Volumn 111, Issue , 2014, Pages 335-349

Optimization of energy and water use in multipurpose batch plants using an improved mathematical formulation

Author keywords

Energy integration; Heat storage; Multipurpose batch plant; Wastewater minimization

Indexed keywords

BATCH DATA PROCESSING; COSTS; ENVIRONMENTAL IMPACT; HEAT STORAGE; INTEGRATION; OPTIMIZATION;

EID: 84897009770     PISSN: 00092509     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ces.2014.02.036     Document Type: Article
Times cited : (21)

References (66)
  • 1
    • 80053921337 scopus 로고    scopus 로고
    • Wastewater minimization in multipurpose batch plants with a regeneration unit: multiple contaminants
    • Adekola O., Majozi T. Wastewater minimization in multipurpose batch plants with a regeneration unit: multiple contaminants. Comput. Chem. Eng. 2011, 35:2824-2836.
    • (2011) Comput. Chem. Eng. , vol.35 , pp. 2824-2836
    • Adekola, O.1    Majozi, T.2
  • 2
    • 84879548950 scopus 로고    scopus 로고
    • Unified approach for the optimization of energy and water in multipurpose batch plants using a flexible scheduling framework
    • Adekola O., Stamp J., Majozi T., Garg A., Bandyopadhyay S. Unified approach for the optimization of energy and water in multipurpose batch plants using a flexible scheduling framework. Ind. Eng. Chem. Res. 2013, 52:8488-8506.
    • (2013) Ind. Eng. Chem. Res. , vol.52 , pp. 8488-8506
    • Adekola, O.1    Stamp, J.2    Majozi, T.3    Garg, A.4    Bandyopadhyay, S.5
  • 3
    • 0043093730 scopus 로고    scopus 로고
    • Incorporating heat integration in batch process scheduling
    • Adonyi R., Romero J., Puigjaner L., Friedler F. Incorporating heat integration in batch process scheduling. Appl. Therm. Eng. 2003, 23:1743-1762.
    • (2003) Appl. Therm. Eng. , vol.23 , pp. 1743-1762
    • Adonyi, R.1    Romero, J.2    Puigjaner, L.3    Friedler, F.4
  • 5
    • 77950950860 scopus 로고    scopus 로고
    • The challenge of integrating non-continuous processes - milk powder plant case study
    • Atkins M.J., Walmsley M.R.W., Neale J.R. The challenge of integrating non-continuous processes - milk powder plant case study. J. Clean. Prod. 2010, 18:927-934.
    • (2010) J. Clean. Prod. , vol.18 , pp. 927-934
    • Atkins, M.J.1    Walmsley, M.R.W.2    Neale, J.R.3
  • 7
    • 0035339835 scopus 로고    scopus 로고
    • Optimal design of heat-integrated multipurpose batch facilities: a mixed-integer mathematical formulation
    • Barbosa-Póvoa A.P.F.D., Pinto T., Novais A.Q. Optimal design of heat-integrated multipurpose batch facilities: a mixed-integer mathematical formulation. Comput. Chem. Eng. 2001, 25:547-559.
    • (2001) Comput. Chem. Eng. , vol.25 , pp. 547-559
    • Barbosa-Póvoa, A.P.F.D.1    Pinto, T.2    Novais, A.Q.3
  • 10
    • 0034740745 scopus 로고    scopus 로고
    • A computerized and integrated approach for heat exchanger network design in multipurpose batch plants
    • Bozan M., Borak F., Or I. A computerized and integrated approach for heat exchanger network design in multipurpose batch plants. Chem. Eng. Process. 2001, 40:511-524.
    • (2001) Chem. Eng. Process. , vol.40 , pp. 511-524
    • Bozan, M.1    Borak, F.2    Or, I.3
  • 11
    • 0346101524 scopus 로고    scopus 로고
    • Simple continuous-time formulation for short-term scheduling of batch and continuous processes
    • Castro P.M., Barbosa-Povóa A.P., Matos H.A., Novais A.Q. Simple continuous-time formulation for short-term scheduling of batch and continuous processes. Ind. Eng. Chem. Res. 2004, 43:105-118.
