메뉴 건너뛰기




Volumn 38, Issue , 2012, Pages 171-184

Optimal production planning under time-sensitive electricity prices for continuous power-intensive processes

Author keywords

Air separation plants; Cement plants; MILP models; Power intensive systems; Production planning; Time varying electricity prices

Indexed keywords

AIR SEPARATION PLANTS; DISCRETE-TIME; ELECTRICITY PRICES; ELECTRICITY PRICING; EXPLICIT MODELING; INDUSTRIAL CASE STUDY; LARGE SIZES; LOGIC CONSTRAINTS; MILP MODEL; OPERATING EXPENSE; OPERATING MODES; OPTIMAL PRODUCTION; PLANT EQUIPMENTS; PROBLEM INSTANCES; PRODUCTION PLANNING; SYSTEMATIC MODELING; TIME HORIZONS; TIME VARYING; TIME-DEPENDENT;

EID: 84857444866     PISSN: 00981354     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.compchemeng.2011.09.019     Document Type: Article
Times cited : (247)

References (27)
  • 1
    • 0000324065 scopus 로고
    • Disjunctive programming and a hierarchy of relaxations for discrete optimization problems
    • Balas E. Disjunctive programming and a hierarchy of relaxations for discrete optimization problems. SIAM Journal on Algebraic and Discrete Methods 1985, 6:466-486.
    • (1985) SIAM Journal on Algebraic and Discrete Methods , vol.6 , pp. 466-486
    • Balas, E.1
  • 3
    • 67849109965 scopus 로고    scopus 로고
    • New continuous-time scheduling formulation for continuous plants under variable electricity cost
    • Castro P.M., Harjunkoski I., Grossmann I.E. New continuous-time scheduling formulation for continuous plants under variable electricity cost. Industrial & Engineering Chemistry Research 2009, 48:6701-6714.
    • (2009) Industrial & Engineering Chemistry Research , vol.48 , pp. 6701-6714
    • Castro, P.M.1    Harjunkoski, I.2    Grossmann, I.E.3
  • 5
    • 77949264708 scopus 로고    scopus 로고
    • Charles River Associates
    • Primer on demand-side management, with an emphasis on price-responsive programs, CRA no. D06090. Technical report, The World Bank.
    • Charles River Associates. (2005). Primer on demand-side management, with an emphasis on price-responsive programs, CRA no. D06090. Technical report, The World Bank.
    • (2005)
  • 6
    • 84857444515 scopus 로고    scopus 로고
    • The PORTA manual page v. 1.4.1. Technical report, ZIB, Berlin.
    • Christof, T., & Lobel, A. (1997). The PORTA manual page v. 1.4.1. Technical report, ZIB, Berlin.
    • (1997)
    • Christof, T.1    Lobel, A.2
  • 7
    • 0024717922 scopus 로고
    • Optimal demand-side response to electricity spot prices for storage-type customers
    • Daryanian B., Boln R.E., Tabors R.D. Optimal demand-side response to electricity spot prices for storage-type customers. IEEE Transactions on Power Systems 1989, 4:897-903.
    • (1989) IEEE Transactions on Power Systems , vol.4 , pp. 897-903
    • Daryanian, B.1    Boln, R.E.2    Tabors, R.D.3
  • 8
    • 50649125115 scopus 로고    scopus 로고
    • Simultaneous planning and scheduling of single-stage multi-product continuous plants with parallel lines
    • Erdirik-Dogan M., Grossmann I.E. Simultaneous planning and scheduling of single-stage multi-product continuous plants with parallel lines. Computers & Chemical Engineering 2008, 32:2664-2683.
    • (2008) Computers & Chemical Engineering , vol.32 , pp. 2664-2683
    • Erdirik-Dogan, M.1    Grossmann, I.E.2
  • 9
    • 0023537773 scopus 로고
    • Floudas Active constraint strategy for flexibility analysis in chemical processes
    • Grossmann I.E.C.A., Floudas Active constraint strategy for flexibility analysis in chemical processes. Computers & Chemical Engineering 1987, 11:675.
    • (1987) Computers & Chemical Engineering , vol.11 , pp. 675
    • Grossmann, I.E.C.A.1
  • 11
    • 84857440076 scopus 로고    scopus 로고
    • Nonlinear model predictive control and dynamic real time optimization for large-scale processes
    • PhD thesis, Carnegie Mellon University.
    • Huang, R. (2010). Nonlinear model predictive control and dynamic real time optimization for large-scale processes. PhD thesis, Carnegie Mellon University.
    • (2010)
    • Huang, R.1
  • 12
    • 0001610858 scopus 로고    scopus 로고
    • A new approach for quantifying process feasibility: Convex and one Dimensional Quasi-Convex Regions
    • Ierapetritou, M.G. (2001). A new approach for quantifying process feasibility: Convex and one Dimensional Quasi-Convex Regions. AIChE Journal, 47, 1407.
    • (2001) AIChE Journal , vol.47 , pp. 1407
    • Ierapetritou, M.G.1
  • 14
    • 33748305972 scopus 로고    scopus 로고
    • Operations planning with real time pricing of a primary input
    • Karwan K., Keblis M. Operations planning with real time pricing of a primary input. Computers & Operations Research 2007, 34:848-867.
    • (2007) Computers & Operations Research , vol.34 , pp. 848-867
    • Karwan, K.1    Keblis, M.2
  • 15
    • 76449112696 scopus 로고    scopus 로고
