Volumn 52, Issue 13, 2014, Pages 3922-3939

Smart production scheduling with time-dependent and machine-dependent electricity cost by considering distributed energy resources and energy storage

Author keywords

Distributed energy resources; Energy efficiency; Energy storage; Flexible job shop scheduling; Production scheduling; Smart Grid

Indexed keywords

CLIMATE CHANGE; COMPUTER PROGRAMMING; CONSTRAINT THEORY; ELECTRICITY; ENERGY EFFICIENCY; ENERGY POLICY; ENERGY RESOURCES; ENERGY STORAGE; ENERGY UTILIZATION; GREENHOUSE GASES; INDUSTRY; INTEGER PROGRAMMING; OPTIMIZATION; PRODUCTION CONTROL; PRODUCTION ENGINEERING; SMART POWER GRIDS;

EID: 84902783012     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2013.860251     Document Type: Conference Paper
Times cited : (123)

References (21)
  • 1
    • 0035742360 scopus 로고    scopus 로고
    • Project scheduling under time dependent costs - A branch and bound algorithm
    • DOI 10.1023/A:1016046625583
    • Achuthan, N. R., and A. Hardjawidjaja. 2001. "Project Scheduling under Time Dependent Costs -ABranch and Bound Algorithm." Annals of Operations Research 108: 55-74. (Pubitemid 33640261)
    • (2001) Annals of Operations Research , vol.108 , Issue.1-4 , pp. 55-74
    • Achuthan, N.R.1    Hardjawidjaja, A.2
  • 2
    • 0032682389 scopus 로고    scopus 로고
    • Scheduling with time dependent processing times: Review and extensions
    • Alidaee, B., and N. K. Womer. 1999. "Scheduling with Time Dependent Processing Times: Review and Extensions." Journal of the Operational Research Society 50: 711-720.
    • (1999) Journal of the Operational Research Society , vol.50 , pp. 711-720
    • Alidaee, B.1    Womer, N.K.2
  • 3
    • 67849109965 scopus 로고    scopus 로고
    • New continuous-time scheduling formulation for continuous plants under variable electricity cost
    • Castro, P. M., I. Harjunkoski, and I. E. Grossmann. 2009. "New Continuous-time Scheduling Formulation for Continuous Plants under Variable Electricity Cost." Industrial & Engineering Chemistry Research 48: 6701-6714.
    • (2009) Industrial & Engineering Chemistry Research , vol.48 , pp. 6701-6714
    • Castro, P.M.1    Harjunkoski, I.2    Grossmann, I.E.3
  • 5
    • 34447289102 scopus 로고    scopus 로고
    • A hybrid of genetic algorithm and bottleneck shifting for multiobjective flexible job shop scheduling problems
    • DOI 10.1016/j.cie.2007.04.010, PII S0360835207000733
    • Gao, J., M. Gen, L. Sun, and X. Zhao. 2007. "A Hybrid of Genetic Algorithm and Bottleneck Shifting for Multiobjective Flexible Job Shop Scheduling Problems." Computers & Industrial Engineering 53 (1): 149-162. (Pubitemid 47042310)
    • (2007) Computers and Industrial Engineering , vol.53 , Issue.1 , pp. 149-162
    • Gao, J.1    Gen, M.2    Sun, L.3    Zhao, X.4
  • 8
    • 79952450054 scopus 로고    scopus 로고
    • Optimal time-dependent operation of seawater reverse osmosis
    • Ghobeity, A., and A. Mitsos. 2010. "Optimal Time-dependent Operation of Seawater Reverse Osmosis." Desalination 263: 76-88.
    • (2010) Desalination , vol.263 , pp. 76-88
    • Ghobeity, A.1    Mitsos, A.2
  • 9
    • 33751418065 scopus 로고    scopus 로고
    • An effective architecture for learning and evolving flexible job-shop schedules
    • DOI 10.1016/j.ejor.2006.04.007, PII S0377221706002219
    • Ho, N. B., J. C. Tay, M. Edmund, and K. Lai. 2007. "An Effective Architecture for Learning and Evolving Flexible Job Shop Schedules." European Journal of Operational Research 179: 316-333. (Pubitemid 44821629)
    • (2007) European Journal of Operational Research , vol.179 , Issue.2 , pp. 316-333
    • Ho, N.B.1    Tay, J.C.2    Lai, E.M.-K.3
  • 10
    • 80053383675 scopus 로고    scopus 로고
    • Solving production schedulingwith earlinesstardiness penalties by constraint programming
    • Kelbel, J., and Z. Hanzalek. 2011. "Solving Production Schedulingwith EarlinessTardiness Penalties by Constraint Programming." Journal of Intelligent Manufacturing 22: 553-562.
    • (2011) Journal of Intelligent Manufacturing , vol.22 , pp. 553-562
    • Kelbel, J.1    Hanzalek, Z.2
  • 12
    • 80655124481 scopus 로고    scopus 로고