    • (2004) Ind. Eng. Chem. Res. , vol.43 , pp. 105-118
    • Castro, P.M.1    Barbosa-Povóa, A.P.2    Matos, H.A.3    Novais, A.Q.4
  • 12
    • 58549097449 scopus 로고    scopus 로고
    • A resource-task network approach for optimal short-term/periodic scheduling and heat integration in multipurpose batch plants
    • Chen C.L., Chang C.Y. A resource-task network approach for optimal short-term/periodic scheduling and heat integration in multipurpose batch plants. Appl. Therm. Eng. 2009, 29:1195-1208.
    • (2009) Appl. Therm. Eng. , vol.29 , pp. 1195-1208
    • Chen, C.L.1    Chang, C.Y.2
  • 13
    • 49249118604 scopus 로고    scopus 로고
    • Design and optimization of indirect energy storage systems for batch process plants
    • Chen C.L., Ciou Y.J. Design and optimization of indirect energy storage systems for batch process plants. Ind. Eng. Chem. Res. 2008, 47:4817-4829.
    • (2008) Ind. Eng. Chem. Res. , vol.47 , pp. 4817-4829
    • Chen, C.L.1    Ciou, Y.J.2
  • 14
    • 33847629618 scopus 로고    scopus 로고
    • Integrated water network designs for batch processes
    • Cheng K.F., Chang C.T. Integrated water network designs for batch processes. Ind. Eng. Chem. Res. 2007, 46:1241-1253.
    • (2007) Ind. Eng. Chem. Res. , vol.46 , pp. 1241-1253
    • Cheng, K.F.1    Chang, C.T.2
  • 15
  • 16
    • 40449111439 scopus 로고    scopus 로고
    • Slot-based formulation for the short-term scheduling of multistage, multiproduct batch plants with sequence-dependent changeovers
    • Erdirik-Dogan M., Grossmann I.E. Slot-based formulation for the short-term scheduling of multistage, multiproduct batch plants with sequence-dependent changeovers. Ind. Eng. Chem. Res. 2008, 47:1159-1163.
    • (2008) Ind. Eng. Chem. Res. , vol.47 , pp. 1159-1163
    • Erdirik-Dogan, M.1    Grossmann, I.E.2
  • 19
    • 2442583184 scopus 로고    scopus 로고
    • Continuous-time versus discrete-time approaches for scheduling of chemical processes: a review
    • Floudas C.A., Lin X. Continuous-time versus discrete-time approaches for scheduling of chemical processes: a review. Comput. Chem. Eng. 2004, 28:2109-2129.
    • (2004) Comput. Chem. Eng. , vol.28 , pp. 2109-2129
    • Floudas, C.A.1    Lin, X.2
  • 20
    • 49449085876 scopus 로고    scopus 로고
    • Minimum units targeting and network evolution for batch heat exchanger network
    • Foo D.C.Y., Chew Y.H., Lee C.T. Minimum units targeting and network evolution for batch heat exchanger network. Appl. Therm. Eng. 2008, 28:2089-2099.
    • (2008) Appl. Therm. Eng. , vol.28 , pp. 2089-2099
    • Foo, D.C.Y.1    Chew, Y.H.2    Lee, C.T.3
  • 21
    • 27144448005 scopus 로고    scopus 로고
    • Synthesis of maximum water recovery network for batch process systems
    • Foo D.C.Y., Manan Z.A., Tan Y.L. Synthesis of maximum water recovery network for batch process systems. J. Clean. Prod. 2005, 13:1381-1394.
