메뉴 건너뛰기




Volumn 72, Issue , 2015, Pages 183-198

Scheduling and energy - Industrial challenges and opportunities

Author keywords

Demand side Management; Energy efficiency; Production planning; Scheduling; Steel production; Thermo mechanical pulp

Indexed keywords

DEMAND SIDE MANAGEMENT; DEREGULATION; ENERGY EFFICIENCY; MATHEMATICAL PROGRAMMING; POWER MARKETS; PRODUCTION CONTROL; RENEWABLE ENERGY RESOURCES; STEELMAKING; THERMOMECHANICAL PULP;

EID: 84908413270     PISSN: 00981354     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.compchemeng.2014.05.024     Document Type: Article
Times cited : (144)

References (69)
  • 1
    • 84879548950 scopus 로고    scopus 로고
    • Unified approach for the optimization of energy and water in multipurpose batch plants using a flexible scheduling framework
    • Adekola O., Stamp J.D., Majozi T., Garg A., Bandyopadhyay S. Unified approach for the optimization of energy and water in multipurpose batch plants using a flexible scheduling framework. Ind Eng Chem Res 2013, 52(25):8488-8506.
    • (2013) Ind Eng Chem Res , vol.52 , Issue.25 , pp. 8488-8506
    • Adekola, O.1    Stamp, J.D.2    Majozi, T.3    Garg, A.4    Bandyopadhyay, S.5
  • 4
    • 0035339835 scopus 로고    scopus 로고
    • Optimal design of heat-integrated multipurpose batch facilities: a mixed-integer mathematical formulation
    • Barbosa-Póvoa A.P.F.D., Pinto T., Novais A.Q. Optimal design of heat-integrated multipurpose batch facilities: a mixed-integer mathematical formulation. Comput Chem Eng 2001, 25:547-559.
    • (2001) Comput Chem Eng , vol.25 , pp. 547-559
    • Barbosa-Póvoa, A.P.F.D.1    Pinto, T.2    Novais, A.Q.3
  • 7
    • 0035795519 scopus 로고    scopus 로고
    • An improved RTN continuous time formulation for the short-term scheduling of multipurpose batch plants
    • Castro P., Barbosa-Póvoa A.P.F.D., Matos H. An improved RTN continuous time formulation for the short-term scheduling of multipurpose batch plants. Ind Eng Chem Res 2001, 40:2059-2068.
    • (2001) Ind Eng Chem Res , vol.40 , pp. 2059-2068
    • Castro, P.1    Barbosa-Póvoa, A.P.F.D.2    Matos, H.3
  • 8
    • 67849109965 scopus 로고    scopus 로고
    • New continuous-time scheduling formulation for continuous plants under variable electricity cost
    • Castro P.M., Harjunkoski I., Grossmann I.E. New continuous-time scheduling formulation for continuous plants under variable electricity cost. Ind Eng Chem Res 2009, 48(14):6701-6714.
    • (2009) Ind Eng Chem Res , vol.48 , Issue.14 , pp. 6701-6714
    • Castro, P.M.1    Harjunkoski, I.2    Grossmann, I.E.3
  • 9
    • 78449270823 scopus 로고    scopus 로고
    • Optimal scheduling of continuous plants with energy constraints
    • Castro P.M., Harjunkoski I., Grossmann I.E. Optimal scheduling of continuous plants with energy constraints. Comput Chem Eng 2011, 35:372-387.
    • (2011) Comput Chem Eng , vol.35 , pp. 372-387
    • Castro, P.M.1    Harjunkoski, I.2    Grossmann, I.E.3
  • 10
    • 84884177657 scopus 로고    scopus 로고
    • Resource-task network formulations for industrial demand side management of a steel plant
    • Castro P.M., Sun L., Harjunkoski I. Resource-task network formulations for industrial demand side management of a steel plant. Ind Eng Chem Res 2013, 52:13046-13058.
