-
1
-
-
0034287620
-
Planning and scheduling models for refinery operations
-
Pinto J.M., Joly M., and Moro L.F.L. Planning and scheduling models for refinery operations. Comput Chem Eng 24 10 (2000) 2259-2276
-
(2000)
Comput Chem Eng
, vol.24
, Issue.10
, pp. 2259-2276
-
-
Pinto, J.M.1
Joly, M.2
Moro, L.F.L.3
-
2
-
-
0035853891
-
A simultaneous optimization strategy for overall integration in refinery planning
-
Zhang J., Zhu X.X., and Towler G.P. A simultaneous optimization strategy for overall integration in refinery planning. Ind Eng Chem Res 40 12 (2001) 2640-2653
-
(2001)
Ind Eng Chem Res
, vol.40
, Issue.12
, pp. 2640-2653
-
-
Zhang, J.1
Zhu, X.X.2
Towler, G.P.3
-
3
-
-
37948999989
-
-
Kim JH, Yi H, Han C, Park C, Kim Y. Plant-wide multiperiod optimal energy resource distribution and byproduct gas holder level control in the iron and steel making process under varying energy demands. Eighth international symposium on process systems engineering, China; 2003.
-
-
-
-
4
-
-
37949037345
-
-
Wenkai Li, Hui Chi-Wai, Hua Ben, Tong Zhongxuan. Material and energy integration in a petroleum refinery complex. Eighth international symposium on process systems engineering, China; 2003.
-
-
-
-
5
-
-
0022525739
-
Simultaneous optimization and heat integration of chemical processes
-
Duran M.A., and Grossmann I.E. Simultaneous optimization and heat integration of chemical processes. AICHE J 32 1 (1986) 123-138
-
(1986)
AICHE J
, vol.32
, Issue.1
, pp. 123-138
-
-
Duran, M.A.1
Grossmann, I.E.2
-
6
-
-
0031817989
-
A rigorous disjunctive optimization model for simultaneous flow sheet optimization and heat integration
-
Grossmann I.E., Yeomans H., and Kravanja Z. A rigorous disjunctive optimization model for simultaneous flow sheet optimization and heat integration. Comput Chem Eng 22 Suppl. (1998) 157-164
-
(1998)
Comput Chem Eng
, vol.22
, Issue.SUPPL
, pp. 157-164
-
-
Grossmann, I.E.1
Yeomans, H.2
Kravanja, Z.3
-
7
-
-
37949000361
-
-
Xuan Li, Yuan BE. Refinery-wide optimization. Ph. D. Thesis, Texas Tech University; 2000.
-
-
-
-
8
-
-
37949000249
-
-
Wenkai Li. Modeling oil refinery for production planning, scheduling and economic analysis. Ph. D. Thesis, Hong Kong University of Science and Technology; 2004.
-
-
-
-
9
-
-
0025416591
-
Simultaneous production planning and scheduling in multiproduct plants
-
Birewar D.B., and Grossmann I.E. Simultaneous production planning and scheduling in multiproduct plants. Ind Eng Chem Res 29 4 (1990) 570-580
-
(1990)
Ind Eng Chem Res
, vol.29
, Issue.4
, pp. 570-580
-
-
Birewar, D.B.1
Grossmann, I.E.2
-
10
-
-
0348167632
-
Short-term site-wide maintenance scheduling
-
Cheung K.-Y., Hui C.-W., Sakamoto H., Hirata K., and O'Young L. Short-term site-wide maintenance scheduling. Comput Chem Eng 28 1 (2004) 91-102
-
(2004)
Comput Chem Eng
, vol.28
, Issue.1
, pp. 91-102
-
-
Cheung, K.-Y.1
Hui, C.-W.2
Sakamoto, H.3
Hirata, K.4
O'Young, L.5
-
11
-
-
0027657165
-
Symbolic integration of logic in mixed integer linear programming techniques for process synthesis
-
Raman R., and Grossmann I.E. Symbolic integration of logic in mixed integer linear programming techniques for process synthesis. Comput Chem Eng 17 5 (1993) 909-925
-
(1993)
Comput Chem Eng
, vol.17
, Issue.5
, pp. 909-925
-
-
Raman, R.1
Grossmann, I.E.2
-
13
-
-
0003730982
-
-
The Scientific Press, San Francisco, CA
-
Brooke A., Kendrick D., and Meeraus A. GAMS-A user's guide (1998), The Scientific Press, San Francisco, CA
-
(1998)
GAMS-A user's guide
-
-
Brooke, A.1
Kendrick, D.2
Meeraus, A.3
|