    • (2005) J. Clean. Prod. , vol.13 , pp. 1381-1394
    • Foo, D.C.Y.1    Manan, Z.A.2    Tan, Y.L.3
  • 22
    • 33646101686 scopus 로고    scopus 로고
    • Efficient energy use in a slaughter and meat processing plant - opportunities for process integration
    • Fritzson A., Berntsson T. Efficient energy use in a slaughter and meat processing plant - opportunities for process integration. J. Food Eng. 2006, 76:594-604.
    • (2006) J. Food Eng. , vol.76 , pp. 594-604
    • Fritzson, A.1    Berntsson, T.2
  • 24
    • 70349316833 scopus 로고    scopus 로고
    • Sequential methodology for scheduling of heat-integrated batch plants
    • Halim I., Srinivasan R. Sequential methodology for scheduling of heat-integrated batch plants. Ind. Eng. Chem. Res. 2009, 48:8551-8565.
    • (2009) Ind. Eng. Chem. Res. , vol.48 , pp. 8551-8565
    • Halim, I.1    Srinivasan, R.2
  • 25
    • 79960565026 scopus 로고    scopus 로고
    • Sequential methodology for integrated optimization of energy and water use during batch process scheduling
    • Halim I., Srinivasan R. Sequential methodology for integrated optimization of energy and water use during batch process scheduling. Comput. Chem. Eng. 2011, 35:1575-1597.
    • (2011) Comput. Chem. Eng. , vol.35 , pp. 1575-1597
    • Halim, I.1    Srinivasan, R.2
  • 26
    • 0028512271 scopus 로고
    • Omnium: ein verfahren zur optimierung der abwarmenutzung
    • (in German)
    • Hellwig T., Thöne E. Omnium: ein verfahren zur optimierung der abwarmenutzung. BWK (Brennstoff, Warme, Kraft) 1994, 46:393-397. (in German).
    • (1994) BWK (Brennstoff, Warme, Kraft) , vol.46 , pp. 393-397
    • Hellwig, T.1    Thöne, E.2
  • 27
    • 0034387803 scopus 로고    scopus 로고
    • A novel MILP formulation for short-term scheduling of multi-stage multi-product batch plants
    • Hui C.W., Gupta A. A novel MILP formulation for short-term scheduling of multi-stage multi-product batch plants. Comput. Chem. Eng. 2000, 24:2705-2717.
    • (2000) Comput. Chem. Eng. , vol.24 , pp. 2705-2717
    • Hui, C.W.1    Gupta, A.2
  • 28
    • 0032216021 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling: 1. Multipurpose batch processes
    • Ierapetritou M.G., Floudas C.A. Effective continuous-time formulation for short-term scheduling: 1. Multipurpose batch processes. Ind. Eng. Chem. Res. 1998, 37:4341-4359.
    • (1998) Ind. Eng. Chem. Res. , vol.37 , pp. 4341-4359
    • Ierapetritou, M.G.1    Floudas, C.A.2
  • 29
    • 38849197825 scopus 로고    scopus 로고
    • Improving unit-specific event based continuous time approaches for batch processes: integrality gap and task splitting
    • Janak S.L., Floudas C.A. Improving unit-specific event based continuous time approaches for batch processes: integrality gap and task splitting. Comput. Chem. Eng. 2008, 32:913-955.
    • (2008) Comput. Chem. Eng. , vol.32 , pp. 913-955
    • Janak, S.L.1    Floudas, C.A.2
  • 30
    • 0031186347 scopus 로고    scopus 로고
    • Planning and scheduling of parallel semicontinuous processes. II. Short-term scheduling
    • Karimi I.A., McDonald C.M. Planning and scheduling of parallel semicontinuous processes. II. Short-term scheduling. Ind. Eng. Chem. Res. 1997, 36:2701-2714.
    • (1997) Ind. Eng. Chem. Res. , vol.36 , pp. 2701-2714
    • Karimi, I.A.1    McDonald, C.M.2
  • 31
    • 0000417734 scopus 로고
    • Energy and process integration in continuous and batch processes. Innovation in process energy utilization
    • Kemp I.C., Macdonald E.K. Energy and process integration in continuous and batch processes. Innovation in process energy utilization. IChemE Symp. Ser. 1987, 105:185-200.
