메뉴 건너뛰기




Volumn 23, Issue 8, 2017, Pages 1060-1081

Evolution in the intellectual structure of BIM research: a bibliometric analysis

Author keywords

bibliometric analysis; BIM software; Building Information Modelling (BIM); funding structure; project sectors; research areas

Indexed keywords

EDUCATION; FINANCE; INFORMATION THEORY; PROJECT MANAGEMENT;

EID: 85038832984     PISSN: 13923730     EISSN: 18223605     Source Type: Journal    
DOI: 10.3846/13923730.2017.1374301     Document Type: Review
Times cited : (113)

References (226)
  • 1
    • 85013644026 scopus 로고    scopus 로고
    • Integrated collaborative tools for precast supply chain management
    • Abedi, M.,; Fathi, M. S.,; Mirasa, A. K.,; Rawai, N. M., 2016. Integrated collaborative tools for precast supply chain management, Scientia Iranica 23(2): 429–448. https://doi.org/10.24200/sci.2016.2129
    • (2016) Scientia Iranica , vol.23 , Issue.2 , pp. 429-448
    • Abedi, M.1    Fathi, M.S.2    Mirasa, A.K.3    Rawai, N.M.4
  • 2
    • 84884661236 scopus 로고    scopus 로고
    • Building Information Modeling: Systematic course development for undergraduate construction students
    • Ahn, Y. H.,; Cho, C.-S.,; Lee, N., 2013. Building Information Modeling: Systematic course development for undergraduate construction students, Journal of Professional Issues in Engineering Education and Practice 139(4): 290–300. https://doi.org/10.1061/(ASCE)EI.1943-5541.0000164
    • (2013) Journal of Professional Issues in Engineering Education and Practice , vol.139 , Issue.4 , pp. 290-300
    • Ahn, Y.H.1    Cho, C.-S.2    Lee, N.3
  • 3
    • 84890127914 scopus 로고    scopus 로고
    • BIM interface for full vs. semi-automated building energy simulation
    • Ahn, K.-U.,; Kim, Y.-J.,; Park, C.-S.,; Kim, I.,; Lee, K., 2014. BIM interface for full vs. semi-automated building energy simulation, Energy and Buildings 68(B): 671–678. https://doi.org/10.1016/j.enbuild.2013.08.063
    • (2014) Energy and Buildings , vol.68 , Issue.B , pp. 671-678
    • Ahn, K.-U.1    Kim, Y.-J.2    Park, C.-S.3    Kim, I.4    Lee, K.5
  • 4
    • 84950291438 scopus 로고    scopus 로고
    • Contractors’ transformation strategies for adopting Building Information Modeling
    • Ahn, Y. H.,; Kwak, Y. H.,; Suk, S. J., 2016. Contractors’ transformation strategies for adopting Building Information Modeling, Journal of Management in Engineering 32(1). https://doi.org/10.1061/(ASCE)ME.1943-5479.0000390
    • (2016) Journal of Management in Engineering , vol.32 , Issue.1
    • Ahn, Y.H.1    Kwak, Y.H.2    Suk, S.J.3
  • 5
    • 84902679100 scopus 로고    scopus 로고
    • Status of BIM adoption and the BIM experience of cost consultants in Australia
    • Aibinu, A.,; Venkatesh, S., 2014. Status of BIM adoption and the BIM experience of cost consultants in Australia, Journal of Professional Issues in Engineering Education Practice 140: 1–10. https://doi.org/10.1061/(ASCE)EI.1943-5541.0000193
    • (2014) Journal of Professional Issues in Engineering Education Practice , vol.140 , pp. 1-10
    • Aibinu, A.1    Venkatesh, S.2
  • 6
    • 77955582439 scopus 로고    scopus 로고
    • Augmented process model for e-tendering: Towards integrating object models with document management systems
    • Ajam, M.,; Alshawi, M.,; Mezher, T., 2010. Augmented process model for e-tendering: Towards integrating object models with document management systems, Automation in Construction 19(6): 762–778. https://doi.org/10.1016/j.autcon.2010.04.001
    • (2010) Automation in Construction , vol.19 , Issue.6 , pp. 762-778
    • Ajam, M.1    Alshawi, M.2    Mezher, T.3
  • 7
    • 84938863440 scopus 로고    scopus 로고
    • Waste effectiveness of the construction industry: Understanding the impediments and requisites for improvements
    • Ajayi, S. O.,; Oyedele, L. O.,; Bilal, M.,; Akinade, O. O.,; Alaka, H. A. H. A.,; Owolabi, H. A.,; Kadiri, K. O., 2015. Waste effectiveness of the construction industry: Understanding the impediments and requisites for improvements, Resources Conservation and Recycling 102: 101–112. https://doi.org/10.1016/j.resconrec.2015.06.001
    • (2015) Resources Conservation and Recycling , vol.102 , pp. 101-112
    • Ajayi, S.O.1    Oyedele, L.O.2    Bilal, M.3    Akinade, O.O.4    Alaka, H.A.H.A.5    Owolabi, H.A.6    Kadiri, K.O.7
  • 8
  • 9
    • 84925014062 scopus 로고    scopus 로고
    • Using social network theory and simulation to compare traditional versus BIM-lean practice for design error management
    • Al Hattab, M.,; Hamzeh, F.,; Hattab, M. A.,; Hamzeh, F., 2015. Using social network theory and simulation to compare traditional versus BIM-lean practice for design error management, Automation in Construction 52: 59–69. https://doi.org/10.1016/j.autcon.2015.02.014
    • (2015) Automation in Construction , vol.52 , pp. 59-69
    • Al Hattab, M.1    Hamzeh, F.2    Hattab, M.A.3    Hamzeh, F.4
  • 11
    • 84975223720 scopus 로고    scopus 로고
    • Cloud-Based BIM governance platform requirements and specifications: Software engineering approach using BPMN and UML
    • Alreshidi, E.,; Mourshed, M.,; Rezgui, Y., 2016. Cloud-Based BIM governance platform requirements and specifications: Software engineering approach using BPMN and UML, Journal of Computing in Civil Engineering 30(4). https://doi.org/10.1061/(ASCE)CP.1943-5487.0000539
    • (2016) Journal of Computing in Civil Engineering , vol.30 , Issue.4
    • Alreshidi, E.1    Mourshed, M.2    Rezgui, Y.3
  • 12
    • 84896828105 scopus 로고    scopus 로고
    • A method for integrating occupational indoor air quality with building information modeling for scheduling construction activities
    • Altaf, M. S.,; Hashisho, Z.,; Al-Hussein, M., 2014. A method for integrating occupational indoor air quality with building information modeling for scheduling construction activities, Canadian Journal of Civil Engineering 41(3): 245–251. https://doi.org/10.1139/cjce-2013-0230
    • (2014) Canadian Journal of Civil Engineering , vol.41 , Issue.3 , pp. 245-251
    • Altaf, M.S.1    Hashisho, Z.2    Al-Hussein, M.3
  • 13
    • 84884503238 scopus 로고    scopus 로고
    • Requirements for BIM platforms in the concrete reinforcement supply chain
    • Aram, S.,; Eastman, C.,; Sacks, R., 2013. Requirements for BIM platforms in the concrete reinforcement supply chain, Automation in Construction 35: 1–17. https://doi.org/10.1016/j.autcon.2013.01.013
    • (2013) Automation in Construction , vol.35 , pp. 1-17
    • Aram, S.1    Eastman, C.2    Sacks, R.3
  • 14
    • 79551686205 scopus 로고    scopus 로고
    • Technology adoption in the BIM implementation for lean architectural practice
    • Arayici, Y.,; Coates, P.,; Koskela, L.,; Kagioglou, M.,; Usher, C.,; O’Reilly, K., 2011. Technology adoption in the BIM implementation for lean architectural practice, Automation in Construction 20(2): 189–195. https://doi.org/10.1016/j.autcon.2010.09.016
    • (2011) Automation in Construction , vol.20 , Issue.2 , pp. 189-195
    • Arayici, Y.1    Coates, P.2    Koskela, L.3    Kagioglou, M.4    Usher, C.5    O’Reilly, K.6
  • 15
    • 84944058350 scopus 로고    scopus 로고
    • BPOpt: A framework for BIM-based performance optimization
    • Asl, M. R.,; Zarrinmehr, S.,; Bergin, M.,; Yan, W., 2015. BPOpt: A framework for BIM-based performance optimization, Energy and Buildings 108: 401–412. https://doi.org/10.1016/j.enbuild.2015.09.011
    • (2015) Energy and Buildings , vol.108 , pp. 401-412
    • Asl, M.R.1    Zarrinmehr, S.2    Bergin, M.3    Yan, W.4
  • 17
    • 79551681843 scopus 로고    scopus 로고
    • Building information modeling for sustainable design and LEED (R) rating analysis
    • Azhar, S.,; Carlton, W. A.,; Olsen, D.,; Ahmad, I., 2011. Building information modeling for sustainable design and LEED (R) rating analysis, Automation in Construction 20(2): 217–224. https://doi.org/10.1016/j.autcon.2010.09.019
    • (2011) Automation in Construction , vol.20 , Issue.2 , pp. 217-224
    • Azhar, S.1    Carlton, W.A.2    Olsen, D.3    Ahmad, I.4
  • 18
    • 84944442134 scopus 로고    scopus 로고
    • Toward sustainable energy usage in the power generation and construction sectors–A case study of Australia
    • Azzi, M.,; Duc, H.,; Ha, Q. P., 2015. Toward sustainable energy usage in the power generation and construction sectors–A case study of Australia, Automation in Construction 59: 122–127. https://doi.org/10.1016/j.autcon.2015.08.001
    • (2015) Automation in Construction , vol.59 , pp. 122-127
    • Azzi, M.1    Duc, H.2    Ha, Q.P.3
  • 19
    • 77955710066 scopus 로고    scopus 로고
    • Integrating resource production and construction using BIM
    • Babic, N. C.,; Podbreznik, P.,; Rebolj, D., 2010. Integrating resource production and construction using BIM, Automation in Construction 19(5, SI): 539–543. https://doi.org/10.1016/j.autcon.2009.11.005
    • (2010) Automation in Construction , vol.19 , Issue.5, SI , pp. 539-543
    • Babic, N.C.1    Podbreznik, P.2    Rebolj, D.3
  • 20
    • 80052094480 scopus 로고    scopus 로고
    • Decision-making tools for evaluating the impact of materials selection on the carbon footprint of buildings
    • Bank, L. C.,; Thompson, B. P.,; McCarthy, M., 2011. Decision-making tools for evaluating the impact of materials selection on the carbon footprint of buildings, Carbon Management 2(4): 431–441. https://doi.org/10.4155/CMT.11.33
    • (2011) Carbon Management , vol.2 , Issue.4 , pp. 431-441
    • Bank, L.C.1    Thompson, B.P.2    McCarthy, M.3
  • 21
    • 79952291359 scopus 로고    scopus 로고
    • Use of GIS and topology in the identification and resolution of space conflicts
    • Bansal, V. K., 2011. Use of GIS and topology in the identification and resolution of space conflicts, Journal of Computing in Civil Engineering 25(2): 159–171. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000075
    • (2011) Journal of Computing in Civil Engineering , vol.25 , Issue.2 , pp. 159-171
    • Bansal, V.K.1
  • 22
    • 84870828103 scopus 로고    scopus 로고
    • Application of life-cycle assessment to early stage building design for reduced embodied environmental impacts
    • Basbagill, J.,; Flager, F.,; Lepech, M.,; Fischer, M., 2013. Application of life-cycle assessment to early stage building design for reduced embodied environmental impacts, Building and Environment 60: 81–92. https://doi.org/10.1016/j.buildenv.2012.11.009
    • (2013) Building and Environment , vol.60 , pp. 81-92
    • Basbagill, J.1    Flager, F.2    Lepech, M.3    Fischer, M.4
  • 23
    • 77953577936 scopus 로고    scopus 로고
    • Building Information Modeling in architecture, engineering, and construction: Emerging research directions and trends
    • Becerik-Gerber, B.,; Kensek, K., 2010. Building Information Modeling in architecture, engineering, and construction: Emerging research directions and trends, Journal of Professional Issues in Engineering Education and Practice 136(3): 139–147. https://doi.org/10.1061/(ASCE)EI.1943-5541.0000023
    • (2010) Journal of Professional Issues in Engineering Education and Practice , vol.136 , Issue.3 , pp. 139-147
    • Becerik-Gerber, B.1    Kensek, K.2
  • 25
    • 84859575621 scopus 로고    scopus 로고
    • Application areas and data requirements for BIM-enabled facilities management
    • Becerik-Gerber, B.,; Jazizadeh, F.,; Li, N.,; Calis, G., 2012b. Application areas and data requirements for BIM-enabled facilities management, Journal of Construction Engineering and Management 138(3): 431–442. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000433
    • (2012) Journal of Construction Engineering and Management , vol.138 , Issue.3 , pp. 431-442
    • Becerik-Gerber, B.1    Jazizadeh, F.2    Li, N.3    Calis, G.4
  • 26
    • 84898664550 scopus 로고    scopus 로고
    • Interoperability for precast concrete building models
    • Belsky, M.,; Eastman, C.,; Sacks, R.,; Venugopal, M.,; Aram, S.,; Yang, D., 2014. Interoperability for precast concrete building models, PCI Journal, 144–155. https://doi.org/10.15554/pcij.03012014.144.155
    • (2014) PCI Journal , pp. 144-155
    • Belsky, M.1    Eastman, C.2    Sacks, R.3    Venugopal, M.4    Aram, S.5    Yang, D.6
  • 28
    • 84900462381 scopus 로고    scopus 로고
    • Automating surface flatness control using terrestrial laser scanning and building information models
    • Bosché, F.,; Guenet, E., 2014. Automating surface flatness control using terrestrial laser scanning and building information models, Automation in Construction 44: 212–226. https://doi.org/10.1016/j.autcon.2014.03.028
    • (2014) Automation in Construction , vol.44 , pp. 212-226
    • Bosché, F.1    Guenet, E.2
  • 29
    • 84985003646 scopus 로고    scopus 로고
    • BIM for infrastructure: An overall review and constructor perspective
    • Bradley, A.,; Li, H.,; Lark, R.,; Dunn, S., 2016. BIM for infrastructure: An overall review and constructor perspective, Automation in Construction 71: 139–152. https://doi.org/10.1016/j.autcon.2016.08.019
    • (2016) Automation in Construction , vol.71 , pp. 139-152
    • Bradley, A.1    Li, H.2    Lark, R.3    Dunn, S.4
  • 30
    • 80051614724 scopus 로고    scopus 로고
    • Goodbye Pareto principle, hello long tail: The effect of search costs on the concentration of product sales
    • Brynjolfsson, E.,; Hu, Y. J.,; Simester, D., 2011. Goodbye Pareto principle, hello long tail: The effect of search costs on the concentration of product sales, Management Science 57(8): 1373–1386. https://doi.org/10.1287/mnsc.1110.1371
    • (2011) Management Science , vol.57 , Issue.8 , pp. 1373-1386
    • Brynjolfsson, E.1    Hu, Y.J.2    Simester, D.3
  • 31
    • 84872739967 scopus 로고    scopus 로고
    • Building Information Modeling in support of sustainable design and construction
    • Bynum, P.,; Issa, R. R. A.,; Olbina, S., 2013. Building Information Modeling in support of sustainable design and construction, Journal of Construction Engineering and Management 139(1): 24–34. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000560
    • (2013) Journal of Construction Engineering and Management , vol.139 , Issue.1 , pp. 24-34
    • Bynum, P.1    Issa, R.R.A.2    Olbina, S.3
  • 32
    • 84955455717 scopus 로고    scopus 로고
    • Underground pipeline management based on road information modeling to assist in road management
    • Chang, J.-R.,; Lin, H.-S., 2016. Underground pipeline management based on road information modeling to assist in road management, Journal of Performance of Constructed Facilities 30(1). https://doi.org/10.1061/(ASCE)CF.1943-5509.0000631
