메뉴 건너뛰기




Volumn 80, Issue , 2017, Pages 118-136

Bibliometric analysis and review of Building Information Modelling literature published between 2005 and 2015

Author keywords

Bibliometric analysis; BIM; Categorisation; Digital construction; Literature review

Indexed keywords

INFORMATION THEORY; INTEROPERABILITY; SEMANTICS;

EID: 85015428366     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2017.03.005     Document Type: Review
Times cited : (250)

References (206)
  • 1
    • 85051772754 scopus 로고    scopus 로고
    • The European Construction Sector: A Global Partner
    • Available from:
    • [1] European Commission, The European Construction Sector: A Global Partner. Available from: http://ec.europa.eu/DocsRoom/documents/15866/attachments/1/translations/en/renditions/native, 2016.
    • (2016)
    • European Commission1
  • 2
    • 85017746173 scopus 로고    scopus 로고
    • Construction in EU
    • Available from: (cited 2016 June)
    • [2] European Commission, Construction in EU. Available from: http://ec.europa.eu/growth/sectors/construction/index_en.htm, 2016 (cited 2016 June).
    • (2016)
    • European Commission1
  • 3
    • 84884633626 scopus 로고    scopus 로고
    • Life cycle assessment (LCA) and life cycle energy analysis (LCEA) of buildings and the building sector: a review
    • [3] Cabeza, L.F., Rincón, L., Vilariño, V., Pérez, G., Castell, A., Life cycle assessment (LCA) and life cycle energy analysis (LCEA) of buildings and the building sector: a review. Renew. Sustain. Energy Rev. 29:0 (2014), 394–416, 10.1016/j.rser.2013.08.037.
    • (2014) Renew. Sustain. Energy Rev. , vol.29 , pp. 394-416
    • Cabeza, L.F.1    Rincón, L.2    Vilariño, V.3    Pérez, G.4    Castell, A.5
  • 4
    • 0026973067 scopus 로고
    • Modelling multiple views on buildings
    • [4] van Nederveen, G.A., Tolman, F.P., Modelling multiple views on buildings. Autom. Constr. 1:3 (1992), 215–224, 10.1016/0926-5805(92)90014-B.
    • (1992) Autom. Constr. , vol.1 , Issue.3 , pp. 215-224
    • van Nederveen, G.A.1    Tolman, F.P.2
  • 5
    • 84892948018 scopus 로고    scopus 로고
    • Big buzz for BIM — is the latest approach to A/E/C software a revolutionary one or just repackaged technology at a higher price?
    • [5] Hoekstra, J., Big buzz for BIM — is the latest approach to A/E/C software a revolutionary one or just repackaged technology at a higher price?. Architecture 92:7 (2003), 79–81.
    • (2003) Architecture , vol.92 , Issue.7 , pp. 79-81
    • Hoekstra, J.1
  • 6
    • 60950607737 scopus 로고    scopus 로고
    • Brace for BIM — the arrival of building information modeling seems inevitable. Are US architects ready for a revolution?
    • [6] Sullivan, C.C., Brace for BIM — the arrival of building information modeling seems inevitable. Are US architects ready for a revolution?. Architecture 94:4 (2005), 77–78.
    • (2005) Architecture , vol.94 , Issue.4 , pp. 77-78
    • Sullivan, C.C.1
  • 7
    • 60950411904 scopus 로고    scopus 로고
    • Why building information modeling isn't working…yet
    • [7] Sanders, K., Why building information modeling isn't working…yet. Archit. Rec. 192:9 (2004), 181–182.
    • (2004) Archit. Rec. , vol.192 , Issue.9 , pp. 181-182
    • Sanders, K.1
  • 8
    • 78650467695 scopus 로고    scopus 로고
    • Building Information Models – Information Delivery Manual – Part 1: Methodology and Format
    • ed. ISO
    • [8] ISO/DIS 29481-1 2014, Building Information Models – Information Delivery Manual – Part 1: Methodology and Format. ed. ISO, 2014.
    • (2014)
    • ISO/DIS 29481-1 20141
  • 9
    • 77955711321 scopus 로고    scopus 로고
    • Value proposition on interoperability of BIM and collaborative working environments
    • [9] Grilo, A., Jardim-Goncalves, R., Value proposition on interoperability of BIM and collaborative working environments. Autom. Constr. 19:5 (2010), 522–530, 10.1016/j.autcon.2009.11.003.
    • (2010) Autom. Constr. , vol.19 , Issue.5 , pp. 522-530
    • Grilo, A.1    Jardim-Goncalves, R.2
  • 10
    • 84904992306 scopus 로고    scopus 로고
    • Effects of building information modeling during construction
    • [10] Fan, S.-L., Skibniewski, M.J., Hung, T.W., Effects of building information modeling during construction. J. Appl. Sci. Eng. 17:2 (2014), 157–166, 10.6180/jase.2014.17.2.06.
    • (2014) J. Appl. Sci. Eng. , vol.17 , Issue.2 , pp. 157-166
    • Fan, S.-L.1    Skibniewski, M.J.2    Hung, T.W.3
  • 11
    • 84894482902 scopus 로고    scopus 로고
    • Intellectual property rights in building information modeling application in Taiwan
    • [11] Fan, S.-L., Intellectual property rights in building information modeling application in Taiwan. J. Constr. Eng. Manag., 140(3), 2014, 10.1061/(asce)co.1943-7862.0000808.
    • (2014) J. Constr. Eng. Manag. , vol.140 , Issue.3
    • Fan, S.-L.1
  • 12
    • 80054926367 scopus 로고    scopus 로고
    • Design error reduction: toward the effective utilization of building information modeling
    • [12] Love, P.E.D., Edwards, D.J., Han, S., Goh, Y.M., Design error reduction: toward the effective utilization of building information modeling. Res. Eng. Des. 22:3 (2011), 173–187, 10.1007/s00163-011-0105-x.
    • (2011) Res. Eng. Des. , vol.22 , Issue.3 , pp. 173-187
    • Love, P.E.D.1    Edwards, D.J.2    Han, S.3    Goh, Y.M.4
  • 13
    • 79954424532 scopus 로고    scopus 로고
    • A review and outlook for a ‘Building Information Model’ (BIM): a multi-standpoint framework for technological development
    • [13] Cerovsek, T., A review and outlook for a ‘Building Information Model’ (BIM): a multi-standpoint framework for technological development. Adv. Eng. Inform. 25:2 (2011), 224–244, 10.1016/j.aei.2010.06.003.
    • (2011) Adv. Eng. Inform. , vol.25 , Issue.2 , pp. 224-244
    • Cerovsek, T.1
  • 14
    • 79551688323 scopus 로고    scopus 로고
    • Building information modelling (BIM) framework for practical implementation
    • [14] Jung, Y., Joo, M., Building information modelling (BIM) framework for practical implementation. Autom. Constr. 20:2 (2011), 126–133, 10.1016/j.autcon.2010.09.010.
    • (2011) Autom. Constr. , vol.20 , Issue.2 , pp. 126-133
    • Jung, Y.1    Joo, M.2
  • 15
    • 84907426904 scopus 로고    scopus 로고
    • Building Information Modeling (BIM) application framework: the process of expanding from 3D to computable nD
    • [15] Ding, L., Zhou, Y., Akinci, B., Building Information Modeling (BIM) application framework: the process of expanding from 3D to computable nD. Autom. Constr. 46 (2014), 82–93, 10.1016/j.autcon.2014.04.009.
    • (2014) Autom. Constr. , vol.46 , pp. 82-93
    • Ding, L.1    Zhou, Y.2    Akinci, B.3
  • 16
    • 84890525940 scopus 로고    scopus 로고
    • Building Information Modeling (BIM) for existing buildings — literature review and future needs
    • [16] Volk, R., Stengel, J., Schultmann, F., Building Information Modeling (BIM) for existing buildings — literature review and future needs. Autom. Constr. 38 (2014), 109–127, 10.1016/j.autcon.2013.10.023.
    • (2014) Autom. Constr. , vol.38 , pp. 109-127
    • Volk, R.1    Stengel, J.2    Schultmann, F.3
  • 17
    • 70349429622 scopus 로고    scopus 로고
    • Automatic rule-based checking of building designs
    • [17] Eastman, C., Lee, J.M., Jeong, Y.S., Lee, J.K., Automatic rule-based checking of building designs. Autom. Constr. 18:8 (2009), 1011–1033, 10.1016/j.autcon.2009.07.002.
    • (2009) Autom. Constr. , vol.18 , Issue.8 , pp. 1011-1033
    • Eastman, C.1    Lee, J.M.2    Jeong, Y.S.3    Lee, J.K.4
  • 18
    • 84857357863 scopus 로고    scopus 로고
    • Construction safety and digital design: a review
    • [18] Zhou, W., Whyte, J., Sacks, R., Construction safety and digital design: a review. Autom. Constr. 22 (2012), 102–111, 10.1016/j.autcon.2011.07.005.
    • (2012) Autom. Constr. , vol.22 , pp. 102-111
    • Zhou, W.1    Whyte, J.2    Sacks, R.3
  • 19
    • 84905182221 scopus 로고    scopus 로고
    • Survey of digital technologies in procurement of construction projects
    • [19] Ibem, E.O., Laryea, S., Survey of digital technologies in procurement of construction projects. Autom. Constr. 46 (2014), 11–21, 10.1016/j.autcon.2014.07.003.
