메뉴 건너뛰기




Volumn 68, Issue 1, 2012, Pages 202-214

Integration of electroplating process design and operation for simultaneous productivity maximization, energy saving, and freshwater minimization

Author keywords

Energy saving; Hoist scheduling; MINLP; Optimization; Pareto frontier; Water network synthesis

Indexed keywords

DESIGN AND OPERATIONS; ELECTROPLATING INDUSTRY; ELECTROPLATING PROCESS; ENERGY-USE EFFICIENCY; HOIST SCHEDULING; IN-DEPTH STUDY; MINLP; MIXED INTEGER DYNAMIC OPTIMIZATION; OPTIMAL DESIGN; OPTIMIZATION PROBLEMS; PARETO FRONTIERS; SOURCE REDUCTION; TECHNICAL SUPPORT; WATER NETWORK SYNTHESIS; WORK PIECES;

EID: 81055140309     PISSN: 00092509     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ces.2011.09.024     Document Type: Article
Times cited : (21)

References (45)
  • 1
    • 0034049270 scopus 로고    scopus 로고
    • Scenario-integrated modeling and optimization of dynamic systems
    • Abel O., Marquardt W. Scenario-integrated modeling and optimization of dynamic systems. AIChE Journal 2000, 46:803-823.
    • (2000) AIChE Journal , vol.46 , pp. 803-823
    • Abel, O.1    Marquardt, W.2
  • 2
    • 0033135689 scopus 로고    scopus 로고
    • Mixed-integer dynamic optimization I: Problem formulation
    • Allgor R.J., Barton P.I. Mixed-integer dynamic optimization I: Problem formulation. Computers and Chemical Engineering 1999, 23:567-584.
    • (1999) Computers and Chemical Engineering , vol.23 , pp. 567-584
    • Allgor, R.J.1    Barton, P.I.2
  • 3
    • 0028518445 scopus 로고
    • A bounding scheme for deriving the minimal cycle time of a single-transporter N-stage process with time window constraints
    • Armstrong R., Lei L., Gu S. A bounding scheme for deriving the minimal cycle time of a single-transporter N-stage process with time window constraints. European Journal of Operational Research 1994, 78:130-140.
    • (1994) European Journal of Operational Research , vol.78 , pp. 130-140
    • Armstrong, R.1    Lei, L.2    Gu, S.3
  • 6
    • 33847129277 scopus 로고    scopus 로고
    • Dynamic predictive scheduling of operational strategies for continuous processes using mixed-logic dynamic optimization
    • Busch J., Oldenburg J., Santos M., Cruse A., Marquardt W. Dynamic predictive scheduling of operational strategies for continuous processes using mixed-logic dynamic optimization. Computers and Chemical Engineering 2007, 31:574-587.
    • (2007) Computers and Chemical Engineering , vol.31 , pp. 574-587
    • Busch, J.1    Oldenburg, J.2    Santos, M.3    Cruse, A.4    Marquardt, W.5
  • 7
    • 24944488392 scopus 로고    scopus 로고
    • Global mixed-integer dynamic optimization
    • Chachuat B., Singer A.B., Barton P.I. Global mixed-integer dynamic optimization. AIChE Journal 2005, 51:2235-2253.
    • (2005) AIChE Journal , vol.51 , pp. 2235-2253
    • Chachuat, B.1    Singer, A.B.2    Barton, P.I.3
  • 8
    • 0029543596 scopus 로고
    • Cyclic hoist scheduling based on graph theory. Proceedings of the 1995 INRIA/IEEE Symposium on Emerging Technologies and Factory Automation
    • IEEE Computer Society Press, Los Alamitos, CA. 1,
    • Chen, H., Chu, C., Proth, J. M. (1995). Cyclic hoist scheduling based on graph theory. Proceedings of the 1995 INRIA/IEEE Symposium on Emerging Technologies and Factory Automation, IEEE Computer Society Press, Los Alamitos, CA. 1, 451-459.
    • (1995) , pp. 451-459
    • Chen, H.1    Chu, C.2    Proth, J.M.3
  • 9
    • 81055133985 scopus 로고
    • CPLEX. Using the CPLEX callable library. CPLEX Optimization, Inc.: Incline Village, NV.
