메뉴 건너뛰기




Volumn 5, Issue 4, 2011, Pages 471-489

A hybrid CP/MILP method for scheduling with energy costs

Author keywords

Energy; Human resources; Hybrid approach; Parallel machines; Scheduling

Indexed keywords

ENERGY UTILIZATION; HEURISTIC PROGRAMMING; INTEGER PROGRAMMING; PERSONNEL;

EID: 80053503264     PISSN: 17515254     EISSN: 17515262     Source Type: Journal    
DOI: 10.1504/EJIE.2011.042742     Document Type: Article
Times cited : (29)

References (21)
  • 1
    • 80053522292 scopus 로고    scopus 로고
    • 'Modele integre pour l'ordonnancement d'ateliers batch et la planification de centrales de cogeneration
    • MOSIM08, Paris, France
    • Agha, M., Thery, R., Hetreux, G. and Le Lann, J-M. (2008) 'Modele integre pour l'ordonnancement d'ateliers batch et la planification de centrales de cogeneration', Conference Internationale de Modelisation et Simulation, MOSIM08, Paris, France.
    • (2008) Conference Internationale de Modelisation et Simulation
    • Agha, M.1    Thery, R.2    Hetreux, G.3    Le Lann, J.-M.4
  • 2
    • 76449097098 scopus 로고    scopus 로고
    • Integrated production and utility system approach for optimizing industrial unit operations
    • Agha, M., Thery, R., Hetreux, G., Haït, A. and Le Lann, J-M. (2010) 'Integrated production and utility system approach for optimizing industrial unit operations', Energy, Vol. 35, No. 2, pp.611-627.
    • (2010) Energy , vol.35 , Issue.2 , pp. 611-627
    • Agha, M.1    Thery, R.2    Hetreux, G.3    Haït, A.4    Le Lann, J.-M.5
  • 5
    • 0005022772 scopus 로고
    • Hierarchical approach to steel production scheduling under a global energy constraint
    • Boukas, E-K., Haurie, A. and Soumis, F. (1990) 'Hierarchical approach to steel production scheduling under a global energy constraint', Annals of Operations Research, Vol. 26, pp.289-311.
    • (1990) Annals of Operations Research , vol.26 , pp. 289-311
    • Boukas, E.-K.1    Haurie, A.2    Soumis, F.3
  • 6
    • 0006715283 scopus 로고    scopus 로고
    • Solving parallel machine scheduling problems by column generation
    • Chen, Z-L. and Powell, W.B. (1999) 'Solving parallel machine scheduling problems by column generation', INFORMS J. on Computing, Vol. 11, No. 1, pp.78-94.
    • (1999) INFORMS J. on Computing , vol.11 , Issue.1 , pp. 78-94
    • Chen, Z.-L.1    Powell, W.B.2
  • 7
    • 0025474221 scopus 로고
    • A state-of-the-art review of parallel-machine scheduling research
    • Cheng, T. and Sin, C. (1990) 'A state-of-the-art review of parallel-machine scheduling research', European Journal of Operational Research, Vol. 47, pp.271-292.
    • (1990) European Journal of Operational Research , vol.47 , pp. 271-292
    • Cheng, T.1    Sin, C.2
  • 8
    • 0141749146 scopus 로고    scopus 로고
    • Total-site scheduling for better energy utilization
    • Cheung, K-Y. and Hui, C-W. (2004) 'Total-site scheduling for better energy utilization', Journal of Cleaner Production, Vol. 12, pp.171-184.
    • (2004) Journal of Cleaner Production , vol.12 , pp. 171-184
    • Cheung, K.-Y.1    Hui, C.-W.2
  • 9
    • 0030262783 scopus 로고    scopus 로고
    • Scheduling multiprocessor tasks - An overview
    • Drozdowski, M. (2004) 'Scheduling multiprocessor tasks - an overview', European Journal of Operational Research, Vol. 94, pp.215-230.
    • (2004) European Journal of Operational Research , vol.94 , pp. 215-230
    • Drozdowski, M.1
  • 10
