메뉴 건너뛰기




Volumn 20, Issue 7, 2013, Pages 1-8

Two-stage mathematical programming approach for steelmaking process scheduling under variable electricity price

Author keywords

Mathematical programming; Scheduling; Steelmaking process; Variable electricity price

Indexed keywords


EID: 84882564990     PISSN: 1006706X     EISSN: None     Source Type: Journal    
DOI: 10.1016/S1006-706X(13)60118-1     Document Type: Article
Times cited : (42)

References (12)
  • 1
    • 0035899628 scopus 로고    scopus 로고
    • A Review of Planning and Scheduling Systems and Methods for Integrated Steel Production [J]
    • Tang Lixin, Liu Jiyin, Rong Aiying, et al. A Review of Planning and Scheduling Systems and Methods for Integrated Steel Production [J]. European Journal of Operational Research 2001, 133(1):1.
    • (2001) European Journal of Operational Research , vol.133 , Issue.1 , pp. 1
    • Tang, L.1    Liu, J.2    Rong, A.3
  • 2
    • 0033892353 scopus 로고    scopus 로고
    • A Mathematical Programming Model for Scheduling Steelmaking-Continuous Casting Production [J]
    • Tang Lixin, Liu Jiyin, Rong Aiying, et al. A Mathematical Programming Model for Scheduling Steelmaking-Continuous Casting Production [J]. European Journal of Operational Research 2000, 120(2):423.
    • (2000) European Journal of Operational Research , vol.120 , Issue.2 , pp. 423
    • Tang, L.1    Liu, J.2    Rong, A.3
  • 3
    • 0037050386 scopus 로고    scopus 로고
    • Steel-Making Process Scheduling Using Lagrangian Relaxation [J]
    • Tang Lixin, Luh PB, Liu Jiyin, et al. Steel-Making Process Scheduling Using Lagrangian Relaxation [J]. International Journal of Production Research 2002, 40(1):55.
    • (2002) International Journal of Production Research , vol.40 , Issue.1 , pp. 55
    • Tang, L.1    Luh, P.B.2    Liu, J.3
  • 4
    • 0035890549 scopus 로고    scopus 로고
    • A Decomposition Approach for the Scheduling of a Steel Plant Production [J]
    • Harjunkoski I, Grossmann IE A Decomposition Approach for the Scheduling of a Steel Plant Production [J]. Computers and Chemical Engineering 2001, 25(11/12):1647.
    • (2001) Computers and Chemical Engineering , vol.25 , Issue.11-12 , pp. 1647
    • Harjunkoski, I.1    Grossmann, I.E.2
  • 5
    • 33748751184 scopus 로고    scopus 로고
    • A Mixed-Integer Linear Programming Model for the Continuous Casting Planning [J]
    • Bellabdaoui A, Teghem J A Mixed-Integer Linear Programming Model for the Continuous Casting Planning [J]. International Journal of Production Economics 2006, 104(2):260.
    • (2006) International Journal of Production Economics , vol.104 , Issue.2 , pp. 260
    • Bellabdaoui, A.1    Teghem, J.2
  • 6
    • 58549106334 scopus 로고    scopus 로고
    • A Novel Hybrid Algorithm for Scheduling Steel-Making Continuous Casting Production [J]
    • Atighehchian A, Bijari M, Tarkesh H A Novel Hybrid Algorithm for Scheduling Steel-Making Continuous Casting Production [J]. Computer and Operation Research 2009, 36(8):2450.
    • (2009) Computer and Operation Research , vol.36 , Issue.8 , pp. 2450
    • Atighehchian, A.1    Bijari, M.2    Tarkesh, H.3
  • 8
    • 9644281095 scopus 로고    scopus 로고
    • Production Scheduling in a Steelmaking-Continuous Casting Plant [J]
    • Pacciarelli D, Pranzo M Production Scheduling in a Steelmaking-Continuous Casting Plant [J]. Computers and Chemical Engineering 2004, 28(12):2823.
    • (2004) Computers and Chemical Engineering , vol.28 , Issue.12 , pp. 2823
    • Pacciarelli, D.1    Pranzo, M.2
  • 9
    • 76349105056 scopus 로고    scopus 로고
    • Steelmaking and Refining Coordinated Scheduling Problem With Waiting Time and Transportation Consideration [J]
    • Tang Lixin, Guan Jing, Guofen H Steelmaking and Refining Coordinated Scheduling Problem With Waiting Time and Transportation Consideration [J]. Computer and Industrial Engineering 2010, 58(2):239.
    • (2010) Computer and Industrial Engineering , vol.58 , Issue.2 , pp. 239
    • Tang, L.1    Guan, J.2    Guofen, H.3
  • 10
    • 67849109965 scopus 로고    scopus 로고
    • New Continuous-Time Scheduling Formulation for Continuous Plants Under Variable Electricity Cost [J]
    • Castro PM, Harjunkoski I, Grossmann IE New Continuous-Time Scheduling Formulation for Continuous Plants Under Variable Electricity Cost [J]. Industrial and Engineering Chemistry Research 2009, 48(14):6701.
    • (2009) Industrial and Engineering Chemistry Research , vol.48 , Issue.14 , pp. 6701
    • Castro, P.M.1    Harjunkoski, I.2    Grossmann, I.E.3
  • 12
    • 77956872862 scopus 로고    scopus 로고
    • Electrical Load Tracking Scheduling of a Steel Plant [J]
    • Nolde K, Morari M Electrical Load Tracking Scheduling of a Steel Plant [J]. Computers and Chemical Engineering 2010, 34(11):1899.
    • (2010) Computers and Chemical Engineering , vol.34 , Issue.11 , pp. 1899
    • Nolde, K.1    Morari, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.