메뉴 건너뛰기




Volumn 52, Issue 36, 2013, Pages 13046-13058

Resource-task network formulations for industrial demand side management of a steel plant

Author keywords

[No Author keywords available]

Indexed keywords

ALTERNATIVE PROCESS; COMPUTATIONAL PERFORMANCE; ENERGY DISTRIBUTIONS; FLUCTUATING ENERGY; INDUSTRIAL DEMANDS; INDUSTRIAL SECTOR; PRODUCTION SCHEDULING; RESOURCE-TASK NETWORKS;

EID: 84884177657     PISSN: 08885885     EISSN: 15205045     Source Type: Journal    
DOI: 10.1021/ie401044q     Document Type: Article
Times cited : (145)

References (24)
  • 1
    • 78049380491 scopus 로고    scopus 로고
    • The potential of demand-side management in energy-intensive industries for electricity markets in Germany
    • Paulus, M.; Borggrefe, F. The potential of demand-side management in energy-intensive industries for electricity markets in Germany Appl. Energy 2011, 88, 432
    • (2011) Appl. Energy , vol.88 , pp. 432
    • Paulus, M.1    Borggrefe, F.2
  • 2
    • 0035890549 scopus 로고    scopus 로고
    • A Decomposition Approach for the Scheduling of a Steel Plant Production
    • Harjunkoski, I.; Grossmann, I. E. A Decomposition Approach for the Scheduling of a Steel Plant Production Comput. Chem. Eng. 2001, 25, 1647
    • (2001) Comput. Chem. Eng. , vol.25 , pp. 1647
    • Harjunkoski, I.1    Grossmann, I.E.2
  • 3
    • 77956872862 scopus 로고    scopus 로고
    • Electrical load tracking scheduling of a steel plant
    • Nolde, K.; Morari, M. Electrical load tracking scheduling of a steel plant Comput. Chem. Eng. 2010, 34, 1899
    • (2010) Comput. Chem. Eng. , vol.34 , pp. 1899
    • Nolde, K.1    Morari, M.2
  • 4
    • 80053911225 scopus 로고    scopus 로고
    • On electrical load tracking scheduling for a steel plant
    • Häit, A.; Artigues, C. On electrical load tracking scheduling for a steel plant Comput. Chem. Eng. 2011, 35, 3044
    • (2011) Comput. Chem. Eng. , vol.35 , pp. 3044
    • Häit, A.1    Artigues, C.2
  • 5
    • 67849109965 scopus 로고    scopus 로고
    • New Continuous-Time Scheduling Formulation for Continuous Plants under Variable Electricity Cost
    • Castro, P. M.; Harjunkoski, I.; Grossmann, I. E. New Continuous-Time Scheduling Formulation for Continuous Plants under Variable Electricity Cost Ind. Eng. Chem. Res. 2009, 48, 6701
    • (2009) Ind. Eng. Chem. Res. , vol.48 , pp. 6701
    • Castro, P.M.1    Harjunkoski, I.2    Grossmann, I.E.3
  • 7
    • 78449270823 scopus 로고    scopus 로고
    • Optimal scheduling of continuous plants with energy constraints
    • Castro, P. M.; Harjunkoski, I.; Grossmann, I. E. Optimal scheduling of continuous plants with energy constraints Comput. Chem. Eng. 2011, 35, 372
    • (2011) Comput. Chem. Eng. , vol.35 , pp. 372
    • Castro, P.M.1    Harjunkoski, I.2    Grossmann, I.E.3
  • 8
    • 0000685021 scopus 로고    scopus 로고
    • RTN-based rolling horizon algorithms for medium term scheduling of multipurpose plants
    • Dimitriadis, A. D.; Shah, N.; Pantelides, C. C. RTN-based rolling horizon algorithms for medium term scheduling of multipurpose plants Comput. Chem. Eng. 1997, 21, S1061
    • (1997) Comput. Chem. Eng. , vol.21 , pp. 1061
    • Dimitriadis, A.D.1    Shah, N.2    Pantelides, C.C.3
