메뉴 건너뛰기




Volumn 49, Issue 22, 2011, Pages 6591-6608

Transient inter-production scheduling based on Petri nets and constraint programming

Author keywords

constraint programming; cyclic scheduling; Petri nets; transient production

Indexed keywords

CONSTRAINT PROGRAMMING; CYCLIC PRODUCTION; CYCLIC SCHEDULING; DURATION TIME; FINAL STATE; REACHABILITY CONSTRAINTS; REACHABILITY PROBLEM; SCHEDULING PROBLEM; STATE EQUATIONS; TIMED PETRI NETS; TRANSITION FIRINGS;

EID: 80053492505     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2010.519113     Document Type: Review
Times cited : (6)

References (32)
  • 1
    • 34548069654 scopus 로고    scopus 로고
    • A distributed transient inter-production scheduling for flexible manufacturing systems
    • Belkahla Driss, O., et al., 2007. A distributed transient inter-production scheduling for flexible manufacturing systems. Journal Européen des Systémes Automatisés, 41 (1), 101-123.
    • (2007) Journal Européen des Systémes Automatisés , vol.41 , Issue.1 , pp. 101-123
    • Belkahla Driss, O.1
  • 7
    • 34250699118 scopus 로고    scopus 로고
    • Scheduling of flexible manufacturing systems using timed Petri nets and mathematical programming
    • Ann Arbor, Michigan, USA
    • Bourdeaud'huy, T., Hanafi, S., and Yim, P., 2006. Scheduling of flexible manufacturing systems using timed Petri nets and mathematical programming. In: International workshop on discrete event systems. Ann Arbor, Michigan, USA.
    • (2006) International Workshop on Discrete Event Systems
    • Bourdeaud'huy, T.1    Hanafi, S.2    Yim, P.3
  • 8
    • 80053520311 scopus 로고
    • Les problèmes d'ordonnancement : Un domaine très ouvert
    • Carlier, J. and Chretienne, P., 1982. Les problèmes d'ordonnancement : Un domaine très ouvert. RO-RAIRO.175-217.
    • (1982) RO-RAIRO. , pp. 175-217
    • Carlier, J.1    Chretienne, P.2
  • 13
    • 0002802279 scopus 로고
    • Periodic loading of flexible manufacturing systems
    • Bordeaux, France
    • Erschler, J., Leveque, D., and Roubellat, F., 1982. Periodic loading of flexible manufacturing systems. In: IFIP Congress, APMS, Bordeaux, France, 327-339.
    • (1982) IFIP Congress, APMS , pp. 327-339
    • Erschler, J.1    Leveque, D.2    Roubellat, F.3
  • 15
    • 0002973186 scopus 로고
    • Problèmes d'ordonnancement
    • Gotha, 1993. Problèmes d'ordonnancement. RAIRO Recherche Opérationnelle, 27 1 77-150.
    • (1993) RAIRO Recherche Opérationnelle , vol.27 , Issue.1 , pp. 77-150
    • Gotha1
  • 16
    • 0024479894 scopus 로고
    • Performance evaluation of job-shop systems using timed eventgraphs
    • Hillion, H.P. and Proth, J.-M., 1989. Performance evaluation of job-shop systems using timed eventgraphs. IEEE Transactions on Automatic Control, 34 (1), 3-9.
    • (1989) IEEE Transactions on Automatic Control , vol.34 , Issue.1 , pp. 3-9
    • Hillion, H.P.1    Proth, J.-M.2
  • 17
    • 43849104454 scopus 로고    scopus 로고
    • Genetic algorithm for FMS cyclic scheduling
    • Hsu, T., et al., 2008. Genetic algorithm for FMS cyclic scheduling. European Journal of Operational Research, 191 (2), 464-484.
    • (2008) European Journal of Operational Research , vol.191 , Issue.2 , pp. 464-484
    • Hsu, T.1
  • 22
    • 0242360157 scopus 로고    scopus 로고
    • Solving transient scheduling problems with constraint programming
    • Korbaa, O., Yim, P., and Gentina, J.-C., 2000. Solving transient scheduling problems with constraint programming. European Journal of Control (EJC), 6 (6), 511-524.
