-B. Park, "Scheduling analysis of time-constrained dual-armed cluster tools," IEEE Trans. Semicond. Manuf., vol. 16, no. 3, pp. 521-534, Aug. 2003.
    • (2003) IEEE Trans. Semicond. Manuf. , vol.16 , Issue.3 , pp. 521-534
    • Kim, J.-H.1    Lee, T.-E.2    Lee, H.-Y.3    Park, D.-B.4
  • 28
    • 46849094532 scopus 로고    scopus 로고
    • Schedulability analysis of time-constrained cluster tools with bounded time variation by an extended Petri net
    • Jul
    • J.-H. Kim and T.-E. Lee, "Schedulability analysis of time-constrained cluster tools with bounded time variation by an extended Petri net," IEEE Trans. Autom. Sci. Eng., vol. 5, no. 3, pp. 490-503, Jul. 2008.
    • (2008) IEEE Trans. Autom. Sci. Eng. , vol.5 , Issue.3 , pp. 490-503
    • Kim, J.-H.1    Lee, T.-E.2
  • 29
    • 84864684799 scopus 로고    scopus 로고
    • Cyclic scheduling of cluster tools with nonidentical chamber access times between parallel chambers
    • Aug
    • D.-K. Kim, Y.-J. Jung, C. Jung, and T.-E. Lee, "Cyclic scheduling of cluster tools with nonidentical chamber access times between parallel chambers," IEEE Trans. Semicond. Manuf., vol. 25, no. 3, pp. 420-431, Aug. 2012.
    • (2012) IEEE Trans. Semicond. Manuf. , vol.25 , Issue.3 , pp. 420-431
    • Kim, D.-K.1    Jung, Y.-J.2    Jung, C.3    Lee, T.-E.4
  • 30
    • 4344571843 scopus 로고    scopus 로고
    • Cluster tools with chamber revisiting: Modeling and analysis using timed Petri nets
    • Aug
    • W. M. Zuberek, "Cluster tools with chamber revisiting: Modeling and analysis using timed Petri nets," IEEE Trans. Semicond. Manuf., vol. 17, no. 3, pp. 333-344, Aug. 2004.
    • (2004) IEEE Trans. Semicond. Manuf. , vol.17 , Issue.3 , pp. 333-344
    • Zuberek, W.M.1
  • 31
    • 41949134365 scopus 로고    scopus 로고
    • Steady-state throughput and scheduling analysis of multicluster tools: A decomposition approach
    • DOI 10.1109/TASE.2007.906678, 4358085
    • J. Yi, S. Ding, D. Song, and M. T. Zhang, "Steady-state throughput and scheduling analysis of multi-cluster tools: A decomposition approach," IEEE Trans. Autom. Sci. Eng., vol. 5, no. 2, pp. 321-336, Apr. 2008. (Pubitemid 351506277)
    • (2008) IEEE Transactions on Automation Science and Engineering , vol.5 , Issue.2 , pp. 321-336
    • Yi, J.1    Ding, S.2    Song, D.3    Zhang, M.T.4
  • 32
    • 78651080378 scopus 로고    scopus 로고
    • Productivity improvement from using machine buffers in dual-gripper cluster tools
    • Jan
    • N. Geismar, M. Dawande, and C. Sriskandarajah, "Productivity improvement from using machine buffers in dual-gripper cluster tools," IEEE Trans. Autom. Sci. Eng., vol. 8, no. 1, pp. 29-41, Jan. 2011.
    • (2011) IEEE Trans. Autom. Sci. Eng. , vol.8 , Issue.1 , pp. 29-41
    • Geismar, N.1    Dawande, M.2    Sriskandarajah, C.3
  • 35
    • 0028481573 scopus 로고
    • Single-wafer cluster tool performance: An analysis of throughput
    • Aug
    • T. Perkinson, P. McLarty, R. Gyurcsik, and R. Cavin, "Single-wafer cluster tool performance: An analysis of throughput," IEEE Trans. Semicond. Manuf., vol. 7, no. 3, pp. 369-373, Aug. 1994.
    • (1994) IEEE Trans. Semicond. Manuf. , vol.7 , Issue.3 , pp. 369-373
    • Perkinson, T.1    McLarty, P.2    Gyurcsik, R.3    Cavin, R.4
  • 36
    • 84855921402 scopus 로고    scopus 로고
    • A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations
    • L. Mönch, J. W. Fowler, S. Dauzère-Pérès, S. J. Mason, and O. Rose, "A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations," J. Scheduling, vol. 14, no. 6, pp. 583-599, 2011.