    • (2016) Journal of Performance of Constructed Facilities , vol.30 , Issue.1
    • Chang, J.-R.1    Lin, H.-S.2
  • 33
    • 84978281684 scopus 로고    scopus 로고
    • Construction cost and energy performance of single family houses: From integrated design to automated optimization
    • Chardon, S.,; Brangeon, B.,; Bozonnet, E.,; Inard, C., 2016. Construction cost and energy performance of single family houses: From integrated design to automated optimization, Automation in Construction 70: 1–13. https://doi.org/10.1016/j.autcon.2016.06.011
    • (2016) Automation in Construction , vol.70 , pp. 1-13
    • Chardon, S.1    Brangeon, B.2    Bozonnet, E.3    Inard, C.4
  • 34
    • 84901590349 scopus 로고    scopus 로고
    • Asynchronous online collaboration in BIM generation using hybrid client-server and P2P network
    • Chen, H.-M.,; Hou, C., 2014. Asynchronous online collaboration in BIM generation using hybrid client-server and P2P network, Automation in Construction 45: 72–85. https://doi.org/10.1016/j.autcon.2014.05.007
    • (2014) Automation in Construction , vol.45 , pp. 72-85
    • Chen, H.-M.1    Hou, C.2
  • 35
    • 84907448543 scopus 로고    scopus 로고
    • A BIM-based construction quality management model and its applications
    • Chen, L.,; Luo, H., 2014. A BIM-based construction quality management model and its applications, Automation in Construction 46: 64–73. https://doi.org/10.1016/j.autcon.2014.05.009
    • (2014) Automation in Construction , vol.46 , pp. 64-73
    • Chen, L.1    Luo, H.2
  • 36
    • 84884500472 scopus 로고    scopus 로고
    • A framework for an automated and integrated project scheduling and management system
    • Chen, S.,; Grif, F. H. B.,; Chen, P.-H.,; Chang, L.,; Griffis, F. H. H., 2013. A framework for an automated and integrated project scheduling and management system, Automation in Construction 35: 89–110. ttps://doi.org/10.1016/j.autcon.2013.04.002 doi: 10.1016/j.autcon.2013.04.002
    • (2013) Automation in Construction , vol.35 , pp. 89-110
    • Chen, S.1    Grif, F.H.B.2    Chen, P.-H.3    Chang, L.4    Griffis, F.H.H.5
  • 37
    • 84901026670 scopus 로고    scopus 로고
    • Identifying and assessing critical risk factors for BIM projects: Empirical study
    • Chien, K. F.,; Wu, Z. H.,; Huang, S. C., 2014. Identifying and assessing critical risk factors for BIM projects: Empirical study, Automation in Construction 45: 1–15. https://doi.org/10.1016/j.autcon.2014.04.012
    • (2014) Automation in Construction , vol.45 , pp. 1-15
    • Chien, K.F.1    Wu, Z.H.2    Huang, S.C.3
  • 38
    • 84890213196 scopus 로고    scopus 로고
    • Reinforcement placement in a concrete slab object using structural building information modeling
    • Cho, Y. S.,; Lee, S. I.,; Bae, J. S., 2014. Reinforcement placement in a concrete slab object using structural building information modeling, Computer-Aided Civil and Infrastructure Engineering 29(1): 47–59. https://doi.org/10.1111/j.1467-8667.2012.00794.x
    • (2014) Computer-Aided Civil and Infrastructure Engineering , vol.29 , Issue.1 , pp. 47-59
    • Cho, Y.S.1    Lee, S.I.2    Bae, J.S.3
  • 39
    • 84941553195 scopus 로고    scopus 로고
    • Development of an open BIM-based legality system for building administration permission services
    • Choi, J.,; Kim, I., 2015. Development of an open BIM-based legality system for building administration permission services, Journal of Asian Architecture and Building Engineering 14(3): 577–584. https://doi.org/10.3130/jaabe.14.577
    • (2015) Journal of Asian Architecture and Building Engineering , vol.14 , Issue.3 , pp. 577-584
    • Choi, J.1    Kim, I.2
  • 40
    • 84907446900 scopus 로고    scopus 로고
    • Development of BIM-based evacuation regulation checking system for high-rise and complex buildings
    • Choi, J. J.,; Choi, J. J.,; Kim, I., 2014. Development of BIM-based evacuation regulation checking system for high-rise and complex buildings, Automation in Construction 46: 38–49. https://doi.org/10.1016/j.autcon.2013.12.005
    • (2014) Automation in Construction , vol.46 , pp. 38-49
    • Choi, J.J.1    Choi, J.J.2    Kim, I.3
  • 41
    • 84949680819 scopus 로고    scopus 로고
    • Opportunities for enhanced lean construction management using Internet of Things standards
    • Dave, B.,; Kubler, S.,; Främling, K.,; Koskela, L., 2016. Opportunities for enhanced lean construction management using Internet of Things standards, Automation in Construction 61: 86–97. https://doi.org/10.1016/j.autcon.2015.10.009
    • (2016) Automation in Construction , vol.61 , pp. 86-97
    • Dave, B.1    Kubler, S.2    Främling, K.3    Koskela, L.4
  • 42
    • 84870822070 scopus 로고    scopus 로고
    • Implementing ‘Site BIM’: A case study of ICT innovation on a large hospital project
    • Davies, R.,; Harty, C., 2013. Implementing ‘Site BIM’: A case study of ICT innovation on a large hospital project, Automation in Construction 30: 15–24. https://doi.org/10.1016/j.autcon.2012.11.024
    • (2013) Automation in Construction , vol.30 , pp. 15-24
    • Davies, R.1    Harty, C.2
  • 43
    • 84962909790 scopus 로고    scopus 로고
    • Mapping between BIM and 3D GIS in different levels of detail using schema mediation and instance comparison
    • Deng, Y.,; Cheng, J. C. P. P.,; Anumba, C., 2016. Mapping between BIM and 3D GIS in different levels of detail using schema mediation and instance comparison, Automation in Construction 67: 1–21. https://doi.org/10.1016/j.autcon.2016.03.006
    • (2016) Automation in Construction , vol.67 , pp. 1-21
    • Deng, Y.1    Cheng, J.C.P.P.2    Anumba, C.3
  • 44
    • 84926221525 scopus 로고    scopus 로고
    • Segmentation of building point cloud models including detailed architectural/ structural features and MEP systems
    • Dimitrov, A.,; Golparvar-Fard, M., 2015. Segmentation of building point cloud models including detailed architectural/ structural features and MEP systems, Automation in Construction 51: 32–45. https://doi.org/10.1016/j.autcon.2014.12.015
    • (2015) Automation in Construction , vol.51 , pp. 32-45
    • Dimitrov, A.1    Golparvar-Fard, M.2
  • 45
    • 84900427828 scopus 로고    scopus 로고
    • A BIM-enabled information infrastructure for building energy fault detection and diagnostics
    • Dong, B.,; O’Neill, Z.,; Li, Z., 2014. A BIM-enabled information infrastructure for building energy fault detection and diagnostics, Automation in Construction 44: 197–211. https://doi.org/10.1016/j.autcon.2014.04.007
    • (2014) Automation in Construction , vol.44 , pp. 197-211
    • Dong, B.1    O’Neill, Z.2    Li, Z.3
  • 46
    • 77949691000 scopus 로고    scopus 로고
    • Organizational divisions in BIM-enabled commercial construction
    • Dossick, C. S.,; Neff, G., 2010. Organizational divisions in BIM-enabled commercial construction, Journal of Construction Engineering and Management 136(4): 459–467. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000109
    • (2010) Journal of Construction Engineering and Management , vol.136 , Issue.4 , pp. 459-467
    • Dossick, C.S.1    Neff, G.2
  • 47
    • 84912125274 scopus 로고    scopus 로고
    • BIM cloud score: Bench-marking BIM performance
    • Du, J.,; Liu, R.,; Issa, R. R. A., 2014. BIM cloud score: Bench-marking BIM performance, Journal of Construction Engineering and Management 140(11): 1–13. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000891
    • (2014) Journal of Construction Engineering and Management , vol.140 , Issue.11 , pp. 1-13
    • Du, J.1    Liu, R.2    Issa, R.R.A.3
  • 48
    • 84885086703 scopus 로고    scopus 로고
    • BIM implementation throughout the UK construction project lifecycle: An analysis
    • Eadie, R.,; Browne, M.,; Odeyinka, H.,; McKeown, C.,; McNiff, S., 2013. BIM implementation throughout the UK construction project lifecycle: An analysis, Automation in Construction 36: 145–151. https://doi.org/10.1016/j.autcon.2013.09.001
    • (2013) Automation in Construction , vol.36 , pp. 145-151
    • Eadie, R.1    Browne, M.2    Odeyinka, H.3    McKeown, C.4    McNiff, S.5
  • 50
    • 84904159684 scopus 로고    scopus 로고
    • Construction scheduling using Genetic Algorithm based on Building Information Model
    • Faghihi, V.,; Reinschmidt, K. F.,; Kang, J. H., 2014. Construction scheduling using Genetic Algorithm based on Building Information Model, Expert Systems with Applications 41(16): 7565–7578. https://doi.org/10.1016/j.eswa.2014.05.047
    • (2014) Expert Systems with Applications , vol.41 , Issue.16 , pp. 7565-7578
    • Faghihi, V.1    Reinschmidt, K.F.2    Kang, J.H.3
  • 51
    • 84973520106 scopus 로고    scopus 로고
    • Objective-driven and Pareto Front analysis: Optimizing time, cost, and job-site movements
    • Faghihi, V.,; Reinschmidt, K. F.,; Kang, J. H., 2016. Objective-driven and Pareto Front analysis: Optimizing time, cost, and job-site movements, Automation in Construction 69: 79–88. https://doi.org/10.1016/j.autcon.2016.06.003
    • (2016) Automation in Construction , vol.69 , pp. 79-88
    • Faghihi, V.1    Reinschmidt, K.F.2    Kang, J.H.3
  • 52
    • 84894482902 scopus 로고    scopus 로고
    • Intellectual property rights in Building Information Modeling application in Taiwan
    • Fan, S.-L., 2014. Intellectual property rights in Building Information Modeling application in Taiwan, Journal of Construction Engineering and Management 140(3): 1–6. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000808
    • (2014) Journal of Construction Engineering and Management , vol.140 , Issue.3 , pp. 1-6
    • Fan, S.-L.1
  • 53
    • 84904992306 scopus 로고    scopus 로고
    • Effects of building information modeling during construction
    • Fan, S. L.,; Skibniewski, M. J.,; Hung, T. W., 2014. Effects of building information modeling during construction, Journal of Applied Science and Engineering 17(2): 157–166. https://doi.org/10.6180/jase.2014.17.2.06
    • (2014) Journal of Applied Science and Engineering , vol.17 , Issue.2 , pp. 157-166
    • Fan, S.L.1    Skibniewski, M.J.2    Hung, T.W.3
  • 54
    • 84902131466 scopus 로고    scopus 로고
    • BIM as a generic configurator for facilitation of customisation in the AEC industry
    • Farr, E. R. P.,; Piroozfar, P. A. E.,; Robinson, D., 2014. BIM as a generic configurator for facilitation of customisation in the AEC industry, Automation in Construction 45: 119–125. https://doi.org/10.1016/j.autcon.2014.05.012
    • (2014) Automation in Construction , vol.45 , pp. 119-125
    • Farr, E.R.P.1    Piroozfar, P.A.E.2    Robinson, D.3
  • 56
    • 84939536302 scopus 로고    scopus 로고
    • Project quality and change performance differences associated with the use of Building Information Modeling in design and construction projects: Univariate and multivariate analyses
    • Francom, T. C.,; El Asmar, M., 2015. Project quality and change performance differences associated with the use of Building Information Modeling in design and construction projects: Univariate and multivariate analyses, Journal of Construction Engineering and Management 141(9). https://doi.org/10.1061/(ASCE)CO.1943-7862.0000992
    • (2015) Journal of Construction Engineering and Management , vol.141 , Issue.9
    • Francom, T.C.1    El Asmar, M.2
  • 57
    • 84929075776 scopus 로고    scopus 로고
    • A query expansion method for retrieving online BIM resources based on Industry Foundation Classes
    • Gao, G.,; Liu, Y. S.,; Wang, M.,; Gu, M.,; Yong, J. H., 2015. A query expansion method for retrieving online BIM resources based on Industry Foundation Classes, Automation in Construction 56: 14–25. https://doi.org/10.1016/j.autcon.2015.04.006
    • (2015) Automation in Construction , vol.56 , pp. 14-25
    • Gao, G.1    Liu, Y.S.2    Wang, M.3    Gu, M.4    Yong, J.H.5
  • 58
    • 84897416233 scopus 로고    scopus 로고
    • Automated productivity-based schedule animation: Simulation-based approach to time-cost trade-off analysis
    • Gelisen, G.,; Griffis, F. H., 2014. Automated productivity-based schedule animation: Simulation-based approach to time-cost trade-off analysis, Journal of Construction Engineering and Management 140(4): 1–10. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000674
    • (2014) Journal of Construction Engineering and Management , vol.140 , Issue.4 , pp. 1-10
    • Gelisen, G.1    Griffis, F.H.2
  • 59
    • 84867899681 scopus 로고    scopus 로고
    • Systems modelling for sustainable building design
    • Geyer, P., 2012. Systems modelling for sustainable building design, Advanced Engineering Informatics 26(4): 656–668. https://doi.org/10.1016/j.aei.2012.04.005
    • (2012) Advanced Engineering Informatics , vol.26 , Issue.4 , pp. 656-668
    • Geyer, P.1
  • 60
    • 84882317757 scopus 로고    scopus 로고
    • Return on investment analysis of using Building Information Modeling in construction
    • Giel, B. K.,; Issa, R. R. A., 2013. Return on investment analysis of using Building Information Modeling in construction, Journal of Computing in Civil Engineering 27(5): 511–521. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000164
    • (2013) Journal of Computing in Civil Engineering , vol.27 , Issue.5 , pp. 511-521
    • Giel, B.K.1    Issa, R.R.A.2
  • 61
    • 84950241069 scopus 로고    scopus 로고
    • Framework for evaluating the BIM competencies of facility owners
    • Giel, B.,; Issa, R. R. A., 2016. Framework for evaluating the BIM competencies of facility owners, Journal of Management in Engineering 32(1). https://doi.org/10.1061/(ASCE)ME.1943-5479.0000378
    • (2016) Journal of Management in Engineering , vol.32 , Issue.1
    • Giel, B.1    Issa, R.R.A.2
  • 63
    • 84951336284 scopus 로고    scopus 로고
    • Automatic reconstruction of 3D building models from scanned 2D floor plans
    • Gimenez, L.,; Robert, S.,; Suard, F.,; Zreik, K., 2016. Automatic reconstruction of 3D building models from scanned 2D floor plans, Automation in Construction 63: 48–56. https://doi.org/10.1016/j.autcon.2015.12.008
    • (2016) Automation in Construction , vol.63 , pp. 48-56
    • Gimenez, L.1    Robert, S.2    Suard, F.3    Zreik, K.4
  • 64
    • 84921869343 scopus 로고    scopus 로고
    • Developing students’ collaborative skills in interdisciplinary learning environments
    • Gnaur, D.,; Svidt, K.,; Thygesen, M. K., 2015. Developing students’ collaborative skills in interdisciplinary learning environments, International Journal of Engineering Education 31(1): 257–266.