    • (2014) Autom. Constr. , vol.46 , pp. 11-21
    • Ibem, E.O.1    Laryea, S.2
  • 20
    • 84943226220 scopus 로고    scopus 로고
    • A critical analysis of building information modelling systems used in construction projects
    • [20] Abanda, F.H., Vidalakis, C., Oti, A.H., Tah, J.H.M., A critical analysis of building information modelling systems used in construction projects. Adv. Eng. Softw. 90 (2015), 183–201, 10.1016/j.advengsoft.2015.08.009.
    • (2015) Adv. Eng. Softw. , vol.90 , pp. 183-201
    • Abanda, F.H.1    Vidalakis, C.2    Oti, A.H.3    Tah, J.H.M.4
  • 21
    • 84915796696 scopus 로고    scopus 로고
    • BIM-enabled structural design: impacts and future developments in structural modelling, analysis and optimisation processes
    • [21] Chi, H.-L., Wang, X., Jiao, Y., BIM-enabled structural design: impacts and future developments in structural modelling, analysis and optimisation processes. Arch. Comput. Methods Eng. 22:1 (2015), 135–151, 10.1007/s11831-014-9127-7.
    • (2015) Arch. Comput. Methods Eng. , vol.22 , Issue.1 , pp. 135-151
    • Chi, H.-L.1    Wang, X.2    Jiao, Y.3
  • 22
    • 84937521132 scopus 로고    scopus 로고
    • As-built data acquisition and its use in production monitoring and automated layout of civil infrastructure: a survey
    • [22] Son, H., Bosche, F., Kim, C., As-built data acquisition and its use in production monitoring and automated layout of civil infrastructure: a survey. Adv. Eng. Inform. 29:2 (2015), 172–183, 10.1016/j.aei.2015.01.009.
    • (2015) Adv. Eng. Inform. , vol.29 , Issue.2 , pp. 172-183
    • Son, H.1    Bosche, F.2    Kim, C.3
  • 23
    • 84934894902 scopus 로고    scopus 로고
    • Enhancing environmental sustainability over building life cycles through green BIM: a review
    • [23] Wong, J.K.W., Zhou, J., Enhancing environmental sustainability over building life cycles through green BIM: a review. Autom. Constr. 57 (2015), 156–165, 10.1016/j.autcon.2015.06.003.
    • (2015) Autom. Constr. , vol.57 , pp. 156-165
    • Wong, J.K.W.1    Zhou, J.2
  • 24
    • 84930505270 scopus 로고    scopus 로고
    • Status quo and open challenges in vision-based sensing and tracking of temporary resources on infrastructure construction sites
    • [24] Teizer, J., Status quo and open challenges in vision-based sensing and tracking of temporary resources on infrastructure construction sites. Adv. Eng. Inform. 29:2 (2015), 225–238, 10.1016/j.aei.2015.03.006.
    • (2015) Adv. Eng. Inform. , vol.29 , Issue.2 , pp. 225-238
    • Teizer, J.1
  • 25
    • 84930762229 scopus 로고    scopus 로고
    • Bridging BIM and building: from a literature review to an integrated conceptual framework
    • [25] Chen, K., Lu, W.S., Peng, Y., Rowlinson, S., Huang, G.Q., Bridging BIM and building: from a literature review to an integrated conceptual framework. Int. J. Proj. Manag. 33:6 (2015), 1405–1416, 10.1016/j.ijproman.2015.03.006.
    • (2015) Int. J. Proj. Manag. , vol.33 , Issue.6 , pp. 1405-1416
    • Chen, K.1    Lu, W.S.2    Peng, Y.3    Rowlinson, S.4    Huang, G.Q.5
  • 26
    • 84925784934 scopus 로고    scopus 로고
    • Building performance simulation in the early design stage: an introduction to integrated dynamic models
    • [26] Negendahl, K., Building performance simulation in the early design stage: an introduction to integrated dynamic models. Autom. Constr. 54 (2015), 39–53, 10.1016/j.autcon.2015.03.002.
    • (2015) Autom. Constr. , vol.54 , pp. 39-53
    • Negendahl, K.1
  • 27
    • 84940861504 scopus 로고    scopus 로고
    • Patterns and trends in building information modeling (BIM) research: a latent semantic analysis
    • [27] Yalcinkaya, M., Singh, V., Patterns and trends in building information modeling (BIM) research: a latent semantic analysis. Autom. Constr. 59 (2015), 68–80, 10.1016/j.autcon.2015.07.012.
    • (2015) Autom. Constr. , vol.59 , pp. 68-80
    • Yalcinkaya, M.1    Singh, V.2
  • 29
    • 84926276952 scopus 로고    scopus 로고
    • A comparative review of building information modelling implementation in building and infrastructure industries
    • [29] Shou, W.C., Wang, J., Wang, X.Y., Chong, H.Y., A comparative review of building information modelling implementation in building and infrastructure industries. Arch. Comput. Methods Eng. 22:2 (2015), 291–308, 10.1007/s11831-014-9125-9.
    • (2015) Arch. Comput. Methods Eng. , vol.22 , Issue.2 , pp. 291-308
    • Shou, W.C.1    Wang, J.2    Wang, X.Y.3    Chong, H.Y.4
  • 30
    • 84937515182 scopus 로고    scopus 로고
    • 3D as-is building energy modeling and diagnostics: a review of the state-of-the-art
    • [30] Cho, Y.K., Ham, Y., Golpavar-Fard, M., 3D as-is building energy modeling and diagnostics: a review of the state-of-the-art. Adv. Eng. Inform. 29:2 (2015), 184–195, 10.1016/j.aei.2015.03.004.
    • (2015) Adv. Eng. Inform. , vol.29 , Issue.2 , pp. 184-195
    • Cho, Y.K.1    Ham, Y.2    Golpavar-Fard, M.3
  • 31
    • 84961289236 scopus 로고    scopus 로고
    • Information technology applications in construction safety assurance
    • [31] Skibniewski, M.J., Information technology applications in construction safety assurance. J. Civ. Eng. Manag. 20:6 (2014), 778–794, 10.3846/13923730.2014.987693.
    • (2014) J. Civ. Eng. Manag. , vol.20 , Issue.6 , pp. 778-794
    • Skibniewski, M.J.1
  • 32
    • 84937522080 scopus 로고    scopus 로고
    • Construction performance monitoring via still images, time-lapse photos, and video streams: now, tomorrow, and the future
    • [32] Yang, J., Park, M.-W., Vela, P.A., Golparvar-Fard, M., Construction performance monitoring via still images, time-lapse photos, and video streams: now, tomorrow, and the future. Adv. Eng. Inform. 29:2 (2015), 211–224, 10.1016/j.aei.2015.01.011.
    • (2015) Adv. Eng. Inform. , vol.29 , Issue.2 , pp. 211-224
    • Yang, J.1    Park, M.-W.2    Vela, P.A.3    Golparvar-Fard, M.4
  • 33
    • 29144527545 scopus 로고    scopus 로고
    • IFC model viewer to support nD model application
    • [33] Fu, C.F., Aouad, G., Lee, A., Mashall-Ponting, A., Wu, S., IFC model viewer to support nD model application. Autom. Constr. 15:2 (2006), 178–185, 10.1016/j.autcon.2005.04.002.
    • (2006) Autom. Constr. , vol.15 , Issue.2 , pp. 178-185
    • Fu, C.F.1    Aouad, G.2    Lee, A.3    Mashall-Ponting, A.4    Wu, S.5
  • 34
    • 33748134686 scopus 로고    scopus 로고
    • Specifying parametric building object behavior (BOB) for a building information modeling system
    • [34] Lee, G., Sacks, R., Eastman, C.M., Specifying parametric building object behavior (BOB) for a building information modeling system. Autom. Constr. 15:6 (2006), 758–776, 10.1016/j.autcon.2005.09.009.
    • (2006) Autom. Constr. , vol.15 , Issue.6 , pp. 758-776
    • Lee, G.1    Sacks, R.2    Eastman, C.M.3
  • 35
    • 84973587732 scopus 로고
    • A coefficient of agreement for nominal scales
    • [35] Cohen, J., A coefficient of agreement for nominal scales. Educ. Psychol. Meas. 20:1 (1960), 37–46, 10.1177/001316446002000104.
    • (1960) Educ. Psychol. Meas. , vol.20 , Issue.1 , pp. 37-46
    • Cohen, J.1
  • 36
    • 77950862404 scopus 로고    scopus 로고
    • The Rosewood experiment — building information modeling and interoperability for architectural precast facades
    • [36] Sacks, R., Kaner, I., Eastman, C.M., Jeong, Y.-S., The Rosewood experiment — building information modeling and interoperability for architectural precast facades. Autom. Constr. 19:4 (2010), 419–432, 10.1016/j.autcon.2009.11.012.
    • (2010) Autom. Constr. , vol.19 , Issue.4 , pp. 419-432
    • Sacks, R.1    Kaner, I.2    Eastman, C.M.3    Jeong, Y.-S.4
  • 37
    • 84940712242 scopus 로고    scopus 로고
    • Information modeling of earthquake-damaged reinforced concrete structures
    • [37] Ma, L., Sacks, R., Zeibak-Shini, R., Information modeling of earthquake-damaged reinforced concrete structures. Adv. Eng. Inform. 29:3 (2015), 396–407, 10.1016/j.ael.2015.01.007.
