메뉴 건너뛰기




Volumn 66, Issue 2, 2013, Pages 406-417

Fast reactive scheduling to minimize tardiness penalty and energy cost under power consumption uncertainties

Author keywords

Discrete event control; Dynamic scheduling; Energy efficient manufacturing; Power consumption uncertainties; Reactive scheduling

Indexed keywords

DISCRETE EVENT SIMULATION; ELECTRIC POWER UTILIZATION; FLEXIBLE MANUFACTURING SYSTEMS; MANUFACTURE; PARETO PRINCIPLE; PROBABILITY DISTRIBUTIONS; SCHEDULING; SCHEDULING ALGORITHMS;

EID: 84885180584     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2013.07.006     Document Type: Article
Times cited : (22)

References (31)
  • 1
    • 84855766616 scopus 로고    scopus 로고
    • Optimum loading of machines in a flexible manufacturing system using a mixed-integer linear mathematical programming model and genetic algorithm
    • Abazari, A. M., Solimanpur, M., & Sattari, H. (2012). Optimum loading of machines in a flexible manufacturing system using a mixed-integer linear mathematical programming model and genetic algorithm. Computers & Industrial Engineering, 62(2), 469-478.
    • (2012) Computers & Industrial Engineering , vol.62 , Issue.2 , pp. 469-478
    • Abazari, A.M.1    Solimanpur, M.2    Sattari, H.3
  • 6
    • 36248933733 scopus 로고    scopus 로고
    • Comparative performance analysis of a flexible manufacturing system (FMS): A review-period-based control
    • Chan, F. T. S., Bhagwat, R., & Wadhwa, S. (2008). Comparative performance analysis of a flexible manufacturing system (FMS): A review-period-based control. International Journal of Production Research, 46(1), 1-24.
    • (2008) International Journal of Production Research , vol.46 , Issue.1 , pp. 1-24
    • Chan, F.T.S.1    Bhagwat, R.2    Wadhwa, S.3
  • 7
    • 84860460007 scopus 로고    scopus 로고
    • A decision-information synchronisation perspective on the performance of FMS
    • Chan, F. T. S., Chan, H. K., & Bhagwat, R. (2012). A decision-information synchronisation perspective on the performance of FMS. International Journal of Production Research, 50(4), 1203-1213.
    • (2012) International Journal of Production Research , vol.50 , Issue.4 , pp. 1203-1213
    • Chan, F.T.S.1    Chan, H.K.2    Bhagwat, R.3
  • 8
    • 84881614672 scopus 로고    scopus 로고
    • Enhancing rule-based scheduling in wafer fabrication facilities by evolutionary algorithms: Review and opportunity
    • Chiang, T.-C. (2013). Enhancing rule-based scheduling in wafer fabrication facilities by evolutionary algorithms: Review and opportunity. Computers & Industrial Engineering, 64(1), 524-535.
    • (2013) Computers & Industrial Engineering , vol.64 , Issue.1 , pp. 524-535
    • Chiang, T.-C.1
  • 9
    • 84861012619 scopus 로고    scopus 로고
    • Flexible flow shop scheduling with stochastic processing times: A decomposition-based approach
    • Choi, S. H., & Wang, K. (2012). Flexible flow shop scheduling with stochastic processing times: A decomposition-based approach. Computers & Industrial Engineering, 63(2), 362-373.
    • (2012) Computers & Industrial Engineering , vol.63 , Issue.2 , pp. 362-373
    • Choi, S.H.1    Wang, K.2
  • 12
    • 84882319975 scopus 로고    scopus 로고
    • Preference vector ant colony system for minimizing make-span and energy consumption in a hybrid flow shop
    • In L. Wang, A. H. C. Ng, & K. Deb (Eds.), Berlin: Springer Link
    • Du, B., Chen, H., Huang, G. Q., & Yang, H. D. (2011). Preference vector ant colony system for minimizing make-span and energy consumption in a hybrid flow shop. In L. Wang, A. H. C. Ng, & K. Deb (Eds.), Multi-objective evolutionary optimisation for product design and manufacturing. Berlin: Springer Link.
    • (2011) Multi-objective Evolutionary Optimisation for Product Design and Manufacturing
    • Du, B.1    Chen, H.2    Huang, G.Q.3    Yang, H.D.4
  • 13
    • 84869106299 scopus 로고    scopus 로고
    • Parallel-machine scheduling to minimize tardiness penalty and power cost
    • Fang, K.-T., & Lin, B. M. T. (2013). Parallel-machine scheduling to minimize tardiness penalty and power cost. Computers & Industrial Engineering, 64(1), 224-234.
    • (2013) Computers & Industrial Engineering , vol.64 , Issue.1 , pp. 224-234
    • Fang, K.-T.1    Lin, B.M.T.2
  • 14
    • 85030409424 scopus 로고    scopus 로고
    • Scheduling flexible job shop problem subject to machine breakdown with route changing and right-shift strategies
    • He, W., & Sun, D. (2012). Scheduling flexible job shop problem subject to machine breakdown with route changing and right-shift strategies. The International Journal of Advanced Manufacturing Technology.
    • (2012) The International Journal of Advanced Manufacturing Technology
