Volumn 99, Issue 1-2, 2006, Pages 74-87

Scheduling issues for environmentally responsible manufacturing: The case of hoist scheduling in an electroplating line

Author keywords

Environmental responsible manufacturing; Hoist scheduling problem; Scheduling; Sustainability

Indexed keywords

ENVIRONMENTAL RESPONSIBLE MANUFACTURING; HOIST SCHEDULING PROBLEM; NONLINEAR GLOBAL COST FUNCTION; SUSTAINABILITY;

EID: 27644439216     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2004.12.008     Document Type: Conference Paper
Times cited : (68)

References (20)
  • 1
    • 84888903000 scopus 로고
    • Relatif aux ateliers de Traitement de Surface
    • Arrêté du 26 september
    • Arrêté du 26 september 1985 relatif aux ateliers de Traitement de Surface - Journal Officiel Français.
    • (1985) Journal Officiel Français
  • 3
    • 0038510812 scopus 로고    scopus 로고
    • Ordonnancement des lignes de traitement de surface
    • Chapitre 9 section Productique, Ordonnancement de la Production, coordonné par F. Roubellat, P. Lopez, (Eds.), Hermès, -Systèmes Pour l'Ingénieur
    • Baptiste, P., Bloch, C. and Varnier, C., 2001. Chapitre 9: Ordonnancement des lignes de traitement de surface, Traité IC2, Information-Commande- Communication, section Productique, Ordonnancement de la Production, coordonné par F. Roubellat, P. Lopez, (Eds.), Hermès, -Systèmes Pour l'Ingénieur, pp. 259-293.
    • (2001) Traité IC2, Information-Commande-Communication , pp. 259-293
    • Baptiste, P.1    Bloch, C.2    Varnier, C.3
  • 6
    • 84888929211 scopus 로고
    • Cahiers techniques de la direction de la prévention des polluants, no. 18
    • Ministère de l'environnement Agence de bassin Loire-Bretagne
    • Breuil, J.N., 1985. Ministère de l'environnement, Cahiers techniques de la direction de la prévention des polluants, no. 18. Traitement de surface et dépollution à la source. Agence de bassin Loire-Bretagne, 112p.
    • (1985) Traitement de Surface et Dépollution à la Source
    • Breuil, J.N.1
  • 8
    • 0030400880 scopus 로고    scopus 로고
    • Single machine scheduling with chain structured precedence constraints and separation time windows
    • C. Chu, and J.-M. Proth Single machine scheduling with chain structured precedence constraints and separation time windows IEEE Transactions on Robotics and Automation 12 6 1996 835 844
    • (1996) IEEE Transactions on Robotics and Automation , vol.12 , Issue.6 , pp. 835-844
    • Chu, C.1    Proth, J.-M.2
  • 9
    • 0031269154 scopus 로고    scopus 로고
    • A strongly polynomial algorithm for no-wait cyclic robotic flowshop scheduling
    • V. Kats, and E. Levner A strongly polynomial algorithm for no-wait cyclic robotic flowshop scheduling Operations Research Letters 21 1997 171 179
    • (1997) Operations Research Letters , vol.21 , pp. 171-179
    • Kats, V.1    Levner, E.2
  • 13
    • 0003569152 scopus 로고
    • A proof: The cyclic hoist sheduling problem is NP complete
    • Rutgers University
    • Lei, L. and Wang, T.-J., 1989. A proof: The cyclic hoist sheduling problem is NP complete. Rutgers University. Working paper #89-0016.
    • (1989) Working Paper #89-0016 , vol.89 , Issue.16
    • Lei, L.1    Wang, T.-J.2
  • 14
    • 0000402860 scopus 로고
    • The minimum common cycle algorithm for cycle scheduling of two material handling hoists with time window constraints
    • L. Lei, and T.-J. Wang The minimum common cycle algorithm for cycle scheduling of two material handling hoists with time window constraints Management Science 37 12 1991 1629 1639
    • (1991) Management Science , vol.37 , Issue.12 , pp. 1629-1639
    • Lei, L.1    Wang, T.-J.2
  • 16
    • 0016962332 scopus 로고
    • Mathematical programming solution of a hoist scheduling program
    • L.W. Phillips, and P.S. Ünger Mathematical programming solution of a hoist scheduling program AIIE Transactions 8 2 1976 219 225
    • (1976) AIIE Transactions , vol.8 , Issue.2 , pp. 219-225
    • Phillips, L.W.1    Ünger, P.S.2
  • 17
    • 84888890915 scopus 로고    scopus 로고
    • Vers un pilotage propre des lignes de traitement de surface
    • Toulouse, 23-25April
    • Subaï, C., Baptiste, P. and Niel, E., 2003. Vers un pilotage propre des lignes de traitement de surface. Modélisation et Simulation, MOSIM'03, Toulouse, 23-25April, 10p.
    • (2003) Modélisation et Simulation, MOSIM'03
    • Subaï, C.1    Baptiste, P.2    Niel, E.3
  • 20
    • 0027812671 scopus 로고
    • Incremental learning for hoist scheduling problems in circuit board production lines
    • Yih, Y., Chiu, C., 1993. Incremental learning for hoist scheduling problems in circuit board production lines. Manufacturing Aspects in Electronics Packaging ASME, PED vol. 65 EPP vol. 5 pp. 119-124.
    • (1993) Manufacturing Aspects in Electronics Packaging ASME , vol.PED VOL. 65 EPP VOL. 5 , pp. 119-124
    • Yih, Y.1    Chiu, C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.