메뉴 건너뛰기




Volumn 248, Issue 3, 2016, Pages 744-757

Energy-efficient scheduling in manufacturing companies: A review and research framework

Author keywords

Energy efficiency; Manufacturing; Research framework; Review; Scheduling

Indexed keywords

INDUSTRIAL RESEARCH; ITERATIVE METHODS; MANUFACTURE; REVIEWS; SCHEDULING;

EID: 84945488150     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2015.07.017     Document Type: Article
Times cited : (389)

References (139)
  • 2
    • 84879548950 scopus 로고    scopus 로고
    • Unified approach for the optimization of energy and water in multipurpose batch plants using a flexible scheduling framework
    • Adekola O., Stamp J.D., Majozi T., Garg A., Bandyopadhyay S. Unified approach for the optimization of energy and water in multipurpose batch plants using a flexible scheduling framework Industrial & Engineering Chemistry Research 52 25 2013 8488 8506
    • (2013) Industrial & Engineering Chemistry Research , vol.52 , Issue.25 , pp. 8488-8506
    • Adekola, O.1    Stamp, J.D.2    Majozi, T.3    Garg, A.4    Bandyopadhyay, S.5
  • 4
    • 76449097098 scopus 로고    scopus 로고
    • Integrated production and utility system approach for optimizing industrial unit operations
    • Agha M.H., Théry R., Hetreux G., Haït A., Le Lann J.M. Integrated production and utility system approach for optimizing industrial unit operations Energy 35 2 2010 611 627
    • (2010) Energy , vol.35 , Issue.2 , pp. 611-627
    • Agha, M.H.1    Théry, R.2    Hetreux, G.3    Haït, A.4    Le Lann, J.M.5
  • 5
    • 77951770504 scopus 로고    scopus 로고
    • Energy-efficient algorithms
    • Albers S. Energy-efficient algorithms Communications of the ACM 53 5 2010 86 96
    • (2010) Communications of the ACM , vol.53 , Issue.5 , pp. 86-96
    • Albers, S.1
  • 6
    • 84876127402 scopus 로고    scopus 로고
    • The energy scheduling problem: Industrial case-study and constraint propagation techniques
    • Artigues C., Lopez P., Haït A. The energy scheduling problem: Industrial case-study and constraint propagation techniques International Journal of Production Economics 143 1 2013 13 23
    • (2013) International Journal of Production Economics , vol.143 , Issue.1 , pp. 13-23
    • Artigues, C.1    Lopez, P.2    Haït, A.3
  • 7
    • 33644518668 scopus 로고    scopus 로고
    • Peak-load management in steel plants
    • Ashok S. Peak-load management in steel plants Applied Energy 83 5 2006 413 424
    • (2006) Applied Energy , vol.83 , Issue.5 , pp. 413-424
    • Ashok, S.1
  • 8
    • 43849094641 scopus 로고    scopus 로고
    • Peak load management in electrolytic process industries
    • Babu C., Ashok S. Peak load management in electrolytic process industries IEEE Transactions on Power Systems 23 2 2008 399 405
    • (2008) IEEE Transactions on Power Systems , vol.23 , Issue.2 , pp. 399-405
    • Babu, C.1    Ashok, S.2
  • 9
    • 84897473695 scopus 로고    scopus 로고
    • Identification of reservation capacity in critical peak pricing electricity demand response program for sustainable manufacturing systems
    • Bego A., Li L., Sun Z. Identification of reservation capacity in critical peak pricing electricity demand response program for sustainable manufacturing systems International Journal of Energy Research 38 6 2014 728 736
    • (2014) International Journal of Energy Research , vol.38 , Issue.6 , pp. 728-736
    • Bego, A.1    Li, L.2    Sun, Z.3
  • 11
    • 0005022772 scopus 로고
    • Hierarchical approach to steel production scheduling under a global energy constraint
    • Boukas E.-K., Haurie A., Soumis F. Hierarchical approach to steel production scheduling under a global energy constraint Annals of Operations Research 26 1-4 1990 289 311
    • (1990) Annals of Operations Research , vol.26 , Issue.1-4 , pp. 289-311
    • Boukas, E.-K.1    Haurie, A.2    Soumis, F.3
  • 14
    • 84861589845 scopus 로고    scopus 로고
    • Energy-aware scheduling for improving manufacturing process sustainability: A mathematical model for flexible flow shops
    • Bruzzone A.A., Anghinolfi D., Paolucci M., Tonelli F. Energy-aware scheduling for improving manufacturing process sustainability: A mathematical model for flexible flow shops CIRP Annals - Manufacturing Technology 61 1 2012 459 462
    • (2012) CIRP Annals - Manufacturing Technology , vol.61 , Issue.1 , pp. 459-462
    • Bruzzone, A.A.1    Anghinolfi, D.2    Paolucci, M.3    Tonelli, F.4
  • 15
    • 79954585196 scopus 로고    scopus 로고
    • Multiobjective optimization of multiproduct batch plants scheduling under environmental and economic concerns
    • Capón García E., Bojarski A.D., Espuña A., Puigjaner L. Multiobjective optimization of multiproduct batch plants scheduling under environmental and economic concerns AIChE Journal 57 10 2011 2766 2782
    • (2011) AIChE Journal , vol.57 , Issue.10 , pp. 2766-2782
    • Capón García, E.1    Bojarski, A.D.2    Espuña, A.3    Puigjaner, L.4
  • 17
    • 67849109965 scopus 로고    scopus 로고
    • New continuous-time scheduling formulation for continuous plants under variable electricity cost
    • Castro P.M., Harjunkoski I., Grossmann I.E. New continuous-time scheduling formulation for continuous plants under variable electricity cost Industrial & Engineering Chemistry Research 48 14 2009 6701 6714
    • (2009) Industrial & Engineering Chemistry Research , vol.48 , Issue.14 , pp. 6701-6714
    • Castro, P.M.1    Harjunkoski, I.2    Grossmann, I.E.3
  • 19
    • 84884177657 scopus 로고    scopus 로고
