1
-
-
0346101524
-
Simple continuous-time formulation for short-term scheduling of batch and continuous processes
-
Castro P., Barbosa-Póvoa A., Matos H., Novais A. Simple continuous-time formulation for short-term scheduling of batch and continuous processes. Industrial & Engineering Chemistry Research 2004, 43:105.
-
(2004)
Industrial & Engineering Chemistry Research
, vol.43
, pp. 105
-
-
Castro, P.1
Barbosa-Póvoa, A.2
Matos, H.3
Novais, A.4
-
2
-
-
11844300749
-
Simultaneous design and scheduling of multipurpose plants using resource task network based continuous-time formulations
-
Castro P., Barbosa-Póvoa A., Novais A. Simultaneous design and scheduling of multipurpose plants using resource task network based continuous-time formulations. Industrial & Engineering Chemistry Research 2005, 44:343.
-
(2005)
Industrial & Engineering Chemistry Research
, vol.44
, pp. 343
-
-
Castro, P.1
Barbosa-Póvoa, A.2
Novais, A.3
-
3
-
-
67849109965
-
New continuous-time scheduling formulation for continuous plants under variable electricity cost
-
Castro P., Harjunkoski I., Grossmann I. New continuous-time scheduling formulation for continuous plants under variable electricity cost. Industrial & Engineering Chemistry Research 2009, 48:6701.
-
(2009)
Industrial & Engineering Chemistry Research
, vol.48
, pp. 6701
-
-
Castro, P.1
Harjunkoski, I.2
Grossmann, I.3
-
4
-
-
57049159782
-
Scheduling of a continuous plant with recycling of byproducts: A case study from a tissue paper mill
-
Castro P., Westerlund J., Forssell S. Scheduling of a continuous plant with recycling of byproducts: A case study from a tissue paper mill. Computers & Chemical Engineering 2009, 33:347.
-
(2009)
Computers & Chemical Engineering
, vol.33
, pp. 347
-
-
Castro, P.1
Westerlund, J.2
Forssell, S.3
-
5
-
-
58549097449
-
A resource-task network approach for optimal short-term/periodic scheduling and heat integration in multipurpose batch plants
-
Chen C.-L., Chang C.-Y. A resource-task network approach for optimal short-term/periodic scheduling and heat integration in multipurpose batch plants. Applied Thermal Engineering 2009, 29:1195.
-
(2009)
Applied Thermal Engineering
, vol.29
, pp. 1195
-
-
Chen, C.-L.1
Chang, C.-Y.2
-
7
-
-
56549101546
-
Optimal sizing, scheduling and shift policy of the grinding section of a ceramic tile plant
-
Duarte B., Santos L., Mariano J. Optimal sizing, scheduling and shift policy of the grinding section of a ceramic tile plant. Computers Operations Research 2009, 36:1825-1834.
-
(2009)
Computers Operations Research
, vol.36
, pp. 1825-1834
-
-
Duarte, B.1
Santos, L.2
Mariano, J.3
-
8
-
-
54949143585
-
Material transfer operations in batch scheduling. A critical modeling issue
-
Ferrer-Nadal S., Capón-Garcia E., Méndez C., Puigjaner L. Material transfer operations in batch scheduling. A critical modeling issue. Industrial & Engineering Chemistry Research 2008, 47:7721.
-
(2008)
Industrial & Engineering Chemistry Research
, vol.47
, pp. 7721
-
-
Ferrer-Nadal, S.1
Capón-Garcia, E.2
Méndez, C.3
Puigjaner, L.4
-
9
-
-
67651092136
-
A novel network-based continuous-time representation for process scheduling. Part I. Main concepts and mathematical formulation
-
Giménez D., Henning G., Maravelias C. A novel network-based continuous-time representation for process scheduling. Part I. Main concepts and mathematical formulation. Computers & Chemical Engineering 2009, 33:1511.
-
(2009)
Computers & Chemical Engineering
, vol.33
, pp. 1511
-
-
Giménez, D.1
Henning, G.2
Maravelias, C.3
-
10
-
-
25144478491
-
Enterprise-wide optimization: A new frontier in Process Systems Engineering
-
Grossmann I.E. Enterprise-wide optimization: A new frontier in Process Systems Engineering. AIChE Journal 2005, 51:1846.
-
(2005)
AIChE Journal
, vol.51
, pp. 1846
-
-
Grossmann, I.E.1
-
11
-
-
0027545176
-
A general algorithm for short-term scheduling of batch operations. I. MILP formulation
-
Kondili E., Pantelides C.C., Sargent R. A general algorithm for short-term scheduling of batch operations. I. MILP formulation. Computers & Chemical Engineering 1993, 17:211.
-
(1993)
Computers & Chemical Engineering
, vol.17
, pp. 211
-
-
Kondili, E.1
Pantelides, C.C.2
Sargent, R.3
-
13
-
-
67849090336
-
A general continuous state task network formulation for short term scheduling of multipurpose batch plants with due dates
-
A. Kraslawski, I. Turunen (Eds.)
-
Maravelias C., Grossmann I. A general continuous state task network formulation for short term scheduling of multipurpose batch plants with due dates. Proceedings ESCAPE-13 2003, 215. A. Kraslawski, I. Turunen (Eds.).
-
(2003)
Proceedings ESCAPE-13
, pp. 215
-
-
Maravelias, C.1
Grossmann, I.2
-
14
-
-
33748102266
-
State-of-the-art review of optimization methods for short-term scheduling of batch processes
-
Méndez C.A., Cerdá J., Grossmann I.E., Harjunkoski I., Fahl M. State-of-the-art review of optimization methods for short-term scheduling of batch processes. Computers & Chemical Engineering 2006, 30:913.
-
(2006)
Computers & Chemical Engineering
, vol.30
, pp. 913
-
-
Méndez, C.A.1
Cerdá, J.2
Grossmann, I.E.3
Harjunkoski, I.4
Fahl, M.5
-
17
-
-
34248335441
-
Mixed-time mixed-integer linear programming scheduling model
-
Westerlund J., Hastbacka M., Forssell S., Westerlund T. Mixed-time mixed-integer linear programming scheduling model. Industrial & Engineering Chemistry Research 2007, 46:2781.
-
(2007)
Industrial & Engineering Chemistry Research
, vol.46
, pp. 2781
-
-
Westerlund, J.1
Hastbacka, M.2
Forssell, S.3
Westerlund, T.4
|