메뉴 건너뛰기




Volumn 206, Issue 1, 2013, Pages 115-145

Flow shop scheduling with peak power consumption constraints

Author keywords

Combinatorial optimization; Energy; Flow shop; Integer programming; Peak power consumption; Scheduling

Indexed keywords


EID: 84879422697     PISSN: 02545330     EISSN: 15729338     Source Type: Journal    
DOI: 10.1007/s10479-012-1294-z     Document Type: Article
Times cited : (177)

References (29)
  • 1
    • 77951770504 scopus 로고    scopus 로고
    • Energy-efficient algorithms
    • Albers, S. (2010). Energy-efficient algorithms. Communications of the ACM, 53(5), 86-96.
    • (2010) Communications of the ACM , vol.53 , Issue.5 , pp. 86-96
    • Albers, S.1
  • 2
    • 43849094641 scopus 로고    scopus 로고
    • Peak load management in electrolytic process industries
    • Babu, C. A., & Ashok, S. (2008). Peak load management in electrolytic process industries. IEEE Transactions on Power Systems, 23(2), 399-405.
    • (2008) IEEE Transactions on Power Systems , vol.23 , Issue.2 , pp. 399-405
    • Babu, C.A.1    Ashok, S.2
  • 3
    • 33947225230 scopus 로고    scopus 로고
    • Speed scaling to manage energy and temperature
    • Bansal, N., Kimbrel, T., & Pruhs, K. (2007). Speed scaling to manage energy and temperature. Journal of the ACM, 54(1), 1-39.
    • (2007) Journal of the ACM , vol.54 , Issue.1 , pp. 1-39
    • Bansal, N.1    Kimbrel, T.2    Pruhs, K.3
  • 5
    • 16344380801 scopus 로고    scopus 로고
    • Cutting parameter optimization to minimize production time in high speed turning
    • Bouzid, W. (2005). Cutting parameter optimization to minimize production time in high speed turning. Journal of Materials Processing Technology, 161(3), 388-395.
    • (2005) Journal of Materials Processing Technology , vol.161 , Issue.3 , pp. 388-395
    • Bouzid, W.1
  • 10
    • 80054680608 scopus 로고    scopus 로고
    • A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction
    • Fang, K., Uhan, N. A., Zhao, F., & Sutherland, J. W. (2011). A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction. Journal of Manufacturing Systems, 30(4), 234-240.
    • (2011) Journal of Manufacturing Systems , vol.30 , Issue.4 , pp. 234-240
    • Fang, K.1    Uhan, N.A.2    Zhao, F.3    Sutherland, J.W.4
  • 14
    • 33745614518 scopus 로고    scopus 로고
    • Algorithmic problems in power management
    • Irani, S., & Pruhs, K. R. (2005). Algorithmic problems in power management. SIGACT News, 36(2), 63-76.
    • (2005) SIGACT News , vol.36 , Issue.2 , pp. 63-76
    • Irani, S.1    Pruhs, K.R.2
  • 15
    • 59049095348 scopus 로고    scopus 로고
    • Mixed integer programming formulations for single machine scheduling problems
    • Keha, A. B., Khowala, K., & Fowler, J. W. (2009). Mixed integer programming formulations for single machine scheduling problems. Computers & Industrial Engineering, 56(1), 357-367.
    • (2009) Computers & Industrial Engineering , vol.56 , Issue.1 , pp. 357-367
    • Keha, A.B.1    Khowala, K.2    Fowler, J.W.3
  • 17
    • 33645222076 scopus 로고    scopus 로고
    • Optimal voltage allocation techniques for dynamically variable voltage processors
    • Kwon, W. C., & Kim, T. (2005). Optimal voltage allocation techniques for dynamically variable voltage processors. ACM Transactions on Embedded Computing Systems, 4(1), 211-230.
    • (2005) ACM Transactions on Embedded Computing Systems , vol.4 , Issue.1 , pp. 211-230
    • Kwon, W.C.1    Kim, T.2
  • 19
    • 0000237789 scopus 로고
    • On the job-shop scheduling problem
    • Manne, A. S. (1960). On the job-shop scheduling problem. Operations Research, 8(2), 219-223.
    • (1960) Operations Research , vol.8 , Issue.2 , pp. 219-223
    • Manne, A.S.1
  • 20
    • 78650636006 scopus 로고    scopus 로고
    • A framework to minimise total energy consumption and total tardiness on a single machine
    • Mouzon, G., & Yildirim, M. B. (2008). A framework to minimise total energy consumption and total tardiness on a single machine. International Journal of Sustainable Engineering, 1(2), 105-116.
    • (2008) International Journal of Sustainable Engineering , vol.1 , Issue.2 , pp. 105-116
    • Mouzon, G.1    Yildirim, M.B.2
  • 21
    • 34548395445 scopus 로고    scopus 로고
    • Operational methods for minimization of energy consumption of manufacturing equipment
    • Mouzon, G., Yildirim, M. B., & Twomey, J. (2007). Operational methods for minimization of energy consumption of manufacturing equipment. International Journal of Production Research, 45(18-19), 4247-4271.
    • (2007) International Journal of Production Research , vol.45 , Issue.18-19 , pp. 4247-4271
    • Mouzon, G.1    Yildirim, M.B.2    Twomey, J.3
  • 22
    • 0035311079 scopus 로고    scopus 로고
    • Power: a first-class architectural design constraint
    • Mudge, T. (2001). Power: a first-class architectural design constraint. Computer, 34(4), 52-58.
    • (2001) Computer , vol.34 , Issue.4 , pp. 52-58
    • Mudge, T.1
  • 24
    • 0015401303 scopus 로고
    • On the flow-shop sequencing problem with no wait in process
    • Reddi, S. S., & Ramamoorthy, C. V. (1972). On the flow-shop sequencing problem with no wait in process. Operational Research Quarterly, 23(3), 323-331.
    • (1972) Operational Research Quarterly , vol.23 , Issue.3 , pp. 323-331
    • Reddi, S.S.1    Ramamoorthy, C.V.2
  • 27
    • 77950593573 scopus 로고    scopus 로고
    • Evaluation of mixed integer programming formulations for non-preemptive parallel machine scheduling problems
    • Unlu, Y., & Mason, S. J. (2010). Evaluation of mixed integer programming formulations for non-preemptive parallel machine scheduling problems. Computers & Industrial Engineering, 58(4), 785-800.
    • (2010) Computers & Industrial Engineering , vol.58 , Issue.4 , pp. 785-800
    • Unlu, Y.1    Mason, S.J.2
  • 28
    • 0000518993 scopus 로고
    • An integer linear-programming model for machine scheduling
    • Wagner, H. M. (1959). An integer linear-programming model for machine scheduling. Naval Research Logistics Quarterly, 6(2), 134-140.
    • (1959) Naval Research Logistics Quarterly , vol.6 , Issue.2 , pp. 134-140
    • Wagner, H.M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.