    • Resource-task network formulations for industrial demand side management of a steel plant
    • Castro P.M., Sun L., Harjunkoski I. Resource-task network formulations for industrial demand side management of a steel plant Industrial & Engineering Chemistry Research 52 36 2013 13046 13058
    • (2013) Industrial & Engineering Chemistry Research , vol.52 , Issue.36 , pp. 13046-13058
    • Castro, P.M.1    Sun, L.2    Harjunkoski, I.3
  • 20
    • 58549097449 scopus 로고    scopus 로고
    • A resource-task network approach for optimal short-term/periodic scheduling and heat integration in multipurpose batch plants
    • Chen C.-L., Chang C.-Y. A resource-task network approach for optimal short-term/periodic scheduling and heat integration in multipurpose batch plants Applied Thermal Engineering 29 5 2009 1195 1208
    • (2009) Applied Thermal Engineering , vol.29 , Issue.5 , pp. 1195-1208
    • Chen, C.-L.1    Chang, C.-Y.2
  • 22
    • 84890568493 scopus 로고    scopus 로고
    • Sustainable manufacturing and the role of the International Journal of Production Research
    • Chun Y., Bidanda B. Sustainable manufacturing and the role of the International Journal of Production Research International Journal of Production Research 51 23-24 2013 7448 7455
    • (2013) International Journal of Production Research , vol.51 , Issue.23-24 , pp. 7448-7455
    • Chun, Y.1    Bidanda, B.2
  • 23
    • 0003140320 scopus 로고
    • Organizing knowledge syntheses: A taxonomy of literature reviews
    • Cooper H.M. Organizing knowledge syntheses: A taxonomy of literature reviews Knowledge in Society 1 1 1988 104 126
    • (1988) Knowledge in Society , vol.1 , Issue.1 , pp. 104-126
    • Cooper, H.M.1
  • 25
    • 84878535815 scopus 로고    scopus 로고
    • Energy-efficient scheduling for a flexible flow shop using an improved genetic-simulated annealing algorithm
    • Dai M., Tang D., Giret A., Salido M.A., Li W.D. Energy-efficient scheduling for a flexible flow shop using an improved genetic-simulated annealing algorithm Robotics and Computer-Integrated Manufacturing 29 5 2013 418 429
    • (2013) Robotics and Computer-Integrated Manufacturing , vol.29 , Issue.5 , pp. 418-429
    • Dai, M.1    Tang, D.2    Giret, A.3    Salido, M.A.4    Li, W.D.5
  • 26
    • 84857914514 scopus 로고    scopus 로고
    • Operations Research for green logistics - An overview of aspects, issues, contributions and challenges
    • Dekker R., Bloemhof J., Mallidis I. Operations Research for green logistics - An overview of aspects, issues, contributions and challenges European Journal of Operational Research 219 3 2012 671 679
    • (2012) European Journal of Operational Research , vol.219 , Issue.3 , pp. 671-679
    • Dekker, R.1    Bloemhof, J.2    Mallidis, I.3
  • 27
    • 77957738463 scopus 로고    scopus 로고
    • A generic energy consumption model for decision making and energy efficiency optimisation in manufacturing
    • Dietmair A., Verl A. A generic energy consumption model for decision making and energy efficiency optimisation in manufacturing International Journal of Sustainable Engineering 2 2 2009 123 133
    • (2009) International Journal of Sustainable Engineering , vol.2 , Issue.2 , pp. 123-133
    • Dietmair, A.1    Verl, A.2
  • 31
    • 78651278915 scopus 로고    scopus 로고
    • Efficient control for a multi-product quasi-batch process via stochastic dynamic programming
    • Eren E.C., Gautam N. Efficient control for a multi-product quasi-batch process via stochastic dynamic programming IIE Transactions 43 3 2011 192 206
    • (2011) IIE Transactions , vol.43 , Issue.3 , pp. 192-206
    • Eren, E.C.1    Gautam, N.2
  • 32
    • 33846215982 scopus 로고    scopus 로고
    • Publications Office of the European Union Luxembourg
    • Eurostat Europe in figures: Eurostat yearbook 2012 2012 Publications Office of the European Union Luxembourg
    • (2012) Europe in Figures: Eurostat Yearbook 2012
  • 33
    • 80054680608 scopus 로고    scopus 로고
    • A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction
    • Fang K., Uhan N.A., Zhao F., Sutherland J.W. A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction Journal of Manufacturing Systems 30 4 2011 234 240
    • (2011) Journal of Manufacturing Systems , vol.30 , Issue.4 , pp. 234-240
    • Fang, K.1    Uhan, N.A.2    Zhao, F.3    Sutherland, J.W.4
  • 35
    • 84869106299 scopus 로고    scopus 로고
    • Parallel-machine scheduling to minimize tardiness penalty and power cost
    • Fang K.-T., Lin B.M.T. Parallel-machine scheduling to minimize tardiness penalty and power cost Computers & Industrial Engineering 64 1 2013 224 234
    • (2013) Computers & Industrial Engineering , vol.64 , Issue.1 , pp. 224-234
    • Fang, K.-T.1    Lin, B.M.T.2
  • 36
    • 84885187845 scopus 로고    scopus 로고
    • "just-for-Peak" buffer inventory for peak electricity demand reduction of manufacturing systems
    • Fernandez M., Li L., Sun Z. "Just-for-Peak" buffer inventory for peak electricity demand reduction of manufacturing systems International Journal of Production Economics 146 1 2013 178 184
    • (2013) International Journal of Production Economics , vol.146 , Issue.1 , pp. 178-184
    • Fernandez, M.1    Li, L.2    Sun, Z.3
  • 39
    • 84856555735 scopus 로고    scopus 로고
    • Sustainable manufacturing: Trends and research challenges
    • Garetti M., Taisch M. Sustainable manufacturing: Trends and research challenges Production Planning & Control 23 2-3 2012 83 104