    • He, W.1    Sun, D.2
  • 15
    • 80255137417 scopus 로고    scopus 로고
    • Evolutionary algorithm for stochastic job shop scheduling with random processing time
    • Horng, S. C., Lin, S. S., & Yang, F. Y. (2012). Evolutionary algorithm for stochastic job shop scheduling with random processing time. Expert Systems with Applications, 39(3), 3603-3610.
    • (2012) Expert Systems with Applications , vol.39 , Issue.3 , pp. 3603-3610
    • Horng, S.C.1    Lin, S.S.2    Yang, F.Y.3
  • 16
    • 84870066372 scopus 로고    scopus 로고
    • Scheduling FMS with alternative routings using petri nets and near admissible heuristic search
    • Huang, B., Shi, X.-X., & Xu, N. (2012). Scheduling FMS with alternative routings using petri nets and near admissible heuristic search. The International Journal of Advanced Manufacturing Technology, 63(9-12), 1131-1136.
    • (2012) The International Journal of Advanced Manufacturing Technology , vol.63 , Issue.9-12 , pp. 1131-1136
    • Huang, B.1    Shi, X.-X.2    Xu, N.3
  • 18
    • 77955470307 scopus 로고    scopus 로고
    • Dispatching rule for non-identical parallel machines with sequence-dependent setups and quality restrictions
    • Ko, H.-H., Kim, J., Kim, S.-S., & Baek, J.-G. (2010). Dispatching rule for non-identical parallel machines with sequence-dependent setups and quality restrictions. Computers & Industrial Engineering, 59(3), 448-457.
    • (2010) Computers & Industrial Engineering , vol.59 , Issue.3 , pp. 448-457
    • Ko, H.-H.1    Kim, J.2    Kim, S.-S.3    Baek, J.-G.4
  • 20
    • 76549113337 scopus 로고    scopus 로고
    • Training a neural network to select dispatching rules in real time
    • Mouelhi-Chibani, W., & Pierreval, H. (2010). Training a neural network to select dispatching rules in real time. Computers & Industrial Engineering, 58(2), 249-256.
    • (2010) Computers & Industrial Engineering , vol.58 , Issue.2 , pp. 249-256
    • Mouelhi-Chibani, W.1    Pierreval, H.2
  • 21
    • 68249099005 scopus 로고    scopus 로고
    • A survey of dynamic scheduling in manufacturing systems
    • Ouelhadj, D., & Petrovic, S. (2009). A survey of dynamic scheduling in manufacturing systems. Journal of Scheduling, 12(4), 417-431.
    • (2009) Journal of Scheduling , vol.12 , Issue.4 , pp. 417-431
    • Ouelhadj, D.1    Petrovic, S.2
  • 26
    • 36749027726 scopus 로고    scopus 로고
    • Modified immune algorithm for job selection and operation allocation problem in flexible manufacturing systems
    • Prakash, A., Khilwani, N., Tiwari, M. K., & Cohen, Y. (2008). Modified immune algorithm for job selection and operation allocation problem in flexible manufacturing systems. Advances in Engineering Software, 39(3), 219-232.
    • (2008) Advances in Engineering Software , vol.39 , Issue.3 , pp. 219-232
    • Prakash, A.1    Khilwani, N.2    Tiwari, M.K.3    Cohen, Y.4
  • 28
    • 38849162891 scopus 로고    scopus 로고
    • Evolving dispatching rules using genetic programming for solving multi-objective flexible job-shop problems
    • Tay, J. C., & Ho, N. B. (2008). Evolving dispatching rules using genetic programming for solving multi-objective flexible job-shop problems. Computers & Industrial Engineering, 54(3), 453-473.
    • (2008) Computers & Industrial Engineering , vol.54 , Issue.3 , pp. 453-473
    • Tay, J.C.1    Ho, N.B.2
  • 29
    • 0242703954 scopus 로고    scopus 로고
    • Rescheduling manufacturing systems: A framework of strategies, policies and methods
    • Vieira, G. E., Hermann, J. W., & Lin, E. (2003). Rescheduling manufacturing systems: A framework of strategies, policies and methods. Journal of Scheduling, 6(1), 36-92.
    • (2003) Journal of Scheduling , vol.6 , Issue.1 , pp. 36-92
    • Vieira, G.E.1    Hermann, J.W.2    Lin, E.3
  • 30
    • 84869492892 scopus 로고    scopus 로고
    • Robust scheduling for multi-objective flexible job-shop problems with random machine breakdowns
    • Xiong, J., Xing, L., & Chen, Y. (2012). Robust scheduling for multi-objective flexible job-shop problems with random machine breakdowns. International Journal of Production Economics, 41(1), 112-126.
    • (2012) International Journal of Production Economics , vol.41 , Issue.1 , pp. 112-126
    • Xiong, J.1    Xing, L.2    Chen, Y.3
  • 31
    • 79955479899 scopus 로고    scopus 로고
    • Survey of modeling, planning, and ground verification of space robotic systems
    • Xu, W., Liang, B., & Xu, Y. (2011). Survey of modeling, planning, and ground verification of space robotic systems. Acta Astronautica, 68(11), 1629-1649.
    • (2011) Acta Astronautica , vol.68 , Issue.11 , pp. 1629-1649
    • Xu, W.1    Liang, B.2    Xu, Y.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.