메뉴 건너뛰기




Volumn 30, Issue 4, 2011, Pages 234-240

A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction

Author keywords

Carbon footprint; Makespan; Peak load; Scheduling

Indexed keywords

CARBON FOOTPRINT; COMMERCIAL SOFTWARE; COMPUTATION TIME; CYCLE TIME; ENVIRONMENTAL FACTORS; FLOW SHOP SCHEDULING PROBLEM; FLOW-SHOPS; INDEPENDENT VARIABLES; MAKESPAN; MANUFACTURING SCHEDULING; MATHEMATICAL PROGRAMMING MODELS; MULTI-OBJECTIVE SCHEDULING PROBLEMS; NEW MODEL; OPERATION SPEED; OPTIMAL SCHEDULE; PEAK LOAD; PEAK POWER; SCHEDULING PROBLEM; SINGLE OBJECTIVE; TWO MACHINES;

EID: 80054680608     PISSN: 02786125     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.jmsy.2011.08.004     Document Type: Conference Paper
Times cited : (523)

References (36)
  • 5
    • 34548408149 scopus 로고    scopus 로고
    • Solar Energy International
    • Solar Energy International Energy facts 2006
    • (2006) Energy Facts
  • 7
    • 70449635982 scopus 로고    scopus 로고
    • Reducing the environmental footprint and economic costs of automotive manufacturing through an alternative energy supply
    • Yuan C.Y., and Dornfeld D.A. Reducing the environmental footprint and economic costs of automotive manufacturing through an alternative energy supply Transactions of the North American Manufacturing Research Institution of SME 37 2009 427 434
    • (2009) Transactions of the North American Manufacturing Research Institution of SME , vol.37 , pp. 427-434
    • Yuan, C.Y.1    Dornfeld, D.A.2
  • 11
    • 34547939112 scopus 로고    scopus 로고
    • "Technology wedges" for implementing green manufacturing
    • Transactions of the North American Manufacturing Research Institution of SME 2007 - Papers Presented at NAMRC 35
    • Dornfeld D.A., and Wright P. Technology wedges for implementing green manufacturing Transactions of the North American Manufacturing Research Institution of SME 35 2007 193 200 (Pubitemid 47266652)
    • (2007) Transactions of the North American Manufacturing Research Institution of SME , vol.35 , pp. 193-200
    • Dornfeld, D.1    Wright, P.2
  • 20
    • 34548395445 scopus 로고    scopus 로고
    • Operational methods for minimization of energy consumption of manufacturing equipment
    • DOI 10.1080/00207540701450013, PII 781770536, Sustainable Design and Manufacture
    • Mouzon G., Yildirim M.B., and Twomey J. Operational methods for minimization of energy consumption of manufacturing equipment International Journal of Production Research 45 2007 4247 4271 (Pubitemid 47351658)
    • (2007) International Journal of Production Research , vol.45 , Issue.18-19 , pp. 4247-4271
    • Mouzon, G.1    Yildirim, M.B.2    Twomey, J.3
  • 21
    • 78650636006 scopus 로고    scopus 로고
    • A framework to minimise total energy consumption and total tardiness on a single machine
    • Mouzon G., and Yildirim M.B. A framework to minimise total energy consumption and total tardiness on a single machine International Journal of Sustainable Engineering 1 2008 105 116
    • (2008) International Journal of Sustainable Engineering , vol.1 , pp. 105-116
    • Mouzon, G.1    Yildirim, M.B.2
  • 22
    • 27644439216 scopus 로고    scopus 로고
    • Scheduling issues for environmentally responsible manufacturing: The case of hoist scheduling in an electroplating line
    • DOI 10.1016/j.ijpe.2004.12.008, PII S0925527304004530, Control and Management of Productive Systems
    • Subai C., and Baptiste N.E. Scheduling issues for environmentally responsible manufacturing: the case of hoist scheduling in an electroplating line International Journal of Production Engineering 99 2006 74 87 (Pubitemid 41550212)
    • (2006) International Journal of Production Economics , vol.99 , Issue.1-2 , pp. 74-87
    • Subai, C.1    Baptiste, P.2    Niel, E.3
  • 25
    • 70449565741 scopus 로고    scopus 로고
    • A methodology for planning and controlling workload in a job-shop: A four-way decision-making problem
    • Moreira M.R.A., and Alves RA.F.S. A methodology for planning and controlling workload in a job-shop: a four-way decision-making problem International Journal of Production Research 47 2009 2805 2821
    • (2009) International Journal of Production Research , vol.47 , pp. 2805-2821
    • Moreira, M.R.A.1    Alves, R.S.2
  • 26
    • 68249099005 scopus 로고    scopus 로고
    • A survey of dynamic scheduling in manufacturing systems
    • Ouelhadj D., and Petrovic S. A survey of dynamic scheduling in manufacturing systems Journal of Scheduling 12 2009 417 431
    • (2009) Journal of Scheduling , vol.12 , pp. 417-431
    • Ouelhadj, D.1    Petrovic, S.2
  • 28
    • 40849098593 scopus 로고    scopus 로고
    • Real time distributed shop floor scheduling using an agent-based service-oriented architecture
    • DOI 10.1080/00207540701738052, PII 791536362, Enabling Technologies and Frameworks for Collaborative Intelligent Manufacturing
    • Wang C., Ghenniwa H., and Shen W. Real time distributed shop floor scheduling using an agent-based service-oriented architecture International Journal of Production Research 46 2008 2433 2452 (Pubitemid 351394262)
    • (2008) International Journal of Production Research , vol.46 , Issue.9 , pp. 2433-2452
    • Wang, C.1    Ghenniwa, H.2    Shen, W.3
  • 30
    • 52049091896 scopus 로고    scopus 로고
    • A memetic algorithm for the flexible flow line scheduling problem with processor blocking
    • Tavakkoli-Moghaddama R., Safaei N., and Sassani F. A memetic algorithm for the flexible flow line scheduling problem with processor blocking Computers and Operations Research 36 2009 402 414
    • (2009) Computers and Operations Research , vol.36 , pp. 402-414
    • Tavakkoli-Moghaddama, R.1    Safaei, N.2    Sassani, F.3
  • 31
    • 75749089533 scopus 로고    scopus 로고
    • A constraint programming model for the scheduling of flexible manufacturing systems with machine and tool limitations
    • Zeballos L.J., Quiroga O.D., and Henning G.P. A constraint programming model for the scheduling of flexible manufacturing systems with machine and tool limitations Engineering Applications of Artificial Intelligence 23 2010 229 248
    • (2010) Engineering Applications of Artificial Intelligence , vol.23 , pp. 229-248
    • Zeballos, L.J.1    Quiroga, O.D.2    Henning, G.P.3
  • 32
    • 33646399781 scopus 로고    scopus 로고
    • Algorithms for the car sequencing and the level scheduling problem
    • Drexl A., Kimms A., and Matthiessen L. Algorithms for the car sequencing and the level scheduling problem Journal of Scheduling 9 2006 153 176
    • (2006) Journal of Scheduling , vol.9 , pp. 153-176
    • Drexl, A.1    Kimms, A.2    Matthiessen, L.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.