    • CPLEX. (1995). Using the CPLEX callable library. CPLEX Optimization, Inc.: Incline Village, NV.
    • (1995)
  • 10
    • 0023397367 scopus 로고
    • On the optimization of differential-algebraic process systems
    • Cuthrell J.E., Biegler L.T. On the optimization of differential-algebraic process systems. AIChE Journal 1987, 33:1257-1270.
    • (1987) AIChE Journal , vol.33 , pp. 1257-1270
    • Cuthrell, J.E.1    Biegler, L.T.2
  • 11
  • 12
    • 0028159581 scopus 로고
    • Hazardous Waste Minimization: Is It Taking Root in U.S. Industry? Waste Minimization in Metal Finishing Facilities of the San Francisco Bay Area, California
    • Duke L.D. Hazardous Waste Minimization: Is It Taking Root in U.S. Industry? Waste Minimization in Metal Finishing Facilities of the San Francisco Bay Area, California. Waste Management 1994, 14:49-59.
    • (1994) Waste Management , vol.14 , pp. 49-59
    • Duke, L.D.1
  • 14
    • 33344463112 scopus 로고    scopus 로고
    • ECO-optimization of pre-treatment processes in metal finishing
    • Erol P., Thöming J. ECO-optimization of pre-treatment processes in metal finishing. Computers and Chemical Engineering 2006, 30:587-598.
    • (2006) Computers and Chemical Engineering , vol.30 , pp. 587-598
    • Erol, P.1    Thöming, J.2
  • 15
    • 44349141659 scopus 로고    scopus 로고
    • Grass-roots design of regeneration recycling water networks
    • Feng X., Bai J., Wang H., Zheng X. Grass-roots design of regeneration recycling water networks. Computers & Chemical Engineering 2008, 32(8):1892-1907.
    • (2008) Computers & Chemical Engineering , vol.32 , Issue.8 , pp. 1892-1907
    • Feng, X.1    Bai, J.2    Wang, H.3    Zheng, X.4
  • 16
    • 33947125013 scopus 로고    scopus 로고
    • On the use of graphical method to determine the targets of single-contaminant regeneration recycling water systems
    • Feng X., Bai J., Zheng X. On the use of graphical method to determine the targets of single-contaminant regeneration recycling water systems. Chemical Engineering Science 2007, 62(8):2127-2138.
    • (2007) Chemical Engineering Science , vol.62 , Issue.8 , pp. 2127-2138
    • Feng, X.1    Bai, J.2    Zheng, X.3
  • 18
    • 33847120918 scopus 로고    scopus 로고
    • Simultaneous mixed-integer dynamic optimization for integrated design and control
    • Flores-Tlacuahuac A., Biegler L.T. Simultaneous mixed-integer dynamic optimization for integrated design and control. Computers and Chemical Engineering 2007, 31:588-600.
    • (2007) Computers and Chemical Engineering , vol.31 , pp. 588-600
    • Flores-Tlacuahuac, A.1    Biegler, L.T.2
  • 19
    • 81055127802 scopus 로고
    • GAMS. GAMS Development Corporation: Washington, DC.
    • GAMS. (1992). GAMS Development Corporation: Washington, DC.
    • (1992)
  • 20
    • 50549085819 scopus 로고    scopus 로고
    • Multi-objective optimization for the periodic operation of the naphtha pyrolysis process using a new parallel hybrid algorithm combining NSGA-II with SQP
    • Gao X.D., Chen B.Z., He X.R., Qiu T., Li J.C., Wang C.M. Multi-objective optimization for the periodic operation of the naphtha pyrolysis process using a new parallel hybrid algorithm combining NSGA-II with SQP. Computers & Chemical Engineering 2008, 32:2801-2811.
    • (2008) Computers & Chemical Engineering , vol.32 , pp. 2801-2811
    • Gao, X.D.1    Chen, B.Z.2    He, X.R.3    Qiu, T.4    Li, J.C.5    Wang, C.M.6
  • 22
    • 33344476205 scopus 로고    scopus 로고
    • Global optimization for the synthesis of integrated water systems in chemical processes