    • (2013) Ind Eng Chem Res , vol.52 , pp. 13046-13058
    • Castro, P.M.1    Sun, L.2    Harjunkoski, I.3
  • 12
    • 84869505568 scopus 로고    scopus 로고
    • Integration of scheduling and control with online closed-loop implementation: fast computational strategy and large-scale global optimization algorithm
    • Chu Y., You F. Integration of scheduling and control with online closed-loop implementation: fast computational strategy and large-scale global optimization algorithm. Comput Chem Eng 2012, 47:248-268.
    • (2012) Comput Chem Eng , vol.47 , pp. 248-268
    • Chu, Y.1    You, F.2
  • 14
    • 84908418925 scopus 로고    scopus 로고
    • Demand Response Research Center. Available from: .
    • Demand Response Research Center (2013). Demand Response Research Center. Available from: . http://drrc.lbl.gov/.
    • (2013)
  • 15
    • 79954616986 scopus 로고    scopus 로고
    • Design for environment: a state-of-the-art review
    • Diwekar U., Shastri Y. Design for environment: a state-of-the-art review. Clean Technol Environ Policy 2011, 13(2):227-240.
    • (2011) Clean Technol Environ Policy , vol.13 , Issue.2 , pp. 227-240
    • Diwekar, U.1    Shastri, Y.2
  • 16
    • 84869506805 scopus 로고    scopus 로고
    • Optimal operation: scheduling, advanced control and their integration
    • Engell S., Harjunkoski I. Optimal operation: scheduling, advanced control and their integration. Comput Chem Eng 2012, 47:121-133.
    • (2012) Comput Chem Eng , vol.47 , pp. 121-133
    • Engell, S.1    Harjunkoski, I.2
  • 19
    • 2442583184 scopus 로고    scopus 로고
    • Continuous-time versus discrete-time approaches for scheduling of chemical processes: a review
    • Floudas C.A., Lin X. Continuous-time versus discrete-time approaches for scheduling of chemical processes: a review. Comput Chem Eng 2004, 28:2109-2129.
    • (2004) Comput Chem Eng , vol.28 , pp. 2109-2129
    • Floudas, C.A.1    Lin, X.2
  • 20
    • 84861413180 scopus 로고    scopus 로고
    • Guidelines for the deployment and implementation of manufacturing scheduling systems
    • Framinan J.M., Ruiz R. Guidelines for the deployment and implementation of manufacturing scheduling systems. Int J Prod Res 2012, 50(7):1799-1812.
    • (2012) Int J Prod Res , vol.50 , Issue.7 , pp. 1799-1812
    • Framinan, J.M.1    Ruiz, R.2
  • 21
    • 0035502177 scopus 로고    scopus 로고
    • Optimal scheduling of heat-integrated multipurpose plants under fouling conditions
    • Georgiadis M.C., Papageorgiou L.G. Optimal scheduling of heat-integrated multipurpose plants under fouling conditions. Appl Therm Eng 2001, 21(16):1675-1697.
    • (2001) Appl Therm Eng , vol.21 , Issue.16 , pp. 1675-1697
    • Georgiadis, M.C.1    Papageorgiou, L.G.2
  • 22
    • 0000711418 scopus 로고
    • A branch-bound solution to the general scheduling problem
    • Greenberg H. A branch-bound solution to the general scheduling problem. Oper Res 1968, 16:353-361.
    • (1968) Oper Res , vol.16 , pp. 353-361
    • Greenberg, H.1
  • 23
    • 25144478491 scopus 로고    scopus 로고
    • Enterprise-wide optimization: a new frontier in process systems engineering
    • Grossmann I.E. Enterprise-wide optimization: a new frontier in process systems engineering. AIChE J 2005, 51:1846-1857.
    • (2005) AIChE J , vol.51 , pp. 1846-1857
    • Grossmann, I.E.1
  • 24
    • 84879024245 scopus 로고    scopus 로고
    • Continuous-time batch scheduling approach for optimizing electricity consumption cost
    • Hadera H., Harjunkoski I. Continuous-time batch scheduling approach for optimizing electricity consumption cost. Comput Aided Chem Eng 2013, 32:403-408.