    • (2015) International Journal of Engineering Education , vol.31 , Issue.1 , pp. 257-266
    • Gnaur, D.1    Svidt, K.2    Thygesen, M.K.3
  • 65
    • 45749088540 scopus 로고    scopus 로고
    • Integrating construction process documentation into Building Information Modeling
    • Goedert, J. D.,; Meadati, P., 2008. Integrating construction process documentation into Building Information Modeling, Journal of Construction Engineering and Management 134(7): 509–516. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:7(509)
    • (2008) Journal of Construction Engineering and Management , vol.134 , Issue.7 , pp. 509-516
    • Goedert, J.D.1    Meadati, P.2
  • 66
    • 84870838177 scopus 로고    scopus 로고
    • Holistic system architecture for energy efficient building operation
    • Gökçe, H. U.,; Gökçe, K. U., 2013. Holistic system architecture for energy efficient building operation, Sustainable Cities and Society 6(1): 77–84. https://doi.org/10.1016/j.scs.2012.07.003
    • (2013) Sustainable Cities and Society , vol.6 , Issue.1 , pp. 77-84
    • Gökçe, H.U.1    Gökçe, K.U.2
  • 67
    • 84936860692 scopus 로고    scopus 로고
    • Integrated system platform for energy efficient building operations
    • Gökçe, H. U.,; Gökçe, K. U., 2014a. Integrated system platform for energy efficient building operations, Journal of Computing in Civil Engineering 28(6): 1–11. https://doi.org/10.1061/(ASCE)CP
    • (2014) Journal of Computing in Civil Engineering , vol.28 , Issue.6 , pp. 1-11
    • Gökçe, H.U.1    Gökçe, K.U.2
  • 68
    • 84888440120 scopus 로고    scopus 로고
    • Multi-dimensional energy monitoring, analysis and optimization system for energy efficient building operations
    • Gökce, H. U.,; Gökce, K. U., 2014b. Multi-dimensional energy monitoring, analysis and optimization system for energy efficient building operations, Sustainable Cities and Society 10: 161–173. https://doi.org/10.1016/j.scs.2013.08.004
    • (2014) Sustainable Cities and Society , vol.10 , pp. 161-173
    • Gökce, H.U.1    Gökce, K.U.2
  • 69
    • 79551684312 scopus 로고    scopus 로고
    • Challenging electronic procurement in the AEC sector: A BIM-based integrated perspective
    • Grilo, A. A.,; Jardim-Goncalves, R., 2011. Challenging electronic procurement in the AEC sector: A BIM-based integrated perspective, Automation in Construction 20(2): 107–114. https://doi.org/10.1016/j.autcon.2010.09.008
    • (2011) Automation in Construction , vol.20 , Issue.2 , pp. 107-114
    • Grilo, A.A.1    Jardim-Goncalves, R.2
  • 70
    • 84876676399 scopus 로고    scopus 로고
    • Cloud-Marketplaces: Distributed e-procurement for the AEC sector
    • Grilo, A.,; Jardim-Goncalves, R., 2013. Cloud-Marketplaces: Distributed e-procurement for the AEC sector, Advanced Engineering Informatics 27(2): 160–172. https://doi.org/10.1016/j.aei.2012.10.004
    • (2013) Advanced Engineering Informatics , vol.27 , Issue.2 , pp. 160-172
    • Grilo, A.1    Jardim-Goncalves, R.2
  • 71
    • 84872363169 scopus 로고    scopus 로고
    • Construction collaborative networks: the case study of a building information modelling-based office building project
    • Grilo, A.,; Zutshi, A.,; Jardim-Goncalves, R.,; Steiger-Garcao, A., 2013. Construction collaborative networks: the case study of a building information modelling-based office building project, International Journal of Computer Integrated Manufacturing 26(1–2): 152–165. https://doi.org/10.1080/0951192X.2012.681918
    • (2013) International Journal of Computer Integrated Manufacturing , vol.26 , Issue.1-2 , pp. 152-165
    • Grilo, A.1    Zutshi, A.2    Jardim-Goncalves, R.3    Steiger-Garcao, A.4
  • 72
    • 78149283543 scopus 로고    scopus 로고
    • Understanding and facilitating BIM adoption in the AEC industry
    • Gu, N.,; London, K., 2010. Understanding and facilitating BIM adoption in the AEC industry, Automation in Construction 19(8): 988–999. https://doi.org/10.1016/j.autcon.2010.09.002
    • (2010) Automation in Construction , vol.19 , Issue.8 , pp. 988-999
    • Gu, N.1    London, K.2
  • 73
    • 84929177219 scopus 로고    scopus 로고
    • Mapping actual thermal properties to building elements in gbXML-based BIM for reliable building energy performance modelling
    • Ham, Y.,; Golparvar-Fard, M., 2015. Mapping actual thermal properties to building elements in gbXML-based BIM for reliable building energy performance modelling, Automation in Construction 49: 214–224. https://doi.org/10.1016/j.autcon.2014.07.009
    • (2015) Automation in Construction , vol.49 , pp. 214-224
    • Ham, Y.1    Golparvar-Fard, M.2
  • 74
    • 84960881324 scopus 로고    scopus 로고
    • Formalized knowledge of construction sequencing for visual monitoring of work-in-progress via incomplete point clouds and low-LoD 4D BIMs
    • Han, K. K.,; Cline, D.,; Golparvar-Fard, M., 2015. Formalized knowledge of construction sequencing for visual monitoring of work-in-progress via incomplete point clouds and low-LoD 4D BIMs, Advanced Engineering Informatics 29(4): 889–901. https://doi.org/10.1016/j.aei.2015.10.006
    • (2015) Advanced Engineering Informatics , vol.29 , Issue.4 , pp. 889-901
    • Han, K.K.1    Cline, D.2    Golparvar-Fard, M.3
  • 75
    • 84884616342 scopus 로고    scopus 로고
    • State of practice of Building Information Modeling in mechanical and electrical construction industries
    • Hanna, A.,; Boodai, F.,; El Asmar, M., 2013. State of practice of Building Information Modeling in mechanical and electrical construction industries, Journal of Construction Engineering and Management 139(10): 1–8. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000747
    • (2013) Journal of Construction Engineering and Management , vol.139 , Issue.10 , pp. 1-8
    • Hanna, A.1    Boodai, F.2    El Asmar, M.3
  • 76
    • 84910631340 scopus 로고    scopus 로고
    • State of practice of Building Information Modeling in the electrical construction industry
    • Hanna, A. S.,; Yeutter, M.,; Aoun, D. G., 2014. State of practice of Building Information Modeling in the electrical construction industry, Journal of Construction Engineering and Management 140(12). https://doi.org/10.1061/(ASCE)CO.1943-7862.0000893
    • (2014) Journal of Construction Engineering and Management , vol.140 , Issue.12
    • Hanna, A.S.1    Yeutter, M.2    Aoun, D.G.3
  • 77
    • 84857357646 scopus 로고    scopus 로고
    • Aligning building information model tools and construction management methods
    • Hartmann, T.,; Van Meerveld, H.,; Vossebeld, N.,; Adriaanse, A., 2012. Aligning building information model tools and construction management methods, Automation in Construction 22: 605–613. https://doi.org/10.1016/j.autcon.2011.12.011
    • (2012) Automation in Construction , vol.22 , pp. 605-613
    • Hartmann, T.1    Van Meerveld, H.2    Vossebeld, N.3    Adriaanse, A.4
  • 78
    • 84925936172 scopus 로고    scopus 로고
    • BIM extension for the sustainability appraisal of conceptual steel design
    • Henry, A.,; Tizani, W.,; Oti, A. H.,; Tizani, W.,; Henry, A.,; Tizani, W., 2015. BIM extension for the sustainability appraisal of conceptual steel design, Advanced Engineering Informatics 29(1): 28–46. https://doi.org/10.1016/j.aei.2014.09.001
    • (2015) Advanced Engineering Informatics , vol.29 , Issue.1 , pp. 28-46
    • Henry, A.1    Tizani, W.2    Oti, A.H.3    Tizani, W.4    Henry, A.5    Tizani, W.6
  • 79
    • 40849134303 scopus 로고    scopus 로고
    • Building information modelling–Experts’ views on standardisation and industry deployment
    • Howard, R.,; Björk, B. C., 2008. Building information modelling–Experts’ views on standardisation and industry deployment, Advanced Engineering Informatics 22(2): 271–280. https://doi.org/10.1016/j.aei.2007.03.001
    • (2008) Advanced Engineering Informatics , vol.22 , Issue.2 , pp. 271-280
    • Howard, R.1    Björk, B.C.2
  • 80
    • 84959536960 scopus 로고    scopus 로고
    • Improving interoperability between architectural and structural design models: An industry foundation classes-based approach with web-based tools
    • Hu, Z.-Z.,; Zhang, X.-Y.,; Wang, H.-W.,; Kassem, M., 2016. Improving interoperability between architectural and structural design models: An industry foundation classes-based approach with web-based tools, Automation in Construction 66: 29–42. https://doi.org/10.1016/j.autcon.2016.02.001
    • (2016) Automation in Construction , vol.66 , pp. 29-42
    • Hu, Z.-Z.1    Zhang, X.-Y.2    Wang, H.-W.3    Kassem, M.4
  • 81
    • 83755228572 scopus 로고    scopus 로고
    • Design of track alignment using Building Information Modeling
    • Huang, S.-F.,; Chen, C.,; Dzeng, R.-J., 2011. Design of track alignment using Building Information Modeling, Journal of Transportation Engineering 137(11): 823–830. https://doi.org/10.1061/(ASCE)TE.1943-5436.0000287
    • (2011) Journal of Transportation Engineering , vol.137 , Issue.11 , pp. 823-830
    • Huang, S.-F.1    Chen, C.2    Dzeng, R.-J.3
  • 82
    • 84976500659 scopus 로고    scopus 로고
    • Green building assessment tool (GBAT) for integrated BIM-based design decisions
    • Ilhan, B.,; Yaman, H., 2016. Green building assessment tool (GBAT) for integrated BIM-based design decisions, Automation in Construction 70: 26–37. https://doi.org/10.1016/j.autcon.2016.05.001
    • (2016) Automation in Construction , vol.70 , pp. 26-37
    • Ilhan, B.1    Yaman, H.2
  • 83
    • 84934988457 scopus 로고    scopus 로고
    • Integration of Building Information Modeling and economic and environmental impact analysis to support sustainable building design
    • Inyim, P.,; Rivera, J.,; Zhu, Y., 2015. Integration of Building Information Modeling and economic and environmental impact analysis to support sustainable building design, Journal of Management in Engineering 31(1, SI): 1–10. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000308
    • (2015) Journal of Management in Engineering , vol.31 , Issue.1, SI , pp. 1-10
    • Inyim, P.1    Rivera, J.2    Zhu, Y.3
  • 84
    • 84872313658 scopus 로고    scopus 로고
    • Integrating BIM and GIS to improve the visual monitoring of construction supply chain management
    • Irizarry, J.,; Karan, E. P.,; Jalaei, F., 2013. Integrating BIM and GIS to improve the visual monitoring of construction supply chain management, Automation in Construction 31: 241–254. https://doi.org/10.1016/j.autcon.2012.12.005
    • (2013) Automation in Construction , vol.31 , pp. 241-254
    • Irizarry, J.1    Karan, E.P.2    Jalaei, F.3
  • 85
    • 84937510653 scopus 로고    scopus 로고
    • Integrating Building Information Modeling (BIM) and LEED system at the conceptual design stage of sustainable buildings
    • Jalaei, F.,; Jrade, A., 2015. Integrating Building Information Modeling (BIM) and LEED system at the conceptual design stage of sustainable buildings, Sustainable Cities and Society 18: 95–107. https://doi.org/10.1016/j.scs.2015.06.007
    • (2015) Sustainable Cities and Society , vol.18 , pp. 95-107
    • Jalaei, F.1    Jrade, A.2
  • 86
    • 84871635396 scopus 로고    scopus 로고
    • Professionalism in digitally mediated project work
    • Jaradat, S.,; Whyte, J.,; Luck, R., 2013. Professionalism in digitally mediated project work, Building Research and Information 41(1, SI): 51–59. https://doi.org/10.1080/09613218.2013.743398
    • (2013) Building Research and Information , vol.41 , Issue.1, SI , pp. 51-59
    • Jaradat, S.1    Whyte, J.2    Luck, R.3
  • 87
    • 84983130758 scopus 로고    scopus 로고
    • Automated rule-based constructability checking: Case study of formwork
    • Jiang, L.,; Leicht, R. M., 2015. Automated rule-based constructability checking: Case study of formwork, Journal of Management in Engineering 31(1): 1–10. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000304
    • (2015) Journal of Management in Engineering , vol.31 , Issue.1 , pp. 1-10
    • Jiang, L.1    Leicht, R.M.2
  • 88
    • 84925706478 scopus 로고    scopus 로고
    • Realtime visualization of building information models (BIM)
    • Johansson, M.,; Roupe, M.,; Bosch-Sijtsema, P., 2015. Realtime visualization of building information models (BIM), Automation in Construction 54: 69–82. https://doi.org/10.1016/j.autcon.2015.03.018
    • (2015) Automation in Construction , vol.54 , pp. 69-82
    • Johansson, M.1    Roupe, M.2    Bosch-Sijtsema, P.3
  • 89
    • 84881598885 scopus 로고    scopus 로고
    • Integrating building information modelling with sustainability to design building projects at the conceptual stage
    • Jrade, A.,; Jalaei, F., 2013. Integrating building information modelling with sustainability to design building projects at the conceptual stage, Building Simulation 6(4): 429–444. https://doi.org/10.1007/s12273-013-0120-0
    • (2013) Building Simulation , vol.6 , Issue.4 , pp. 429-444
    • Jrade, A.1    Jalaei, F.2
  • 90
    • 84941560258 scopus 로고    scopus 로고
    • BIM-based carbon dioxide emission quantity assessment method in Korea