    • (1987) IChemE Symp. Ser. , vol.105 , pp. 185-200
    • Kemp, I.C.1    Macdonald, E.K.2
  • 32
    • 2642556248 scopus 로고    scopus 로고
    • Automated design of discontinuous water systems
    • Kim J.K., Smith R. Automated design of discontinuous water systems. Process. Saf. Environ. 2004, 82:238-248.
    • (2004) Process. Saf. Environ. , vol.82 , pp. 238-248
    • Kim, J.K.1    Smith, R.2
  • 33
    • 0027545176 scopus 로고
    • A general algorithm for short-term scheduling of batch operations. I. MILP formulation
    • Kondili E., Pantelides C.C., Sargent R.W.H. A general algorithm for short-term scheduling of batch operations. I. MILP formulation. Comput. Chem. Eng. 1993, 17:211-227.
    • (1993) Comput. Chem. Eng. , vol.17 , pp. 211-227
    • Kondili, E.1    Pantelides, C.C.2    Sargent, R.W.H.3
  • 34
    • 0035456560 scopus 로고    scopus 로고
    • Indirect and mixed direct-indirect heat integration of batch processes based on Pinch Analysis
    • Krummenacher P., Favrat D. Indirect and mixed direct-indirect heat integration of batch processes based on Pinch Analysis. Int. J. Appl. Thermodyn. 2001, 4:135-143.
    • (2001) Int. J. Appl. Thermodyn. , vol.4 , pp. 135-143
    • Krummenacher, P.1    Favrat, D.2
  • 35
    • 75249090444 scopus 로고    scopus 로고
    • An analysis of some unit-specific event-based models for the short-term scheduling of non-continuous processes
    • Li J., Susarla N., Karimi I.A., Shaik M., Floudas C.A. An analysis of some unit-specific event-based models for the short-term scheduling of non-continuous processes. Ind. Eng. Chem. Res. 2010, 49:633-647.
    • (2010) Ind. Eng. Chem. Res. , vol.49 , pp. 633-647
    • Li, J.1    Susarla, N.2    Karimi, I.A.3    Shaik, M.4    Floudas, C.A.5
  • 36
    • 0346734333 scopus 로고    scopus 로고
    • Resource-constrained scheduling of parallel production lines using asynchronous slots
    • Lim M.F., Karimi I.A. Resource-constrained scheduling of parallel production lines using asynchronous slots. Ind. Eng. Chem. Res. 2003, 42:6832-6842.
    • (2003) Ind. Eng. Chem. Res. , vol.42 , pp. 6832-6842
    • Lim, M.F.1    Karimi, I.A.2
  • 37
    • 33846785064 scopus 로고    scopus 로고
    • Scheduling multistage, multiproduct batch plants with non identical parallel units and unlimited intermediate storage
    • Liu Y., Karimi I.A. Scheduling multistage, multiproduct batch plants with non identical parallel units and unlimited intermediate storage. Chem. Eng. Sci. 2007, 62:1549-1566.
    • (2007) Chem. Eng. Sci. , vol.62 , pp. 1549-1566
    • Liu, Y.1    Karimi, I.A.2
  • 38
    • 38849188495 scopus 로고    scopus 로고
    • Scheduling multistage batch plants with parallel units and no interstage storage
    • Liu Y., Karimi I.A. Scheduling multistage batch plants with parallel units and no interstage storage. Comput. Chem. Eng. 2008, 32:671-693.
    • (2008) Comput. Chem. Eng. , vol.32 , pp. 671-693
    • Liu, Y.1    Karimi, I.A.2
  • 39
    • 33645139809 scopus 로고    scopus 로고
    • Heat integration of multipurpose batch plants using a continuous-time framework
    • Majozi T. Heat integration of multipurpose batch plants using a continuous-time framework. Appl. Therm. Eng. 2006, 26:1369-1377.
