메뉴 건너뛰기




Volumn 11, Issue 3, 2014, Pages 789-797

Energy efficiency management of an integrated serial production line and HVAC system

Author keywords

Energy savings opportunity; integrated heating venting and air conditioning (HVAC) and production; recovery time

Indexed keywords

ENERGY EFFICIENCY; MANUFACTURE;

EID: 84904392964     PISSN: 15455955     EISSN: None     Source Type: Journal    
DOI: 10.1109/TASE.2013.2284915     Document Type: Article
Times cited : (49)

References (28)
  • 1
    • 84890266890 scopus 로고    scopus 로고
    • Assessment study on sensors and automation in the industries of the future: Reports on industrial controls, information processing, automation, and robotics
    • B. Bennet et al., "Assessment study on sensors and automation in the industries of the future: Reports on industrial controls, information processing, automation, and robotics," DOE Energy Efficiency and Renewable Energy Industrial Technologies Program, 2004.
    • (2004) DOE Energy Efficiency and Renewable Energy Industrial Technologies Program
    • Bennet, B.1
  • 2
    • 84876146805 scopus 로고    scopus 로고
    • Energy saving opportunity analysis of automotive serial production systems
    • Apr.
    • Q. Chang et al., "Energy saving opportunity analysis of automotive serial production systems," IEEE Trans. Autom. Sci. Eng., vol. 10, no. 2, pp. 334-342, Apr. 2012.
    • (2012) IEEE Trans. Autom. Sci. Eng. , vol.10 , Issue.2 , pp. 334-342
    • Chang, Q.1
  • 3
    • 78649985524 scopus 로고    scopus 로고
    • Transient analysis of downtimes and bottleneck dynamics in serial manufacturing systems
    • Oct.
    • Q. Chang et al., "Transient analysis of downtimes and bottleneck dynamics in serial manufacturing systems," ASME Trans. J. Manuf. Sci. Eng., vol. 132, no. 5, p. 051015, Oct. 2010.
    • (2010) ASME Trans. J. Manuf. Sci. Eng. , vol.132 , Issue.5 , pp. 051015
    • Chang, Q.1
  • 4
    • 84859920255 scopus 로고    scopus 로고
    • The costs of downtime incidents in serial multi-stage manufacturing systems
    • Apr.
    • J. Liu et al., "The costs of downtime incidents in serial multi-stage manufacturing systems," ASME Trans. J. Manuf. Sci. Eng., vol. 134, no. 2, p. 02101, Apr. 2012.
    • (2012) ASME Trans. J. Manuf. Sci. Eng. , vol.134 , Issue.2 , pp. 02101
    • Liu, J.1
  • 7
    • 34548395445 scopus 로고    scopus 로고
    • Operational methods for minimization of energy consumption of manufacturing equipment
    • DOI 10.1080/00207540701450013, PII 781770536, Sustainable Design and Manufacture
    • G. Mouzon, M. B. Yildirim, and J. Twomey, "Operational methods forminimization of energy consumption ofmanufacturing equipment," Int. J. Prod. Res., vol. 45, pp. 4247-4271, 2007. (Pubitemid 47351658)
    • (2007) International Journal of Production Research , vol.45 , Issue.18-19 , pp. 4247-4271
    • Mouzon, G.1    Yildirim, M.B.2    Twomey, J.3
  • 8
    • 78650636006 scopus 로고    scopus 로고
    • A framework tominimize total energy consumption and total tardiness on a single machine
    • G. Mouzon and M. B. Yildirim, "A framework tominimize total energy consumption and total tardiness on a single machine," Int. J. Sustainable Eng., vol. 1, no. 2, pp. 105-116, 2008.
    • (2008) Int. J. Sustainable Eng. , vol.1 , Issue.2 , pp. 105-116
    • Mouzon, G.1    Yildirim, M.B.2
  • 9
    • 4243118645 scopus 로고    scopus 로고
    • Environmentally benign manufacturing: Observations from Japan, Europe and the United States
    • T. C. Gutowski et al., "Environmentally benign manufacturing: Observations from Japan, Europe and the United States," J. Cleaner Prod., vol. 13, pp. 1-17, 2005.
    • (2005) J. Cleaner Prod. , vol.13 , pp. 1-17
    • Gutowski, T.C.1
  • 10
    • 84871756814 scopus 로고    scopus 로고
    • Energy-efficient production systems through schedulebased operations
    • Jan.
    • G. Chen et al., "Energy-efficient production systems through schedulebased operations," IEEE Trans. Autom. Sci. Eng., vol. 10, no. 1, pp. 27-37, Jan. 2013.
    • (2013) IEEE Trans. Autom. Sci. Eng. , vol.10 , Issue.1 , pp. 27-37
    • Chen, G.1
  • 11
    • 80053511710 scopus 로고    scopus 로고
    • Production system design to achieve energy savings in an automotive paint shop
    • C. A. Guerrero et al., "Production system design to achieve energy savings in an automotive paint shop," Int. J. Prod. Res., vol. 49, no. 22, pp. 6679-6785, 2011.
    • (2011) Int. J. Prod. Res. , vol.49 , Issue.22 , pp. 6679-6785
    • Guerrero, C.A.1
  • 12
    • 82455166861 scopus 로고    scopus 로고
    • Energy consumption reduction for sustainable manufacturing systems considering machines with multiple power states
    • Corvallis, OR, USA
    • Z. Sun et al., "Energy consumption reduction for sustainable manufacturing systems considering machines with multiple power states," in Proc. 6th Annu. ASME Int. Manuf. Sci. Eng. Conf., Corvallis, OR, USA, 2011, pp. 99-103.
    • (2011) Proc. 6th Annu. ASME Int. Manuf. Sci. Eng. Conf. , pp. 99-103
    • Sun, Z.1
  • 13
    • 80054680608 scopus 로고    scopus 로고