  • 9
    • 84869475896 scopus 로고    scopus 로고
    • Robust Integer Optimization and Scheduling Problems for Large Electricity Consumers
    • Montreal, Canada, June 27-29
    • Vujanic, R.; Mariéthoz, S.; Goulart, P.; Morari, M. Robust Integer Optimization and Scheduling Problems for Large Electricity Consumers. 2012 American Control Conference, Montreal, Canada, June 27-29, 2012; pp 3108-3113.
    • (2012) 2012 American Control Conference , pp. 3108-3113
    • Vujanic, R.1    Mariéthoz, S.2    Goulart, P.3    Morari, M.4
  • 10
    • 84857444866 scopus 로고    scopus 로고
    • Optimal production planning under time-sensitive electricity prices for continuous power-intensive processes
    • Mitra, S.; Grossmann, I. E.; Pinto, J. M.; Arora, N. Optimal production planning under time-sensitive electricity prices for continuous power-intensive processes Comput. Chem. Eng. 2012, 38, 171
    • (2012) Comput. Chem. Eng. , vol.38 , pp. 171
    • Mitra, S.1    Grossmann, I.E.2    Pinto, J.M.3    Arora, N.4
  • 11
    • 11844300749 scopus 로고    scopus 로고
    • Simultaneous Design and Scheduling of Multipurpose Plants Using Resource Task Network Based Continuous-Time Formulations
    • Castro, P.; Barbosa-Póvoa, A.; Novais, A. Simultaneous Design and Scheduling of Multipurpose Plants Using Resource Task Network Based Continuous-Time Formulations Ind. Eng. Chem. Res. 2005, 44, 343
    • (2005) Ind. Eng. Chem. Res. , vol.44 , pp. 343
    • Castro, P.1    Barbosa-Póvoa, A.2    Novais, A.3
  • 12
    • 0027545176 scopus 로고
    • A General Algorithm for Short-Term Scheduling of Batch Operations - I. MILP Formulation
    • Kondili, E.; Pantelides, C. C.; Sargent, R. A General Algorithm for Short-Term Scheduling of Batch Operations-I. MILP Formulation Comput. Chem. Eng. 1993, 17, 211
    • (1993) Comput. Chem. Eng. , vol.17 , pp. 211
    • Kondili, E.1    Pantelides, C.C.2    Sargent, R.3
  • 13
    • 79551710495 scopus 로고    scopus 로고
    • A General Framework for Process Scheduling
    • Sundaramoorthy, A.; Maravelias, C. T. A General Framework for Process Scheduling AIChE J. 2011, 57, 695-710
    • (2011) AIChE J. , vol.57 , pp. 695-710
    • Sundaramoorthy, A.1    Maravelias, C.T.2
  • 14
    • 79955536361 scopus 로고    scopus 로고
    • Computational Study of Network-Based Mixed-Integer Programming Approaches for Chemical Production Scheduling
    • Sundaramoorthy, A.; Maravelias, C. T. Computational Study of Network-Based Mixed-Integer Programming Approaches for Chemical Production Scheduling Ind. Eng. Chem. Res. 2011, 50, 5023
    • (2011) Ind. Eng. Chem. Res. , vol.50 , pp. 5023
    • Sundaramoorthy, A.1    Maravelias, C.T.2
  • 16
    • 79851508341 scopus 로고    scopus 로고
    • Long-term scheduling of a single-unit multi-product continuous process to manufacture high performance glass
    • Lima, R. M.; Grossmann, I. E.; Jiao, Y. Long-term scheduling of a single-unit multi-product continuous process to manufacture high performance glass Comput. Chem. Eng. 2011, 35, 554
    • (2011) Comput. Chem. Eng. , vol.35 , pp. 554
    • Lima, R.M.1    Grossmann, I.E.2    Jiao, Y.3
  • 17
    • 84860375846 scopus 로고    scopus 로고