    • (2006) Appl. Therm. Eng. , vol.26 , pp. 1369-1377
    • Majozi, T.1
  • 40
    • 64549156059 scopus 로고    scopus 로고
    • Minimization of energy use in multipurpose batch plants using heat storage: an aspect of cleaner production
    • Majozi T. Minimization of energy use in multipurpose batch plants using heat storage: an aspect of cleaner production. J. Clean. Prod. 2009, 17:945-950.
    • (2009) J. Clean. Prod. , vol.17 , pp. 945-950
    • Majozi, T.1
  • 41
    • 70249130814 scopus 로고    scopus 로고
    • A mathematical optimisation approach for wastewater minimization in multipurpose batch plants: multiple contaminants
    • Majozi T., Gouws J.F. A mathematical optimisation approach for wastewater minimization in multipurpose batch plants: multiple contaminants. Comput. Chem. Eng. 2009, 33:1826-1840.
    • (2009) Comput. Chem. Eng. , vol.33 , pp. 1826-1840
    • Majozi, T.1    Gouws, J.F.2
  • 42
    • 0035852008 scopus 로고    scopus 로고
    • A novel continuous-time MILP Formulation for multipurpose bach plants
    • Majozi T., Zhu X.X. A novel continuous-time MILP Formulation for multipurpose bach plants. Ind. Eng. Chem. Res. 2001, 40:5935-5949.
    • (2001) Ind. Eng. Chem. Res. , vol.40 , pp. 5935-5949
    • Majozi, T.1    Zhu, X.X.2
  • 43
    • 0037635200 scopus 로고    scopus 로고
    • New general continuous-time state-task network formulation for short-term scheduling of multipurpose batch plants
    • Maravelias C.T., Grossmann I.E. New general continuous-time state-task network formulation for short-term scheduling of multipurpose batch plants. Ind. Eng. Chem. Res. 2003, 42:3056-3074.
    • (2003) Ind. Eng. Chem. Res. , vol.42 , pp. 3056-3074
    • Maravelias, C.T.1    Grossmann, I.E.2
  • 44
    • 0343627890 scopus 로고    scopus 로고
    • Optimal scheduling of a resource-constrained multiproduct batch plant supplying intermediates to nearby end product facilities
    • Méndez C.A., Cerdá J. Optimal scheduling of a resource-constrained multiproduct batch plant supplying intermediates to nearby end product facilities. Comput. Chem. Eng. 2000, 24:369-376.
    • (2000) Comput. Chem. Eng. , vol.24 , pp. 369-376
    • Méndez, C.A.1    Cerdá, J.2
  • 45
    • 0034307307 scopus 로고    scopus 로고
    • Optimal scheduling of batch plants satisfying multiple product orders with different due-dates
    • Méndez C.A., Henning G.P., Cerdá J. Optimal scheduling of batch plants satisfying multiple product orders with different due-dates. Comput. Chem. Eng. 2000, 24:2223-2245.
    • (2000) Comput. Chem. Eng. , vol.24 , pp. 2223-2245
    • Méndez, C.A.1    Henning, G.P.2    Cerdá, J.3
  • 46
    • 33748102266 scopus 로고    scopus 로고
    • State of- the-art review of optimization methods for short-term scheduling of batch processes
    • Méndez C.A., Cerdá J., Grossmann I.E., Harjunkoski I., Fahl M. State of- the-art review of optimization methods for short-term scheduling of batch processes. Comput. Chem. Eng. 2006, 30:913-946.