    • (2000) European Journal of Control (EJC) , vol.6 , Issue.6 , pp. 511-524
    • Korbaa, O.1    Yim, P.2    Gentina, J.-C.3
  • 24
    • 3242697916 scopus 로고    scopus 로고
    • Modeling and analysis of ratio-driven FMS using unfolding time Petri nets
    • Lee, J. and Korbaa, O., 2004. Modeling and analysis of ratio-driven FMS using unfolding time Petri nets. Computers and Industrial Engineering (CIE), 46 (4), 639-653.
    • (2004) Computers and Industrial Engineering (CIE) , vol.46 , Issue.4 , pp. 639-653
    • Lee, J.1    Korbaa, O.2
  • 25
    • 0041833805 scopus 로고
    • Résolution d'un problème d'ordonnancement cyclique àitérations indépendantes et contraintes de ressources
    • Munier, A., 1991. Résolution d'un problème d'ordonnancement cyclique àitérations indépendantes et contraintes de ressources. RO-RAIRO, 25 (2), 161-182.
    • (1991) RO-RAIRO , vol.25 , Issue.2 , pp. 161-182
    • Munier, A.1
  • 26
    • 0024645936 scopus 로고
    • Petri nets: Properties, analysis and applications
    • Murata, T., 1989. Petri nets: Properties, analysis and applications. Proceedings of the IEEE , 77 (4), 541-580.
    • (1989) Proceedings of the IEEE , vol.77 , Issue.4 , pp. 541-580
    • Murata, T.1
  • 27
    • 0029484203 scopus 로고
    • Petri net modeling of ratio-driven flexible manufacturing systems and applications on the wip for cyclic schedules
    • Vancouver, Canada
    • Ohl, H., et al., 1995. Petri net modeling of ratio-driven flexible manufacturing systems and applications on the wip for cyclic schedules. In: IEEE SMC'95. Vol. 4, Vancouver, Canada, 3081-3086.
    • (1995) IEEE SMC'95. , vol.4 , pp. 3081-3086
    • Ohl, H.1
  • 28
    • 0019058848 scopus 로고
    • Performance evaluation of asynchronous concurrent systems using petri nets
    • Ramamoorthy, C.V. and Gary, S., 1980. Performance evaluation of asynchronous concurrent systems using Petri nets. IEEE Transactions on Software Engineering, SE-6 (5), 440-449. (Pubitemid 11453640)
    • (1980) IEEE Transactions on Software Engineering , vol.SE-6 , Issue.5 , pp. 440-449
    • Ramamoorthy, C.V.1    Ho Gary, S.2
  • 30
    • 0008917539 scopus 로고
    • A mathematical model for periodic scheduling problems
    • Serafini, P. and Ukovich, W., 1989. A mathematical model for periodic scheduling problems. SIAM Journal of Discrete Mathematics, 2 (4), 550-581.
    • (1989) SIAM Journal of Discrete Mathematics , vol.2 , Issue.4 , pp. 550-581
    • Serafini, P.1    Ukovich, W.2
  • 31
    • 0008934988 scopus 로고
    • Modeling and analysis methods for a class of hybrid dynamic systems
    • Belgium
    • Valentin, C., 1994. Modeling and analysis methods for a class of hybrid dynamic systems. In: ADPM '94, Brussels, Belgium, 221-226.
    • (1994) ADPM '94, Brussels , pp. 221-226
    • Valentin, C.1
  • 32
    • 0037496858 scopus 로고
    • A CLP approach for finding a transition schedule between two cyclic mono-product productions in electroplating facilities
    • Mons, Belgium
    • Varnier, C. and Baptiste, P., 1995. A CLP approach for finding a transition schedule between two cyclic mono-product productions in electroplating facilities. In: International conference on industrial engineering and production management, Mons, Belgium. Vol. 1, 194-203.
    • (1995) International Conference on Industrial Engineering and Production Management , vol.1 , pp. 194-203
    • Varnier, C.1    Baptiste, P.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.