    • Karuppiah R., Grossmann I.E. Global optimization for the synthesis of integrated water systems in chemical processes. Computers & Chemical Engineering 2006, 30:650-673.
    • (2006) Computers & Chemical Engineering , vol.30 , pp. 650-673
    • Karuppiah, R.1    Grossmann, I.E.2
  • 23
    • 0028744478 scopus 로고
    • Scheduling semiconductor manufacturing plants
    • Kumar P.R. Scheduling semiconductor manufacturing plants. IEEE Control System 1994, 14:33-40.
    • (1994) IEEE Control System , vol.14 , pp. 33-40
    • Kumar, P.R.1
  • 24
    • 30544443075 scopus 로고    scopus 로고
    • Environmentally conscious hoist scheduling for electroplating facilities
    • Kuntay I., Xu Q., Uygun K., Huang Y.L. Environmentally conscious hoist scheduling for electroplating facilities. Chemical Engineering Communications 2006, 193:273-293.
    • (2006) Chemical Engineering Communications , vol.193 , pp. 273-293
    • Kuntay, I.1    Xu, Q.2    Uygun, K.3    Huang, Y.L.4
  • 26
    • 0003569152 scopus 로고
    • A Proof: The cyclic hoist scheduling problem is NP-complete.
    • Working paper 89-0016, Rutgers University.
    • Lei, L. Wang, T. J. (1989). A Proof: The cyclic hoist scheduling problem is NP-complete. Working paper 89-0016, Rutgers University.
    • (1989)
    • Lei, L.1    Wang, T.J.2
  • 27
    • 0028396353 scopus 로고
    • Determining optimal cyclic hoist schedules on a single-hoist electroplating line
    • Lei L., Wang T.J. Determining optimal cyclic hoist schedules on a single-hoist electroplating line. IIE Transaction 1994, 26:25-33.
    • (1994) IIE Transaction , vol.26 , pp. 25-33
    • Lei, L.1    Wang, T.J.2
  • 28
    • 33751261200 scopus 로고    scopus 로고
    • Economic evaluation of water network system through the net present value method based on cost and benefits estimations
    • Lim S.R., Park D., Lee D.S., Park J.M. Economic evaluation of water network system through the net present value method based on cost and benefits estimations. Industrial & Engineering Chemistry Research 2006, 45:7710-7718.
    • (2006) Industrial & Engineering Chemistry Research , vol.45 , pp. 7710-7718
    • Lim, S.R.1    Park, D.2    Lee, D.S.3    Park, J.M.4
  • 29
    • 35548950288 scopus 로고    scopus 로고
    • Synthesis of an economically friendly water system by maximizing net present value
    • Lim S.R., Park D., Park J.M. Synthesis of an economically friendly water system by maximizing net present value. Industrial Engineering Chemistry Research 2007, 46:6936-6943.
    • (2007) Industrial Engineering Chemistry Research , vol.46 , pp. 6936-6943
    • Lim, S.R.1    Park, D.2    Park, J.M.3
  • 30
    • 80052627390 scopus 로고    scopus 로고
    • Simultaneous mixed-integer dynamic optimization for environmentally benign electroplating
    • Liu C.W., Fu J., Xu Q. Simultaneous mixed-integer dynamic optimization for environmentally benign electroplating. Computers & Chemical Engineering 2011, 35(11):2411-2425.
    • (2011) Computers & Chemical Engineering , vol.35 , Issue.11 , pp. 2411-2425
    • Liu, C.W.1    Fu, J.2    Xu, Q.3
  • 32
    • 0016962332 scopus 로고
    • Mathematical programming solution of a hoist scheduling program
    • Philips L.W., Unger P.S. Mathematical programming solution of a hoist scheduling program. AIIE Transactions 1976, 8:219-225.
    • (1976) AIIE Transactions , vol.8 , pp. 219-225
    • Philips, L.W.1    Unger, P.S.2
  • 33
    • 47849099434 scopus 로고    scopus 로고
    • Integrated scheduling and dynamic optimization of grade transitions for a continuous polymerization reactor