    • (2006) Comput. Chem. Eng. , vol.30 , pp. 913-946
    • Méndez, C.A.1    Cerdá, J.2    Grossmann, I.E.3    Harjunkoski, I.4    Fahl, M.5
  • 47
    • 0035339828 scopus 로고    scopus 로고
    • An MILP continuous-time approach to short-term scheduling of resource-constrained multistage flowshop batch facilities
    • Méndez C.A., Henning G.P., Cerdá J. An MILP continuous-time approach to short-term scheduling of resource-constrained multistage flowshop batch facilities. Comput. Chem. Eng. 2001, 25:701-711.
    • (2001) Comput. Chem. Eng. , vol.25 , pp. 701-711
    • Méndez, C.A.1    Henning, G.P.2    Cerdá, J.3
  • 48
    • 2442495043 scopus 로고    scopus 로고
    • An MILP continuous-time framework for short-term scheduling of multipurpose batch processes under different operation strategies
    • Méndez C.A., Cerdá J. An MILP continuous-time framework for short-term scheduling of multipurpose batch processes under different operation strategies. Opt. Eng. 2003, 4:7-22.
    • (2003) Opt. Eng. , vol.4 , pp. 7-22
    • Méndez, C.A.1    Cerdá, J.2
  • 50
    • 79958833214 scopus 로고    scopus 로고
    • The green brewery concept Energy efficiency and the use of renewable energy sources in breweries
    • Muster-Slawitsch B., Weiss W., Schnitzer H., Brunner C. The green brewery concept Energy efficiency and the use of renewable energy sources in breweries. Appl. Therm. Eng. 2011, 31:2123-2134.
    • (2011) Appl. Therm. Eng. , vol.31 , pp. 2123-2134
    • Muster-Slawitsch, B.1    Weiss, W.2    Schnitzer, H.3    Brunner, C.4
  • 52
    • 0028500039 scopus 로고
    • Optimal cyclic scheduling of multistage continuous multiproduct plants
    • Pinto J.M., Grossmann I.E. Optimal cyclic scheduling of multistage continuous multiproduct plants. Comput. Chem. Eng. 1994, 1994(18):797-816.
    • (1994) Comput. Chem. Eng. , vol.1994 , Issue.18 , pp. 797-816
    • Pinto, J.M.1    Grossmann, I.E.2
  • 53
    • 0037273122 scopus 로고    scopus 로고
    • Optimal design of heat-integrated multipurpose batch facilities with economic savings in utilities: a mixed integer mathematical formulation
    • Pinto T., Novais A.Q., Barbosa-Póvoa A.P.F.D. Optimal design of heat-integrated multipurpose batch facilities with economic savings in utilities: a mixed integer mathematical formulation. Ann. Operat. Res. 2003, 120:201-230.
    • (2003) Ann. Operat. Res. , vol.120 , pp. 201-230
    • Pinto, T.1    Novais, A.Q.2    Barbosa-Póvoa, A.P.F.D.3
  • 54
    • 84858186693 scopus 로고    scopus 로고
    • An Energy Integration Tool for Batch Process, Sustainable Development of Energy, Water and Environment Systems.
    • Pires, A.C., Fernandes, C.M., Nunes, C.P., 2003. An Energy Integration Tool for Batch Process, Sustainable Development of Energy, Water and Environment Systems. In: Proceedings of the 3rd Dubrovnik Conference, pp. 175-185.
    • (2003) In: Proceedings of the 3rd Dubrovnik Conference , pp. 175-185
    • Pires, A.C.1    Fernandes, C.M.2    Nunes, C.P.3
  • 55
    • 1642331599 scopus 로고    scopus 로고
    • A new continuous-time formulation for scheduling crude oil operations
    • Reddy P.C.P., Karimi I.A., Srinivasan R. A new continuous-time formulation for scheduling crude oil operations. Chem. Eng. Sci. 2004, 59:1325-1341.
    • (2004) Chem. Eng. Sci. , vol.59 , pp. 1325-1341
    • Reddy, P.C.P.1    Karimi, I.A.2    Srinivasan, R.3
  • 56
    • 0029717404 scopus 로고    scopus 로고
    • A simple continuous-time process scheduling formulation and a novel solution algorithm
    • Schilling G., Pantelides C. A simple continuous-time process scheduling formulation and a novel solution algorithm. Comput. Chem. Eng. 1996, 20:1221-1226.