    • Jun, H.,; Lim, N.,; Kim, M., 2015. BIM-based carbon dioxide emission quantity assessment method in Korea, Journal of Asian Architecture and Building Engineering 14(3): 569–576. https://doi.org/10.3130/jaabe.14.569
    • (2015) Journal of Asian Architecture and Building Engineering , vol.14 , Issue.3 , pp. 569-576
    • Jun, H.1    Lim, N.2    Kim, M.3
  • 91
    • 84975225173 scopus 로고    scopus 로고
    • Slim BIM charts for rapidly visualizing and quantifying levels of BIM adoption and implementation
    • Jung, W.,; Lee, G., 2016. Slim BIM charts for rapidly visualizing and quantifying levels of BIM adoption and implementation, Journal of Computing in Civil Engineering 30(4). https://doi.org/10.1061/(ASCE)CP.1943-5487.0000554
    • (2016) Journal of Computing in Civil Engineering , vol.30 , Issue.4
    • Jung, W.1    Lee, G.2
  • 92
    • 84975317723 scopus 로고    scopus 로고
    • Automated 3D wireframe modeling of indoor structures from point clouds using constrained least-squares adjustment for as-built BIM
    • Jung, J.,; Hong, S.,; Yoon, S.,; Kim, J.,; Heo, J., 2015. Automated 3D wireframe modeling of indoor structures from point clouds using constrained least-squares adjustment for as-built BIM, Journal of Computing in Civil Engineering 30(1): 4015074. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000556
    • (2015) Journal of Computing in Civil Engineering , vol.30 , Issue.1 , pp. 4015074
    • Jung, J.1    Hong, S.2    Yoon, S.3    Kim, J.4    Heo, J.5
  • 93
    • 85009376668 scopus 로고    scopus 로고
    • Object composite query method using IFC and LandXML based on BIM linkage model
    • Kang, T. W., 2017. Object composite query method using IFC and LandXML based on BIM linkage model, Automation in Construction 76: 14–23. https://doi.org/10.1016/j.autcon.2017.01.008
    • (2017) Automation in Construction , vol.76 , pp. 14-23
    • Kang, T.W.1
  • 94
    • 84925705205 scopus 로고    scopus 로고
    • A study on software architecture for effective BIM/GIS-based facility management data integration
    • Kang, T. W.,; Hong, C. H., 2015. A study on software architecture for effective BIM/GIS-based facility management data integration, Automation in Construction 54: 25–38. https://doi.org/10.1016/j.autcon.2015.03.019
    • (2015) Automation in Construction , vol.54 , pp. 25-38
    • Kang, T.W.1    Hong, C.H.2
  • 95
    • 84964828598 scopus 로고    scopus 로고
    • Managing construction schedule by telepresence: Integration of site video feed with an active nD CAD simulation
    • Kang, L. S.,; Kim, H. S.,; Moon, H. S.,; Kim, S.-K. K., 2016. Managing construction schedule by telepresence: Integration of site video feed with an active nD CAD simulation, Automation in Construction 68: 32–43. https://doi.org/10.1016/j.autcon.2016.04.003
    • (2016) Automation in Construction , vol.68 , pp. 32-43
    • Kang, L.S.1    Kim, H.S.2    Moon, H.S.3    Kim, S.K.K.4
  • 96
    • 84924971295 scopus 로고    scopus 로고
    • Extending BIM interoperability to preconstruction operations using geospatial analyses and semantic web services
    • Karan, E. P.,; Irizarry, J., 2015. Extending BIM interoperability to preconstruction operations using geospatial analyses and semantic web services, Automation in Construction 53: 1–12. https://doi.org/10.1016/j.autcon.2015.02.012
    • (2015) Automation in Construction , vol.53 , pp. 1-12
    • Karan, E.P.1    Irizarry, J.2
  • 97
    • 84873353979 scopus 로고    scopus 로고
    • Use of BIM for effective visualization teaching approach in construction education
    • Kim, J.-L., 2012. Use of BIM for effective visualization teaching approach in construction education, Journal of Professional Issues in Engineering Education and Practice 138(3): 214–223. https://doi.org/10.1061/(ASCE)EI.1943-5541.0000102
    • (2012) Journal of Professional Issues in Engineering Education and Practice , vol.138 , Issue.3 , pp. 214-223
    • Kim, J.-L.1
  • 98
    • 84876135548 scopus 로고    scopus 로고
    • Energy modeling system using Building Information Modeling open standards
    • Kim, H.,; Anderson, K., 2013. Energy modeling system using Building Information Modeling open standards, Journal of Computing in Civil Engineering 27(3): 203–211. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000215
    • (2013) Journal of Computing in Civil Engineering , vol.27 , Issue.3 , pp. 203-211
    • Kim, H.1    Anderson, K.2
  • 99
    • 84930472774 scopus 로고    scopus 로고
    • Design integrated parametric modeling methodology for Han-ok
    • Kim, J.,; Jeon, B. H., 2012. Design integrated parametric modeling methodology for Han-ok, Journal of Asian Architecture and Building Engineering 11(2): 239–243. https://doi.org/10.3130/jaabe.11.239
    • (2012) Journal of Asian Architecture and Building Engineering , vol.11 , Issue.2 , pp. 239-243
    • Kim, J.1    Jeon, B.H.2
  • 100
    • 84930486485 scopus 로고    scopus 로고
    • Development of an IFC-based IDF converter for supporting energy performance assessment in the early design phase
    • Kim, I.,; Kim, J.,; Seo, J., 2012. Development of an IFC-based IDF converter for supporting energy performance assessment in the early design phase, Journal of Asian Architecture and Building Engineering 11(2): 313–320. https://doi.org/10.3130/jaabe.11.313
    • (2012) Journal of Asian Architecture and Building Engineering , vol.11 , Issue.2 , pp. 313-320
    • Kim, I.1    Kim, J.2    Seo, J.3
  • 101
    • 84884500391 scopus 로고    scopus 로고
    • Generating construction schedules through automatic data extraction using open BIM (building information modeling) technology
    • Kim, H.,; Anderson, K.,; Lee, S.,; Hildreth, J., 2013. Generating construction schedules through automatic data extraction using open BIM (building information modeling) technology, Automation in Construction 35: 285–295. https://doi.org/10.1016/j.autcon2013.05.020
    • (2013) Automation in Construction , vol.35 , pp. 285-295
    • Kim, H.1    Anderson, K.2    Lee, S.3    Hildreth, J.4
  • 102
    • 84871764113 scopus 로고    scopus 로고
    • Automated construction progress measurement using a 4D building information model and 3D data
    • Kim, C. C.,; Son, H.,; Kim, C. C., 2013. Automated construction progress measurement using a 4D building information model and 3D data, Automation in Construction 31: 75–82. https://doi.org/10.1016/j.autcon.2012.11.041
    • (2013) Automation in Construction , vol.31 , pp. 75-82
    • Kim, C.C.1    Son, H.2    Kim, C.C.3
  • 103
    • 84939839522 scopus 로고    scopus 로고
    • A process to divide curved walls in IFC-BIM into segmented straight walls for building energy analysis
    • Kim, K.,; Yu, J., 2016a. A process to divide curved walls in IFC-BIM into segmented straight walls for building energy analysis, Journal of Civil Engineering and Management 22(3): 333–345. https://doi.org/10.3846/13923730.2014.897975
    • (2016) Journal of Civil Engineering and Management , vol.22 , Issue.3 , pp. 333-345
    • Kim, K.1    Yu, J.2
  • 104
    • 84958056317 scopus 로고    scopus 로고
    • BIM-based building energy load calculation system for designers
    • Kim, K.,; Yu, J., 2016b. BIM-based building energy load calculation system for designers, KSCE Journal of Civil Engineering 20(2): 549–563. https://doi.org/10.1007/s12205-015-1625-0
    • (2016) KSCE Journal of Civil Engineering , vol.20 , Issue.2 , pp. 549-563
    • Kim, K.1    Yu, J.2
  • 105
    • 84898865862 scopus 로고    scopus 로고
    • Sharing of temporary structures: Formalization and planning application
    • Kim, J.,; Fischer, M.,; Kunz, J.,; Levitt, R., 2014. Sharing of temporary structures: Formalization and planning application, Automation in Construction 43: 187–194. https://doi.org/10.1016/j.autcon.2014.03.018
    • (2014) Automation in Construction , vol.43 , pp. 187-194
    • Kim, J.1    Fischer, M.2    Kunz, J.3    Levitt, R.4
  • 106
    • 84928004043 scopus 로고    scopus 로고
    • Information retrieval framework for hazard identification in construction
    • Kim, H.,; Lee, H.-S.,; Park, M.,; Chung, B.,; Hwang, S., 2015a. Information retrieval framework for hazard identification in construction, Journal of Computing in Civil Engineering 29(3): 1–10. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000340
    • (2015) Journal of Computing in Civil Engineering , vol.29 , Issue.3 , pp. 1-10
    • Kim, H.1    Lee, H.-S.2    Park, M.3    Chung, B.4    Hwang, S.5
  • 107
    • 84967016888 scopus 로고    scopus 로고
    • BIM IFC information mapping to building energy analysis (BEA) model with manually extended material information
    • Kim, H.,; Shen, Z.,; Kim, I.,; Kim, K.,; Stumpf, A.,; Yu, J., 2015b. BIM IFC information mapping to building energy analysis (BEA) model with manually extended material information, Automation in Construction 68: 183–193. https://doi.org/10.1016/j.autcon.2016.04.002
    • (2015) Automation in Construction , vol.68 , pp. 183-193
    • Kim, H.1    Shen, Z.2    Kim, I.3    Kim, K.4    Stumpf, A.5    Yu, J.6
  • 108
    • 84926189988 scopus 로고    scopus 로고
    • Developing a physical BIM library for building thermal energy simulation
    • Kim, J. B.,; Jeong, W.,; Clayton, M. J.,; Haberl, J. S.,; Yan, W., 2015c. Developing a physical BIM library for building thermal energy simulation, Automation in Construction 50: 16–28. https://doi.org/10.1016/j.autcon.2014.10.011
    • (2015) Automation in Construction , vol.50 , pp. 16-28
    • Kim, J.B.1    Jeong, W.2    Clayton, M.J.3    Haberl, J.S.4    Yan, W.5
  • 109
    • 84938679031 scopus 로고    scopus 로고
    • BIM-based decision-support method for master planning of sustainable large-scale developments
    • Kim, J. I.,; Jung, J.,; Fischer, M.,; Orr, R., 2015d. BIM-based decision-support method for master planning of sustainable large-scale developments, Automation in Construction 58: 95–108. https://doi.org/10.1016/j.autcon.2015.07.003
    • (2015) Automation in Construction , vol.58 , pp. 95-108
    • Kim, J.I.1    Jung, J.2    Fischer, M.3    Orr, R.4
  • 110
    • 84929312021 scopus 로고    scopus 로고
    • A framework for dimensional and surface quality assessment of precast concrete elements using BIM and 3D laser scanning
    • Kim, M.-K.,; Cheng, J. C. P.,; Sohn, H.,; Chang, C.-C., 2015e. A framework for dimensional and surface quality assessment of precast concrete elements using BIM and 3D laser scanning, Automation in Construction 49: 225–238. https://doi.org/10.1016/j.autcon.2014.07.010
    • (2015) Automation in Construction , vol.49 , pp. 225-238
    • Kim, M.-K.1    Cheng, J.C.P.2    Sohn, H.3    Chang, C.-C.4
  • 111
    • 84958055395 scopus 로고    scopus 로고
    • Developing a 3D intelligent object model for the application of construction planning/simulation in a highway project
    • Kim, H.,; Shen, Z.,; Moon, H.,; Ju, K.,; Choi, W., 2016a. Developing a 3D intelligent object model for the application of construction planning/simulation in a highway project, KSCE Journal of Civil Engineering 20(2): 538–548. https://doi.org/10.1007/s12205-015-0463-4
    • (2016) KSCE Journal of Civil Engineering , vol.20 , Issue.2 , pp. 538-548
    • Kim, H.1    Shen, Z.2    Moon, H.3    Ju, K.4    Choi, W.5
  • 112
    • 84982847693 scopus 로고    scopus 로고
    • Integrating work sequences and temporary structures into safety planning: Automated scaffolding-related safety hazard identification and prevention in BIM
    • Kim, K.,; Cho, Y.,; Zhang, S., 2016b. Integrating work sequences and temporary structures into safety planning: Automated scaffolding-related safety hazard identification and prevention in BIM, Automation in Construction 70: 128–142. https://doi.org/10.1016/j.autcon.2016.06.012
    • (2016) Automation in Construction , vol.70 , pp. 128-142
    • Kim, K.1    Cho, Y.2    Zhang, S.3
  • 113
    • 84995487486 scopus 로고    scopus 로고
    • Automated dimensional quality assurance of full-scale precast concrete elements using laser scanning and BIM
    • Kim, M.-K.,; Wang, Q.,; Park, J.-W.,; Cheng, J. C. P.,; Sohn, H.,; Chang, C.-C., 2016c. Automated dimensional quality assurance of full-scale precast concrete elements using laser scanning and BIM, Automation in Construction 72: 102–114. https://doi.org/10.1016/j.autcon.2016.08.035
    • (2016) Automation in Construction , vol.72 , pp. 102-114
    • Kim, M.-K.1    Wang, Q.2    Park, J.-W.3    Cheng, J.C.P.4    Sohn, H.5    Chang, C.-C.6
  • 114
    • 84938614550 scopus 로고    scopus 로고
    • Assessment of BIM acceptance degree of Korean AEC participants
    • Kim, S.,; Park, C. H.,; Chin, S., 2016d. Assessment of BIM acceptance degree of Korean AEC participants, KSCE Journal of Civil Engineering 20(4): 1163–1177. https://doi.org/10.1007/s12205-015-0647-y
    • (2016) KSCE Journal of Civil Engineering , vol.20 , Issue.4 , pp. 1163-1177
    • Kim, S.1    Park, C.H.2    Chin, S.3
  • 115
    • 54049120023 scopus 로고    scopus 로고
    • Teams, contracts, & BIM
    • Knight, M. D., 2008. Teams, contracts, & BIM, Ashrae Journal 50(9): 72.
