메뉴 건너뛰기




Volumn 159, Issue , 2015, Pages 296-303

An effective neighborhood search for scheduling in dual-resource constrained interval job shop with environmental objective

Author keywords

Dual resource constrained job shop; Dynamical neighborhood search; Interval carbon footprint; Scheduling

Indexed keywords

CARBON; CARBON FOOTPRINT; OPTIMIZATION; SCHEDULING ALGORITHMS;

EID: 84915748713     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2014.07.026     Document Type: Article
Times cited : (69)

References (20)
  • 1
    • 74549184136 scopus 로고    scopus 로고
    • A multi-criteria adaptive control scheme based on neural networks and fuzzy inference for DRC manufacturing systems
    • O.U. Araz, and L. Salum A multi-criteria adaptive control scheme based on neural networks and fuzzy inference for DRC manufacturing systems Int. J. Prod. Res. 48 1 2010 251 270
    • (2010) Int. J. Prod. Res. , vol.48 , Issue.1 , pp. 251-270
    • Araz, O.U.1    Salum, L.2
  • 2
    • 34250084648 scopus 로고
    • Routing and scheduling in a flexible job shop by tabu search
    • P. Brandimarte Routing and scheduling in a flexible job shop by tabu search Ann. Oper. Res. 41 1 1993 157 183
    • (1993) Ann. Oper. Res. , vol.41 , Issue.1 , pp. 157-183
    • Brandimarte, P.1
  • 3
    • 34249754216 scopus 로고
    • A generalized permutation approach for job shop scheduling with genetic algorithms
    • C. Bierwirth A generalized permutation approach for job shop scheduling with genetic algorithms OR Spectrum 17 1995 87 92
    • (1995) OR Spectrum , vol.17 , pp. 87-92
    • Bierwirth, C.1
  • 4
    • 67349093510 scopus 로고    scopus 로고
    • Minimizing total tardiness for the machine scheduling and worker assignment problems in identical parallel machines using genetic algorithms
    • L.A. Chaudhry, and P.R. Drake Minimizing total tardiness for the machine scheduling and worker assignment problems in identical parallel machines using genetic algorithms Int. J. Adv. Manuf. Technol. 42 5-6 2009 581 594
    • (2009) Int. J. Adv. Manuf. Technol. , vol.42 , Issue.56 , pp. 581-594
    • Chaudhry, L.A.1    Drake, P.R.2
  • 5
    • 0042261208 scopus 로고    scopus 로고
    • An integrated approach for modeling and solving the general multiprocessor job-shop scheduling problem using tabu search
    • S. Dauzère-Pérès, and J. Paulli An integrated approach for modeling and solving the general multiprocessor job-shop scheduling problem using tabu search Ann. Oper. Res. 70 1997 281 306
    • (1997) Ann. Oper. Res. , vol.70 , pp. 281-306
    • Dauzère-Pérès, S.1    Paulli, J.2
  • 6
    • 0032658950 scopus 로고    scopus 로고
    • A genetic algorithm based approach for scheduling of dual-resource constrained manufacturing systems
    • H. ElMaraghy, V. Patel, and I. Ben Abdallah A genetic algorithm based approach for scheduling of dual-resource constrained manufacturing systems CIRP Ann.-Manuf. Technol. 48 1 1999 369 372
    • (1999) CIRP Ann.-Manuf. Technol. , vol.48 , Issue.1 , pp. 369-372
    • Elmaraghy, H.1    Patel, V.2    Ben Abdallah, I.3
  • 7
    • 0041083148 scopus 로고    scopus 로고
    • Scheduling of manufacturing systems under dual-resource constraints using genetic algorithms
    • H. ElMaraghy, V. Patel, and I. Ben Abdallah Scheduling of manufacturing systems under dual-resource constraints using genetic algorithms J. Manuf. Syst. 19 1 2000 186 198
    • (2000) J. Manuf. Syst. , vol.19 , Issue.1 , pp. 186-198
    • Elmaraghy, H.1    Patel, V.2    Ben Abdallah, I.3
  • 8
    • 80054680608 scopus 로고    scopus 로고
    • A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction
    • K. Fang, N. Uhan, F. Zhao, and J.W. Sutherland A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction J. Manuf. Syst. 30 2011 234 240
    • (2011) J. Manuf. Syst. , vol.30 , pp. 234-240
    • Fang, K.1    Uhan, N.2    Zhao, F.3    Sutherland, J.W.4
  • 9
    • 0034818087 scopus 로고    scopus 로고
    • Variable neighborhood search: Principles and applications