    • (2011) J. Scheduling , vol.14 , Issue.6 , pp. 583-599
    • Mönch, L.1    Fowler, J.W.2    Dauzère-Pérès, S.3    Mason, S.J.4    Rose, O.5
  • 37
    • 78149435135 scopus 로고    scopus 로고
    • Analysis of circular cluster tools: Transient behavior and semiconductor equipment models
    • in Aug
    • Y. Ahn and J. R. Morrison, "Analysis of circular cluster tools: Transient behavior and semiconductor equipment models," in Proc. IEEE Int. Conf. Autom. Sci. Eng., Aug. 2010, pp. 420-425.
    • (2010) Proc. IEEE Int. Conf. Autom. Sci. Eng. , pp. 420-425
    • Ahn, Y.1    Morrison, J.R.2
  • 38
    • 85023501284 scopus 로고    scopus 로고
    • Scheduling start-up and close-down periods of dual-armed cluster tools with wafer delay regulation
    • T.-K. Kim, C. Jung, and T.-E. Lee, "Scheduling start-up and close-down periods of dual-armed cluster tools with wafer delay regulation," Int. J. Prod. Res., vol. 50, no. 10, pp. 2785-2795, 2012.
    • (2012) Int. J. Prod. Res. , vol.50 , Issue.10 , pp. 2785-2795
    • Kim, T.-K.1    Jung, C.2    Lee, T.-E.3
  • 39
    • 1342287000 scopus 로고    scopus 로고
    • Deadlock-free scheduling of photolithography equipment in semiconductor fabrication
    • Feb
    • H. J. Yoon and D. Y. Lee, "Deadlock-free scheduling of photolithography equipment in semiconductor fabrication," IEEE Trans. Semicond. Manuf., vol. 17, no. 1, pp. 42-54, Feb. 2004.
    • (2004) IEEE Trans. Semicond. Manuf. , vol.17 , Issue.1 , pp. 42-54
    • Yoon, H.J.1    Lee, D.Y.2
  • 40
    • 84871811802 scopus 로고    scopus 로고
    • Scheduling cluster tools with ready time constraints for consecutive small lots
    • Jan
    • H.-J. Kim, J.-H. Lee, C. Jung, and T.-E. Lee, "Scheduling cluster tools with ready time constraints for consecutive small lots," IEEE Trans. Autom. Sci. Eng., vol. 10, no. 1, pp. 145-159, Jan. 2013.
    • (2013) IEEE Trans. Autom. Sci. Eng. , vol.10 , Issue.1 , pp. 145-159
    • Kim, H.-J.1    Lee, J.-H.2    Jung, C.3    Lee, T.-E.4
  • 41
    • 50249129439 scopus 로고    scopus 로고
    • Multiagent scheduling transient inter-production states for many cyclic productions
    • in Nov
    • O. B. Driss, O. Korbaa, K. Ghedira, and P. Yim, "Multiagent scheduling transient inter-production states for many cyclic productions," in Proc. IEEE Int. Conf. Ind. Electron., Nov. 2006, pp. 3767-3772.
    • (2006) Proc. IEEE Int. Conf. Ind. Electron. , pp. 3767-3772
    • Driss, O.B.1    Korbaa, O.2    Ghedira, K.3    Yim, P.4
  • 42
    • 80053492505 scopus 로고    scopus 로고
    • Transient inter-production scheduling based on Petri nets and constraint programming
    • T. Bourdeaudhuy, O. Belkahla, P. Yim, O. Korbaa, and K. Ghedira, "Transient inter-production scheduling based on Petri nets and constraint programming," Int. J. Prod. Res., vol. 49, no. 22, pp. 6591-6608, 2011.
    • (2011) Int. J. Prod. Res. , vol.49 , Issue.22 , pp. 6591-6608
    • Bourdeaudhuy, T.1    Belkahla, O.2    Yim, P.3    Korbaa, O.4    Ghedira, K.5
  • 43
    • 0024645936 scopus 로고
    • Petri nets: Properties, analysis and applications
    • Apr
    • T. Murata, "Petri nets: Properties, analysis and applications," Proc. IEEE, vol. 77, no. 4, pp. 541-580, Apr. 1989.
    • (1989) Proc. IEEE , vol.77 , Issue.4 , pp. 541-580
    • Murata, T.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.