    • (2008) Ashrae Journal , vol.50 , Issue.9 , pp. 72
    • Knight, M.D.1
  • 117
    • 84905578177 scopus 로고    scopus 로고
    • Building Information Modeling (BIM)-based daylighting simulation and analysis
    • Kota, S.,; Haberl, J. S.,; Clayton, M. J.,; Yan, W., 2014. Building Information Modeling (BIM)-based daylighting simulation and analysis, Energy and Buildings 81: 391–403. https://doi.org/10.1016/j.enbuild.2014.06.043
    • (2014) Energy and Buildings , vol.81 , pp. 391-403
    • Kota, S.1    Haberl, J.S.2    Clayton, M.J.3    Yan, W.4
  • 118
  • 119
    • 84875747202 scopus 로고    scopus 로고
    • Brokering innovation to better leverage R&D investment
    • Kraatz, J. A.,; Hampson, K. D., 2013. Brokering innovation to better leverage R&D investment, Building Research and Information 41(2): 187–197. https://doi.org/10.1080/09613218.2013.749771
    • (2013) Building Research and Information , vol.41 , Issue.2 , pp. 187-197
    • Kraatz, J.A.1    Hampson, K.D.2
  • 120
    • 84969793945 scopus 로고    scopus 로고
    • A new systemic approach to improve the sustainability performance of office buildings in the early design stage
    • Kreiner, H.,; Passer, A.,; Wallbaum, H., 2015. A new systemic approach to improve the sustainability performance of office buildings in the early design stage, Energy and Buildings 109: 385–396. https://doi.org/10.1016/j.enbuild.2015.09.040
    • (2015) Energy and Buildings , vol.109 , pp. 385-396
    • Kreiner, H.1    Passer, A.2    Wallbaum, H.3
  • 121
    • 84860799169 scopus 로고    scopus 로고
    • A 3D analyzer for BIM-enabled Life Cycle Assessment of the whole process of construction
    • Kulahcioglu, T.,; Dang, J.,; Toklu, C., 2012. A 3D analyzer for BIM-enabled Life Cycle Assessment of the whole process of construction, HVAC&R Research 18: 283–293. https://doi.org/10.1080/10789669.2012.634264
    • (2012) HVAC&R Research , vol.18 , pp. 283-293
    • Kulahcioglu, T.1    Dang, J.2    Toklu, C.3
  • 122
    • 84941342239 scopus 로고    scopus 로고
    • A BIM-based automated site layout planning framework for congested construction sites
    • Kumar, S. S.,; Cheng, J. C. P., 2015. A BIM-based automated site layout planning framework for congested construction sites, Automation in Construction 59: 24–37. https://doi.org/10.1016/j.autcon.2015.07.008
    • (2015) Automation in Construction , vol.59 , pp. 24-37
    • Kumar, S.S.1    Cheng, J.C.P.2
  • 123
    • 84958614316 scopus 로고    scopus 로고
    • Comparative study of BIM acceptance between Korea and the United States
    • Lee, S.,; Yu, J., 2016. Comparative study of BIM acceptance between Korea and the United States, Journal of Construction Engineering and Management 142(3). https://doi.org/10.1061/(ASCE)CO.1943-7862.0001076
    • (2016) Journal of Construction Engineering and Management , vol.142 , Issue.3
    • Lee, S.1    Yu, J.2
  • 124
    • 84857371393 scopus 로고    scopus 로고
    • 3 City project–Economic impact of BIM-assisted design validation
    • 3 City project–Economic impact of BIM-assisted design validation, Automation in Construction 22: 577–586. https://doi.org/10.1016/j.autcon.2011.12.003
    • (2012) Automation in Construction , vol.22 , pp. 577-586
    • Lee, G.1    Park, H.K.2    Won, J.3
  • 125
    • 84863293193 scopus 로고    scopus 로고
    • Efficiency analysis of set-based design with structural building information modeling (S-BIM) on high-rise building structures
    • Lee, S.,; Bae, J.,; Cho, Y. S., 2012b. Efficiency analysis of set-based design with structural building information modeling (S-BIM) on high-rise building structures, Automation in Construction 23: 20–32. https://doi.org/10.1016/j.autcon.2011.12.008
    • (2012) Automation in Construction , vol.23 , pp. 20-32
    • Lee, S.1    Bae, J.2    Cho, Y.S.3
  • 126
    • 84888011560 scopus 로고    scopus 로고
    • Extended process to product modeling (xPPM) for integrated and seamless IDM and MVD development
    • Lee, G.,; Park, Y. H.,; Ham, S., 2013. Extended process to product modeling (xPPM) for integrated and seamless IDM and MVD development, Advanced Engineering Informatics 27(4): 636–651. https://doi.org/10.1016/j.aei.2013.08.004
    • (2013) Advanced Engineering Informatics , vol.27 , Issue.4 , pp. 636-651
    • Lee, G.1    Park, Y.H.2    Ham, S.3
  • 127
    • 84907555756 scopus 로고    scopus 로고
    • A system model for analyzing and accumulating construction work crew’s productivity data using image processing technologies
    • Lee, C.,; Son, J.,; Lee, S., 2014. A system model for analyzing and accumulating construction work crew’s productivity data using image processing technologies, Journal of Asian Architecture and Building Engineering 13(3): 547–554. https://doi.org/10.3130/jaabe.13.547
    • (2014) Journal of Asian Architecture and Building Engineering , vol.13 , Issue.3 , pp. 547-554
    • Lee, C.1    Son, J.2    Lee, S.3
  • 128
    • 84926228393 scopus 로고    scopus 로고
    • Quantitative analysis of warnings in building information modeling (BIM)
    • Lee, H. W.,; Oh, H.,; Kim, Y.,; Choi, K.,; Woo, H., 2015a. Quantitative analysis of warnings in building information modeling (BIM), Automation in Construction 51: 23–31. https://doi.org/10.1016/j.autcon.2014.12.007
    • (2015) Automation in Construction , vol.51 , pp. 23-31
    • Lee, H.W.1    Oh, H.2    Kim, Y.3    Choi, K.4    Woo, H.5
  • 129
    • 84952333230 scopus 로고    scopus 로고
    • Green template for life cycle assessment of buildings based on Building Information Modeling: Focus on embodied environmental impact
    • Lee, S.,; Tae, S.,; Roh, S.,; Kim, T., 2015b. Green template for life cycle assessment of buildings based on Building Information Modeling: Focus on embodied environmental impact, Sustainability 7(12): 16498–16512. https://doi.org/10.3390/su71215830
    • (2015) Sustainability , vol.7 , Issue.12 , pp. 16498-16512
    • Lee, S.1    Tae, S.2    Roh, S.3    Kim, T.4
  • 130
    • 84975853362 scopus 로고    scopus 로고
    • A study on data visualization of embedded sensors for building energy monitoring using BIM
    • Lee, D.,; Cha, G.,; Park, S., 2016. A study on data visualization of embedded sensors for building energy monitoring using BIM, International Journal of Precision Engineering and Manufacturing 17(6): 807–814. https://doi.org/10.1007/s12541-016-0099-4
    • (2016) International Journal of Precision Engineering and Manufacturing , vol.17 , Issue.6 , pp. 807-814
    • Lee, D.1    Cha, G.2    Park, S.3
  • 131
    • 84988231376 scopus 로고    scopus 로고
    • BIM energy modeling: Case study of a teaching module for sustainable design and donstruction dourses
    • Lewis, A. M.,; Valdes-Vasquez, R.,; Shealy, T., 2015. BIM energy modeling: Case study of a teaching module for sustainable design and donstruction dourses, Journal of Professional Issues in Engineering Education and Practice 141(2): 1–6. https://doi.org/10.1061/(ASCE)EI.1943-5541.0000230
    • (2015) Journal of Professional Issues in Engineering Education and Practice , vol.141 , Issue.2 , pp. 1-6
    • Lewis, A.M.1    Valdes-Vasquez, R.2    Shealy, T.3
  • 132
    • 84896520582 scopus 로고    scopus 로고
    • A BIM centered indoor localization algorithm to support building fire emergency response operations
    • Li, N.,; Becerik-Gerber, B.,; Krishnamachari, B.,; Soibelman, L., 2014. A BIM centered indoor localization algorithm to support building fire emergency response operations, Automation in Construction 42: 78–89. https://doi.org/10.1016/j.autcon.2014.02.019
    • (2014) Automation in Construction , vol.42 , pp. 78-89
    • Li, N.1    Becerik-Gerber, B.2    Krishnamachari, B.3    Soibelman, L.4
  • 133
    • 84899941085 scopus 로고    scopus 로고
    • Construction 3D BIM-based knowledge management system: A case study
    • Lin, Y.-C., 2014. Construction 3D BIM-based knowledge management system: A case study, Journal of Civil Engineering and Management 20(2): 186–200. https://doi.org/10.3846/13923730.2013.801887
    • (2014) Journal of Civil Engineering and Management , vol.20 , Issue.2 , pp. 186-200
    • Lin, Y.-C.1
  • 134
    • 84925161573 scopus 로고    scopus 로고
    • BIM-based integrated approach for detailed construction scheduling under resource constraints
    • Liu, H.,; Al-Hussein, M.,; Lu, M., 2015a. BIM-based integrated approach for detailed construction scheduling under resource constraints, Automation in Construction 53: 29–43. https://doi.org/10.1016/j.autcon.2015.03.008
    • (2015) Automation in Construction , vol.53 , pp. 29-43
    • Liu, H.1    Al-Hussein, M.2    Lu, M.3
  • 135
    • 84939189028 scopus 로고    scopus 로고
    • Building information modeling based building design optimization for sustainability
    • Liu, S.,; Meng, X.,; Tam, C., 2015b. Building information modeling based building design optimization for sustainability, Energy and Buildings 105: 139–153. https://doi.org/10.1016/j.enbuild.2015.06.037
    • (2015) Energy and Buildings , vol.105 , pp. 139-153
    • Liu, S.1    Meng, X.2    Tam, C.3
  • 136
    • 84939185429 scopus 로고    scopus 로고
    • A BIM-aided construction waste minimisation framework
    • Liu, Z.,; Osniani, M.,; Demian, P.,; Baldwin, A., 2015c. A BIM-aided construction waste minimisation framework, Automation in Construction 59: 1–23. https://doi.org/10.1016/j.autcon.2015.07.020
    • (2015) Automation in Construction , vol.59 , pp. 1-23
    • Liu, Z.1    Osniani, M.2    Demian, P.3    Baldwin, A.4
  • 137
    • 84929092313 scopus 로고    scopus 로고
    • Future proofing PPPs: Life-cycle performance measurement and Building Information Modelling
    • Love, P. E. D.,; Liu, J.,; Matthews, J.,; Sing, C.,; Smith, J., 2015. Future proofing PPPs: Life-cycle performance measurement and Building Information Modelling, Automation in Construction 56: 26–35. https://doi.org/10.1016/j.autcon.2015.04.008
    • (2015) Automation in Construction , vol.56 , pp. 26-35
    • Love, P.E.D.1    Liu, J.2    Matthews, J.3    Sing, C.4    Smith, J.5
  • 138
    • 84977995964 scopus 로고    scopus 로고
    • Construction material safety-stock determination under nonstationary stochastic demand and random supply yield
    • Lu, H.,; Wang, H.,; Xie, Y.,; Li, H., 2016. Construction material safety-stock determination under nonstationary stochastic demand and random supply yield, IEEE Transactions on Engineering Management 63(2): 201–212. https://doi.org/10.1109/TEM.2016.2536146
    • (2016) IEEE Transactions on Engineering Management , vol.63 , Issue.2 , pp. 201-212
    • Lu, H.1    Wang, H.2    Xie, Y.3    Li, H.4
  • 139
    • 84930946851 scopus 로고    scopus 로고
    • Cost-benefit analysis of Building Information Modeling implementation in building projects through demystification of time-effort distribution curves