    • (2013) Comput Aided Chem Eng , vol.32 , pp. 403-408
    • Hadera, H.1    Harjunkoski, I.2
  • 25
    • 80053911225 scopus 로고    scopus 로고
    • On electrical load tracking scheduling for a steel plant
    • Haït A., Artigues C. On electrical load tracking scheduling for a steel plant. Comput Chem Eng 2011, 35(12):3044-3047.
    • (2011) Comput Chem Eng , vol.35 , Issue.12 , pp. 3044-3047
    • Haït, A.1    Artigues, C.2
  • 26
    • 80053503264 scopus 로고    scopus 로고
    • A hybrid CP/MILP method for scheduling with energy costs
    • Haït A., Artigues C. A hybrid CP/MILP method for scheduling with energy costs. Eur J Ind Eng 2011, 5(4):471-489.
    • (2011) Eur J Ind Eng , vol.5 , Issue.4 , pp. 471-489
    • Haït, A.1    Artigues, C.2
  • 27
    • 70349316833 scopus 로고    scopus 로고
    • Sequential methodology for scheduling of heat-integrated batch plants
    • Halim I., Srinivasan R. Sequential methodology for scheduling of heat-integrated batch plants. Ind Eng Chem Res 2009, 48(18):8551-8565.
    • (2009) Ind Eng Chem Res , vol.48 , Issue.18 , pp. 8551-8565
    • Halim, I.1    Srinivasan, R.2
  • 28
    • 0035890549 scopus 로고    scopus 로고
    • A Decomposition approach for the scheduling of a steel plant production
    • Harjunkoski I., Grossmann I.E. A Decomposition approach for the scheduling of a steel plant production. Comput Chem Eng 2001, 25:1647-1660.
    • (2001) Comput Chem Eng , vol.25 , pp. 1647-1660
    • Harjunkoski, I.1    Grossmann, I.E.2
  • 32
    • 0032216021 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling. 1. Multipurpose batch processes
    • Ierapetritou M.G., Floudas C.A. Effective continuous-time formulation for short-term scheduling. 1. Multipurpose batch processes. Ind Eng Chem Res 1998, 37:4341-4359.
    • (1998) Ind Eng Chem Res , vol.37 , pp. 4341-4359
    • Ierapetritou, M.G.1    Floudas, C.A.2
  • 34
    • 38849197825 scopus 로고    scopus 로고
    • Improving unit-specific event based continuous-time approaches for batch processes: integrality gap and task splitting
    • Janak S.L., Floudas C.A. Improving unit-specific event based continuous-time approaches for batch processes: integrality gap and task splitting. Comput Chem Eng 2008, 32:913-955.
    • (2008) Comput Chem Eng , vol.32 , pp. 913-955
    • Janak, S.L.1    Floudas, C.A.2
  • 35
    • 0027545176 scopus 로고
    • A general algorithm for short-term scheduling of batch operations - I MILP formulation
    • Kondili E., Pantelides C., Sargent R.W.H. A general algorithm for short-term scheduling of batch operations - I MILP formulation. Comput Chem Eng 1993, 17:211-227.
    • (1993) Comput Chem Eng , vol.17 , pp. 211-227
    • Kondili, E.1    Pantelides, C.2    Sargent, R.W.H.3
  • 36
    • 0027676050 scopus 로고
    • Production planning for the rational use of energy in multiproduct continuous plants
    • Kondili E., Shah N., Pantelides C.C. Production planning for the rational use of energy in multiproduct continuous plants. Comput Chem Eng 1993, 17:S123-S128.
    • (1993) Comput Chem Eng , vol.17 , pp. S123-S128
    • Kondili, E.1    Shah, N.2    Pantelides, C.C.3
  • 37
    • 38849148294 scopus 로고    scopus 로고
    • Process scheduling under uncertainty: review and challenges
    • Li Z., Ierapetritou M. Process scheduling under uncertainty: review and challenges. Comput Chem Eng 2008, 32:715-727.
    • (2008) Comput Chem Eng , vol.32 , pp. 715-727
    • Li, Z.1    Ierapetritou, M.2
  • 38
    • 84862837236 scopus 로고    scopus 로고
    • An efficient unit-specific event-based continuous-time MILP formulation for short-term scheduling of multistage and multiproduct batch plants
    • Li J., Xiao X., Floudas C.A. An efficient unit-specific event-based continuous-time MILP formulation for short-term scheduling of multistage and multiproduct batch plants. Comput Aided Chem Eng 2012, 30:772-776.