    • (2012) Production Planning & Control , vol.23 , Issue.2-3 , pp. 83-104
    • Garetti, M.1    Taisch, M.2
  • 40
    • 0035502177 scopus 로고    scopus 로고
    • Optimal scheduling of heat-integrated multipurpose plants under fouling conditions
    • Georgiadis M.C., Papageorgiou L.G. Optimal scheduling of heat-integrated multipurpose plants under fouling conditions Applied Thermal Engineering 21 16 2001 1675 1697
    • (2001) Applied Thermal Engineering , vol.21 , Issue.16 , pp. 1675-1697
    • Georgiadis, M.C.1    Papageorgiou, L.G.2
  • 42
    • 0030174722 scopus 로고    scopus 로고
    • Global strategy for energy and waste analysis in scheduling and planning of multiproduct batch chemical processes
    • Grau R., Graells M., Corominas J., Espuña A., Puigjaner L. Global strategy for energy and waste analysis in scheduling and planning of multiproduct batch chemical processes Computers & Chemical Engineering 20 6 1996 853 868
    • (1996) Computers & Chemical Engineering , vol.20 , Issue.6 , pp. 853-868
    • Grau, R.1    Graells, M.2    Corominas, J.3    Espuña, A.4    Puigjaner, L.5
  • 44
    • 84879024245 scopus 로고    scopus 로고
    • Continuous-time batch scheduling approach for optimizing electricity consumption cost
    • Hadera H., Harjunkoski I. Continuous-time batch scheduling approach for optimizing electricity consumption cost Computer Aided Chemical Engineering 32 2013 403 408
    • (2013) Computer Aided Chemical Engineering , vol.32 , pp. 403-408
    • Hadera, H.1    Harjunkoski, I.2
  • 46
    • 80053911225 scopus 로고    scopus 로고
    • On electrical load tracking scheduling for a steel plant
    • Haït A., Artigues C. On electrical load tracking scheduling for a steel plant Computers & Chemical Engineering 35 12 2011 3044 3047
    • (2011) Computers & Chemical Engineering , vol.35 , Issue.12 , pp. 3044-3047
    • Haït, A.1    Artigues, C.2
  • 47
    • 70349316833 scopus 로고    scopus 로고
    • Sequential methodology for scheduling of heat-integrated batch plants
    • Halim I., Srinivasan R. Sequential methodology for scheduling of heat-integrated batch plants Industrial & Engineering Chemistry Research 48 18 2009 8551 8565
    • (2009) Industrial & Engineering Chemistry Research , vol.48 , Issue.18 , pp. 8551-8565
    • Halim, I.1    Srinivasan, R.2
  • 48
    • 79960565026 scopus 로고    scopus 로고
    • Sequential methodology for integrated optimization of energy and water use during batch process scheduling
    • Halim I., Srinivasan R. Sequential methodology for integrated optimization of energy and water use during batch process scheduling Computers & Chemical Engineering 35 8 2011 1575 1597
    • (2011) Computers & Chemical Engineering , vol.35 , Issue.8 , pp. 1575-1597
    • Halim, I.1    Srinivasan, R.2
  • 49
    • 84925331852 scopus 로고    scopus 로고
    • An energy-responsive optimization method for machine tool selection and operation sequence in flexible machining job shops
    • He Y., Li Y., Wu T., Sutherland J.W. An energy-responsive optimization method for machine tool selection and operation sequence in flexible machining job shops Journal of Cleaner Production 87 2014 245 254
    • (2014) Journal of Cleaner Production , vol.87 , pp. 245-254
    • He, Y.1    Li, Y.2    Wu, T.3    Sutherland, J.W.4
  • 50
    • 82055191581 scopus 로고    scopus 로고
    • A modeling method of task-oriented energy consumption for machining manufacturing system
    • He Y., Liu B., Zhang X., Gao H., Liu X. A modeling method of task-oriented energy consumption for machining manufacturing system Journal of Cleaner Production 23 1 2012 167 174
    • (2012) Journal of Cleaner Production , vol.23 , Issue.1 , pp. 167-174
    • He, Y.1    Liu, B.2    Zhang, X.3    Gao, H.4    Liu, X.5
  • 51
    • 77956328789 scopus 로고    scopus 로고
    • Methods for integrating energy consumption and environmental impact considerations into the production operation of machining processes
    • He Y., Liu F. Methods for integrating energy consumption and environmental impact considerations into the production operation of machining processes Chinese Journal of Mechanical Engineering 23 4 2010 428 436
    • (2010) Chinese Journal of Mechanical Engineering , vol.23 , Issue.4 , pp. 428-436
    • He, Y.1    Liu, F.2
  • 52
    • 0026203180 scopus 로고
    • Single machine scheduling problem with a common deadline and resource dependent release dates
    • Janiak A. Single machine scheduling problem with a common deadline and resource dependent release dates European Journal of Operational Research 53 3 1991 317 325
    • (1991) European Journal of Operational Research , vol.53 , Issue.3 , pp. 317-325
    • Janiak, A.1
  • 53
    • 84861047212 scopus 로고    scopus 로고
    • Impact of sustainable manufacturing practices on consumer perception and revenue growth: An emerging economy perspective
    • Jayaraman V., Singh R., Anandnarayan A. Impact of sustainable manufacturing practices on consumer perception and revenue growth: An emerging economy perspective International Journal of Production Research 50 5 2012 1395 1410
    • (2012) International Journal of Production Research , vol.50 , Issue.5 , pp. 1395-1410
    • Jayaraman, V.1    Singh, R.2    Anandnarayan, A.3
  • 54
    • 84881156644 scopus 로고    scopus 로고
    • Minimizing resource consumption on uniform parallel machines with a bound on makespan
    • Ji M., Wang J.-Y., Lee W.-C. Minimizing resource consumption on uniform parallel machines with a bound on makespan Computers & Operations Research 40 12 2013 2970 2974