    • Lu, W.,; Fung, A.,; Peng, Y.,; Liang, C.,; Rowlinson, S., 2014. Cost-benefit analysis of Building Information Modeling implementation in building projects through demystification of time-effort distribution curves, Building and Environment 82: 317–327. https://doi.org/10.1016/j.buildenv.2014.08.030
    • (2014) Building and Environment , vol.82 , pp. 317-327
    • Lu, W.1    Fung, A.2    Peng, Y.3    Liang, C.4    Rowlinson, S.5
  • 140
    • 84931042668 scopus 로고    scopus 로고
    • Investigating the role of lean practices in enabling BIM adoption: Evidence from two Indian cases
    • Mahalingam, A.,; Yadav, A. K.,; Varaprasad, J., 2015. Investigating the role of lean practices in enabling BIM adoption: Evidence from two Indian cases, Journal of Construction Engineering and Management 141(7). https://doi.org/10.1061/(ASCE)CO.1943-7862.0000982
    • (2015) Journal of Construction Engineering and Management , vol.141 , Issue.7
    • Mahalingam, A.1    Yadav, A.K.2    Varaprasad, J.3
  • 141
    • 84946866725 scopus 로고    scopus 로고
    • Construction safety risk drivers: A BIM approach
    • Malekitabar, H.,; Ardeshir, A.,; Sebt, M. H.,; Stouffs, R., 2016. Construction safety risk drivers: A BIM approach, Safety Science 82: 445–455. https://doi.org/10.1016/j.ssci.2015.11.002
    • (2016) Safety Science , vol.82 , pp. 445-455
    • Malekitabar, H.1    Ardeshir, A.2    Sebt, M.H.3    Stouffs, R.4
  • 142
    • 79959246466 scopus 로고    scopus 로고
    • The intellectual structure of research into PPPs: A bibliometric analysis
    • Marsilio, M.,; Cappellaro, G.,; Cuccurullo, C., 2011. The intellectual structure of research into PPPs: A bibliometric analysis, Public Management Review 13(6): 763–782. https://doi.org/10.1080/14719037.2010.539112
    • (2011) Public Management Review , vol.13 , Issue.6 , pp. 763-782
    • Marsilio, M.1    Cappellaro, G.2    Cuccurullo, C.3
  • 143
    • 84897795418 scopus 로고    scopus 로고
    • BIM-based framework for managing performance of subway stations
    • Marzouk, M.,; Abdelaty, A., 2014a. BIM-based framework for managing performance of subway stations, Automation in Construction 41: 70–77. https://doi.org/10.1016/j.autcon.2014.02.004
    • (2014) Automation in Construction , vol.41 , pp. 70-77
    • Marzouk, M.1    Abdelaty, A.2
  • 144
    • 84907514796 scopus 로고    scopus 로고
    • Monitoring thermal comfort in subways using building information modelling
    • Marzouk, M.,; Abdelaty, A., 2014b. Monitoring thermal comfort in subways using building information modelling, Energy and Buildings 84: 252–257. https://doi.org/10.1016/j.enbuild.2014.08.006
    • (2014) Energy and Buildings , vol.84 , pp. 252-257
    • Marzouk, M.1    Abdelaty, A.2
  • 145
    • 84949544141 scopus 로고    scopus 로고
    • Decision support for tower crane selection with building information models and genetic algorithms
    • Marzouk, M.,; Abubakr, A., 2016. Decision support for tower crane selection with building information models and genetic algorithms, Automation in Construction 61: 1–15. https://doi.org/10.1016/j.autcon.2015.09.008
    • (2016) Automation in Construction , vol.61 , pp. 1-15
    • Marzouk, M.1    Abubakr, A.2
  • 146
    • 84938348521 scopus 로고    scopus 로고
    • Real time progress management: Re-engineering processes for cloud-based BIM in construction
    • Matthews, J.,; Love, P. E. D.,; Heinemann, S.,; Chandler, R.,; Rumsey, C.,; Olatunji, O., 2015. Real time progress management: Re-engineering processes for cloud-based BIM in construction, Automation in Construction 58: 38–47. https://doi.org/10.1016/j.autcon.2015.07.004
    • (2015) Automation in Construction , vol.58 , pp. 38-47
    • Matthews, J.1    Love, P.E.D.2    Heinemann, S.3    Chandler, R.4    Rumsey, C.5    Olatunji, O.6
  • 147
    • 84961262722 scopus 로고    scopus 로고
    • Bridge information modeling for inspection and evaluation
    • McGuire, B.,; Atadero, R.,; Clevenger, C.,; Ozbek, M., 2016. Bridge information modeling for inspection and evaluation, Journal of Bridge Engineering 21(4). https://doi.org/10.1061/(ASCE)BE.1943-5592.0000850
    • (2016) Journal of Bridge Engineering , vol.21 , Issue.4
    • McGuire, B.1    Atadero, R.2    Clevenger, C.3    Ozbek, M.4
  • 149
    • 84905567533 scopus 로고    scopus 로고
    • Developing critical success factors for the assessment of BIM technology adoption: Part II. Analysis and results
    • Mom, M.,; Tsai, M.-H.,; Hsieh, S.-H., 2014. Developing critical success factors for the assessment of BIM technology adoption: Part II. Analysis and results, Journal of the Chinese Institute of Engineers 37(7): 859–868. https://doi.org/10.1080/02533839.2014.888798
    • (2014) Journal of the Chinese Institute of Engineers , vol.37 , Issue.7 , pp. 859-868
    • Mom, M.1    Tsai, M.-H.2    Hsieh, S.-H.3
  • 150
    • 84894901111 scopus 로고    scopus 로고
    • Development of a schedule-workspace interference management system simultaneously considering the overlap level of parallel schedules and workspaces
    • Moon, H.,; Kim, H.,; Kim, C.,; Kang, L., 2014. Development of a schedule-workspace interference management system simultaneously considering the overlap level of parallel schedules and workspaces, Automation in Construction 39: 93–105. https://doi.org/10.1016/j.autcon.2013.06.001
    • (2014) Automation in Construction , vol.39 , pp. 93-105
    • Moon, H.1    Kim, H.2    Kim, C.3    Kang, L.4
  • 151
    • 84888002203 scopus 로고    scopus 로고
    • Localization of RFID-equipped assets during the operation phase of facilities
    • Motamedi, A.,; Mostafa, M.,; Hammad, A.,; Soltani, M. M.,; Hammad, A., 2013. Localization of RFID-equipped assets during the operation phase of facilities, Advanced Engineering Informatics 27(4): 566–579. https://doi.org/10.1016/j.aei.2013.07.001
    • (2013) Advanced Engineering Informatics , vol.27 , Issue.4 , pp. 566-579
    • Motamedi, A.1    Mostafa, M.2    Hammad, A.3    Soltani, M.M.4    Hammad, A.5
  • 152
    • 84924079175 scopus 로고    scopus 로고
    • Automated 3D compliance checking in pipe spool fabrication
    • Nahangi, M.,; Haas, C. T., 2014. Automated 3D compliance checking in pipe spool fabrication, Advanced Engineering Informatics 28(4): 360–369. https://doi.org/10.1016/j.aei.2014.04.001
    • (2014) Advanced Engineering Informatics , vol.28 , Issue.4 , pp. 360-369
    • Nahangi, M.1    Haas, C.T.2
  • 153
    • 84949673338 scopus 로고    scopus 로고
    • Skeleton-based discrepancy feedback for automated realignment of industrial assemblies
    • Nahangi, M.,; Haas, C. T., 2016. Skeleton-based discrepancy feedback for automated realignment of industrial assemblies, Automation in Construction 61: 147–161. https://doi.org/10.1016/j.autcon.2015.10.014
    • (2016) Automation in Construction , vol.61 , pp. 147-161
    • Nahangi, M.1    Haas, C.T.2
  • 154
    • 84873384199 scopus 로고    scopus 로고
    • Assessing Building Information Modeling estimating techniques using data from the classroom
    • Nassar, K., 2012. Assessing Building Information Modeling estimating techniques using data from the classroom, Journal of Professional Issues in Engineering Education and Practice 138(3): 171–180. https://doi.org/10.1061/(ASCE)EI.1943-5541.0000101
    • (2012) Journal of Professional Issues in Engineering Education and Practice , vol.138 , Issue.3 , pp. 171-180
    • Nassar, K.1
  • 155
    • 84925869296 scopus 로고    scopus 로고
    • Productivity improvement of precast shop drawings generation through BIM-based process re-engineering
    • Nath, T.,; Attarzadeh, M.,; Tiong, R. L. K.,; Chidambaram, C.,; Yu, Z., 2015. Productivity improvement of precast shop drawings generation through BIM-based process re-engineering, Automation in Construction 54: 54–68. https://doi.org/10.1016/j.autcon.2015.03.014
    • (2015) Automation in Construction , vol.54 , pp. 54-68
    • Nath, T.1    Attarzadeh, M.2    Tiong, R.L.K.3    Chidambaram, C.4    Yu, Z.5
  • 158
    • 84941361215 scopus 로고    scopus 로고
    • Integrated system for BIM-based collaborative design
    • Oh, M.,; Lee, J.,; Wan, S.,; Jeong, Y., 2015. Integrated system for BIM-based collaborative design, Automation in Construction 58: 196–206. https://doi.org/10.1016/j.autcon.2015.07.015
    • (2015) Automation in Construction , vol.58 , pp. 196-206
    • Oh, M.1    Lee, J.2    Wan, S.3    Jeong, Y.4
  • 161
    • 85038816947 scopus 로고    scopus 로고
    • Achieving Value for Money (VFM) in construction projects
    • Retrieved from
    • Olatunji, S. O.,; Olawumi, T. O.,; Awodele, O. A., 2017a. Achieving Value for Money (VFM) in construction projects, Journal of Civil and Environmental Research 9(2): 54–64. Retrieved from: http://iiste.org/Journals/index.php/CER/article/viewFile/35270/36293
    • (2017) Journal of Civil and Environmental Research , vol.9 , Issue.2 , pp. 54-64
    • Olatunji, S.O.1    Olawumi, T.O.2    Awodele, O.A.3
  • 163
    • 85028530854 scopus 로고    scopus 로고
    • Establishment of critical causal factors for electrical cost estimating techniques
    • Olawumi, T. O., 2016. Establishment of critical causal factors for electrical cost estimating techniques, World Scientific News 53(3): 354–366.
    • (2016) World Scientific News , vol.53 , Issue.3 , pp. 354-366
    • Olawumi, T.O.1
  • 164
    • 85028565823 scopus 로고    scopus 로고
    • Are quantity surveyors competent to value for civil engineering works? Evaluating QSs’ competencies and militating factors
    • Olawumi, T. O.,; Ayegun, O. A., 2016. Are quantity surveyors competent to value for civil engineering works? Evaluating QSs’ competencies and militating factors, Journal of Education and Practice 7(16): 1–16.
    • (2016) Journal of Education and Practice , vol.7 , Issue.16 , pp. 1-16
    • Olawumi, T.O.1    Ayegun, O.A.2
  • 165
    • 85028539794 scopus 로고    scopus 로고
    • Value management–Creating functional value for construction project: An exploratory study
    • Olawumi, T. O.,; Akinrata, E. B.,; Arijeloye, B. T., 2016. Value management–Creating functional value for construction project: An exploratory study, World Scientific News 54: 40–59.
    • (2016) World Scientific News , vol.54 , pp. 40-59
    • Olawumi, T.O.1    Akinrata, E.B.2    Arijeloye, B.T.3
  • 166
    • 84925936172 scopus 로고    scopus 로고
    • BIM extension for the sustainability appraisal of conceptual steel design
    • Oti, A. H.,; Tizani, W., 2015. BIM extension for the sustainability appraisal of conceptual steel design, Advanced Engineering Informatics 29(1): 28–46. https://doi.org/10.1016/j.aei.2014.09.001
    • (2015) Advanced Engineering Informatics , vol.29 , Issue.1 , pp. 28-46
    • Oti, A.H.1    Tizani, W.2
  • 168
    • 85038836966 scopus 로고
    • Cours d’economie politique, in G. H. Bousquet, G. Busino (Eds. 1. Librairie Droz, Geneva. [Originally published in 1896]
    • Pareto, V., 1964. Cours d’economie politique, in G. H. Bousquet, G. Busino (Eds.). Oevres Completes de Vilfredo Pareto, Vol. 1. Librairie Droz, Geneva. [Originally published in 1896].