    • (2015) Adv. Eng. Inform. , vol.29 , Issue.3 , pp. 396-407
    • Ma, L.1    Sacks, R.2    Zeibak-Shini, R.3
  • 38
    • 84859567183 scopus 로고    scopus 로고
    • Semantics of model views for information exchanges using the industry foundation class schema
    • [38] Venugopal, M., Eastman, C.M., Sacks, R., Teizer, J., Semantics of model views for information exchanges using the industry foundation class schema. Adv. Eng. Inform. 26:2 (2012), 411–428, 10.1016/j.aei.2012.01.005.
    • (2012) Adv. Eng. Inform. , vol.26 , Issue.2 , pp. 411-428
    • Venugopal, M.1    Eastman, C.M.2    Sacks, R.3    Teizer, J.4
  • 39
    • 84856211831 scopus 로고    scopus 로고
    • Model interoperability in building information modelling
    • [39] Steel, J., Drogemuller, R., Toth, B., Model interoperability in building information modelling. Softw. Syst. Model. 11:1 (2012), 99–109, 10.1007/s10270-010-0178-4.
    • (2012) Softw. Syst. Model. , vol.11 , Issue.1 , pp. 99-109
    • Steel, J.1    Drogemuller, R.2    Toth, B.3
  • 40
    • 63749129585 scopus 로고    scopus 로고
    • Benchmark tests for BIM data exchanges of precast concrete
    • [40] Jeong, Y.S., Eastman, C.M., Sacks, R., Kaner, I., Benchmark tests for BIM data exchanges of precast concrete. Autom. Constr. 18:4 (2009), 469–484, 10.1016/j.autcon.2008.11.001.
    • (2009) Autom. Constr. , vol.18 , Issue.4 , pp. 469-484
    • Jeong, Y.S.1    Eastman, C.M.2    Sacks, R.3    Kaner, I.4
  • 41
    • 84921643579 scopus 로고    scopus 로고
    • Processing of topological BIM queries using boundary representation based methods
    • [41] Daum, S., Borrmann, A., Processing of topological BIM queries using boundary representation based methods. Adv. Eng. Inform. 28:4 (2014), 272–286, 10.1016/j.aei.2014.06.001.
    • (2014) Adv. Eng. Inform. , vol.28 , Issue.4 , pp. 272-286
    • Daum, S.1    Borrmann, A.2
  • 42
    • 84888013050 scopus 로고    scopus 로고
    • BIMQL — an open query language for building information models
    • [42] Mazairac, W., Beetz, J., BIMQL — an open query language for building information models. Adv. Eng. Inform. 27:4 (2013), 444–456, 10.1016/j.aei.2013.06.001.
    • (2013) Adv. Eng. Inform. , vol.27 , Issue.4 , pp. 444-456
    • Mazairac, W.1    Beetz, J.2
  • 43
    • 84879452618 scopus 로고    scopus 로고
    • A BIM-oriented model for supporting indoor navigation requirements
    • [43] Isikdag, U., Zlatanova, S., Underwood, J., A BIM-oriented model for supporting indoor navigation requirements. Comput. Environ. Urban Syst. 41 (2013), 112–123, 10.1016/j.compenvurbsys.2013.05.001.
    • (2013) Comput. Environ. Urban Syst. , vol.41 , pp. 112-123
    • Isikdag, U.1    Zlatanova, S.2    Underwood, J.3
  • 44
    • 84876691805 scopus 로고    scopus 로고
    • The IFC-based path planning for 3D indoor spaces
    • [44] Lin, Y.-H., Liu, Y.-S., Gao, G., Han, X.-G., Lai, C.-Y., Gu, M., The IFC-based path planning for 3D indoor spaces. Adv. Eng. Inform. 27:2 (2013), 189–205, 10.1016/j.aei.2012.10.001.
    • (2013) Adv. Eng. Inform. , vol.27 , Issue.2 , pp. 189-205
    • Lin, Y.-H.1    Liu, Y.-S.2    Gao, G.3    Han, X.-G.4    Lai, C.-Y.5    Gu, M.6
  • 46
    • 84928045639 scopus 로고    scopus 로고
    • IFC-based graph data model for topological queries on building elements
    • [46] Khalili, A., Chua, D.K.H., IFC-based graph data model for topological queries on building elements. J. Comput. Civ. Eng., 29(3), 2015, 10.1061/(asce)cp.1943-5487.0000331.
    • (2015) J. Comput. Civ. Eng. , vol.29 , Issue.3
    • Khalili, A.1    Chua, D.K.H.2
  • 47
    • 84924971295 scopus 로고    scopus 로고
    • Extending BIM interoperability to preconstruction operations using geospatial analyses and semantic web services
    • [47] Karan, E.P., Irizarry, J., Extending BIM interoperability to preconstruction operations using geospatial analyses and semantic web services. Autom. Constr. 53 (2015), 1–12, 10.1016/j.autcon.2015.02.012.
    • (2015) Autom. Constr. , vol.53 , pp. 1-12
    • Karan, E.P.1    Irizarry, J.2
  • 48
    • 79953733556 scopus 로고    scopus 로고
    • Past, present and future of information and knowledge sharing in the construction industry: towards semantic service-based e-construction?
    • [48] Rezgui, Y., Boddy, S., Wetherill, M., Cooper, G., Past, present and future of information and knowledge sharing in the construction industry: towards semantic service-based e-construction?. Comput. Aided Des. 43:5 (2011), 502–515, 10.1016/j.cad.2009.06.005.
    • (2011) Comput. Aided Des. , vol.43 , Issue.5 , pp. 502-515
    • Rezgui, Y.1    Boddy, S.2    Wetherill, M.3    Cooper, G.4
  • 49
    • 84898014121 scopus 로고    scopus 로고
    • BIM and ontology-based approach for building cost estimation
    • [49] Lee, S.K., Kim, K.R., Yu, J.H., BIM and ontology-based approach for building cost estimation. Autom. Constr. 41 (2014), 96–105, 10.1016/j.autcon.2013.10.020.
    • (2014) Autom. Constr. , vol.41 , pp. 96-105
    • Lee, S.K.1    Kim, K.R.2    Yu, J.H.3
  • 50
    • 84960806004 scopus 로고    scopus 로고
    • An ontology-based analysis of the industry foundation class schema for building information model exchanges
    • [50] Venugopal, M., Eastman, C.M., Teizer, J., An ontology-based analysis of the industry foundation class schema for building information model exchanges. Adv. Eng. Inform. 29:4 (2015), 940–957, 10.1016/j.aei.2015.09.006.
    • (2015) Adv. Eng. Inform. , vol.29 , Issue.4 , pp. 940-957
    • Venugopal, M.1    Eastman, C.M.2    Teizer, J.3
  • 51
    • 77955715185 scopus 로고    scopus 로고
    • Two design patterns for facilitating building information model-based synchronous collaboration
    • [51] Isikdag, U., Underwood, J., Two design patterns for facilitating building information model-based synchronous collaboration. Autom. Constr. 19:5 (2010), 544–553, 10.1016/j.autcon.2009.11.006.
    • (2010) Autom. Constr. , vol.19 , Issue.5 , pp. 544-553
    • Isikdag, U.1    Underwood, J.2
  • 52
    • 84861819316 scopus 로고    scopus 로고
    • Design patterns for BIM-based service-oriented architectures
    • [52] Isikdag, U., Design patterns for BIM-based service-oriented architectures. Autom. Constr. 25 (2012), 59–71, 10.1016/j.autcon.2012.04.013.
    • (2012) Autom. Constr. , vol.25 , pp. 59-71
    • Isikdag, U.1
  • 53
    • 84860350602 scopus 로고    scopus 로고
    • User-centric knowledge representations based on ontology for AEC design collaboration
    • [53] Lee, J., Jeong, Y., User-centric knowledge representations based on ontology for AEC design collaboration. Comput. Aided Des. 44:8 (2012), 735–748, 10.1016/j.cad.2012.03.011.
    • (2012) Comput. Aided Des. , vol.44 , Issue.8 , pp. 735-748
    • Lee, J.1    Jeong, Y.2
  • 54
    • 81355138828 scopus 로고    scopus 로고
    • Building information modeling-based user activity simulation and evaluation method for improving designer-user communications
    • [54] Shen, W.L., Shen, Q.P., Sun, Q.B., Building information modeling-based user activity simulation and evaluation method for improving designer-user communications. Autom. Constr. 21 (2012), 148–160, 10.1016/j.autcon.2011.05.022.
    • (2012) Autom. Constr. , vol.21 , pp. 148-160
    • Shen, W.L.1    Shen, Q.P.2    Sun, Q.B.3
  • 55
    • 79551689722 scopus 로고    scopus 로고
    • A theoretical framework of a BIM-based multi-disciplinary collaboration platform
    • [55] Singh, V., Gu, N., Wang, X., A theoretical framework of a BIM-based multi-disciplinary collaboration platform. Autom. Constr. 20:2 (2011), 134–144, 10.1016/j.autcon.2010.09.011.
    • (2011) Autom. Constr. , vol.20 , Issue.2 , pp. 134-144
    • Singh, V.1    Gu, N.2    Wang, X.3
  • 56
    • 84872363169 scopus 로고    scopus 로고
    • Construction collaborative networks: the case study of a building information modelling-based office building project
    • [56] Grilo, A., Zutshi, A., Jardim-Goncalves, R., Steiger-Garcao, A., Construction collaborative networks: the case study of a building information modelling-based office building project. Int. J. Comput. Integr. Manuf. 26:1–2 (2013), 152–165, 10.1080/0951192x.2012.681918.