    • (2012) Comput Aided Chem Eng , vol.30 , pp. 772-776
    • Li, J.1    Xiao, X.2    Floudas, C.A.3
  • 39
    • 84866929231 scopus 로고    scopus 로고
    • Production scheduling of a large-scale steel making continuous casting process via unit-specific event-based continuous-time models: short-term and medium-term scheduling
    • Li J., Xiao X., Tang Q., Floudas C.A. Production scheduling of a large-scale steel making continuous casting process via unit-specific event-based continuous-time models: short-term and medium-term scheduling. Ind Eng Chem Res 2012, 51(21):7300-7319.
    • (2012) Ind Eng Chem Res , vol.51 , Issue.21 , pp. 7300-7319
    • Li, J.1    Xiao, X.2    Tang, Q.3    Floudas, C.A.4
  • 40
    • 84860610233 scopus 로고    scopus 로고
    • General framework and modeling approach classification for chemical production scheduling
    • Maravelias C.T. General framework and modeling approach classification for chemical production scheduling. AIChE J 2012, 58(6):1812-1828.
    • (2012) AIChE J , vol.58 , Issue.6 , pp. 1812-1828
    • Maravelias, C.T.1
  • 41
    • 0037635200 scopus 로고    scopus 로고
    • A new general continuous-time state task network formulation for short term, scheduling of multipurpose batch plants
    • Maravelias C.T., Grossmann I.E. A new general continuous-time state task network formulation for short term, scheduling of multipurpose batch plants. Ind Eng Chem Res 2003, 42:3056-3074.
    • (2003) Ind Eng Chem Res , vol.42 , pp. 3056-3074
    • Maravelias, C.T.1    Grossmann, I.E.2
  • 42
    • 0344063349 scopus 로고    scopus 로고
    • Minimization of the makespan with a discrete-time state-task network formulation
    • Maravelias C.T., Grossmann I.E. Minimization of the makespan with a discrete-time state-task network formulation. Ind Eng Chem Res 2003, 42(24):6252-6257.
    • (2003) Ind Eng Chem Res , vol.42 , Issue.24 , pp. 6252-6257
    • Maravelias, C.T.1    Grossmann, I.E.2
  • 43
    • 2442495043 scopus 로고    scopus 로고
    • An MILP continuous-time framework for short-term scheduling of multipurpose batch processes under different operation strategies
    • Mendez C.A., Cerda J. An MILP continuous-time framework for short-term scheduling of multipurpose batch processes under different operation strategies. Optim Eng 2003, 4:7-22.
    • (2003) Optim Eng , vol.4 , pp. 7-22
    • Mendez, C.A.1    Cerda, J.2
  • 44
    • 33748102266 scopus 로고    scopus 로고
    • State-of-the-art review of optimization methods for short-term scheduling of batch processes
    • Mendez C.A., Cerdá J., Grossmann I.E., Harjunkoski I., Fahl M. State-of-the-art review of optimization methods for short-term scheduling of batch processes. Comput Chem Eng 2006, 30:913-946.
    • (2006) Comput Chem Eng , vol.30 , pp. 913-946
    • Mendez, C.A.1    Cerdá, J.2    Grossmann, I.E.3    Harjunkoski, I.4    Fahl, M.5
  • 45
    • 84887622375 scopus 로고    scopus 로고
    • Tightening methods for continuous-time mixed-integer programming models for chemical production scheduling
    • Merchan A.F., Velez S., Maravelias C.T. Tightening methods for continuous-time mixed-integer programming models for chemical production scheduling. AIChE J 2013, 59(12):4461-4467.
    • (2013) AIChE J , vol.59 , Issue.12 , pp. 4461-4467
    • Merchan, A.F.1    Velez, S.2    Maravelias, C.T.3
  • 46
    • 84857444866 scopus 로고    scopus 로고
    • Optimal production planning under time-sensitive electricity prices for continuous power-intensive processes
    • Mitra S., Grossmann I.E., Pinto J.M., Arora N. Optimal production planning under time-sensitive electricity prices for continuous power-intensive processes. Comput Chem Eng 2012, 38:171-184.