    • (1964) Oevres Completes de Vilfredo Pareto
    • Pareto, V.1
  • 169
    • 85010874897 scopus 로고    scopus 로고
    • WBS-based dynamic multi-dimensional BIM database for total construction as-built documentation
    • Park, J.,; Cai, H., 2017. WBS-based dynamic multi-dimensional BIM database for total construction as-built documentation, Automation in Construction 77: 15–23. https://doi.org/10.1016/j.autcon.2017.01.021
    • (2017) Automation in Construction , vol.77 , pp. 15-23
    • Park, J.1    Cai, H.2
  • 170
    • 79551688640 scopus 로고    scopus 로고
    • Teaching construction project management with BIM support: Experience and lessons learned
    • Peterson, F.,; Hartmann, T.,; Fruchter, R.,; Fischer, M., 2011. Teaching construction project management with BIM support: Experience and lessons learned, Automation in Construction 20(2): 115–125. https://doi.org/10.1016/j.autcon.2010.09.009
    • (2011) Automation in Construction , vol.20 , Issue.2 , pp. 115-125
    • Peterson, F.1    Hartmann, T.2    Fruchter, R.3    Fischer, M.4
  • 171
    • 84886516786 scopus 로고    scopus 로고
    • Building Information Modeling education for construction engineering and management. II: Procedures and implementation case study
    • Pikas, E.,; Sacks, R.,; Hazzan, O., 2013. Building Information Modeling education for construction engineering and management. II: Procedures and implementation case study, Journal of Construction Engineering and Management 139(11). https://doi.org/10.1061/(ASCE)CO.1943-7862.0000765
    • (2013) Journal of Construction Engineering and Management , vol.139 , Issue.11
    • Pikas, E.1    Sacks, R.2    Hazzan, O.3
  • 172
    • 84922893172 scopus 로고    scopus 로고
    • A conceptual approach to track design changes within a multidisciplinary building information modeling environment
    • Pilehchian, B.,; Staub-French, S.,; Nepal, M. P., 2015. A conceptual approach to track design changes within a multidisciplinary building information modeling environment, Canadian Journal of Civil Engineering 42(2): 139–152. https://doi.org/10.1139/cjce-2014-0078
    • (2015) Canadian Journal of Civil Engineering , vol.42 , Issue.2 , pp. 139-152
    • Pilehchian, B.1    Staub-French, S.2    Nepal, M.P.3
  • 173
    • 84938601028 scopus 로고    scopus 로고
    • Measuring the impact of BIM on labor productivity in a small specialty contracting enterprise through action-research
    • Poirier, E. A.,; Staub-French, S.,; Forgues, D., 2015. Measuring the impact of BIM on labor productivity in a small specialty contracting enterprise through action-research, Automation in Construction 58: 74–84. https://doi.org/10.1016/j.autcon.2015.07.002
    • (2015) Automation in Construction , vol.58 , pp. 74-84
    • Poirier, E.A.1    Staub-French, S.2    Forgues, D.3
  • 174
    • 84873728925 scopus 로고    scopus 로고
    • Building Information Modeling-based analysis to minimize waste rate of structural reinforcement
    • Porwal, A.,; Hewage, K. N., 2012. Building Information Modeling-based analysis to minimize waste rate of structural reinforcement, Journal of Construction Engineering and Management 138(8): 943–954. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000508
    • (2012) Journal of Construction Engineering and Management , vol.138 , Issue.8 , pp. 943-954
    • Porwal, A.1    Hewage, K.N.2
  • 175
    • 4644273893 scopus 로고    scopus 로고
    • Changes in the intellectual structure of strategic management research: a bibliometric study of the Strategic Management Journal
    • Ramos-Rodríguez, A.-R.,; Ruíz-Navarro, J., 2004. Changes in the intellectual structure of strategic management research: a bibliometric study of the Strategic Management Journal, 1980–2000, Strategic Management Journal 25(10): 981–1004. https://doi.org/10.1002/smj.397
    • (2004) 1980–2000, Strategic Management Journal , vol.25 , Issue.10 , pp. 981-1004
    • Ramos-Rodríguez, A.-R.1    Ruíz-Navarro, J.2
  • 176
    • 84860295399 scopus 로고    scopus 로고
    • Exploring how information exchanges can be enhanced through Cloud BIM
    • Redmond, A.,; Hore, A.,; Alshawi, M.,; West, R., 2012. Exploring how information exchanges can be enhanced through Cloud BIM, Automation in Construction 24: 175–183. https://doi.org/10.1016/j.autcon.2012.02.003
    • (2012) Automation in Construction , vol.24 , pp. 175-183
    • Redmond, A.1    Hore, A.2    Alshawi, M.3    West, R.4
  • 177
    • 84876757253 scopus 로고    scopus 로고
    • A governance approach for BIM management acr lifecycle and supply chains using mixed-modes of information delivery
    • oss
    • Rezgui, Y.,; Beach, T.,; Rana, O., 2013. A governance approach for BIM management across lifecycle and supply chains using mixed-modes of information delivery, Journal of Civil Engineering and Management 19(2): 239–258. https://doi.org/10.3846/13923730.2012.760480
    • (2013) Journal of Civil Engineering and Management , vol.19 , Issue.2 , pp. 239-258
    • Rezgui, Y.1    Beach, T.2    Rana, O.3
  • 178
    • 37249086234 scopus 로고    scopus 로고
    • Structural BIM: Discussion, case studies and latest developments
    • Robinson, C., 2007. Structural BIM: Discussion, case studies and latest developments, Structural Design of Tall and Special Buildings 16(4): 519–533. https://doi.org/10.1002/tal.417
    • (2007) Structural Design of Tall and Special Buildings , vol.16 , Issue.4 , pp. 519-533
    • Robinson, C.1
  • 179
    • 84960403896 scopus 로고    scopus 로고
    • A study on the LEED energy simulation process using BIM
    • Ryu, H.-S.,; Park, K.-S., 2016. A study on the LEED energy simulation process using BIM, Sustainability 8(2): 138. https://doi.org/10.3390/su8020138
    • (2016) Sustainability , vol.8 , Issue.2 , pp. 138
    • Ryu, H.-S.1    Park, K.-S.2
  • 180
    • 73949102330 scopus 로고    scopus 로고
    • Teaching Building Information Modeling as an integral part of freshman year civil engineering education
    • Sacks, R.,; Barak, R., 2010. Teaching Building Information Modeling as an integral part of freshman year civil engineering education, Journal of Professional Issues in Engineering Education and Practice 136(1): 30–38. https://doi.org/10.1061/(ASCE)EI.1943-5541.0000003
    • (2010) Journal of Professional Issues in Engineering Education and Practice , vol.136 , Issue.1 , pp. 30-38
    • Sacks, R.1    Barak, R.2
  • 181
    • 84886516189 scopus 로고    scopus 로고
    • Building Information Modeling education for construction engineering and management. I: Industry requirements, state of the art, and gap analysis
    • Sacks, R.,; Pikas, E., 2013. Building Information Modeling education for construction engineering and management. I: Industry requirements, state of the art, and gap analysis, Journal of Construction Engineering and Management 139(11): 1–12. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000759
    • (2013) Journal of Construction Engineering and Management , vol.139 , Issue.11 , pp. 1-12
    • Sacks, R.1    Pikas, E.2
  • 182
    • 77955883757 scopus 로고    scopus 로고
    • Interaction of Lean and Building Information Modeling in construction
    • Sacks, R.,; Koskela, L.,; Dave, B. A.,; Owen, R., 2010a. Interaction of Lean and Building Information Modeling in construction, Journal of Construction Engineering and Management 136(9): 968–980. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000203
    • (2010) Journal of Construction Engineering and Management , vol.136 , Issue.9 , pp. 968-980
    • Sacks, R.1    Koskela, L.2    Dave, B.A.3    Owen, R.4
  • 183
    • 77955687856 scopus 로고    scopus 로고
    • Requirements for building information modeling based lean production management systems for construction
    • Sacks, R.,; Radosavljevic, M.,; Barak, R., 2010b. Requirements for building information modeling based lean production management systems for construction, Automation in Construction 19(5): 641–655. https://doi.org/10.1016/j.autcon.2010.02.010
    • (2010) Automation in Construction , vol.19 , Issue.5 , pp. 641-655
    • Sacks, R.1    Radosavljevic, M.2    Barak, R.3
  • 184
    • 84913588394 scopus 로고    scopus 로고
    • Building Information Modelling application: focus-group discussion
    • Salleh, H.,; Fung, W. P., 2014. Building Information Modelling application: focus-group discussion, Gradevinar 66(8): 705–714.
    • (2014) Gradevinar , vol.66 , Issue.8 , pp. 705-714
    • Salleh, H.1    Fung, W.P.2
  • 185
    • 84921845207 scopus 로고    scopus 로고
    • The introduction of the BIM concept in civil engineering curriculum
    • Sampaio, Z. A., 2015. The introduction of the BIM concept in civil engineering curriculum, International Journal of Engineering Education 31(1B): 302–315.
    • (2015) International Journal of Engineering Education , vol.31 , Issue.1B , pp. 302-315
    • Sampaio, Z.A.1
  • 186
    • 84888139132 scopus 로고    scopus 로고
    • A longitudinal study of the adoption of IT technology in the Swedish building sector
    • Samuelson, O.,; Björk, B. C., 2014. A longitudinal study of the adoption of IT technology in the Swedish building sector, Automation in Construction 37: 182–190. https://doi.org/10.1016/j.autcon.2013.10.006
    • (2014) Automation in Construction , vol.37 , pp. 182-190
    • Samuelson, O.1    Björk, B.C.2
  • 187
    • 84888160242 scopus 로고    scopus 로고
    • Adoption processes for EDM, EDI and BIM technologies in the construction industry
    • Samuelson, O.,; Björk, B., 2016. Adoption processes for EDM, EDI and BIM technologies in the construction industry, Journal of Civil Engineering and Management 19(1): 172–187. https://doi.org/10.3846/13923730.2013.801888
    • (2016) Journal of Civil Engineering and Management , vol.19 , Issue.1 , pp. 172-187
    • Samuelson, O.1    Björk, B.2
  • 188
    • 85015428366 scopus 로고    scopus 로고
    • Bibliometric analysis and review of Building Information Modelling literature published between 2005 and 2015
    • Santos, R.,; Costa, A. A.,; Grilo, A., 2017. Bibliometric analysis and review of Building Information Modelling literature published between 2005 and 2015, Automation in Construction 80: 118–136. https://doi.org/10.1016/j.autcon.2017.03.005
    • (2017) Automation in Construction , vol.80 , pp. 118-136
    • Santos, R.1    Costa, A.A.2    Grilo, A.3
  • 190
    • 84944462905 scopus 로고    scopus 로고
    • BIM application to select appropriate design alternative with consideration of LCA and LCCA
    • Article ID 281640
    • Shin, Y.,; Cho, K., 2015. BIM application to select appropriate design alternative with consideration of LCA and LCCA, Mathematical Problems in Engineering. Article ID 281640. https://doi.org/10.1155/2015/281640
    • (2015) Mathematical Problems in Engineering
    • Shin, Y.1    Cho, K.2
  • 191
    • 85016169861 scopus 로고    scopus 로고
    • Multiple representation approach to achieve high-performance spatial queries of 3D BIM data using a relational database
    • Solihin, W.,; Eastman, C.,; Lee, Y.-C., 2017. Multiple representation approach to achieve high-performance spatial queries of 3D BIM data using a relational database, Automation in Construction 81: 369–388. https://doi.org/10.1016/j.autcon.2017.03.014
    • (2017) Automation in Construction , vol.81 , pp. 369-388
    • Solihin, W.1    Eastman, C.2    Lee, Y.-C.3
  • 193
    • 59049095324 scopus 로고    scopus 로고
    • Building information modelling framework: A research and delivery foundation for industry stakeholders
    • Succar, B., 2009. Building information modelling framework: A research and delivery foundation for industry stakeholders, Automation in Construction 18(3): 357–375. https://doi.org/10.1016/j.autcon.2008.10.003
    • (2009) Automation in Construction , vol.18 , Issue.3 , pp. 357-375
    • Succar, B.1
  • 194
    • 84929353774 scopus 로고    scopus 로고
    • Macro-BIM adoption: Conceptual structures
    • Succar, B.,; Kassem, M., 2015. Macro-BIM adoption: Conceptual structures, Automation in Construction 57: 64–79. https://doi.org/10.1016/j.autcon.2015.04.018
    • (2015) Automation in Construction , vol.57 , pp. 64-79
    • Succar, B.1    Kassem, M.2
  • 195
    • 84884498619 scopus 로고    scopus 로고
    • An integrated approach to BIM competency assessment, acquisition and application
    • Succar, B.,; Sher, W.,; Williams, A., 2013. An integrated approach to BIM competency assessment, acquisition and application, Automation in Construction 35: 174–189. https://doi.org/10.1016/j.autcon.2013.05.016
    • (2013) Automation in Construction , vol.35 , pp. 174-189
    • Succar, B.1    Sher, W.2    Williams, A.3
  • 196
    • 84929415439 scopus 로고    scopus 로고
    • The interaction between BIM’s promotion and interest game under information asymmetry
    • Sun, J.,; Wang, L., 2015. The interaction between BIM’s promotion and interest game under information asymmetry, Journal of Industrial and Management Optimization 11(4): 1301–1319. https://doi.org/10.3934/jimo.2015.11.1301
    • (2015) Journal of Industrial and Management Optimization , vol.11 , Issue.4 , pp. 1301-1319
    • Sun, J.1    Wang, L.2
  • 197
    • 85014777835 scopus 로고    scopus 로고
    • A BIM-based framework for lift planning in topsides disassembly of offshore oil and gas platforms
    • Tan, Y.,; Song, Y.,; Liu, X.,; Wang, X.,; Cheng, J. C. P., 2017. A BIM-based framework for lift planning in topsides disassembly of offshore oil and gas platforms, Automation in Construction 79: 19–30. https://doi.org/10.1016/j.autcon.2017.02.008
    • (2017) Automation in Construction , vol.79 , pp. 19-30
    • Tan, Y.1    Song, Y.2    Liu, X.3    Wang, X.4    Cheng, J.C.P.5
  • 198
    • 84924603136 scopus 로고    scopus 로고
    • A new 3D indoor/outdoor spatial model for indoor emergency response facilitation
    • Tashakkori, H.,; Rajabifard, A.,; Kalantari, M., 2015. A new 3D indoor/outdoor spatial model for indoor emergency response facilitation, Building and Environment 89(1): 170–182. https://doi.org/10.1016/j.buildenv.2015.02.036
    • (2015) Building and Environment , vol.89 , Issue.1 , pp. 170-182