    • (2013) Computers & Operations Research , vol.40 , Issue.12 , pp. 2970-2974
    • Ji, M.1    Wang, J.-Y.2    Lee, W.-C.3
  • 56
    • 0442264226 scopus 로고    scopus 로고
    • Planning and scheduling in the process industry
    • Kallrath J. Planning and scheduling in the process industry OR Spectrum 24 3 2002 219 250
    • (2002) OR Spectrum , vol.24 , Issue.3 , pp. 219-250
    • Kallrath, J.1
  • 59
    • 0027545176 scopus 로고
    • A general algorithm for short-term scheduling of batch operations - I. MILP formulation
    • Kondili E., Pantelides C.C., Sargent R. A general algorithm for short-term scheduling of batch operations - I. MILP formulation Computers & Chemical Engineering 17 2 1993 211 227
    • (1993) Computers & Chemical Engineering , vol.17 , Issue.2 , pp. 211-227
    • Kondili, E.1    Pantelides, C.C.2    Sargent, R.3
  • 60
    • 0027676050 scopus 로고
    • Production planning for the rational use of energy in multiproduct continuous plants
    • Kondili E., Shah N., Pantelides C.C. Production planning for the rational use of energy in multiproduct continuous plants Computers & Chemical Engineering 17 Suppl. 1 1993 123 128
    • (1993) Computers & Chemical Engineering , vol.17 , pp. 123-128
    • Kondili, E.1    Shah, N.2    Pantelides, C.C.3
  • 62
  • 63
    • 84885180584 scopus 로고    scopus 로고
    • Fast reactive scheduling to minimize tardiness penalty and energy cost under power consumption uncertainties
    • Le C.V., Pang C.K. Fast reactive scheduling to minimize tardiness penalty and energy cost under power consumption uncertainties Computers & Industrial Engineering 66 2 2013 406 417
    • (2013) Computers & Industrial Engineering , vol.66 , Issue.2 , pp. 406-417
    • Le, C.V.1    Pang, C.K.2
  • 64
    • 0029359084 scopus 로고
    • Optimal scheduling of cyclic batch processes for heat integration - I. Basic formulation
    • Lee B., Reklaitis G. Optimal scheduling of cyclic batch processes for heat integration - I. Basic formulation Computers & Chemical Engineering 19 8 1995 883 905
    • (1995) Computers & Chemical Engineering , vol.19 , Issue.8 , pp. 883-905
    • Lee, B.1    Reklaitis, G.2
  • 65
    • 84915748713 scopus 로고    scopus 로고
    • An effective neighborhood search for scheduling in dual-resource constrained interval job shop with environmental objective
    • Lei D., Guo X. An effective neighborhood search for scheduling in dual-resource constrained interval job shop with environmental objective International Journal of Production Economics 159 2015 296 303
    • (2015) International Journal of Production Economics , vol.159 , pp. 296-303
    • Lei, D.1    Guo, X.2
  • 66
    • 84892367623 scopus 로고    scopus 로고
    • A framework for characterising energy consumption of machining manufacturing systems
    • Li Y., He Y., Wang Y., Yan P., Liu X. A framework for characterising energy consumption of machining manufacturing systems International Journal of Production Research 52 2 2014 314 325
    • (2014) International Journal of Production Research , vol.52 , Issue.2 , pp. 314-325
    • Li, Y.1    He, Y.2    Wang, Y.3    Yan, P.4    Liu, X.5
  • 68
    • 84938209207 scopus 로고    scopus 로고
    • Production planning of multi-stage multi-option seru production systems with sustainable measures
    • press
    • Liu C., Dang F., Li W., Lian J., Evans S., Yin Y. Production planning of multi-stage multi-option seru production systems with sustainable measures Journal of Cleaner Production 2014 10.1016/j.jclepro.2014.03.033 in press
    • (2014) Journal of Cleaner Production
    • Liu, C.1    Dang, F.2    Li, W.3    Lian, J.4    Evans, S.5    Yin, Y.6
  • 69
    • 84922368522 scopus 로고    scopus 로고
    • Sustainable performance oriented operational decision-making of single machine systems with deterministic product arrival time
    • Liu C., Yang J., Lian J., Li W., Evans S., Yin Y. Sustainable performance oriented operational decision-making of single machine systems with deterministic product arrival time Journal of Cleaner Production 85 2014 318 330
    • (2014) Journal of Cleaner Production , vol.85 , pp. 318-330
    • Liu, C.1    Yang, J.2    Lian, J.3    Li, W.4    Evans, S.5    Yin, Y.6
  • 70
    • 81055140309 scopus 로고    scopus 로고
    • Integration of electroplating process design and operation for simultaneous productivity maximization, energy saving, and freshwater minimization
    • Liu C., Zhao C., Xu Q. Integration of electroplating process design and operation for simultaneous productivity maximization, energy saving, and freshwater minimization Chemical Engineering Science 68 1 2012 202 214
    • (2012) Chemical Engineering Science , vol.68 , Issue.1 , pp. 202-214
    • Liu, C.1    Zhao, C.2    Xu, Q.3
  • 71
    • 84892366845 scopus 로고    scopus 로고
    • Reduction of power consumption and carbon footprints by applying multi-objective optimisation via genetic algorithms
    • Liu C.-H., Huang D.-H. Reduction of power consumption and carbon footprints by applying multi-objective optimisation via genetic algorithms International Journal of Production Research 52 2 2014 337 352
    • (2014) International Journal of Production Research , vol.52 , Issue.2 , pp. 337-352
    • Liu, C.-H.1    Huang, D.-H.2
  • 72
    • 79960662362 scopus 로고    scopus 로고
    • State-of-the-art sustainability analysis methodologies for efficient decision support in green production operations