    • (2013) Int. J. Comput. Integr. Manuf. , vol.26 , Issue.1-2 , pp. 152-165
    • Grilo, A.1    Zutshi, A.2    Jardim-Goncalves, R.3    Steiger-Garcao, A.4
  • 57
    • 77955582439 scopus 로고    scopus 로고
    • Augmented process model for e-tendering: towards integrating object models with document management systems
    • [57] Ajam, M., Alshawi, M., Mezher, T., Augmented process model for e-tendering: towards integrating object models with document management systems. Autom. Constr. 19:6 (2010), 762–778, 10.1016/j.autcon.2010.04.001.
    • (2010) Autom. Constr. , vol.19 , Issue.6 , pp. 762-778
    • Ajam, M.1    Alshawi, M.2    Mezher, T.3
  • 58
    • 84945130258 scopus 로고    scopus 로고
    • Using augmented reality in a multiscreen environment for construction discussion
    • [58] Lin, T.H., Liu, C.H., Tsai, M.H., Kang, S.C., Using augmented reality in a multiscreen environment for construction discussion. J. Comput. Civ. Eng., 29(6), 2015, 10.1061/(asce)cp.1943-5487.0000420.
    • (2015) J. Comput. Civ. Eng. , vol.29 , Issue.6
    • Lin, T.H.1    Liu, C.H.2    Tsai, M.H.3    Kang, S.C.4
  • 59
    • 77955715786 scopus 로고    scopus 로고
    • Design team stories exploring interdisciplinary use of 3D object models in practice
    • [59] Moum, A., Design team stories exploring interdisciplinary use of 3D object models in practice. Autom. Constr. 19:5 (2010), 554–569, 10.1016/j.autcon.2009.11.007.
    • (2010) Autom. Constr. , vol.19 , Issue.5 , pp. 554-569
    • Moum, A.1
  • 60
    • 84878347849 scopus 로고    scopus 로고
    • The user pre-occupancy evaluation method in designer-client communication in early design stage: a case study
    • [60] Shen, W., Zhang, X., Shen, G.Q., Fernando, T., The user pre-occupancy evaluation method in designer-client communication in early design stage: a case study. Autom. Constr. 32 (2013), 112–124, 10.1016/j.autcon.2013.01.014.
    • (2013) Autom. Constr. , vol.32 , pp. 112-124
    • Shen, W.1    Zhang, X.2    Shen, G.Q.3    Fernando, T.4
  • 61
    • 73349089939 scopus 로고    scopus 로고
    • Exchange model and exchange object concepts for implementation of national BIM standards
    • [61] Eastman, C.M., Jeong, Y.S., Sacks, R., Kaner, I., Exchange model and exchange object concepts for implementation of national BIM standards. J. Comput. Civ. Eng. 24:1 (2010), 25–34, 10.1061/(asce)0887-3801(2010)24:1(25).
    • (2010) J. Comput. Civ. Eng. , vol.24 , Issue.1 , pp. 25-34
    • Eastman, C.M.1    Jeong, Y.S.2    Sacks, R.3    Kaner, I.4
  • 62
    • 84888011560 scopus 로고    scopus 로고
    • Extended process to product modeling (xPPM) for integrated and seamless IDM and MVD development
    • [62] Lee, G., Park, Y.H., Ham, S., Extended process to product modeling (xPPM) for integrated and seamless IDM and MVD development. Adv. Eng. Inform. 27:4 (2013), 636–651, 10.1016/j.aei.2013.08.004.
    • (2013) Adv. Eng. Inform. , vol.27 , Issue.4 , pp. 636-651
    • Lee, G.1    Park, Y.H.2    Ham, S.3
  • 63
    • 80053589124 scopus 로고    scopus 로고
    • Quality assessment of coupled civil engineering applications
    • [63] Froebel, T., Firmenich, B., Koch, C., Quality assessment of coupled civil engineering applications. Adv. Eng. Inform. 25:4 (2011), 625–639, 10.1016/j.aei.2011.08.005.
    • (2011) Adv. Eng. Inform. , vol.25 , Issue.4 , pp. 625-639
    • Froebel, T.1    Firmenich, B.2    Koch, C.3
  • 64
    • 79960161211 scopus 로고    scopus 로고
    • Role-based access to facilities lifecycle information on RFID tags
    • [64] Motamedi, A., Saini, R., Hammad, A., Zhu, B., Role-based access to facilities lifecycle information on RFID tags. Adv. Eng. Inform. 25:3 (2011), 559–568, 10.1016/j.aei.2011.03.004.
    • (2011) Adv. Eng. Inform. , vol.25 , Issue.3 , pp. 559-568
    • Motamedi, A.1    Saini, R.2    Hammad, A.3    Zhu, B.4
  • 65
    • 84876678424 scopus 로고    scopus 로고
    • A cloud approach to unified lifecycle data management in architecture, engineering, construction and facilities management: integrating BIMs and SNS
    • [65] Jiao, Y., Wang, Y., Zhang, S., Li, Y., Yang, B., Yuan, L., A cloud approach to unified lifecycle data management in architecture, engineering, construction and facilities management: integrating BIMs and SNS. Adv. Eng. Inform. 27:2 (2013), 173–188, 10.1016/j.aei.2012.11.006.
    • (2013) Adv. Eng. Inform. , vol.27 , Issue.2 , pp. 173-188
    • Jiao, Y.1    Wang, Y.2    Zhang, S.3    Li, Y.4    Yang, B.5    Yuan, L.6
  • 66
    • 84894905294 scopus 로고    scopus 로고
    • Supply-chain transparency within industrialized construction projects
    • [66] Cus-Babic, N., Rebolj, D., Nekrep-Perc, M., Podbreznik, P., Supply-chain transparency within industrialized construction projects. Comput. Ind. 65:2 (2014), 345–353, 10.1016/j.compind.2013.12.003.
    • (2014) Comput. Ind. , vol.65 , Issue.2 , pp. 345-353
    • Cus-Babic, N.1    Rebolj, D.2    Nekrep-Perc, M.3    Podbreznik, P.4
  • 67
    • 84899941085 scopus 로고    scopus 로고
    • Construction 3D BIM-based knowledge system: a case study
    • [67] Lin, Y.-C., Construction 3D BIM-based knowledge system: a case study. J. Civ. Eng. Manag. 20:2 (2014), 186–200, 10.3846/13923730.2013.801887.
    • (2014) J. Civ. Eng. Manag. , vol.20 , Issue.2 , pp. 186-200
    • Lin, Y.-C.1
  • 68
    • 85017733225 scopus 로고    scopus 로고
    • Directive 2014/24/EU - European Union Public Procurement Directive
    • [68] European Commission, Directive 2014/24/EU - European Union Public Procurement Directive. 2014.
    • (2014)
    • European Commission1
  • 69
    • 84869871543 scopus 로고    scopus 로고
    • Building operation and energy performance: monitoring, analysis and optimisation toolkit
    • [69] Costa, A., Keane, M.M., Torrens, J.I., Corry, E., Building operation and energy performance: monitoring, analysis and optimisation toolkit. Appl. Energy 101 (2013), 310–316, 10.1016/j.apenergy.2011.10.037.
    • (2013) Appl. Energy , vol.101 , pp. 310-316
    • Costa, A.1    Keane, M.M.2    Torrens, J.I.3    Corry, E.4
  • 70
    • 80053649823 scopus 로고    scopus 로고
    • Surveying and digital workflow in energy performance retrofit projects using prefabricated elements
    • [70] Larsen, K.E., Lattke, F., Ott, S., Winter, S., Surveying and digital workflow in energy performance retrofit projects using prefabricated elements. Autom. Constr. 20:8 (2011), 999–1011, 10.1016/j.autcon.2011.04.001.
    • (2011) Autom. Constr. , vol.20 , Issue.8 , pp. 999-1011
    • Larsen, K.E.1    Lattke, F.2    Ott, S.3    Winter, S.4
  • 71
    • 84886602648 scopus 로고    scopus 로고
    • Simulation and evaluation of building information modeling in a real pilot site
    • [71] Eguaras-Martinez, M., Vidaurre-Arbizu, M., Martin-Gomez, C., Simulation and evaluation of building information modeling in a real pilot site. Appl. Energy 114 (2014), 475–484, 10.1016/j.apenergy.2013.09.047.
    • (2014) Appl. Energy , vol.114 , pp. 475-484
    • Eguaras-Martinez, M.1    Vidaurre-Arbizu, M.2    Martin-Gomez, C.3
  • 72
    • 84886554707 scopus 로고    scopus 로고
    • As-Is 3D thermal modeling for existing building envelopes using a hybrid LIDAR system
    • [72] Wang, C., Cho, Y., Gai, M., As-Is 3D thermal modeling for existing building envelopes using a hybrid LIDAR system. J. Comput. Civ. Eng. 27:6 (2012), 645–656, 10.1061/(ASCE)CP.1943-5487.0000273.