    • Tashakkori, H.1    Rajabifard, A.2    Kalantari, M.3
  • 199
    • 62549091452 scopus 로고    scopus 로고
    • Paradigm trajectories of Building Information Modeling practice in project networks
    • Taylor, J. E.,; Bernstein, P. G., 2009. Paradigm trajectories of Building Information Modeling practice in project networks, Journal of Management in Engineering 25(2): 69–76. https://doi.org/10.1061/(ASCE)0742-597X(2009)25:2(69)
    • (2009) Journal of Management in Engineering , vol.25 , Issue.2 , pp. 69-76
    • Taylor, J.E.1    Bernstein, P.G.2
  • 200
    • 71649102600 scopus 로고    scopus 로고
    • Use of system dynamics as a decision-making tool in building design and operation
    • Thompson, B. P.,; Bank, L. C., 2010. Use of system dynamics as a decision-making tool in building design and operation, Building and Environment 45(4): 1006–1015. https://doi.org/10.1016/j.buildenv.2009.10.008
    • (2010) Building and Environment , vol.45 , Issue.4 , pp. 1006-1015
    • Thompson, B.P.1    Bank, L.C.2
  • 201
    • 84892945423 scopus 로고    scopus 로고
    • Workflow re-engineering of design-build projects using a BIM tool
    • Tsai, M., Md, A. M.,; Kang, S.-C.,; Hsieh, S.,; Matin, A., 2014a. Workflow re-engineering of design-build projects using a BIM tool, Journal of the Chinese Institute of Engineers 37(1): 88–102. https://doi.org/10.1080/02533839.2012.751302
    • (2014) Journal of the Chinese Institute of Engineers , vol.37 , Issue.1 , pp. 88-102
    • Tsai, M.1    Md, A.M.2    Kang, S.-C.3    Hsieh, S.4    Matin, A.5
  • 202
    • 84905582671 scopus 로고    scopus 로고
    • Developing critical success factors for the assessment of BIM technology adoption: part I. Methodology and survey
    • Tsai, M.-H.,; Mom, M.,; Hsieh, S.-H., 2014b. Developing critical success factors for the assessment of BIM technology adoption: part I. Methodology and survey, Journal of the Chinese Institute of Engineers 37(7): 845–858. https://doi.org/10.1080/02533839.2014.888798
    • (2014) Journal of the Chinese Institute of Engineers , vol.37 , Issue.7 , pp. 845-858
    • Tsai, M.-H.1    Mom, M.2    Hsieh, S.-H.3
  • 203
    • 84896345500 scopus 로고    scopus 로고
    • Developing BIM-assisted as-built schedule management system for general contractors
    • Tserng, H.-P.,; Ho, S.-P.,; Jan, S.-H., 2014. Developing BIM-assisted as-built schedule management system for general contractors, Journal of Civil Engineering and Management 20(1): 47–58. https://doi.org/10.3846/13923730.2013.851112
    • (2014) Journal of Civil Engineering and Management , vol.20 , Issue.1 , pp. 47-58
    • Tserng, H.-P.1    Ho, S.-P.2    Jan, S.-H.3
  • 204
    • 84875026723 scopus 로고    scopus 로고
    • Toward automated earned value tracking using 3D imaging tools
    • Turkan, Y.,; Bosche, F.,; Haas, C. T.,; Haas, R., 2013. Toward automated earned value tracking using 3D imaging tools, Journal of Construction Engineering and Management 139(4): 423–433. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000629
    • (2013) Journal of Construction Engineering and Management , vol.139 , Issue.4 , pp. 423-433
    • Turkan, Y.1    Bosche, F.2    Haas, C.T.3    Haas, R.4
  • 205
    • 84890525940 scopus 로고    scopus 로고
    • Building Information Modeling (BIM) for existing buildings–literature review and future needs
    • Volk, R.,; Stengel, J.,; Schultmann, F., 2014. Building Information Modeling (BIM) for existing buildings–literature review and future needs, Automation in Construction 38: 109–127. https://doi.org/10.1016/j.autcon.2013.10.023
    • (2014) Automation in Construction , vol.38 , pp. 109-127
    • Volk, R.1    Stengel, J.2    Schultmann, F.3
  • 206
    • 84913612611 scopus 로고    scopus 로고
    • Process-oriented approach of teaching Building Information Modeling in construction management
    • Wang, L.,; Leite, F., 2014. Process-oriented approach of teaching Building Information Modeling in construction management, Journal of Professional Issues in Engineering Education and Practice 140(4). https://doi.org/10.1061/(ASCE)EI.1943-5541.0000203
    • (2014) Journal of Professional Issues in Engineering Education and Practice , vol.140 , Issue.4
    • Wang, L.1    Leite, F.2
  • 207
    • 84959018685 scopus 로고    scopus 로고
    • Process knowledge capture in BIM-based mechanical, electrical, and plumbing design coordination meetings
    • Wang, L.,; Leite, F., 2016. Process knowledge capture in BIM-based mechanical, electrical, and plumbing design coordination meetings, Journal of Computing in Civil Engineering 30(2): 1–1. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000484
    • (2016) Journal of Computing in Civil Engineering , vol.30 , Issue.2 , pp. 1
    • Wang, L.1    Leite, F.2
  • 208
    • 84887850438 scopus 로고    scopus 로고
    • Integrating building information models with construction process simulations for project scheduling support
    • Wang, W.-C.,; Weng, S.-W.,; Wang, S.-H.,; Chen, C.-Y., 2014a. Integrating building information models with construction process simulations for project scheduling support, Automation in Construction 37: 68–80. https://doi.org/10.1016/j.autcon.2013.10.009
    • (2014) Automation in Construction , vol.37 , pp. 68-80
    • Wang, W.-C.1    Weng, S.-W.2    Wang, S.-H.3    Chen, C.-Y.4
  • 209
    • 84902124617 scopus 로고    scopus 로고
    • An innovative method for project control in LNG project through 5D CAD: A case study
    • Wang, X.,; Yung, P.,; Luo, H.,; Truijens, M., 2014b. An innovative method for project control in LNG project through 5D CAD: A case study, Automation in Construction 45: 126–135. https://doi.org/10.1016/j.autcon.2014.05.011
    • (2014) Automation in Construction , vol.45 , pp. 126-135
    • Wang, X.1    Yung, P.2    Luo, H.3    Truijens, M.4
  • 210
    • 84944408053 scopus 로고    scopus 로고
    • Applying building information modeling to support fire safety management
    • Wang, S.-H.,; Wang, W.-C.,; Wang, K.-C.,; Shih, S.-Y., 2015. Applying building information modeling to support fire safety management, Automation in Construction 59: 158–167. https://doi.org/10.1016/j.autcon.2015.02.001
    • (2015) Automation in Construction , vol.59 , pp. 158-167
    • Wang, S.-H.1    Wang, W.-C.2    Wang, K.-C.3    Shih, S.-Y.4
  • 211
    • 80053601079 scopus 로고    scopus 로고
    • Digital buildings–challenges and opportunities
    • Watson, A., 2011. Digital buildings–challenges and opportunities, Advanced Engineering Informatics 25(4): 573–581. https://doi.org/10.1016/j.aei.2011.07.003
    • (2011) Advanced Engineering Informatics , vol.25 , Issue.4 , pp. 573-581
    • Watson, A.1
  • 212
    • 84864275288 scopus 로고    scopus 로고
    • BIM-centric daylight profiler for simulation (BDP4SIM): A methodology for automated product model decomposition and re-composition for climate-based daylighting simulation
    • Welle, B.,; Rogers, Z.,; Fischer, M., 2012. BIM-centric daylight profiler for simulation (BDP4SIM): A methodology for automated product model decomposition and re-composition for climate-based daylighting simulation, Building and Environment 58: 114–134. https://doi.org/10.1016/j.buildenv.2012.06.021
    • (2012) Building and Environment , vol.58 , pp. 114-134
    • Welle, B.1    Rogers, Z.2    Fischer, M.3
  • 213
    • 84945280951 scopus 로고    scopus 로고
    • The use of a BIM-based framework to support safe facility management processes
    • Wetzel, E. M.,; Thabet, W. Y., 2015. The use of a BIM-based framework to support safe facility management processes, Automation in Construction 60: 12–24. https://doi.org/10.1016/j.autcon.2015.09.004
    • (2015) Automation in Construction , vol.60 , pp. 12-24
    • Wetzel, E.M.1    Thabet, W.Y.2
  • 214
    • 84973125221 scopus 로고    scopus 로고
    • How to tell if a BIM project is successful: A goal-driven approach
    • Won, J.,; Lee, G., 2016. How to tell if a BIM project is successful: A goal-driven approach, Automation in Construction 69: 34–43. https://doi.org/10.1016/j.autcon.2016.05.022
    • (2016) Automation in Construction , vol.69 , pp. 34-43
    • Won, J.1    Lee, G.2
  • 215
    • 84952362417 scopus 로고    scopus 로고
    • Quantification of construction waste prevented by BIM-based design validation: Case studies in South Korea
    • Won, J.,; Cheng, J. C. P.,; Lee, G., 2016. Quantification of construction waste prevented by BIM-based design validation: Case studies in South Korea, Waste Management 49: 170–180. https://doi.org/10.1016/j.wasman.2015.12.026
    • (2016) Waste Management , vol.49 , pp. 170-180
    • Won, J.1    Cheng, J.C.P.2    Lee, G.3
  • 216
    • 84886578981 scopus 로고    scopus 로고
    • Where to focus for successful adoption of Building Information Modeling within organization
    • Won, J.,; Lee, G.,; Dossick, C.,; Messner, J., 2013. Where to focus for successful adoption of Building Information Modeling within organization, Journal of Construction Engineering and Management 139(11). https://doi.org/10.1061/(ASCE)CO.1943-7862.0000731
    • (2013) Journal of Construction Engineering and Management , vol.139 , Issue.11
    • Won, J.1    Lee, G.2    Dossick, C.3    Messner, J.4
  • 217
    • 84934894902 scopus 로고    scopus 로고
    • Enhancing environmental sustainability over building life cycles through green BIM: A review
    • Wong, J. K. W.,; Zhou, J., 2015. Enhancing environmental sustainability over building life cycles through green BIM: A review, Automation in Construction 57: 156–165. https://doi.org/10.1016/j.autcon.2015.06.003
    • (2015) Automation in Construction , vol.57 , pp. 156-165
    • Wong, J.K.W.1    Zhou, J.2
  • 218
    • 84900435585 scopus 로고    scopus 로고
    • Implementing ‘BEAM Plus’ for BIM-based sustainability analysis
    • Wong, J. K.-W.,; Kuan, K.-L., 2014. Implementing ‘BEAM Plus’ for BIM-based sustainability analysis, Automation in Construction 44: 163–175. https://doi.org/10.1016/j.autcon.2014.04.003
    • (2014) Automation in Construction , vol.44 , pp. 163-175
    • Wong, J.K.W.1    Kuan, K.-L.2
  • 219
    • 84958157887 scopus 로고    scopus 로고
    • A relationship framework for Building Information Modeling (BIM) capability in quantity surveying practice and project performance
    • Wong, P. F.,; Salleh, H.,; Rahim, F. A. M., 2015. A relationship framework for Building Information Modeling (BIM) capability in quantity surveying practice and project performance, Informes De La Construccion 67: 119. https://doi.org/10.3989/ic.15.007
    • (2015) Informes De La Construccion , vol.67 , pp. 119
    • Wong, P.F.1    Salleh, H.2    Rahim, F.A.M.3
  • 220
    • 84896335728 scopus 로고    scopus 로고
    • BIM education and recruiting: Survey-based comparative analysis of issues, perceptions, and collaboration opportunities
    • Wu, W.,; Issa, R. R. A., 2014. BIM education and recruiting: Survey-based comparative analysis of issues, perceptions, and collaboration opportunities, Journal of Professional Issues in Engineering Education and Practice 140(2). https://doi.org/10.1061/(ASCE)EI.1943-5541.0000186
    • (2014) Journal of Professional Issues in Engineering Education and Practice , vol.140 , Issue.2
    • Wu, W.1    Issa, R.R.A.2
  • 221
    • 84934993368 scopus 로고    scopus 로고
    • BIM execution planning in green building projects: LEED as a use case
    • Wu, W.,; Issa, R. R. A., 2015. BIM execution planning in green building projects: LEED as a use case, Journal of Management in Engineering 31(1): 1–18. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000314
    • (2015) Journal of Management in Engineering , vol.31 , Issue.1 , pp. 1-18
    • Wu, W.1    Issa, R.R.A.2
  • 222
    • 84873283130 scopus 로고    scopus 로고
    • Automatic creation of semantically rich 3D building models from laser scanner data
    • Xiong, X.,; Adan, A.,; Akinci, B.,; Huber, D., 2013. Automatic creation of semantically rich 3D building models from laser scanner data, Automation in Construction 31: 325–337. https://doi.org/10.1016/j.autcon.2012.10.006
    • (2013) Automation in Construction , vol.31 , pp. 325-337
    • Xiong, X.1    Adan, A.2    Akinci, B.3    Huber, D.4
  • 223
    • 84891823275 scopus 로고    scopus 로고
    • Users-orientated evaluation of building information model in the Chinese construction industry
    • Xu, H.,; Feng, J.,; Li, S., 2014. Users-orientated evaluation of building information model in the Chinese construction industry, Automation in Construction 39: 32–46. https://doi.org/10.1016/j.autcon.2013.12.004
    • (2014) Automation in Construction , vol.39 , pp. 32-46
    • Xu, H.1    Feng, J.2    Li, S.3
  • 224
    • 84940861504 scopus 로고    scopus 로고
    • Patterns and trends in Building Information Modeling (BIM) research: A latent semantic analysis
    • Yalcinkaya, M.,; Singh, V., 2015. Patterns and trends in Building Information Modeling (BIM) research: A latent semantic analysis, Automation in Construction 59: 68–80. https://doi.org/10.1016/j.autcon.2015.07.012
    • (2015) Automation in Construction , vol.59 , pp. 68-80
    • Yalcinkaya, M.1    Singh, V.2
  • 225
    • 84976291131 scopus 로고    scopus 로고
    • BIM and sustainability education: Incorporating instructional needs into curriculum planning in CEM programs accredited by ACCE
    • Zhang, J.,; Schmidt, K.,; Li, H., 2016. BIM and sustainability education: Incorporating instructional needs into curriculum planning in CEM programs accredited by ACCE, Sustainability 8(6): 525. https://doi.org/10.3390/su8060525
    • (2016) Sustainability , vol.8 , Issue.6 , pp. 525
    • Zhang, J.1    Schmidt, K.2    Li, H.3
  • 226
    • 85017102724 scopus 로고    scopus 로고
    • A scientometric review of global BIM research: Analysis and visualization
    • Zhao, X., 2017. A scientometric review of global BIM research: Analysis and visualization, Automation in Construction 80: 37–47. https://doi.org/10.1016/j.autcon.2017.04.002
    • (2017) Automation in Construction , vol.80 , pp. 37-47
    • Zhao, X.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.