    • P. Hansen, and N. Mladenovíc Variable neighborhood search: principles and applications Eur. J. Oper. Res. 130 3 2001 449 467
    • (2001) Eur. J. Oper. Res. , vol.130 , Issue.3 , pp. 449-467
    • Hansen, P.1    Mladenovíc, N.2
  • 10
    • 37449003041 scopus 로고    scopus 로고
    • A nonlinear interval number programming method for uncertain optimization problems
    • C. Jiang, X. Han, G.R. Liu, and G.P. Liu A nonlinear interval number programming method for uncertain optimization problems Eur. J. Oper. Res. 188 2008 1 13
    • (2008) Eur. J. Oper. Res. , vol.188 , pp. 1-13
    • Jiang, C.1    Han, X.2    Liu, G.R.3    Liu, G.P.4
  • 11
    • 0033999129 scopus 로고    scopus 로고
    • Examination of worker assignment and dispatching rules for managing vital customer priorities in dual resource constrained job shop scheduling environments
    • H.V. Kher Examination of worker assignment and dispatching rules for managing vital customer priorities in dual resource constrained job shop scheduling environments Comput. Oper. Res. 27 6 2000 525 537
    • (2000) Comput. Oper. Res. , vol.27 , Issue.6 , pp. 525-537
    • Kher, H.V.1
  • 13
    • 77951099246 scopus 로고    scopus 로고
    • A genetic algorithm for flexible job shop scheduling with fuzzy processing time
    • D.M. Lei A genetic algorithm for flexible job shop scheduling with fuzzy processing time Int. J. Prod. Res. 48 10 2010 2995 3013
    • (2010) Int. J. Prod. Res. , vol.48 , Issue.10 , pp. 2995-3013
    • Lei, D.M.1
  • 14
    • 80054888050 scopus 로고    scopus 로고
    • Population-based neighborhood search for job shop scheduling with interval processing time
    • D.M. Lei Population-based neighborhood search for job shop scheduling with interval processing time Comput. Ind. Eng. 61 4 2011 1200 1208
    • (2011) Comput. Ind. Eng. , vol.61 , Issue.4 , pp. 1200-1208
    • Lei, D.M.1
  • 15
    • 84861871365 scopus 로고    scopus 로고
    • Co-evolutionary genetic algorithm for fuzzy flexible job shop scheduling
    • D.M. Lei Co-evolutionary genetic algorithm for fuzzy flexible job shop scheduling Appl. Soft Comput. 12 8 2012 2237 2245
    • (2012) Appl. Soft Comput. , vol.12 , Issue.8 , pp. 2237-2245
    • Lei, D.M.1
  • 16
    • 84880922087 scopus 로고    scopus 로고
    • Chemical-reaction optimization for solving fuzzy job-shop scheduling problem with flexible maintenance activities
    • J.Q. Li, and Q.K. Pan Chemical-reaction optimization for solving fuzzy job-shop scheduling problem with flexible maintenance activities Int. J. Prod. Econ. 145 1 2013 4 17
    • (2013) Int. J. Prod. Econ. , vol.145 , Issue.1 , pp. 4-17
    • Li, J.Q.1    Pan, Q.K.2
  • 17
    • 84866162200 scopus 로고    scopus 로고
    • max in a worker-constrained job shop
    • max in a worker-constrained job shop Comp. Oper. Res. 40 1 2013 328 343
    • (2013) Comp. Oper. Res. , vol.40 , Issue.1 , pp. 328-343
    • Lobo, B.J.1
  • 18
    • 84878318174 scopus 로고    scopus 로고
    • Non-permutation flowshop scheduling with dual resources
    • Y. Mehravaran, and R. Logendran Non-permutation flowshop scheduling with dual resources Expert Syst. Appl. 40 13 2013 5061 5076
    • (2013) Expert Syst. Appl. , vol.40 , Issue.13 , pp. 5061-5076
    • Mehravaran, Y.1    Logendran, R.2
  • 19
    • 33746239345 scopus 로고    scopus 로고
    • Scheduling with flexible resources in parallel workcenters to minimize maximum completion time
    • A.J. Ruiz-Torres, and G. Centeno Scheduling with flexible resources in parallel workcenters to minimize maximum completion time Comput. Oper. Res. 34 1 2007 48 69
    • (2007) Comput. Oper. Res. , vol.34 , Issue.1 , pp. 48-69
    • Ruiz-Torres, A.J.1    Centeno, G.2
  • 20
    • 80051792786 scopus 로고    scopus 로고
    • Recent developments in dual resource constrained (DRC) systems research
    • J. Xu, X. Xu, and S.Q. Xie Recent developments in dual resource constrained (DRC) systems research Eur. J. Oper. Res. 215 2 2011 309 318
    • (2011) Eur. J. Oper. Res. , vol.215 , Issue.2 , pp. 309-318
    • Xu, J.1    Xu, X.2    Xie, S.Q.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.