    • (2012) Comput Chem Eng , vol.38 , pp. 171-184
    • Mitra, S.1    Grossmann, I.E.2    Pinto, J.M.3    Arora, N.4
  • 48
    • 77956872862 scopus 로고    scopus 로고
    • Electrical load tracking scheduling of a steel plant
    • Nolde K., Morari M. Electrical load tracking scheduling of a steel plant. Comput Chem Eng 2010, 34:1899-1903.
    • (2010) Comput Chem Eng , vol.34 , pp. 1899-1903
    • Nolde, K.1    Morari, M.2
  • 51
    • 0028699940 scopus 로고
    • Optimal scheduling of heat-integrated multipurpose plants
    • Papageorgiou L.G., Shah N., Pantelides C.C. Optimal scheduling of heat-integrated multipurpose plants. Ind Eng Chem Res 1994, 33(12):3168-3186.
    • (1994) Ind Eng Chem Res , vol.33 , Issue.12 , pp. 3168-3186
    • Papageorgiou, L.G.1    Shah, N.2    Pantelides, C.C.3
  • 53
    • 0028500039 scopus 로고
    • Optimal cyclic scheduling of multistage multiproduct continuous plants
    • Pinto J., Grossmann I.E. Optimal cyclic scheduling of multistage multiproduct continuous plants. Comput Chem Eng 1994, 18:797-816.
    • (1994) Comput Chem Eng , vol.18 , pp. 797-816
    • Pinto, J.1    Grossmann, I.E.2
  • 54
    • 0001690679 scopus 로고
    • Continuous time mixed integer linear programming model for the short-term scheduling of multistage batch plants
    • Pinto J., Grossmann I.E. Continuous time mixed integer linear programming model for the short-term scheduling of multistage batch plants. Ind Eng Chem Res 1995, 34:3037.
    • (1995) Ind Eng Chem Res , vol.34 , pp. 3037
    • Pinto, J.1    Grossmann, I.E.2
  • 55
    • 44949199421 scopus 로고    scopus 로고
    • TMP production scheduling under uncertainty: methodology and case studies
    • Pulkkinen P., Ritala R. TMP production scheduling under uncertainty: methodology and case studies. Chem Eng Process 2008, 47:1492-1503.
    • (2008) Chem Eng Process , vol.47 , pp. 1492-1503
    • Pulkkinen, P.1    Ritala, R.2
  • 56
    • 84884904407 scopus 로고    scopus 로고
    • Closing the loops: an industrial perspective on the present and future impact of control
    • Sand G., Terwiesch P. Closing the loops: an industrial perspective on the present and future impact of control. Eur J Control 2013, 19:341-350.
    • (2013) Eur J Control , vol.19 , pp. 341-350
    • Sand, G.1    Terwiesch, P.2
  • 58
    • 84897009770 scopus 로고    scopus 로고
    • Optimization of energy and water use in multipurpose batch plants using an improved mathematical formulation
    • Seid E.R., Majozi T. Optimization of energy and water use in multipurpose batch plants using an improved mathematical formulation. Chem Eng Sci 2014, 111:335-349.
    • (2014) Chem Eng Sci , vol.111 , pp. 335-349
    • Seid, E.R.1    Majozi, T.2
  • 59
    • 0027545175 scopus 로고
    • A general algorithm for short-term scheduling of batch operations-II. Computational issues
    • Shah N., Pantelides C.C., Sargent W.H. A general algorithm for short-term scheduling of batch operations-II. Computational issues. Comput Chem Eng 1993, 2:229-244.
    • (1993) Comput Chem Eng , vol.2 , pp. 229-244
    • Shah, N.1    Pantelides, C.C.2    Sargent, W.H.3
  • 60
    • 33947498929 scopus 로고    scopus 로고
    • Improved unit-specific event-based continuous-time model for short-term scheduling of continuous processes: rigorous treatment of storage requirements
    • Shaik M.A., Floudas C.A. Improved unit-specific event-based continuous-time model for short-term scheduling of continuous processes: rigorous treatment of storage requirements. Ind Eng Chem Res 2007, 46(6):1764-1779.