    • Liu S., Leat M., Smith M.H. State-of-the-art sustainability analysis methodologies for efficient decision support in green production operations International Journal of Sustainable Engineering 4 3 2011 236 250
    • (2011) International Journal of Sustainable Engineering , vol.4 , Issue.3 , pp. 236-250
    • Liu, S.1    Leat, M.2    Smith, M.H.3
  • 73
    • 84893758734 scopus 로고    scopus 로고
    • An investigation into minimising total energy consumption and total weighted tardiness in job shops
    • Liu Y., Dong H., Lohse N., Petrovic S., Gindy N. An investigation into minimising total energy consumption and total weighted tardiness in job shops Journal of Cleaner Production 65 2014 87 96
    • (2014) Journal of Cleaner Production , vol.65 , pp. 87-96
    • Liu, Y.1    Dong, H.2    Lohse, N.3    Petrovic, S.4    Gindy, N.5
  • 75
    • 33645139809 scopus 로고    scopus 로고
    • Heat integration of multipurpose batch plants using a continuous-time framework
    • Majozi T. Heat integration of multipurpose batch plants using a continuous-time framework Applied Thermal Engineering 26 13 2006 1369 1377
    • (2006) Applied Thermal Engineering , vol.26 , Issue.13 , pp. 1369-1377
    • Majozi, T.1
  • 76
    • 64549156059 scopus 로고    scopus 로고
    • Minimization of energy use in multipurpose batch plants using heat storage: An aspect of cleaner production
    • Majozi T. Minimization of energy use in multipurpose batch plants using heat storage: An aspect of cleaner production Journal of Cleaner Production 17 10 2009 945 950
    • (2009) Journal of Cleaner Production , vol.17 , Issue.10 , pp. 945-950
    • Majozi, T.1
  • 78
    • 84871945269 scopus 로고    scopus 로고
    • Energy reduction in a pallet-constrained flow shop through on-off control of idle machines
    • Mashaei M., Lennartson B. Energy reduction in a pallet-constrained flow shop through on-off control of idle machines IEEE Transactions on Automation Science and Engineering 10 1 2013 45 56
    • (2013) IEEE Transactions on Automation Science and Engineering , vol.10 , Issue.1 , pp. 45-56
    • Mashaei, M.1    Lennartson, B.2
  • 79
    • 84896389193 scopus 로고    scopus 로고
    • Hierarchical scheduling of continuous casters and hot strip mills in the steel industry: A block planning application
    • Mattik I., Amorim P., Günther H.-O. Hierarchical scheduling of continuous casters and hot strip mills in the steel industry: A block planning application International Journal of Production Research 52 9 2014 2576 2591
    • (2014) International Journal of Production Research , vol.52 , Issue.9 , pp. 2576-2591
    • Mattik, I.1    Amorim, P.2    Günther, H.-O.3
  • 83
    • 0027676045 scopus 로고
    • Using batches for modeling and optimizing the brewhouses of an industrial brewery
    • Mignon D., Hermia J. Using batches for modeling and optimizing the brewhouses of an industrial brewery Computers & Chemical Engineering 17 Supplement 1 1993 51 56
    • (1993) Computers & Chemical Engineering , vol.17 , Issue.SUPPLEMENT 1 , pp. 51-56
    • Mignon, D.1    Hermia, J.2
  • 84
    • 0030106674 scopus 로고    scopus 로고
    • Peak utility load reduction in batch processes operated periodically and under uncertainty
    • Mignon D., Hermia J. Peak utility load reduction in batch processes operated periodically and under uncertainty Computers & Chemical Engineering 20 3 1996 249 263
    • (1996) Computers & Chemical Engineering , vol.20 , Issue.3 , pp. 249-263
    • Mignon, D.1    Hermia, J.2
  • 85
    • 84857444866 scopus 로고    scopus 로고
    • Optimal production planning under time-sensitive electricity prices for continuous power-intensive processes
    • Mitra S., Grossmann I.E., Pinto J.M., Arora N. Optimal production planning under time-sensitive electricity prices for continuous power-intensive processes Computers & Chemical Engineering 38 2012 171 184
    • (2012) Computers & Chemical Engineering , vol.38 , pp. 171-184
    • Mitra, S.1    Grossmann, I.E.2    Pinto, J.M.3    Arora, N.4
  • 86
    • 84902783012 scopus 로고    scopus 로고
    • Smart production scheduling with time-dependent and machine-dependent electricity cost by considering distributed energy resources and energy storage
    • Moon J.-Y., Park J. Smart production scheduling with time-dependent and machine-dependent electricity cost by considering distributed energy resources and energy storage International Journal of Production Research 52 13 2014 3922 3939
    • (2014) International Journal of Production Research , vol.52 , Issue.13 , pp. 3922-3939
    • Moon, J.-Y.1    Park, J.2
  • 87
    • 84888317190 scopus 로고    scopus 로고
    • Optimization of production scheduling with time-dependent and machine-dependent electricity cost for industrial energy efficiency
    • Moon J.-Y., Shin K., Park J. Optimization of production scheduling with time-dependent and machine-dependent electricity cost for industrial energy efficiency The International Journal of Advanced Manufacturing Technology 68 1-4 2013 523 535
    • (2013) The International Journal of Advanced Manufacturing Technology , vol.68 , Issue.1-4 , pp. 523-535
    • Moon, J.-Y.1    Shin, K.2    Park, J.3
  • 88
    • 78650636006 scopus 로고    scopus 로고
    • A framework to minimise total energy consumption and total tardiness on a single machine
    • Mouzon G., Yildirim M.B. A framework to minimise total energy consumption and total tardiness on a single machine International Journal of Sustainable Engineering 1 2 2008 105 116