    • Generalized Disjunctive Programming as a Systematic Modeling Framework to Derive Scheduling Formulations
    • Castro, P. M.; Grossmann, I. E. Generalized Disjunctive Programming as a Systematic Modeling Framework to Derive Scheduling Formulations Ind. Eng. Chem. Res. 2012, 51, 5781
    • (2012) Ind. Eng. Chem. Res. , vol.51 , pp. 5781
    • Castro, P.M.1    Grossmann, I.E.2
  • 18
    • 0035281676 scopus 로고    scopus 로고
    • Short-Term Planning of Blending Processes: Scheduling and Nonlinear Optimization of Recipes
    • Glismann, K.; Gruhn, G. Short-Term Planning of Blending Processes: Scheduling and Nonlinear Optimization of Recipes Chem. Eng. Technol. 2001, 24 (3) 246
    • (2001) Chem. Eng. Technol. , vol.24 , Issue.3 , pp. 246
    • Glismann, K.1    Gruhn, G.2
  • 19
    • 0037093416 scopus 로고    scopus 로고
    • Dynamic modelling and scheduling of an industrial batch system
    • Castro, P.; Matos, H.; Barbosa-Póvoa, A. P. F. D. Dynamic modelling and scheduling of an industrial batch system Comput. Chem. Eng. 2002, 26, 671
    • (2002) Comput. Chem. Eng. , vol.26 , pp. 671
    • Castro, P.1    Matos, H.2    Barbosa-Póvoa, A.P.F.D.3
  • 20
    • 43449083507 scopus 로고    scopus 로고
    • Optimal Equipment Allocation for High Plant Flexibility: An Industrial Case Study
    • Castro, P. M.; Novais, A. Q.; Carvalho, A. Optimal Equipment Allocation for High Plant Flexibility: An Industrial Case Study Ind. Eng. Chem. Res. 2008, 47, 2742
    • (2008) Ind. Eng. Chem. Res. , vol.47 , pp. 2742
    • Castro, P.M.1    Novais, A.Q.2    Carvalho, A.3
  • 21
    • 56549101546 scopus 로고    scopus 로고
    • Optimal Sizing, Scheduling and Shift Policy of the Grinding Section of a Ceramic Tile Plant
    • Duarte, B.; Santos, L.; Mariano, J. Optimal Sizing, Scheduling and Shift Policy of the Grinding Section of a Ceramic Tile Plant Comput. Oper. Res. 2009, 36, 1825
    • (2009) Comput. Oper. Res. , vol.36 , pp. 1825
    • Duarte, B.1    Santos, L.2    Mariano, J.3
  • 22
    • 71749086095 scopus 로고    scopus 로고
    • Enterprise-wide optimization in an integrated chemical complex
    • Wassick, J. Enterprise-wide optimization in an integrated chemical complex Comput. Chem. Eng. 2009, 33, 1950
    • (2009) Comput. Chem. Eng. , vol.33 , pp. 1950
    • Wassick, J.1
  • 23
    • 84879024245 scopus 로고    scopus 로고
    • Continuous-time Batch Scheduling Approach for Optimizing Electricity Consumption Cost
    • Hadera, H.; Harjunkoski, I. Continuous-time Batch Scheduling Approach for Optimizing Electricity Consumption Cost Comput.-Aided Chem. Eng. 2013, 32, 403-408
    • (2013) Comput.-Aided Chem. Eng. , vol.32 , pp. 403-408
    • Hadera, H.1    Harjunkoski, I.2
  • 24
    • 84888317190 scopus 로고    scopus 로고
    • Optimization of production scheduling with time-dependent and machine-dependent electricity cost for industrial energy efficiency
    • Moon, J.; Shin, K.; Park, J. Optimization of production scheduling with time-dependent and machine-dependent electricity cost for industrial energy efficiency Int. J. Adv. Manuf. Technol. 2013, 68, 523-535
    • (2013) Int. J. Adv. Manuf. Technol. , vol.68 , pp. 523
    • Moon, J.1    Shin, K.2    Park, J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.