    • (2012) J. Comput. Civ. Eng. , vol.27 , Issue.6 , pp. 645-656
    • Wang, C.1    Cho, Y.2    Gai, M.3
  • 73
    • 84887838871 scopus 로고    scopus 로고
    • A conceptual framework to support solar PV simulation using an open-BIM data exchange standard
    • [73] Gupta, A., Cemesova, A., Hopfe, C.J., Rezgui, Y., Sweet, T., A conceptual framework to support solar PV simulation using an open-BIM data exchange standard. Autom. Constr. 37 (2014), 166–181, 10.1016/j.autcon.2013.10.005.
    • (2014) Autom. Constr. , vol.37 , pp. 166-181
    • Gupta, A.1    Cemesova, A.2    Hopfe, C.J.3    Rezgui, Y.4    Sweet, T.5
  • 74
    • 84890127914 scopus 로고    scopus 로고
    • BIM interface for full vs. semi-automated building energy simulation
    • [74] Ahn, K.-U., Kim, Y.-J., Park, C.-S., Kim, I., Lee, K., BIM interface for full vs. semi-automated building energy simulation. Energy Build. 68 (2014), 671–678, 10.1016/j.enbuild.2013.08.063.
    • (2014) Energy Build. , vol.68 , pp. 671-678
    • Ahn, K.-U.1    Kim, Y.-J.2    Park, C.-S.3    Kim, I.4    Lee, K.5
  • 75
    • 84856259015 scopus 로고    scopus 로고
    • ThermalOpt: a methodology for automated BIM-based multidisciplinary thermal simulation for use in optimization environments
    • [75] Welle, B., Haymaker, J., Rogers, Z., ThermalOpt: a methodology for automated BIM-based multidisciplinary thermal simulation for use in optimization environments. Build. Simul. 4:4 (2011), 293–313, 10.1007/s12273-011-0052-5.
    • (2011) Build. Simul. , vol.4 , Issue.4 , pp. 293-313
    • Welle, B.1    Haymaker, J.2    Rogers, Z.3
  • 76
    • 80052094480 scopus 로고    scopus 로고
    • Decision-making tools for evaluating the impact of materials selection on the carbon footprint of buildings
    • [76] Bank, L.C., Thompson, B.P., McCarthy, M., Decision-making tools for evaluating the impact of materials selection on the carbon footprint of buildings. Carbon Manag. 2:4 (2011), 431–441, 10.4155/cmt.11.33.
    • (2011) Carbon Manag. , vol.2 , Issue.4 , pp. 431-441
    • Bank, L.C.1    Thompson, B.P.2    McCarthy, M.3
  • 77
    • 84884622805 scopus 로고    scopus 로고
    • Embodied and operational energy for new-build housing: a case study of construction methods in the UK
    • [77] Iddon, C.R., Firth, S.K., Embodied and operational energy for new-build housing: a case study of construction methods in the UK. Energy Build. 67 (2013), 479–488, 10.1016/j.enbuild.2013.08.041.
    • (2013) Energy Build. , vol.67 , pp. 479-488
    • Iddon, C.R.1    Firth, S.K.2
  • 78
    • 79551681843 scopus 로고    scopus 로고
    • Building information modeling for sustainable design and LEED (R) rating analysis
    • [78] Azhar, S., Carlton, W.A., Olsen, D., Ahmad, I., Building information modeling for sustainable design and LEED (R) rating analysis. Autom. Constr. 20:2 (2011), 217–224, 10.1016/j.autcon.2010.09.019.
    • (2011) Autom. Constr. , vol.20 , Issue.2 , pp. 217-224
    • Azhar, S.1    Carlton, W.A.2    Olsen, D.3    Ahmad, I.4
  • 79
    • 84900435585 scopus 로고    scopus 로고
    • Implementing ‘BEAM Plus’ for BIM-based sustainability analysis
    • [79] Wong, J.K.-W., Kuan, K.-L., Implementing ‘BEAM Plus’ for BIM-based sustainability analysis. Autom. Constr. 44 (2014), 163–175, 10.1016/j.autcon.2014.04.003.
    • (2014) Autom. Constr. , vol.44 , pp. 163-175
    • Wong, J.K.-W.1    Kuan, K.-L.2
  • 80
    • 84897795418 scopus 로고    scopus 로고
    • BIM-based framework for managing performance of subway stations
    • [80] Marzouk, M., Abdelaty, A., BIM-based framework for managing performance of subway stations. Autom. Constr. 41 (2014), 70–77, 10.1016/j.autcon.2014.02.004.
    • (2014) Autom. Constr. , vol.41 , pp. 70-77
    • Marzouk, M.1    Abdelaty, A.2
  • 82
    • 84901916702 scopus 로고    scopus 로고
    • The importance of use and end-of-life phases to the life cycle greenhouse gas (GHG) emissions of concrete — a review
    • [82] Wu, P., Xia, B., Zhao, X., The importance of use and end-of-life phases to the life cycle greenhouse gas (GHG) emissions of concrete — a review. Renew. Sustain. Energy Rev. 37 (2014), 360–369, 10.1016/j.rser.2014.04.070.
    • (2014) Renew. Sustain. Energy Rev. , vol.37 , pp. 360-369
    • Wu, P.1    Xia, B.2    Zhao, X.3
  • 83
    • 79955547252 scopus 로고    scopus 로고
    • Intelligent sustainable design: integration of carbon accounting and building information modeling
    • [83] Stadel, A., Eboli, J., Ryberg, A., Mitchell, J., Spatari, S., Intelligent sustainable design: integration of carbon accounting and building information modeling. J. Prof. Issues Eng. Educ. Pract. 137:2 (2011), 51–54, 10.1061/(asce)ei.1943-5541.0000053.
    • (2011) J. Prof. Issues Eng. Educ. Pract. , vol.137 , Issue.2 , pp. 51-54
    • Stadel, A.1    Eboli, J.2    Ryberg, A.3    Mitchell, J.4    Spatari, S.5
  • 84
    • 84870828103 scopus 로고    scopus 로고
    • Application of life-cycle assessment to early stage building design for reduced embodied environmental impacts
    • [84] Basbagill, J., Flager, F., Lepech, M., Fischer, M., Application of life-cycle assessment to early stage building design for reduced embodied environmental impacts. Build. Environ. 60 (2013), 81–92, 10.1016/j.buildenv.2012.11.009.
    • (2013) Build. Environ. , vol.60 , pp. 81-92
    • Basbagill, J.1    Flager, F.2    Lepech, M.3    Fischer, M.4
  • 85
    • 84902154585 scopus 로고    scopus 로고
    • A multi-objective feedback approach for evaluating sequential conceptual building design decisions
    • [85] Basbagill, J.P., Flager, F.L., Lepech, M., A multi-objective feedback approach for evaluating sequential conceptual building design decisions. Autom. Constr. 45 (2014), 136–150, 10.1016/j.autcon.2014.04.015.
    • (2014) Autom. Constr. , vol.45 , pp. 136-150
    • Basbagill, J.P.1    Flager, F.L.2    Lepech, M.3
  • 86
    • 84881598885 scopus 로고    scopus 로고
    • Integrating building information modelling with sustainability to design building projects at the conceptual stage
    • [86] Jrade, A., Jalaei, F., Integrating building information modelling with sustainability to design building projects at the conceptual stage. Build. Simul. 6:4 (2013), 429–444, 10.1007/s12273-013-0120-0.
    • (2013) Build. Simul. , vol.6 , Issue.4 , pp. 429-444
    • Jrade, A.1    Jalaei, F.2
  • 87
    • 84926430399 scopus 로고    scopus 로고
    • Life-cycle thinking and the LEED rating system: global perspective on building energy use and environmental impacts
    • [87] Al-Ghamdi, S.G., Bilec, M.M., Life-cycle thinking and the LEED rating system: global perspective on building energy use and environmental impacts. Environ. Sci. Technol. 49:7 (2015), 4048–4056, 10.1021/es505938u.
    • (2015) Environ. Sci. Technol. , vol.49 , Issue.7 , pp. 4048-4056
    • Al-Ghamdi, S.G.1    Bilec, M.M.2
  • 88
    • 84925936172 scopus 로고    scopus 로고
    • BIM extension for the sustainability appraisal of conceptual steel design
    • [88] Oti, A.H., Tizani, W., BIM extension for the sustainability appraisal of conceptual steel design. Adv. Eng. Inform. 29:1 (2015), 28–46, 10.1016/j.aei.2014.09.001.
    • (2015) Adv. Eng. Inform. , vol.29 , Issue.1 , pp. 28-46
    • Oti, A.H.1    Tizani, W.2
  • 89
    • 84905578177 scopus 로고    scopus 로고
    • Building Information Modeling (BIM)-based daylighting simulation and analysis
    • [89] Kota, S., Haberl, J.S., Clayton, M.J., Yan, W., Building Information Modeling (BIM)-based daylighting simulation and analysis. Energy Build. 81 (2014), 391–403, 10.1016/j.enbuild.2014.06.043.
    • (2014) Energy Build. , vol.81 , pp. 391-403
    • Kota, S.1    Haberl, J.S.2    Clayton, M.J.3    Yan, W.4
  • 90
    • 84886525348 scopus 로고    scopus 로고
    • Indoor daylight simulation performed on automatically generated as-built 3D models
    • [90] Díaz-Vilariño, L., Lagüela, S., Armesto, J., Arias, P., Indoor daylight simulation performed on automatically generated as-built 3D models. Energy Build. 68:Part A (2014), 54–62, 10.1016/j.enbuild.2013.02.064.