    • 77955274108 scopus 로고    scopus 로고
    • Parallel machine scheduling with precedence constraints and setup times
    • doi:10.1016/j.cor.2010.03.003
    • Gacias, B., Artigues, C. and Lopez, P. (2010) 'Parallel machine scheduling with precedence constraints and setup times', Computers and Operations Research, doi:10.1016/j.cor.2010.03.003.
    • (2010) Computers and Operations Research
    • Gacias, B.1    Artigues, C.2    Lopez, P.3
  • 11
    • 34447103177 scopus 로고    scopus 로고
    • Reflections on implementing industrial ecology through eco-industrial park development
    • DOI 10.1016/j.jclepro.2007.02.003, PII S095965260700039X, From Material Flow Analysis to Material Flow Management
    • Gibbs, D. and Deutz, P. (2007) 'Reflexion on implementing industrial ecology through ecoindustrial park development', Journal of Cleaner Production, Vol. 15, No. 17, pp.1683-1695. (Pubitemid 47030915)
    • (2007) Journal of Cleaner Production , vol.15 , Issue.17 , pp. 1683-1695
    • Gibbs, D.1    Deutz, P.2
  • 13
    • 0035890549 scopus 로고    scopus 로고
    • A decomposition approach for the scheduling of a steel plant production
    • DOI 10.1016/S0098-1354(01)00729-3, PII S0098135401007293
    • Harjunkoski, I. and Grossmann, I. (2001) 'A decomopsition approach for the scheduling of a steel plant production', Computers and Chemical Engineering, Vol. 25, pp.1647-1660. (Pubitemid 33086119)
    • (2001) Computers and Chemical Engineering , vol.25 , Issue.11-12 , pp. 1647-1660
    • Harjunkoski, I.1    Grossmann, I.E.2
  • 14
    • 33745614518 scopus 로고    scopus 로고
    • Algorithmic problems in power management
    • Irani, S. and Pruhs, K. (2005) 'Algorithmic problems in power management', SIGACT News, Vol. 36, No. 2, pp.63-76.
    • (2005) SIGACT News , vol.36 , Issue.2 , pp. 63-76
    • Irani, S.1    Pruhs, K.2
  • 15
    • 0036885225 scopus 로고    scopus 로고
    • A material and energy flow model for co-production of heat and power
    • DOI 10.1016/S0959-6526(01)00066-X, PII S095965260100066X
    • Korhonen, J. (2002) 'A material and energy flow for co-production of heat and power', Journal of Cleaner Production, Vol. 10, pp.537-544. (Pubitemid 34660482)
    • (2002) Journal of Cleaner Production , vol.10 , Issue.6 , pp. 537-544
    • Korhonen, J.1
  • 17
    • 34548623540 scopus 로고    scopus 로고
    • Search tree based approaches for parallel machine scheduling
    • DOI 10.1016/j.cor.2006.07.008, PII S0305054806001547
    • Neron, E., Tercinet, F. and Sourd, F. (2008) 'Search tree based approaches for parallel machine scheduling', Computers and Operations Research, Vol. 35, No. 4, pp.1127-1137. (Pubitemid 47404763)
    • (2008) Computers and Operations Research , vol.35 , Issue.4 , pp. 1127-1137
    • Neron, E.1    Tercinet, F.2    Sourd, F.3
  • 20
    • 33745697691 scopus 로고    scopus 로고
    • Integer programming and constraint programming in solving a multimachine assignment scheduling problem with deadlines and release dates
    • DOI 10.1287/ijoc.1040.0110
    • Sadykov, R. and Wolsey, L.A. (2006) 'Integer programming and constraint programming in solving a multimachine assignment scheduling problem with deadlines and release dates', INFORMS Journal on Computing, Vol. 18, No. 2, pp.209-217. (Pubitemid 44000304)
    • (2006) INFORMS Journal on Computing , vol.18 , Issue.2 , pp. 209-217
    • Sadykov, R.1    Wolsey, L.A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.