    • Prata A., Oldenburg J., Kroll A., Marquardt W. Integrated scheduling and dynamic optimization of grade transitions for a continuous polymerization reactor. Computers Chemical Engineering 2008, 32:463-476.
    • (2008) Computers Chemical Engineering , vol.32 , pp. 463-476
    • Prata, A.1    Oldenburg, J.2    Kroll, A.3    Marquardt, W.4
  • 35
    • 84957376979 scopus 로고    scopus 로고
    • A generic model and hybrid algorithm for hoist scheduling problems
    • Proceedings of the Fourth International Conference on Principles and Practice of Constant Programming,
    • Rodosek, R. Wallace, M. G. (1998). A generic model and hybrid algorithm for hoist scheduling problems, Proceedings of the Fourth International Conference on Principles and Practice of Constant Programming, 385-399.
    • (1998) , pp. 385-399
    • Rodosek, R.1    Wallace, M.G.2
  • 36
    • 0024029390 scopus 로고
    • Hoist scheduling for a PCB electroplating facility
    • Shapiro G.W., Nuttle H.W. Hoist scheduling for a PCB electroplating facility. IIE Transactions 1988, 20:157-167.
    • (1988) IIE Transactions , vol.20 , pp. 157-167
    • Shapiro, G.W.1    Nuttle, H.W.2
  • 37
    • 27644439216 scopus 로고    scopus 로고
    • Scheduling issues for environmentally responsible manufacturing: The case of hoist scheduling in an electroplating line
    • Subaï C., Baptiste P., Niel E. Scheduling issues for environmentally responsible manufacturing: The case of hoist scheduling in an electroplating line. International Journal of Production Economics 2006, 99:74-87.
    • (2006) International Journal of Production Economics , vol.99 , pp. 74-87
    • Subaï, C.1    Baptiste, P.2    Niel, E.3
  • 38
    • 34548593306 scopus 로고    scopus 로고
    • Simultaneous cyclic scheduling and optimal control of polymerization reactors
    • Terrazas-Moreno S., Flores-Tlacuahuac A., Grossmann I.E. Simultaneous cyclic scheduling and optimal control of polymerization reactors. AIChE Journal 2007, 53:2301-2315.
    • (2007) AIChE Journal , vol.53 , pp. 2301-2315
    • Terrazas-Moreno, S.1    Flores-Tlacuahuac, A.2    Grossmann, I.E.3
  • 40
    • 0025459923 scopus 로고
    • A combined penalty function and outer-approximation method for MINLP optimization
    • Viswanathan J., Grossmann I.E. A combined penalty function and outer-approximation method for MINLP optimization. Computers and Chemical Engineering. 1990, 14(7):769-782.
    • (1990) Computers and Chemical Engineering. , vol.14 , Issue.7 , pp. 769-782
    • Viswanathan, J.1    Grossmann, I.E.2
  • 41
    • 11144256163 scopus 로고    scopus 로고
    • Graph-assisted cyclic hoist scheduling for environmentally benign electroplating
    • Xu Q., Huang Y.L. Graph-assisted cyclic hoist scheduling for environmentally benign electroplating. Industrial & Engineering Chemistry Research 2004, 43(26):8307-8316.
    • (2004) Industrial & Engineering Chemistry Research , vol.43 , Issue.26 , pp. 8307-8316
    • Xu, Q.1    Huang, Y.L.2
  • 42
    • 81055127801 scopus 로고    scopus 로고
    • Simultaneous cyclic hoist scheduling and water-reuse network design for environmentally benign electroplating.
    • Proceedings of the 2008 International Conference on Foundation of Computer-Aided Process Operation (FOCAPO)
    • Xu, Q. Liu, C. (2008). Simultaneous cyclic hoist scheduling and water-reuse network design for environmentally benign electroplating. Proceedings of the 2008 International Conference on Foundation of Computer-Aided Process Operation (FOCAPO), 183-186.
    • (2008) , pp. 183-186
    • Xu, Q.1    Liu, C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.