    • (2014) Energy Build. , vol.68 , pp. 54-62
    • Díaz-Vilariño, L.1    Lagüela, S.2    Armesto, J.3    Arias, P.4
  • 91
    • 84881229920 scopus 로고    scopus 로고
    • A BIM-based system for demolition and renovation waste estimation and planning
    • [91] Cheng, J.C.P., Ma, L.Y.H., A BIM-based system for demolition and renovation waste estimation and planning. Waste Manag. 33:6 (2013), 1539–1551, 10.1016/j.wasman.2013.03.001.
    • (2013) Waste Manag. , vol.33 , Issue.6 , pp. 1539-1551
    • Cheng, J.C.P.1    Ma, L.Y.H.2
  • 92
    • 84907514796 scopus 로고    scopus 로고
    • Monitoring thermal comfort in subways using building information modeling
    • [92] Marzouk, M., Abdelaty, A., Monitoring thermal comfort in subways using building information modeling. Energy Build. 84 (2014), 252–257, 10.1016/j.enbuild.2014.08.006.
    • (2014) Energy Build. , vol.84 , pp. 252-257
    • Marzouk, M.1    Abdelaty, A.2
  • 93
    • 84939189028 scopus 로고    scopus 로고
    • Building information modeling based building design optimization for sustainability
    • [93] Liu, S., Meng, X.H., Tam, C.M., Building information modeling based building design optimization for sustainability. Energy Build. 105 (2015), 139–153, 10.1016/j.enbuild.2015.06.037.
    • (2015) Energy Build. , vol.105 , pp. 139-153
    • Liu, S.1    Meng, X.H.2    Tam, C.M.3
  • 94
    • 40849134303 scopus 로고    scopus 로고
    • Building information modelling — experts’ views on standardisation and industry deployment
    • [94] Howard, R., Bjork, B.-C., Building information modelling — experts’ views on standardisation and industry deployment. Adv. Eng. Inform. 22:2 (2008), 271–280, 10.1016/j.aei.2007.03.001.
    • (2008) Adv. Eng. Inform. , vol.22 , Issue.2 , pp. 271-280
    • Howard, R.1    Bjork, B.-C.2
  • 95
    • 79551683904 scopus 로고    scopus 로고
    • Application and extension of the IFC standard in construction cost estimating for tendering in China
    • [95] Ma, Z., Wei, Z., Song, W., Lou, Z., Application and extension of the IFC standard in construction cost estimating for tendering in China. Autom. Constr. 20:2 (2011), 196–204, 10.1016/j.autcon.2010.09.017.
    • (2011) Autom. Constr. , vol.20 , Issue.2 , pp. 196-204
    • Ma, Z.1    Wei, Z.2    Song, W.3    Lou, Z.4
  • 96
    • 84907446900 scopus 로고    scopus 로고
    • Development of BIM-based evacuation regulation checking system for high-rise and complex buildings
    • [96] Choi, J., Choi, J., Kim, I., Development of BIM-based evacuation regulation checking system for high-rise and complex buildings. Autom. Constr. 46 (2014), 38–49, 10.1016/j.autcon.2013.12.005.
    • (2014) Autom. Constr. , vol.46 , pp. 38-49
    • Choi, J.1    Choi, J.2    Kim, I.3
  • 97
    • 84869092675 scopus 로고    scopus 로고
    • Building Information Modeling (BIM) and safety: automatic safety checking of construction models and schedules
    • [97] Zhang, S., Teizer, J., Lee, J.-K., Eastman, C.M., Venugopal, M., Building Information Modeling (BIM) and safety: automatic safety checking of construction models and schedules. Autom. Constr. 29 (2013), 183–195, 10.1016/j.autcon.2012.05.006.
    • (2013) Autom. Constr. , vol.29 , pp. 183-195
    • Zhang, S.1    Teizer, J.2    Lee, J.-K.3    Eastman, C.M.4    Venugopal, M.5
  • 98
    • 84922569995 scopus 로고    scopus 로고
    • Development of an object model for automated compliance checking
    • [98] Malsane, S., Matthews, J., Lockley, S., Love, P.E.D., Greenwood, D., Development of an object model for automated compliance checking. Autom. Constr. 49 (2015), 51–58, 10.1016/j.autcon2014.10.004.
    • (2015) Autom. Constr. , vol.49 , pp. 51-58
    • Malsane, S.1    Matthews, J.2    Lockley, S.3    Love, P.E.D.4    Greenwood, D.5
  • 99
    • 84860281943 scopus 로고    scopus 로고
    • How to measure the benefits of BIM — a case study approach
    • [99] Barlish, K., Sullivan, K., How to measure the benefits of BIM — a case study approach. Autom. Constr. 24 (2012), 149–159, 10.1016/j.autcon.2012.02.008.
    • (2012) Autom. Constr. , vol.24 , pp. 149-159
    • Barlish, K.1    Sullivan, K.2
  • 100
    • 84901026670 scopus 로고    scopus 로고
    • Identifying and assessing critical risk factors for BIM projects: empirical study
    • [100] Chien, K.-F., Wu, Z.-H., Huang, S.-C., Identifying and assessing critical risk factors for BIM projects: empirical study. Autom. Constr. 45 (2014), 1–15, 10.1016/j.autcon.2014.04.012.
    • (2014) Autom. Constr. , vol.45 , pp. 1-15
    • Chien, K.-F.1    Wu, Z.-H.2    Huang, S.-C.3
  • 101
    • 84885394627 scopus 로고    scopus 로고
    • A benefits realization management building information modeling framework for asset owners
    • [101] Love, P.E.D., Matthews, J., Simpson, I., Hill, A., Olatunji, O.A., A benefits realization management building information modeling framework for asset owners. Autom. Constr. 37 (2014), 1–10, 10.1016/j.autcon.2013.09.007.
    • (2014) Autom. Constr. , vol.37 , pp. 1-10
    • Love, P.E.D.1    Matthews, J.2    Simpson, I.3    Hill, A.4    Olatunji, O.A.5
  • 102
    • 84882317757 scopus 로고    scopus 로고
    • Return on investment analysis of using building information modeling in construction
    • [102] Giel, B.K., Issa, R.R.A., Return on investment analysis of using building information modeling in construction. J. Comput. Civ. Eng. 27:5 (2013), 511–521, 10.1061/(asce)cp.1943-5487.0000164.
    • (2013) J. Comput. Civ. Eng. , vol.27 , Issue.5 , pp. 511-521
    • Giel, B.K.1    Issa, R.R.A.2
  • 103
    • 84857371393 scopus 로고    scopus 로고
    • D-3 City project — economic impact of BIM-assisted design validation
    • [103] Lee, G., Park, H.K., Won, J., D-3 City project — economic impact of BIM-assisted design validation. Autom. Constr. 22 (2012), 577–586, 10.1016/j.autcon.2011.12.003.
    • (2012) Autom. Constr. , vol.22 , pp. 577-586
    • Lee, G.1    Park, H.K.2    Won, J.3
  • 104
    • 84884502868 scopus 로고    scopus 로고
    • From justification to evaluation: building information modeling for asset owners
    • [104] Love, P.E.D., Simpson, I., Hill, A., Standing, C., From justification to evaluation: building information modeling for asset owners. Autom. Constr. 35 (2013), 208–216, 10.1016/j.autcon.2013.05.008.
    • (2013) Autom. Constr. , vol.35 , pp. 208-216
    • Love, P.E.D.1    Simpson, I.2    Hill, A.3    Standing, C.4
  • 105
    • 84876757253 scopus 로고    scopus 로고
    • A governance approach for bim management across lifecycle and supply chains using mixed-modes of information delivery
    • [105] Rezgui, Y., Beach, T., Rana, O., A governance approach for bim management across lifecycle and supply chains using mixed-modes of information delivery. J. Civ. Eng. Manag. 19:2 (2013), 239–258, 10.3846/13923730.2012.760480.
    • (2013) J. Civ. Eng. Manag. , vol.19 , Issue.2 , pp. 239-258
    • Rezgui, Y.1    Beach, T.2    Rana, O.3
  • 106
    • 84885086703 scopus 로고    scopus 로고
    • BIM implementation throughout the UK construction project lifecycle: an analysis
    • [106] Eadie, R., Browne, M., Odeyinka, H., McKeown, C., McNiff, S., BIM implementation throughout the UK construction project lifecycle: an analysis. Autom. Constr. 36 (2013), 145–151, 10.1016/j.autcon.2013.09.001.
    • (2013) Autom. Constr. , vol.36 , pp. 145-151
    • Eadie, R.1    Browne, M.2    Odeyinka, H.3    McKeown, C.4    McNiff, S.5
  • 107
    • 70449520088 scopus 로고    scopus 로고
    • Understanding adoption and use of BIM as the creation of actor networks
    • [107] Linderoth, H.C.J., Understanding adoption and use of BIM as the creation of actor networks. Autom. Constr. 19:1 (2010), 66–72, 10.1016/j.autcon.2009.09.003.
    • (2010) Autom. Constr. , vol.19 , Issue.1 , pp. 66-72
    • Linderoth, H.C.J.1
  • 108
    • 84888139132 scopus 로고    scopus 로고
    • A longitudinal study of the adoption of IT technology in the Swedish building sector
    • [108] Samuelson, O., Bjork, B.-C., A longitudinal study of the adoption of IT technology in the Swedish building sector. Autom. Constr. 37 (2014), 182–190, 10.1016/j.autcon.2013.10.006.