    • A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction
    • Oct.
    • K. Fan et al., "A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction," J. Manuf. Syst., vol. 30, no. 4, pp. 234-240, Oct 2011.
    • (2011) J. Manuf. Syst. , vol.30 , Issue.4 , pp. 234-240
    • Fan, K.1
  • 14
    • 44149091951 scopus 로고    scopus 로고
    • A cost-effective operating strategy to reduce energy consumption in a HVAC system
    • DOI 10.1002/er.1364
    • S. Moujaes and N. Nassif, "A cost-effective operating strategy to reduce energy consumption in a HVAC system," Int. J. Energy Res., vol. 32, pp. 543-558, 2008. (Pubitemid 351715535)
    • (2008) International Journal of Energy Research , vol.32 , Issue.6 , pp. 543-558
    • Nassif, N.1    Moujaes, S.2
  • 16
    • 77649219633 scopus 로고    scopus 로고
    • RobustMPC for temperature control of air-conditioning systems concerning on constraints and multitype uncertainties
    • X. Xu, S. Wang, and G. Huang, "RobustMPC for temperature control of air-conditioning systems concerning on constraints and multitype uncertainties," Building Serv. Eng. Res. Technol., vol. 31, no. 1, pp. 39-55, 2010.
    • (2010) Building Serv. Eng. Res. Technol. , vol.31 , Issue.1 , pp. 39-55
    • Xu, X.1    Wang, S.2    Huang, G.3
  • 17
    • 84904385882 scopus 로고    scopus 로고
    • Decision making methodology to reduce energy in automobile manufacturing
    • Berkeley, CA, USA
    • K. C. McKinstry et al., "Decision making methodology to reduce energy in automobile manufacturing," in Proc. 19th CIRP Int. Conf. Life Cycle Eng., Berkeley, CA, USA, 2012, pp. 67-71.
    • (2012) Proc. 19th CIRP Int. Conf. Life Cycle Eng. , pp. 67-71
    • McKinstry, K.C.1
  • 18
    • 38649125566 scopus 로고    scopus 로고
    • Supervisory and optimal control of building HVAC systems: A review
    • S. Wang and Z. Ma, "Supervisory and optimal control of building HVAC systems: A review," HVAC&R Res., vol. 14, no. 1, pp. 3-32, 2008. (Pubitemid 351167357)
    • (2008) HVAC and R Research , vol.14 , Issue.1 , pp. 3-32
    • Wang, S.1    Ma, Z.2
  • 19
    • 85072438968 scopus 로고    scopus 로고
    • Energy efficiency as industrial management practice: The ford production system and institutionalizing energy efficiency
    • J. C. Ghislain and A. T. Mckane, "Energy efficiency as industrial management practice: The Ford production system and institutionalizing energy efficiency," SAE Int., pp. 01-0829, 2006.
    • (2006) SAE Int. , pp. 01-0829
    • Ghislain, J.C.1    McKane, A.T.2
  • 20
    • 84904392784 scopus 로고    scopus 로고
    • Energy assessment strategies
    • Washington, DC, USA:U.S. Environmental Protection Agency (EPA), ch. 3
    • "Energy assessment strategies," in Lean and Energy Toolkit. Washington, DC, USA:U.S. Environmental ProtectionAgency (EPA), 2009, ch. 3.
    • (2009) Lean and Energy Toolkit
  • 21
    • 84871802084 scopus 로고    scopus 로고
    • A simulation-based tool for energy efficient building design for a class of manufacturing plants
    • Jan.
    • H. Liu et al., "A simulation-based tool for energy efficient building design for a class of manufacturing plants," IEEE Trans. Autom. Sci. Eng., vol. 10, no. 1, pp. 117-123, Jan. 2012.
    • (2012) IEEE Trans. Autom. Sci. Eng. , vol.10 , Issue.1 , pp. 117-123
    • Liu, H.1
  • 22
    • 84873348507 scopus 로고    scopus 로고
    • Energy savings for a manufacturing facility using building simulation modeling: A case study
    • Dec.
    • G. P. Moynihan and D. Triantafillu, "Energy savings for a manufacturing facility using building simulation modeling: A case study," Eng. Manage. J., vol. 24, no. 4, Dec. 2012.
    • (2012) Eng. Manage. J. , vol.24 , Issue.4
    • Moynihan, G.P.1    Triantafillu, D.2
  • 23
    • 0009455220 scopus 로고
    • Influence of storage bin capacity on the average standstill time of a production line
    • B. A. Sevast'yanov, "Influence of storage bin capacity on the average standstill time of a production line," Theory of Probability and its Appl., vol. 7, no. 4, pp. 429-438, 1962.
    • (1962) Theory of Probability and Its Appl. , vol.7 , Issue.4 , pp. 429-438
    • Sevast'yanov, B.A.1
  • 24
    • 0018444869 scopus 로고
    • Effect of interstage buffer storage on the output of two unreliable production units in series, with different production rates
    • J. Wijngaard, "The effect of interstage buffer storage on output of two unreliable production units in series with different production rates," AIIE Trans., vol. 11, no. 1, pp. 42-47, 1979. (Pubitemid 9444965)
    • (1979) AIIE Trans , vol.11 , Issue.1 , pp. 42-47
    • Wijngaard Jacob1
  • 28
    • 84890264102 scopus 로고    scopus 로고
    • Basic concepts manual-essential information you need about running energy plus
    • Washington, DC, USA: DOE
    • "Basic concepts manual-essential information you need about running energy plus," in Getting Started with Energy Plus. Washington, DC, USA: DOE, 2012.
    • (2012) Getting Started with Energy Plus


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.