    • (2007) Ind Eng Chem Res , vol.46 , Issue.6 , pp. 1764-1779
    • Shaik, M.A.1    Floudas, C.A.2
  • 61
    • 84878692988 scopus 로고    scopus 로고
    • Unification of STN and RTN based models for short-term scheduling of batch plants with shared resources
    • Shaik M.A., Vooradi R. Unification of STN and RTN based models for short-term scheduling of batch plants with shared resources. Chem Eng Sci 2013, 98:104-124.
    • (2013) Chem Eng Sci , vol.98 , pp. 104-124
    • Shaik, M.A.1    Vooradi, R.2
  • 62
    • 79961031255 scopus 로고    scopus 로고
    • Optimum heat storage design for heat integrated multipurpose batch plants
    • Stamp J., Majozi T. Optimum heat storage design for heat integrated multipurpose batch plants. Energy 2011, 36(8):5119-5131.
    • (2011) Energy , vol.36 , Issue.8 , pp. 5119-5131
    • Stamp, J.1    Majozi, T.2
  • 64
    • 77955820606 scopus 로고    scopus 로고
    • A novel approach to scheduling multipurpose batch plants using unit-slots
    • Susarla N., Li J., Karimi I.A. A novel approach to scheduling multipurpose batch plants using unit-slots. AIChE J 2010, 56(7):1859-1879.
    • (2010) AIChE J , vol.56 , Issue.7 , pp. 1859-1879
    • Susarla, N.1    Li, J.2    Karimi, I.A.3
  • 65
    • 84864496958 scopus 로고    scopus 로고
    • A novel multi-grid formulation for scheduling semi-continuous plants
    • Susarla N., Li J., Karimi I.A. A novel multi-grid formulation for scheduling semi-continuous plants. Comput Aided Chem Eng 2012, 31:1075-1079.
    • (2012) Comput Aided Chem Eng , vol.31 , pp. 1075-1079
    • Susarla, N.1    Li, J.2    Karimi, I.A.3
  • 66
    • 84875000745 scopus 로고    scopus 로고
    • Reformulations and branching methods for mixed-integer programming chemical production scheduling models
    • Velez S., Maravelias C.T. Reformulations and branching methods for mixed-integer programming chemical production scheduling models. Ind Eng Chem Res 2013, 52(10):3832-3841.
    • (2013) Ind Eng Chem Res , vol.52 , Issue.10 , pp. 3832-3841
    • Velez, S.1    Maravelias, C.T.2
  • 67
    • 77951681272 scopus 로고    scopus 로고
    • Planning and scheduling under uncertainty: a review across multiple sectors
    • Verderame P.M., Elia J.A., Li J., Floudas C.A. Planning and scheduling under uncertainty: a review across multiple sectors. Ind Eng Chem Res 2010, 49(9):3993-4017.
    • (2010) Ind Eng Chem Res , vol.49 , Issue.9 , pp. 3993-4017
    • Verderame, P.M.1    Elia, J.A.2    Li, J.3    Floudas, C.A.4
  • 68
    • 84861572031 scopus 로고    scopus 로고
    • A new heuristic for plant-wide schedule coordination problems: the intersection coordination heuristic
    • Xu C., Sand G., Harjunkoski I., Engell S. A new heuristic for plant-wide schedule coordination problems: the intersection coordination heuristic. Comput Chem Eng 2012, 42:152-167.
    • (2012) Comput Chem Eng , vol.42 , pp. 152-167
    • Xu, C.1    Sand, G.2    Harjunkoski, I.3    Engell, S.4
  • 69
    • 84863191392 scopus 로고    scopus 로고
    • Integration of scheduling and control with closed loop implementation
    • Zhuge J., Ierapetritou M.G. Integration of scheduling and control with closed loop implementation. Ind Eng Chem Res 2012, 51(25):8550-8565.
    • (2012) Ind Eng Chem Res , vol.51 , Issue.25 , pp. 8550-8565
    • Zhuge, J.1    Ierapetritou, M.G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.