-
1
-
-
80053522292
-
'Modele integre pour l'ordonnancement d'ateliers batch et la planification de centrales de cogeneration
-
MOSIM08, Paris, France
-
Agha, M., Thery, R., Hetreux, G. and Le Lann, J-M. (2008) 'Modele integre pour l'ordonnancement d'ateliers batch et la planification de centrales de cogeneration', Conference Internationale de Modelisation et Simulation, MOSIM08, Paris, France.
-
(2008)
Conference Internationale de Modelisation et Simulation
-
-
Agha, M.1
Thery, R.2
Hetreux, G.3
Le Lann, J.-M.4
-
2
-
-
76449097098
-
Integrated production and utility system approach for optimizing industrial unit operations
-
Agha, M., Thery, R., Hetreux, G., Haït, A. and Le Lann, J-M. (2010) 'Integrated production and utility system approach for optimizing industrial unit operations', Energy, Vol. 35, No. 2, pp.611-627.
-
(2010)
Energy
, vol.35
, Issue.2
, pp. 611-627
-
-
Agha, M.1
Thery, R.2
Hetreux, G.3
Haït, A.4
Le Lann, J.-M.5
-
4
-
-
80053504370
-
-
UTC Technical Report 2000/288
-
Baptiste, Ph., Jouglet, A., Le Pape, C. and Nuijten, W. (2000) 'A constraint-based approach to minimize the weighted number of late jobs on parallel machines', UTC Technical Report 2000/288.
-
(2000)
A Constraint-based Approach to Minimize the Weighted Number of Late Jobs on Parallel Machines
-
-
Baptiste, Ph.1
Jouglet, A.2
Le Pape, C.3
Nuijten, W.4
-
5
-
-
0005022772
-
Hierarchical approach to steel production scheduling under a global energy constraint
-
Boukas, E-K., Haurie, A. and Soumis, F. (1990) 'Hierarchical approach to steel production scheduling under a global energy constraint', Annals of Operations Research, Vol. 26, pp.289-311.
-
(1990)
Annals of Operations Research
, vol.26
, pp. 289-311
-
-
Boukas, E.-K.1
Haurie, A.2
Soumis, F.3
-
6
-
-
0006715283
-
Solving parallel machine scheduling problems by column generation
-
Chen, Z-L. and Powell, W.B. (1999) 'Solving parallel machine scheduling problems by column generation', INFORMS J. on Computing, Vol. 11, No. 1, pp.78-94.
-
(1999)
INFORMS J. on Computing
, vol.11
, Issue.1
, pp. 78-94
-
-
Chen, Z.-L.1
Powell, W.B.2
-
7
-
-
0025474221
-
A state-of-the-art review of parallel-machine scheduling research
-
Cheng, T. and Sin, C. (1990) 'A state-of-the-art review of parallel-machine scheduling research', European Journal of Operational Research, Vol. 47, pp.271-292.
-
(1990)
European Journal of Operational Research
, vol.47
, pp. 271-292
-
-
Cheng, T.1
Sin, C.2
-
8
-
-
0141749146
-
Total-site scheduling for better energy utilization
-
Cheung, K-Y. and Hui, C-W. (2004) 'Total-site scheduling for better energy utilization', Journal of Cleaner Production, Vol. 12, pp.171-184.
-
(2004)
Journal of Cleaner Production
, vol.12
, pp. 171-184
-
-
Cheung, K.-Y.1
Hui, C.-W.2
-
9
-
-
0030262783
-
Scheduling multiprocessor tasks - An overview
-
Drozdowski, M. (2004) 'Scheduling multiprocessor tasks - an overview', European Journal of Operational Research, Vol. 94, pp.215-230.
-
(2004)
European Journal of Operational Research
, vol.94
, pp. 215-230
-
-
Drozdowski, M.1
-
10
-
-
77955274108
-
Parallel machine scheduling with precedence constraints and setup times
-
doi:10.1016/j.cor.2010.03.003
-
Gacias, B., Artigues, C. and Lopez, P. (2010) 'Parallel machine scheduling with precedence constraints and setup times', Computers and Operations Research, doi:10.1016/j.cor.2010.03.003.
-
(2010)
Computers and Operations Research
-
-
Gacias, B.1
Artigues, C.2
Lopez, P.3
-
11
-
-
34447103177
-
Reflections on implementing industrial ecology through eco-industrial park development
-
DOI 10.1016/j.jclepro.2007.02.003, PII S095965260700039X, From Material Flow Analysis to Material Flow Management
-
Gibbs, D. and Deutz, P. (2007) 'Reflexion on implementing industrial ecology through ecoindustrial park development', Journal of Cleaner Production, Vol. 15, No. 17, pp.1683-1695. (Pubitemid 47030915)
-
(2007)
Journal of Cleaner Production
, vol.15
, Issue.17
, pp. 1683-1695
-
-
Gibbs, D.1
Deutz, P.2
-
12
-
-
80053511823
-
Ordonnancement sous contraintes d' energie et de ressources humaines
-
Haït, A., Artigues, C, Trepanier, M. and Baptiste, P. (2007) 'Ordonnancement sous contraintes d' energie et de ressources humaines', 11e Congres de la Sociéte Francaise de Génie des Procedes, Saint-Etienne, France, Recents progres en Genie des Procédes, Vol. 96.
