메뉴 건너뛰기




Volumn 45, Issue 3, 1997, Pages 421-439

Scheduling in robotic cells: Classification, two and three machine cells

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; MACHINERY; MANUFACTURE; MATERIALS HANDLING; OPTIMIZATION; PRODUCTIVITY; ROBOTICS;

EID: 0031142587     PISSN: 0030364X     EISSN: None     Source Type: Journal    
DOI: 10.1287/opre.45.3.421     Document Type: Article
Times cited : (111)

References (18)
  • 1
    • 0025476266 scopus 로고
    • A graph partitioning procedure for machine assignment and cell formation in group technology
    • ASKIN, R. G. AND K. S. CHIU. 1990. A Graph Partitioning Procedure for Machine Assignment and Cell Formation in Group Technology. Int. J. Production Res. 28, 1555-1572.
    • (1990) Int. J. Production Res. , vol.28 , pp. 1555-1572
    • Askin, R.G.1    Chiu, K.S.2
  • 2
    • 77649094790 scopus 로고
    • Simulation modeling of robotic assembly cell incorporating carousel
    • S. Y. Nof (ed.). Elsevier Press
    • BADALAMENTI, J. AND H. BAO. 1986. Simulation Modeling of Robotic Assembly Cell Incorporating Carousel. Robotics and Material Flow, S. Y. Nof (ed.). Elsevier Press.
    • (1986) Robotics and Material Flow
    • Badalamenti, J.1    Bao, H.2
  • 6
    • 0020388157 scopus 로고
    • Direct clustering algorithm for group formation in cellular manufacture
    • CHAN, H. M. AND D. A. MILNER. 1982. Direct Clustering Algorithm for Group Formation in Cellular Manufacture. J. Manufacturing Sys. 1, 64-76.
    • (1982) J. Manufacturing Sys. , vol.1 , pp. 64-76
    • Chan, H.M.1    Milner, D.A.2
  • 8
    • 0031272146 scopus 로고    scopus 로고
    • Cyclic scheduling of identical parts in a robotic cell
    • to appear
    • CRAMA, Y. AND J. VAN DE KLUNDERT. 1997. Cyclic Scheduling of Identical Parts in a Robotic Cell. Opns. Res., to appear.
    • (1997) Opns. Res.
    • Crama, Y.1    Van Klundert, J.D.E.2
  • 9
    • 0021487364 scopus 로고
    • Optimal bin picking and insertion plans for assembly robots
    • DREZNER, Z. AND S. Y. NOF. 1984. Optimal Bin Picking and Insertion Plans for Assembly Robots. IIE Trans. 16, 262-270.
    • (1984) IIE Trans. , vol.16 , pp. 262-270
    • Drezner, Z.1    Nof, S.Y.2
  • 10
    • 85033299432 scopus 로고    scopus 로고
    • Design and operational issues in AGV-served manufacturing systems
    • to appear
    • GANESHARAJAH, T., N. G. HALL, AND C. SRISKANDARAJAH. 1997. Design and Operational Issues in AGV-Served Manufacturing Systems. Ann. Opns. Res., to appear.
    • (1997) Ann. Opns. Res.
    • Ganesharajah, T.1    Hall, N.G.2    Sriskandarajah, C.3
  • 11
    • 0001068310 scopus 로고
    • Sequencing a one state-variable machine: A solvable case of the traveling salesman problem
    • GILMORE, P. C. AND R. E. GOMORY. 1964. Sequencing a One State-variable Machine: A Solvable Case of the Traveling Salesman Problem. Opns. Res. 12, 655-679.
    • (1964) Opns. Res. , vol.12 , pp. 655-679
    • Gilmore, P.C.1    Gomory, R.E.2
  • 13
    • 0023326907 scopus 로고
    • The generalized group technology concept
    • KUSIAK, A. 1987. The Generalized Group Technology Concept. Int. J. Prod. Res. 25, 561-569.
    • (1987) Int. J. Prod. Res. , vol.25 , pp. 561-569
    • Kusiak, A.1
  • 15
    • 0030396562 scopus 로고    scopus 로고
    • Sequencing of robot activities and parts in two machine robotic Cells
    • LOGENDRAN, R. AND C. SRISKANDARAJAH. 1996. Sequencing of Robot Activities and Parts in Two Machine Robotic Cells. Int. J. Prod. Res. 34, 3447-3463.
    • (1996) Int. J. Prod. Res. , vol.34 , pp. 3447-3463
    • Logendran, R.1    Sriskandarajah, C.2
  • 16
    • 0025498065 scopus 로고
    • Cyclic sequencing problems in the two-machine permutation flow shop: Complexity, worst-case, and average-case analysis
    • MATSUO, H. 1990. Cyclic Sequencing Problems in the Two-machine Permutation Flow Shop: Complexity, Worst-case, and Average-case Analysis, Naval Res. Logist. 37, 679-694.
    • (1990) Naval Res. Logist. , vol.37 , pp. 679-694
    • Matsuo, H.1
  • 17
    • 0000197379 scopus 로고
    • A crane scheduling problem in a computer-integrated manufacturing environment
    • MATSUO, H., J. S. SHANG, AND R. S. SULLIVAN. 1991. A Crane Scheduling Problem in a Computer-integrated Manufacturing Environment. Mgmt. Sci. 37, 587-606.
    • (1991) Mgmt. Sci. , vol.37 , pp. 587-606
    • Matsuo, H.1    Shang, J.S.2    Sullivan, R.S.3
  • 18
    • 0002436396 scopus 로고
    • Machine grouping for efficient production
    • MCAULEY, J. 1972. Machine Grouping for Efficient Production. The Production Engineer, 51, 53-57.
    • (1972) The Production Engineer , vol.51 , pp. 53-57
    • Mcauley, J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.