    • (2014) Autom. Constr. , vol.37 , pp. 182-190
    • Samuelson, O.1    Bjork, B.-C.2
  • 109
    • 78149283543 scopus 로고    scopus 로고
    • Understanding and facilitating BIM adoption in the AEC industry
    • [109] Gu, N., London, K., Understanding and facilitating BIM adoption in the AEC industry. Autom. Constr. 19:8 (2010), 988–999, 10.1016/j.autcon.2010.09.002.
    • (2010) Autom. Constr. , vol.19 , Issue.8 , pp. 988-999
    • Gu, N.1    London, K.2
  • 110
    • 84875747202 scopus 로고    scopus 로고
    • Brokering innovation to better leverage R&D investment
    • [110] Kraatz, J.A., Hampson, K.D., Brokering innovation to better leverage R&D investment. Build. Res. Inf. 41:2 (2013), 187–197, 10.1080/09613218.2013.749771.
    • (2013) Build. Res. Inf. , vol.41 , Issue.2 , pp. 187-197
    • Kraatz, J.A.1    Hampson, K.D.2
  • 111
    • 84931563418 scopus 로고    scopus 로고
    • How far can BIM reduce information asymmetry in the Australian construction context?
    • [111] Forsythe, P., Sankaran, S., Biesenthal, C., How far can BIM reduce information asymmetry in the Australian construction context?. Proj. Manag. J. 46:3 (2015), 75–87, 10.1002/pmj.21504.
    • (2015) Proj. Manag. J. , vol.46 , Issue.3 , pp. 75-87
    • Forsythe, P.1    Sankaran, S.2    Biesenthal, C.3
  • 112
    • 84891823275 scopus 로고    scopus 로고
    • Users-orientated evaluation of building information model in the Chinese construction industry
    • [112] Xu, H., Feng, J., Li, S., Users-orientated evaluation of building information model in the Chinese construction industry. Autom. Constr. 39 (2014), 32–46, 10.1016/j.autcon.2013.12.004.
    • (2014) Autom. Constr. , vol.39 , pp. 32-46
    • Xu, H.1    Feng, J.2    Li, S.3
  • 113
    • 77953577936 scopus 로고    scopus 로고
    • Building information modeling in architecture, engineering, and construction: emerging research directions and trends
    • [113] Becerik-Gerber, B., Kensek, K., Building information modeling in architecture, engineering, and construction: emerging research directions and trends. J. Prof. Issues Eng. Educ. Pract. 136:3 (2010), 139–147, 10.1061/(asce)ei.1943-5541.0000023.
    • (2010) J. Prof. Issues Eng. Educ. Pract. , vol.136 , Issue.3 , pp. 139-147
    • Becerik-Gerber, B.1    Kensek, K.2
  • 114
    • 84872739967 scopus 로고    scopus 로고
    • Building information modeling in support of sustainable design and construction
    • [114] Bynum, P., Issa, R.R.A., Olbina, S., Building information modeling in support of sustainable design and construction. J. Constr. Eng. Manag.-ASCE 139:1 (2013), 24–34, 10.1061/(asce)co.1943-7862.0000560.
    • (2013) J. Constr. Eng. Manag.-ASCE , vol.139 , Issue.1 , pp. 24-34
    • Bynum, P.1    Issa, R.R.A.2    Olbina, S.3
  • 115
    • 80053601079 scopus 로고    scopus 로고
    • Digital buildings — challenges and opportunities
    • [115] Watson, A., Digital buildings — challenges and opportunities. Adv. Eng. Inform. 25:4 (2011), 573–581, 10.1016/j.aei.2011.07.003.
    • (2011) Adv. Eng. Inform. , vol.25 , Issue.4 , pp. 573-581
    • Watson, A.1
  • 116
    • 84859575621 scopus 로고    scopus 로고
    • Application areas and data requirements for BIM-enabled facilities management
    • [116] Becerik-Gerber, B., Jazizadeh, F., Li, N., Calis, G., Application areas and data requirements for BIM-enabled facilities management. J. Constr. Eng. Manag.-ASCE 138:3 (2012), 431–442, 10.1061/(asce)co.1943-7862.0000433.
    • (2012) J. Constr. Eng. Manag.-ASCE , vol.138 , Issue.3 , pp. 431-442
    • Becerik-Gerber, B.1    Jazizadeh, F.2    Li, N.3    Calis, G.4
  • 117
    • 77949691000 scopus 로고    scopus 로고
    • Organizational divisions in BIM-enabled commercial construction
    • [117] Dossick, C.S., Neff, G., Organizational divisions in BIM-enabled commercial construction. J. Constr. Eng. Manag.-ASCE 136:4 (2010), 459–467, 10.1061/(asce)co.1943-7862.0000109.
    • (2010) J. Constr. Eng. Manag.-ASCE , vol.136 , Issue.4 , pp. 459-467
    • Dossick, C.S.1    Neff, G.2
  • 118
    • 79957567251 scopus 로고    scopus 로고
    • Analysis of modeling effort and impact of different levels of detail in building information models
    • [118] Leite, F., Akcamete, A., Akinci, B., Atasoy, G., Kiziltas, S., Analysis of modeling effort and impact of different levels of detail in building information models. Autom. Constr. 20:5 (2011), 601–609, 10.1016/j.autcon.2010.11.027.
    • (2011) Autom. Constr. , vol.20 , Issue.5 , pp. 601-609
    • Leite, F.1    Akcamete, A.2    Akinci, B.3    Atasoy, G.4    Kiziltas, S.5
  • 119
    • 59049095324 scopus 로고    scopus 로고
    • Building information modelling framework: a research and delivery foundation for industry stakeholders
    • [119] Succar, B., Building information modelling framework: a research and delivery foundation for industry stakeholders. Autom. Constr. 18:3 (2009), 357–375, 10.1016/j.autcon.2008.10.003.
    • (2009) Autom. Constr. , vol.18 , Issue.3 , pp. 357-375
    • Succar, B.1
  • 120
    • 62549091452 scopus 로고    scopus 로고
    • Paradigm trajectories of building information modeling practice in project networks
    • [120] Taylor, J.E., Bernstein, P.G., Paradigm trajectories of building information modeling practice in project networks. J. Manag. Eng. 25:2 (2009), 69–76, 10.1061/(asce)0742-597x(2009)25:2(69).
    • (2009) J. Manag. Eng. , vol.25 , Issue.2 , pp. 69-76
    • Taylor, J.E.1    Bernstein, P.G.2
  • 121
    • 84872240863 scopus 로고    scopus 로고
    • Building Information Modeling (BIM) partnering framework for public construction projects
    • [121] Porwal, A., Hewage, K.N., Building Information Modeling (BIM) partnering framework for public construction projects. Autom. Constr. 31 (2013), 204–214, 10.1016/j.autcon.2012.12.004.
    • (2013) Autom. Constr. , vol.31 , pp. 204-214
    • Porwal, A.1    Hewage, K.N.2
  • 122
    • 84867483365 scopus 로고    scopus 로고
    • Building information modeling integrated with electronic commerce material procurement and supplier performance management system
    • [122] Ren, Y., Skibniewski, M.J., Jiang, S., Building information modeling integrated with electronic commerce material procurement and supplier performance management system. J. Civ. Eng. Manag. 18:5 (2012), 642–654, 10.3846/13923730.2012.719835.
    • (2012) J. Civ. Eng. Manag. , vol.18 , Issue.5 , pp. 642-654
    • Ren, Y.1    Skibniewski, M.J.2    Jiang, S.3
  • 123
    • 79551688640 scopus 로고    scopus 로고
    • Teaching construction project management with BIM support: experience and lessons learned
    • [123] Peterson, F., Hartmann, T., Fruchter, R., Fischer, M., Teaching construction project management with BIM support: experience and lessons learned. Autom. Constr. 20:2 (2011), 115–125, 10.1016/j.autcon.2010.09.009.
    • (2011) Autom. Constr. , vol.20 , Issue.2 , pp. 115-125
    • Peterson, F.1    Hartmann, T.2    Fruchter, R.3    Fischer, M.4
  • 124
    • 73949102330 scopus 로고    scopus 로고
    • Teaching building information modeling as an integral part of freshman year civil engineering education
    • [124] Sacks, R., Barak, R., Teaching building information modeling as an integral part of freshman year civil engineering education. J. Prof. Issues Eng. Educ. Pract. 136:1 (2010), 30–38, 10.1061/(asce)ei.1943-5541.0000003.
    • (2010) J. Prof. Issues Eng. Educ. Pract. , vol.136 , Issue.1 , pp. 30-38
    • Sacks, R.1    Barak, R.2
  • 125
    • 84939441504 scopus 로고    scopus 로고
    • Surveying the evolution of computing in architecture, engineering, and construction education
    • [125] Gerber, D., Khashe, S., Smith, I., Surveying the evolution of computing in architecture, engineering, and construction education. J. Comput. Civ. Eng., 29(5), 2013, 04014060, 10.1061/(ASCE)CP.1943-5487.0000361.
    • (2013) J. Comput. Civ. Eng. , vol.29 , Issue.5 , pp. 04014060
    • Gerber, D.1    Khashe, S.2    Smith, I.3
  • 126
    • 79960651369 scopus 로고    scopus 로고
    • Knowledge-based parametric tools for concrete masonry walls: conceptual design and preliminary structural analysis
    • [126] Cavieres, A., Gentry, R., Al-Haddad, T., Knowledge-based parametric tools for concrete masonry walls: conceptual design and preliminary structural analysis. Autom. Constr. 20:6 (2011), 716–728, 10.1016/j.autcon.2011.01.003.