-
(2007)
11e Congres de la Sociéte Francaise de Génie des Procedes, Saint-Etienne, France, Recents Progres en Genie des Procédes
, vol.96
-
-
Haït, A.1
Artigues, C.2
Trepanier, M.3
Baptiste, P.4
-
13
-
-
0035890549
-
A decomposition approach for the scheduling of a steel plant production
-
DOI 10.1016/S0098-1354(01)00729-3, PII S0098135401007293
-
Harjunkoski, I. and Grossmann, I. (2001) 'A decomopsition approach for the scheduling of a steel plant production', Computers and Chemical Engineering, Vol. 25, pp.1647-1660. (Pubitemid 33086119)
-
(2001)
Computers and Chemical Engineering
, vol.25
, Issue.11-12
, pp. 1647-1660
-
-
Harjunkoski, I.1
Grossmann, I.E.2
-
14
-
-
33745614518
-
Algorithmic problems in power management
-
Irani, S. and Pruhs, K. (2005) 'Algorithmic problems in power management', SIGACT News, Vol. 36, No. 2, pp.63-76.
-
(2005)
SIGACT News
, vol.36
, Issue.2
, pp. 63-76
-
-
Irani, S.1
Pruhs, K.2
-
15
-
-
0036885225
-
A material and energy flow model for co-production of heat and power
-
DOI 10.1016/S0959-6526(01)00066-X, PII S095965260100066X
-
Korhonen, J. (2002) 'A material and energy flow for co-production of heat and power', Journal of Cleaner Production, Vol. 10, pp.537-544. (Pubitemid 34660482)
-
(2002)
Journal of Cleaner Production
, vol.10
, Issue.6
, pp. 537-544
-
-
Korhonen, J.1
-
16
-
-
69849097830
-
IBM ILOG CP optimizer for detailed scheduling illustrated on three problems
-
Laborie, P. (2009) 'IBM ILOG CP optimizer for detailed scheduling illustrated on three problems', Proceedings of the 6th International Conference, on Integration of AI and OR Techniques in Constraint Programming for Combinatorial Optimization Problems (CP-AI-OR'09), LNCS, Vol. 5547, pp.148-162.
-
(2009)
Proceedings of the 6th International Conference, on Integration of AI and or Techniques in Constraint Programming for Combinatorial Optimization Problems (CP-AI-OR'09), LNCS
, vol.5547
, pp. 148-162
-
-
Laborie, P.1
-
17
-
-
34548623540
-
Search tree based approaches for parallel machine scheduling
-
DOI 10.1016/j.cor.2006.07.008, PII S0305054806001547
-
Neron, E., Tercinet, F. and Sourd, F. (2008) 'Search tree based approaches for parallel machine scheduling', Computers and Operations Research, Vol. 35, No. 4, pp.1127-1137. (Pubitemid 47404763)
-
(2008)
Computers and Operations Research
, vol.35
, Issue.4
, pp. 1127-1137
-
-
Neron, E.1
Tercinet, F.2
Sourd, F.3
-
19
-
-
65249132296
-
Scheduling integrated circuit assembly operations on die bonder
-
Pearn, W.L., Chung, S.H. and Lai, CM. (2007) 'Scheduling integrated circuit assembly operations on die bonder', IEEE Transactions on Electronics Packaging Manufacturing, Vol. 30, No. 2.
-
(2007)
IEEE Transactions on Electronics Packaging Manufacturing
, vol.30
, Issue.2
-
-
Pearn, W.L.1
Chung, S.H.2
Lai, C.M.3
-
20
-
-
33745697691
-
Integer programming and constraint programming in solving a multimachine assignment scheduling problem with deadlines and release dates
-
DOI 10.1287/ijoc.1040.0110
-
Sadykov, R. and Wolsey, L.A. (2006) 'Integer programming and constraint programming in solving a multimachine assignment scheduling problem with deadlines and release dates', INFORMS Journal on Computing, Vol. 18, No. 2, pp.209-217. (Pubitemid 44000304)
-
(2006)
INFORMS Journal on Computing
, vol.18
, Issue.2
, pp. 209-217
-
-
Sadykov, R.1
Wolsey, L.A.2
-
21
-
-
62749103521
-
A branch-and-bound algorithm for parallel machine scheduling problems
-
Society for Computer Simulation International (SCS), Portofino, Italy
-
Salem, A., Anagnostopoulos, G.C. and Rabadi, G. (2000) 'A branch-and-bound algorithm for parallel machine scheduling problems', in Harbour, Maritime & Multimodal Logistics Modeling and Simulation Workshop, Society for Computer Simulation International (SCS), Portofino, Italy.
-
(2000)
Harbour, Maritime & Multimodal Logistics Modeling and Simulation Workshop
-
-
Salem, A.1
Anagnostopoulos, G.C.2
Rabadi, G.3
|