    • (1996) Comput. Chem. Eng. , vol.20 , pp. 1221-1226
    • Schilling, G.1    Pantelides, C.2
  • 57
    • 81055157692 scopus 로고    scopus 로고
    • A robust mathematical formulation for multipurpose batch plants
    • Seid R., Majozi T. A robust mathematical formulation for multipurpose batch plants. Chem. Eng. Sci. 2012, 68:36-53.
    • (2012) Chem. Eng. Sci. , vol.68 , pp. 36-53
    • Seid, R.1    Majozi, T.2
  • 58
    • 65349119397 scopus 로고    scopus 로고
    • Novel unified modeling approach for short term scheduling
    • Shaik M., Floudas C. Novel unified modeling approach for short term scheduling. Ind. Eng. Chem. Res. 2009, 48:2947-2964.
    • (2009) Ind. Eng. Chem. Res. , vol.48 , pp. 2947-2964
    • Shaik, M.1    Floudas, C.2
  • 59
    • 33748760882 scopus 로고    scopus 로고
    • Continuous-time models for short-term scheduling of multipurpose batch plants: a comparative study
    • Shaik M.A., Janak S.L., Floudas C.A. Continuous-time models for short-term scheduling of multipurpose batch plants: a comparative study. Ind. Eng. Chem. Res. 2006, 45:6190-6209.
    • (2006) Ind. Eng. Chem. Res. , vol.45 , pp. 6190-6209
    • Shaik, M.A.1    Janak, S.L.2    Floudas, C.A.3
  • 60
    • 79961031255 scopus 로고    scopus 로고
    • Optimal heat storage design for heat integrated multipurpose batch plants
    • Stamp J., Majozi T. Optimal heat storage design for heat integrated multipurpose batch plants. Energy 2011, 36(8):1-13.
    • (2011) Energy , vol.36 , Issue.8 , pp. 1-13
    • Stamp, J.1    Majozi, T.2
  • 61
    • 15344346066 scopus 로고    scopus 로고
    • A simpler better slot-based continuous-time formulation for short-term scheduling in multipurpose batch plants
    • Sundaramoorthy A., Karimi I.A. A simpler better slot-based continuous-time formulation for short-term scheduling in multipurpose batch plants. Chem. Eng. Sci. 2005, 60:2679-2702.
    • (2005) Chem. Eng. Sci. , vol.60 , pp. 2679-2702
    • Sundaramoorthy, A.1    Karimi, I.A.2
  • 62
    • 77955820606 scopus 로고    scopus 로고
    • A novel approach to scheduling of multipurpose batch plants using unit slots
    • Susarla N., Li J., Karimi I.A. A novel approach to scheduling of multipurpose batch plants using unit slots. AICHE J. 2010, 56:1859-1879.
    • (2010) AICHE J. , vol.56 , pp. 1859-1879
    • Susarla, N.1    Li, J.2    Karimi, I.A.3
  • 63
    • 74249092488 scopus 로고    scopus 로고
    • Energy saving opportunities in heat integrated plant retrofit
    • Tokos H., Pintarič ZN., Glavič P. Energy saving opportunities in heat integrated plant retrofit. Appl. Therm. Eng. 2010, 30:36-44.
    • (2010) Appl. Therm. Eng. , vol.30 , pp. 36-44
    • Tokos, H.1    Pintarič, Z.N.2    Glavič, P.3
  • 66
    • 0028410889 scopus 로고
    • Wastewater minimization
    • Wang Y.P., Smith R. Wastewater minimization. Chem. Eng. Sci. 1994, 49(7):981-1006.
    • (1994) Chem. Eng. Sci. , vol.49 , Issue.7 , pp. 981-1006
    • Wang, Y.P.1    Smith, R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.