    • (2008) International Journal of Sustainable Engineering , vol.1 , Issue.2 , pp. 105-116
    • Mouzon, G.1    Yildirim, M.B.2
  • 89
    • 34548395445 scopus 로고    scopus 로고
    • Operational methods for minimization of energy consumption of manufacturing equipment
    • Mouzon G., Yildirim M.B., Twomey J. Operational methods for minimization of energy consumption of manufacturing equipment International Journal of Production Research 45 18-19 2007 4247 4271
    • (2007) International Journal of Production Research , vol.45 , Issue.18-19 , pp. 4247-4271
    • Mouzon, G.1    Yildirim, M.B.2    Twomey, J.3
  • 91
    • 84861806590 scopus 로고    scopus 로고
    • Optimal design of sustainable chemical processes and supply chains: A review
    • Nikolopoulou A., Ierapetritou M.G. Optimal design of sustainable chemical processes and supply chains: A review Computers & Chemical Engineering 44 2012 94 103
    • (2012) Computers & Chemical Engineering , vol.44 , pp. 94-103
    • Nikolopoulou, A.1    Ierapetritou, M.G.2
  • 92
    • 0027553763 scopus 로고
    • Industrial production planning with optimal electricity cost
    • Nilsson K. Industrial production planning with optimal electricity cost Energy Conversion and Management 34 3 1993 153 158
    • (1993) Energy Conversion and Management , vol.34 , Issue.3 , pp. 153-158
    • Nilsson, K.1
  • 93
    • 0027787178 scopus 로고
    • Industrial applications of production planning with optimal electricity demand
    • Nilsson K., Söderström M. Industrial applications of production planning with optimal electricity demand Applied Energy 46 2 1993 181 192
    • (1993) Applied Energy , vol.46 , Issue.2 , pp. 181-192
    • Nilsson, K.1    Söderström, M.2
  • 94
    • 77956872862 scopus 로고    scopus 로고
    • Electrical load tracking scheduling of a steel plant
    • Nolde K., Morari M. Electrical load tracking scheduling of a steel plant Computers & Chemical Engineering 34 11 2010 1899 1903
    • (2010) Computers & Chemical Engineering , vol.34 , Issue.11 , pp. 1899-1903
    • Nolde, K.1    Morari, M.2
  • 95
    • 0032785140 scopus 로고    scopus 로고
    • A hierarchical planning system for energy intensive production environments
    • Özdamar L., Birbil Ş.I. A hierarchical planning system for energy intensive production environments International Journal of Production Economics 58 2 1999 115 129
    • (1999) International Journal of Production Economics , vol.58 , Issue.2 , pp. 115-129
    • Özdamar, L.1    Birbil, S.I.A.2
  • 96
    • 84896315442 scopus 로고    scopus 로고
    • Reactive and energy-aware scheduling of flexible manufacturing systems using potential fields
    • Pach C., Berger T., Sallez Y., Bonte T., Adam E., Trentesaux D. Reactive and energy-aware scheduling of flexible manufacturing systems using potential fields Computers in Industry 65 3 2014 434 448
    • (2014) Computers in Industry , vol.65 , Issue.3 , pp. 434-448
    • Pach, C.1    Berger, T.2    Sallez, Y.3    Bonte, T.4    Adam, E.5    Trentesaux, D.6
  • 99
    • 0030135572 scopus 로고    scopus 로고
    • What is energy efficiency?
    • Patterson M.G. What is energy efficiency? Energy Policy 24 5 1996 377 390
    • (1996) Energy Policy , vol.24 , Issue.5 , pp. 377-390
    • Patterson, M.G.1
  • 100
    • 84895062696 scopus 로고    scopus 로고
    • A holistic approach to achieving energy efficiency for interoperable machining systems
    • Peng T., Xu X. A holistic approach to achieving energy efficiency for interoperable machining systems International Journal of Sustainable Engineering 7 2 2013 111 129
    • (2013) International Journal of Sustainable Engineering , vol.7 , Issue.2 , pp. 111-129
    • Peng, T.1    Xu, X.2
  • 102
    • 53649104796 scopus 로고    scopus 로고
    • Sustainable production technologies which take into account environmental constraints
    • Radulescu M., Rədulescu S., Radulescu C.Z. Sustainable production technologies which take into account environmental constraints European Journal of Operational Research 193 3 2009 730 740
    • (2009) European Journal of Operational Research , vol.193 , Issue.3 , pp. 730-740
    • Radulescu, M.1    Rədulescu, S.2    Radulescu, C.Z.3
  • 103
    • 84913601353 scopus 로고    scopus 로고
    • Energy-oriented scheduling based on Evolutionary Algorithms
    • Rager M., Gahm C., Denz F. Energy-oriented scheduling based on Evolutionary Algorithms Computers & Operations Research 54 2014 218 231
    • (2014) Computers & Operations Research , vol.54 , pp. 218-231
    • Rager, M.1    Gahm, C.2    Denz, F.3
  • 104
    • 0036758707 scopus 로고    scopus 로고
    • Achieving environmental and productivity improvements through model-based process redesign
    • Rajaram K., Corbett C.J. Achieving environmental and productivity improvements through model-based process redesign Operations Research 50 2 2002 751 763
    • (2002) Operations Research , vol.50 , Issue.2 , pp. 751-763
    • Rajaram, K.1    Corbett, C.J.2
  • 105
    • 83955161111 scopus 로고    scopus 로고
    • Power-aware scheduling of preemptable jobs on identical parallel processors to meet deadlines
    • Rózycki R., Węglarz J. Power-aware scheduling of preemptable jobs on identical parallel processors to meet deadlines European Journal of Operational Research 218 1 2012 68 75
    • (2012) European Journal of Operational Research , vol.218 , Issue.1 , pp. 68-75
    • Rózycki, R.1    Węglarz, J.2
  • 107
    • 84902543815 scopus 로고    scopus 로고
    • Heat integration in multipurpose batch plants using a robust scheduling framework