    • Dynamische Simulation eines Lastmanagements und Integration von Windenergie in ein Elektrizitaetsnetz auf Landesebene unter regelungstechnischen und Kostengesichtspunkten
    • PhD thesis, ETH Zurich.
    • Klobasa, M. (2007). Dynamische Simulation eines Lastmanagements und Integration von Windenergie in ein Elektrizitaetsnetz auf Landesebene unter regelungstechnischen und Kostengesichtspunkten. PhD thesis, ETH Zurich.
    • (2007)
    • Klobasa, M.1
  • 16
    • 78049380491 scopus 로고    scopus 로고
    • The potential of demand-side management in energy-intensive industries for electricity markets in Germany
    • Paulus M., Borggrefe F. The potential of demand-side management in energy-intensive industries for electricity markets in Germany. Applied Energy 2011, 88:432-441.
    • (2011) Applied Energy , vol.88 , pp. 432-441
    • Paulus, M.1    Borggrefe, F.2
  • 17
    • 44949199421 scopus 로고    scopus 로고
    • TMP production scheduling under uncertainty: methodology and case studies
    • Pulkkinen P., Ritala R. TMP production scheduling under uncertainty: methodology and case studies. Chemical Engineering and Processing 2008, 47:1492-1503.
    • (2008) Chemical Engineering and Processing , vol.47 , pp. 1492-1503
    • Pulkkinen, P.1    Ritala, R.2
  • 18
    • 0028461924 scopus 로고
    • Modeling and computational techniques for logic based integer programming
    • Raman R., Grossmann I.E. Modeling and computational techniques for logic based integer programming. Computers & Chemical Engineering 1993, 18:563.
    • (1993) Computers & Chemical Engineering , vol.18 , pp. 563
    • Raman, R.1    Grossmann, I.E.2
  • 19
    • 0026108226 scopus 로고
    • MINLP model for cyclic multiproduct scheduling on continuous parallel lines
    • Sahinidis N.V., Grossmann I.E. MINLP model for cyclic multiproduct scheduling on continuous parallel lines. Computers & Chemical Engineering 1991, 15:85-103.
    • (1991) Computers & Chemical Engineering , vol.15 , pp. 85-103
    • Sahinidis, N.V.1    Grossmann, I.E.2
  • 21
    • 34248578445 scopus 로고    scopus 로고
    • An attainable region approach for effective production planning of multi-product processes
    • Sung C., Maravelias C.T. An attainable region approach for effective production planning of multi-product processes. AIChE Journal 2007, 53:1298-1315.
    • (2007) AIChE Journal , vol.53 , pp. 1298-1315
    • Sung, C.1    Maravelias, C.T.2
  • 22
    • 70349147041 scopus 로고    scopus 로고
    • A projection-based method for production planning of multiproduct facilities
    • Sung C., Maravelias C.T. A projection-based method for production planning of multiproduct facilities. AIChE Journal 2009, 55:2614-2630.
    • (2009) AIChE Journal , vol.55 , pp. 2614-2630
    • Sung, C.1    Maravelias, C.T.2
  • 23
    • 0022045675 scopus 로고
    • An index for operational flexibility in chemical process design. Part I. Formulation and theory
    • Swaney R.E., Grossmann I.E. An index for operational flexibility in chemical process design. Part I. Formulation and theory. AlChE Journal 1985, 31:621.
    • (1985) AlChE Journal , vol.31 , pp. 621
    • Swaney, R.E.1    Grossmann, I.E.2
  • 24
    • 46749146380 scopus 로고    scopus 로고
    • The MathWorks Inc
    • MATLAB 7.10.0.499 (R2010a).
    • The MathWorks Inc. (2010). MATLAB 7.10.0.499 (R2010a).
    • (2010)
  • 25
    • 79151485584 scopus 로고    scopus 로고
    • Providing reliability services through demand response: A preliminary evaluation of the demand response capabilities of Alcoa Inc
    • Technical report, U.S. Department of Energy.
    • Todd, D., Caufield, M., Helms, B., Starke, M., Kirby, B., & Kueck, J. (2009). Providing reliability services through demand response: A preliminary evaluation of the demand response capabilities of Alcoa Inc. Technical report, U.S. Department of Energy.
    • (2009)
    • Todd, D.1    Caufield, M.2    Helms, B.3    Starke, M.4    Kirby, B.5    Kueck, J.6
  • 26
    • 84869386202 scopus 로고    scopus 로고
    • Data collection for demand-side management for quantifying its influence on reliability
    • Technical report, North American Electric Reliability Corporation (NERC).
    • Voytas, R., Reynolds, J.M., Masiello, J., Pratt, D., Hughes, J.P., Zarruk, E. et al. (2007). Data collection for demand-side management for quantifying its influence on reliability. Technical report, North American Electric Reliability Corporation (NERC).
    • (2007)
    • Voytas, R.1    Reynolds, J.M.2    Masiello, J.3    Pratt, D.4    Hughes, J.P.5    Zarruk, E.6
  • 27
    • 79961008480 scopus 로고    scopus 로고
    • A multiperiod nonlinear programming approach for operation of air separation plants with variable power pricing
    • Zhu, Y., Legg, S., & Laird, C.D. (2011). A multiperiod nonlinear programming approach for operation of air separation plants with variable power pricing. AIChE Journal, 57, 2421.
    • (2011) AIChE Journal , vol.57 , pp. 2421
    • Zhu, Y.1    Legg, S.2    Laird, C.D.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.