    • Multi-objective operation management of a renewable mg (micro-grid) back-up micro-turbine/fuel cell/battery hybrid power source
    • Moghaddam, A. A., A. Seifi, T. Niknam, and M. R. A. Pahlavani. 2011. "Multi-objective Operation Management of a Renewable MG (micro-grid) Back-up Micro-turbine/Fuel cell/Battery Hybrid Power Source." Energy 36 (11): 6490-6507.
    • (2011) Energy , vol.36 , Issue.11 , pp. 6490-6507
    • Moghaddam, A.A.1    Seifi, A.2    Niknam, T.3    Pahlavani, M.R.A.4
  • 14
    • 79951579853 scopus 로고    scopus 로고
    • Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem
    • Moradi, E., S. M. T. Fatemi Ghomi, and M. Zandieh. 2011. "Bi-objective Optimization Research on Integrated Fixed Time Interval Preventive Maintenance and Production for Scheduling Flexible Job-shop Problem." Expert Systems with Applications 38 (6): 7169- 7178.
    • (2011) Expert Systems with Applications , vol.38 , Issue.6 , pp. 7169-7178
    • Moradi, E.1    Fatemi Ghomi, S.M.T.2    Zandieh, M.3
  • 15
    • 0027553763 scopus 로고
    • Industrial production planning with optimal electricity cost
    • DOI 10.1016/0196-8904(93)90131-S
    • Nilsson, K. 1993. "Industrial Production Planning with Optimal Electricity Cost." Energy Conversion and Management 34 (3): 153-158. (Pubitemid 23616436)
    • (1993) Energy Conversion and Management , vol.34 , Issue.3 , pp. 153-158
    • Nilsson, K.1
  • 16
    • 0027787178 scopus 로고
    • Industrial applications of production planning with optimal electricity demand
    • Nilsson, K., and M. Soderstrom. 1993. "IndustrialApplications of Production Planning with Optimal Electricity Demand." Applied Energy 46 (2): 181-192.
    • (1993) Applied Energy , vol.46 , Issue.2 , pp. 181-192
    • Nilsson, K.1    Soderstrom, M.2
  • 17
    • 40249118429 scopus 로고    scopus 로고
    • A genetic algorithm for the flexible job-shop scheduling problem
    • Pazzella, F., G. Morganti, and G. Ciaschetti. 2007. "A Genetic Algorithm for the Flexible Job-shop Scheduling Problem." Computers and Operations Research 35 (10): 3202-3212.
    • (2007) Computers and Operations Research , vol.35 , Issue.10 , pp. 3202-3212
    • Pazzella, F.1    Morganti, G.2    Ciaschetti, G.3
  • 18
    • 79955653368 scopus 로고    scopus 로고
    • An execution, monitoring and replanning approach for optimal energy management in micro grids
    • Sanseverino, E. R., M. L. D. Silvestre, M. G. Ippolito, A. D. Paola, and G. L. Re. 2011. "An Execution, Monitoring and Replanning Approach for Optimal Energy Management in Micro Grids." Energy 36 (5): 3429-3436.
    • (2011) Energy , vol.36 , Issue.5 , pp. 3429-3436
    • Sanseverino, E.R.1    Silvestre, M.L.D.2    Ippolito, M.G.3    Paola, A.D.4    Re, G.L.5
  • 19
    • 14044268702 scopus 로고    scopus 로고
    • An effectivehybrid optimization approach for multi-objective flexible job-shop scheduling problems
    • Xia,W. J., and Z. M.Wu. 2005. "An EffectiveHybrid Optimization Approach for Multi-objective Flexible Job-shop Scheduling Problems." Computers & Industrial Engineering 48 (2): 409-425.
    • (2005) Computers & Industrial Engineering , vol.48 , Issue.2 , pp. 409-425
    • Xia, W.J.1    Wu, Z.M.2
  • 20
    • 77955472243 scopus 로고    scopus 로고
    • Optimal methodology for a machining process scheduling in spot electricity markets
    • Yusta, J. M., F. Torres, and H. M. Khodr. 2010. "Optimal Methodology for a Machining Process Scheduling in Spot Electricity Markets." Energy Convers Manage 51: 2647-2654.
    • (2010) Energy Convers Manage , vol.51 , pp. 2647-2654
    • Yusta, J.M.1    Torres, F.2    Khodr, H.M.3
  • 21
    • 67349174559 scopus 로고    scopus 로고
    • An effective hybrid particle swarm optimization algorithm for multi-objective flexible job-shop scheduling problem
    • Zhang, G., X. Shao, P. Li, and L. Gao. 2009. "An Effective Hybrid Particle Swarm Optimization Algorithm for Multi-objective Flexible Job-shop Scheduling Problem." Computers & Industrial Engineering 56: 1309-1318.
    • (2009) Computers & Industrial Engineering , vol.56 , pp. 1309-1318
    • Zhang, G.1    Shao, X.2    Li, P.3    Gao, L.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.