    • Seid E.R., Majozi T. Heat integration in multipurpose batch plants using a robust scheduling framework Energy 71 2014 302 320
    • (2014) Energy , vol.71 , pp. 302-320
    • Seid, E.R.1    Majozi, T.2
  • 108
    • 84897009770 scopus 로고    scopus 로고
    • Optimization of energy and water use in multipurpose batch plants using an improved mathematical formulation
    • Seid E.R., Majozi T. Optimization of energy and water use in multipurpose batch plants using an improved mathematical formulation Chemical Engineering Science 111 2014 335 349
    • (2014) Chemical Engineering Science , vol.111 , pp. 335-349
    • Seid, E.R.1    Majozi, T.2
  • 110
    • 47649115146 scopus 로고    scopus 로고
    • From a literature review to a conceptual framework for sustainable supply chain management
    • Seuring S., Müller M. From a literature review to a conceptual framework for sustainable supply chain management Journal of Cleaner Production 16 15 2008 1699 1710
    • (2008) Journal of Cleaner Production , vol.16 , Issue.15 , pp. 1699-1710
    • Seuring, S.1    Müller, M.2
  • 112
    • 77957730064 scopus 로고    scopus 로고
    • Using simulation for more sustainable production systems - Methodologies and case studies
    • Solding P., Petku D., Mardan N. Using simulation for more sustainable production systems - methodologies and case studies International Journal of Sustainable Engineering 2 2 2009 111 122
    • (2009) International Journal of Sustainable Engineering , vol.2 , Issue.2 , pp. 111-122
    • Solding, P.1    Petku, D.2    Mardan, N.3
  • 113
    • 27644439216 scopus 로고    scopus 로고
    • Scheduling issues for environmentally responsible manufacturing: The case of hoist scheduling in an electroplating line
    • Subaï C., Baptiste P., Niel E. Scheduling issues for environmentally responsible manufacturing: The case of hoist scheduling in an electroplating line International Journal of Production Economics 99 1-2 2006 74 87
    • (2006) International Journal of Production Economics , vol.99 , Issue.1-2 , pp. 74-87
    • Subaï, C.1    Baptiste, P.2    Niel, E.3
  • 114
    • 84893817036 scopus 로고    scopus 로고
    • Potential capability estimation for real time electricity demand response of sustainable manufacturing systems using Markov Decision Process
    • Sun Z., Li L. Potential capability estimation for real time electricity demand response of sustainable manufacturing systems using Markov Decision Process Journal of Cleaner Production 65 2014 184 193
    • (2014) Journal of Cleaner Production , vol.65 , pp. 184-193
    • Sun, Z.1    Li, L.2
  • 115
    • 84905924678 scopus 로고    scopus 로고
    • Inventory control for peak electricity demand reduction of manufacturing systems considering the tradeoff between production loss and energy savings
    • Sun Z., Li L., Fernandez M., Wang J. Inventory control for peak electricity demand reduction of manufacturing systems considering the tradeoff between production loss and energy savings Journal of Cleaner Production 82 2014 84 93
    • (2014) Journal of Cleaner Production , vol.82 , pp. 84-93
    • Sun, Z.1    Li, L.2    Fernandez, M.3    Wang, J.4
  • 116
    • 84892918258 scopus 로고    scopus 로고
    • Models and optimisation approaches for scheduling steelmaking-refining-continuous casting production under variable electricity price
    • Tan Y., Liu S. Models and optimisation approaches for scheduling steelmaking-refining-continuous casting production under variable electricity price International Journal of Production Research 52 4 2014 1032 1049
    • (2014) International Journal of Production Research , vol.52 , Issue.4 , pp. 1032-1049
    • Tan, Y.1    Liu, S.2
  • 117
    • 84882564990 scopus 로고    scopus 로고
    • Two-stage mathematical programming approach for steelmaking process scheduling under variable electricity price
    • Tan Y.-y., Huang Y.-l., Liu S.-x. Two-stage mathematical programming approach for steelmaking process scheduling under variable electricity price International Journal of Iron and Steel Research 20 7 2013 1 8
    • (2013) International Journal of Iron and Steel Research , vol.20 , Issue.7 , pp. 1-8
    • Tan, Y.-Y.1    Huang, Y.-L.2    Liu, S.-X.3
  • 118
    • 84855552610 scopus 로고    scopus 로고
    • A stochastic production planning problem with nonlinear cost
    • Tang L., Che P., Liu J. A stochastic production planning problem with nonlinear cost Computers & Operations Research 39 9 2012 1977 1987
    • (2012) Computers & Operations Research , vol.39 , Issue.9 , pp. 1977-1987
    • Tang, L.1    Che, P.2    Liu, J.3
  • 119
    • 84859950122 scopus 로고    scopus 로고
    • The extended resource task network: A framework for the combined scheduling of batch processes and CHP plants
    • Théry R., Hetreux G., Agha M.H., Haït A., Le Lann J.M. The extended resource task network: A framework for the combined scheduling of batch processes and CHP plants International Journal of Production Research 50 3 2012 623 646
    • (2012) International Journal of Production Research , vol.50 , Issue.3 , pp. 623-646
    • Théry, R.1    Hetreux, G.2    Agha, M.H.3    Haït, A.4    Le Lann, J.M.5
  • 121
    • 77955560890 scopus 로고    scopus 로고
    • A column generation based heuristic for sensor placement, activity scheduling and data routing in wireless sensor networks
    • TürkoʇullarI Y.B., Aras N., AltInel I.K., Ersoy C. A column generation based heuristic for sensor placement, activity scheduling and data routing in wireless sensor networks European Journal of Operational Research 207 2 2010 1014 1026
    • (2010) European Journal of Operational Research , vol.207 , Issue.2 , pp. 1014-1026
    • TürkoʇullarI, Y.B.1    Aras, N.2    AltInel, I. K.3    Ersoy, C.4
  • 123
    • 78651324717 scopus 로고    scopus 로고
    • International standard industrial classification of all economic activities (ISIC)
    • 4th ed. United Nations Publications New York
    • United Nations, Department of Economic and Social Affairs. International standard industrial classification of all economic activities (ISIC) Statistical papers. Series M 4th ed. 2008 United Nations Publications New York
    • (2008) Statistical Papers. Series M
  • 126
    • 0032119613 scopus 로고    scopus 로고
    • A definition of theory: Research guidelines for different theory-building research methods in operations management
    • Wacker J. A definition of theory: Research guidelines for different theory-building research methods in operations management Journal of Operations Management 16 4 1998 361 385
    • (1998) Journal of Operations Management , vol.16 , Issue.4 , pp. 361-385
    • Wacker, J.1
  • 127
    • 84863268763 scopus 로고    scopus 로고
    • Optimal vehicle batching and sequencing to reduce energy consumption and atmospheric emissions in automotive paint shops
    • Wang J., Li J.L., Huang N. Optimal vehicle batching and sequencing to reduce energy consumption and atmospheric emissions in automotive paint shops International Journal of Sustainable Manufacturing 2 2-3 2011 141 160
    • (2011) International Journal of Sustainable Manufacturing , vol.2 , Issue.2-3 , pp. 141-160
    • Wang, J.1    Li, J.L.2    Huang, N.3
  • 128
    • 84888434930 scopus 로고    scopus 로고
    • Time-of-use based electricity demand response for sustainable manufacturing systems
    • Wang Y., Li L. Time-of-use based electricity demand response for sustainable manufacturing systems Energy 63 2013 233 244
    • (2013) Energy , vol.63 , pp. 233-244
    • Wang, Y.1    Li, L.2
  • 130
    • 0012903874 scopus 로고    scopus 로고
    • Analyzing the past to prepare for the future: Writing a literature review
    • Webster J., Watson R.T. Analyzing the past to prepare for the future: Writing a literature review MIS Quarterly 26 2 2002 xiii xxiii
    • (2002) MIS Quarterly , vol.26 , Issue.2 , pp. xiii-xxiii
    • Webster, J.1    Watson, R.T.2
  • 131
    • 84867843497 scopus 로고    scopus 로고
    • Single-machine sustainable production planning to minimize total energy consumption and total completion time using a multiple objective genetic algorithm
    • Yildirim M.B., Mouzon G. Single-machine sustainable production planning to minimize total energy consumption and total completion time using a multiple objective genetic algorithm IEEE Transactions on Engineering Management 59 4 2012 585
    • (2012) IEEE Transactions on Engineering Management , vol.59 , Issue.4 , pp. 585
    • Yildirim, M.B.1    Mouzon, G.2
  • 132
    • 77955472243 scopus 로고    scopus 로고
    • Optimal methodology for a machining process scheduling in spot electricity markets
    • Yusta J.M., Torres F., Khodr H.M. Optimal methodology for a machining process scheduling in spot electricity markets Energy Conversion and Management 51 12 2010 2647 2654
    • (2010) Energy Conversion and Management , vol.51 , Issue.12 , pp. 2647-2654
    • Yusta, J.M.1    Torres, F.2    Khodr, H.M.3
  • 133
    • 84893738940 scopus 로고    scopus 로고
    • Energy implications in a two-stage production system with controllable production rates
    • Zanoni S., Bettoni L., Glock C.H. Energy implications in a two-stage production system with controllable production rates International Journal of Production Economics 149 2014 164 171
    • (2014) International Journal of Production Economics , vol.149 , pp. 164-171
    • Zanoni, S.1    Bettoni, L.2    Glock, C.H.3
  • 134
    • 37849188054 scopus 로고    scopus 로고
    • Effective MILP model for oil refinery-wide production planning and better energy utilization
    • Zhang B.J., Hua B. Effective MILP model for oil refinery-wide production planning and better energy utilization Journal of Cleaner Production 15 5 2007 439 448
    • (2007) Journal of Cleaner Production , vol.15 , Issue.5 , pp. 439-448
    • Zhang, B.J.1    Hua, B.2
  • 138
    • 84927943896 scopus 로고    scopus 로고
    • Reduction of carbon emissions and project makespan by a Pareto-based estimation of distribution algorithm
    • JUNE 2015 press
    • Zheng H.-y., Wang L. Reduction of carbon emissions and project makespan by a Pareto-based estimation of distribution algorithm International Journal of Production Economics 164 June 2015 2014 10.1016/j.ijpe.2014.12.010 in press
    • (2014) International Journal of Production Economics , vol.164
    • Zheng, H.-Y.1    Wang, L.2
  • 139
    • 84938215020 scopus 로고    scopus 로고
    • Production energy optimization using low dynamic programming, a decision support tool for sustainable manufacturing
    • press
    • Zhu Q., Lujia F., Mayyas A., Omar M., Al-Hammadi Y., Al Saleh S. Production energy optimization using low dynamic programming, a decision support tool for sustainable manufacturing Journal of Cleaner Production 2014 10.1016/j.jclepro.2014.02.066 in press
    • (2014) Journal of Cleaner Production
    • Zhu, Q.1    Lujia, F.2    Mayyas, A.3    Omar, M.4    Al-Hammadi, Y.5    Al Saleh, S.6


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.