    • (2011) Autom. Constr. , vol.20 , Issue.6 , pp. 716-728
    • Cavieres, A.1    Gentry, R.2    Al-Haddad, T.3
  • 127
    • 84884498965 scopus 로고    scopus 로고
    • Customer interactive building information modeling for apartment unit design
    • [127] Lee, S., Ha, M., Customer interactive building information modeling for apartment unit design. Autom. Constr. 35 (2013), 424–430, 10.1016/j.autcon.2013.05.026.
    • (2013) Autom. Constr. , vol.35 , pp. 424-430
    • Lee, S.1    Ha, M.2
  • 128
    • 84864275288 scopus 로고    scopus 로고
    • BIM-Centric Daylight Profiler for Simulation (BDP4SIM): a methodology for automated product model decomposition and recomposition for climate-based daylighting simulation
    • [128] Welle, B., Rogers, Z., Fischer, M., BIM-Centric Daylight Profiler for Simulation (BDP4SIM): a methodology for automated product model decomposition and recomposition for climate-based daylighting simulation. Build. Environ. 58 (2012), 114–134, 10.1016/j.buildenv.2012.06.021.
    • (2012) Build. Environ. , vol.58 , pp. 114-134
    • Welle, B.1    Rogers, Z.2    Fischer, M.3
  • 129
    • 84902492782 scopus 로고    scopus 로고
    • Building information modeling steered by evolutionary computing
    • [129] Rafiq, M.Y., Rustell, M.J., Building information modeling steered by evolutionary computing. J. Comput. Civ. Eng., 28(4), 2014, 10.1061/(asce)cp.1943-5487.0000295.
    • (2014) J. Comput. Civ. Eng. , vol.28 , Issue.4
    • Rafiq, M.Y.1    Rustell, M.J.2
  • 130
    • 84862777218 scopus 로고    scopus 로고
    • General system architecture for BIM: an integrated approach for design and analysis
    • [130] Sanguinetti, P., Abdelmohsen, S., Lee, J., Sheward, H., Eastman, C., General system architecture for BIM: an integrated approach for design and analysis. Adv. Eng. Inform. 26:2 (2012), 317–333, 10.1016/j.aei.2011.12.001.
    • (2012) Adv. Eng. Inform. , vol.26 , Issue.2 , pp. 317-333
    • Sanguinetti, P.1    Abdelmohsen, S.2    Lee, J.3    Sheward, H.4    Eastman, C.5
  • 131
    • 70450209479 scopus 로고    scopus 로고
    • Visualization of work flow to support lean construction
    • [131] Sacks, R., Treckmann, M., Rozenfeld, O., Visualization of work flow to support lean construction. J. Constr. Eng. Manag. 135:12 (2009), 1307–1315, 10.1061/(asce)co.1943-7862.0000102.
    • (2009) J. Constr. Eng. Manag. , vol.135 , Issue.12 , pp. 1307-1315
    • Sacks, R.1    Treckmann, M.2    Rozenfeld, O.3
  • 132
    • 77955687856 scopus 로고    scopus 로고
    • Requirements for building information modeling based lean production management systems for construction
    • [132] Sacks, R., Radosavljevic, M., Barak, R., Requirements for building information modeling based lean production management systems for construction. Autom. Constr. 19:5 (2010), 641–655, 10.1016/j.autcon.2010.02.010.
    • (2010) Autom. Constr. , vol.19 , Issue.5 , pp. 641-655
    • Sacks, R.1    Radosavljevic, M.2    Barak, R.3
  • 133
    • 84870822070 scopus 로고    scopus 로고
    • Implementing ‘Site BIM’: a case study of ICT innovation on a large hospital project
    • [133] Davies, R., Harty, C., Implementing ‘Site BIM’: a case study of ICT innovation on a large hospital project. Autom. Constr. 30 (2013), 15–24, 10.1016/j.autcon.2012.11.024.
    • (2013) Autom. Constr. , vol.30 , pp. 15-24
    • Davies, R.1    Harty, C.2
  • 134
    • 79954601661 scopus 로고    scopus 로고
    • Integrating BIM and gaming for real-time interactive architectural visualization
    • [134] Yan, W., Culp, C., Graf, R., Integrating BIM and gaming for real-time interactive architectural visualization. Autom. Constr. 20:4 (2011), 446–458, 10.1016/j.autcon.2010.11.013.
    • (2011) Autom. Constr. , vol.20 , Issue.4 , pp. 446-458
    • Yan, W.1    Culp, C.2    Graf, R.3
  • 135
    • 60449086917 scopus 로고    scopus 로고
    • Unique requirements of building information modeling for cast-in-place reinforced concrete
    • [135] Barak, R., Jeong, Y.S., Sacks, R., Eastman, C.M., Unique requirements of building information modeling for cast-in-place reinforced concrete. J. Comput. Civ. Eng. 23:2 (2009), 64–74, 10.1061/(asce)0887-3801(2009)23:2(64).
    • (2009) J. Comput. Civ. Eng. , vol.23 , Issue.2 , pp. 64-74
    • Barak, R.1    Jeong, Y.S.2    Sacks, R.3    Eastman, C.M.4
  • 136
    • 80053608291 scopus 로고    scopus 로고
    • Designing a BIM-based serious game for fire safety evacuation simulations
    • [136] Rueppel, U., Schatz, K., Designing a BIM-based serious game for fire safety evacuation simulations. Adv. Eng. Inform. 25:4 (2011), 600–611, 10.1016/j.aei.2011.08.001.
    • (2011) Adv. Eng. Inform. , vol.25 , Issue.4 , pp. 600-611
    • Rueppel, U.1    Schatz, K.2
  • 137
    • 49549122201 scopus 로고    scopus 로고
    • lFC and building lifecycle management
    • [137] Vanlande, R., Nicolle, C., Cruz, C., lFC and building lifecycle management. Autom. Constr. 18:1 (2008), 70–78, 10.1016/j.autcon.2008.05.001.
    • (2008) Autom. Constr. , vol.18 , Issue.1 , pp. 70-78
    • Vanlande, R.1    Nicolle, C.2    Cruz, C.3
  • 138
    • 84888002203 scopus 로고    scopus 로고
    • Localization of RFID-equipped assets during the operation phase of facilities
    • [138] Motamedi, A., Soltani, M.M., Hammad, A., Localization of RFID-equipped assets during the operation phase of facilities. Adv. Eng. Inform. 27:4 (2013), 566–579, 10.1016/j.aei.2013.07.001.
    • (2013) Adv. Eng. Inform. , vol.27 , Issue.4 , pp. 566-579
    • Motamedi, A.1    Soltani, M.M.2    Hammad, A.3
  • 139
    • 71649102600 scopus 로고    scopus 로고
    • Use of system dynamics as a decision-making tool in building design and operation
    • [139] Thompson, B.P., Bank, L.C., Use of system dynamics as a decision-making tool in building design and operation. Build. Environ. 45:4 (2010), 1006–1015, 10.1016/j.buildenv.2009.10.008.
    • (2010) Build. Environ. , vol.45 , Issue.4 , pp. 1006-1015
    • Thompson, B.P.1    Bank, L.C.2
  • 140
    • 84876676399 scopus 로고    scopus 로고
    • Cloud-marketplaces: distributed e-procurement for the AEC sector
    • [140] Grilo, A., Jardim-Goncalves, R., Cloud-marketplaces: distributed e-procurement for the AEC sector. Adv. Eng. Inform. 27:2 (2013), 160–172, 10.1016/j.aei.2012.10.004.
    • (2013) Adv. Eng. Inform. , vol.27 , Issue.2 , pp. 160-172
    • Grilo, A.1    Jardim-Goncalves, R.2
  • 141
    • 79551684312 scopus 로고    scopus 로고
    • Challenging electronic procurement in the AEC sector: a BIM-based integrated perspective
    • [141] Grilo, A., Jardim-Goncalves, R., Challenging electronic procurement in the AEC sector: a BIM-based integrated perspective. Autom. Constr. 20:2 (2011), 107–114, 10.1016/j.autcon.2010.09.008.
    • (2011) Autom. Constr. , vol.20 , Issue.2 , pp. 107-114
    • Grilo, A.1    Jardim-Goncalves, R.2
  • 142
    • 77950863933 scopus 로고    scopus 로고
    • SOA4BIM: putting the building and construction industry in the single European information space
    • [142] Jardim-Goncalves, R., Grilo, A., SOA4BIM: putting the building and construction industry in the single European information space. Autom. Constr. 19:4 (2010), 388–397, 10.1016/j.autcon.2009.11.009.
    • (2010) Autom. Constr. , vol.19 , Issue.4 , pp. 388-397
    • Jardim-Goncalves, R.1    Grilo, A.2
  • 143
    • 84860295399 scopus 로고    scopus 로고
    • Exploring how information exchanges can be enhanced through cloud BIM
    • [143] Redmond, A., Hore, A., Alshawi, M., West, R., Exploring how information exchanges can be enhanced through cloud BIM. Autom. Constr. 24 (2012), 175–183, 10.1016/j.autcon.2012.02.003.
    • (2012) Autom. Constr. , vol.24 , pp. 175-183
    • Redmond, A.1    Hore, A.2    Alshawi, M.3    West, R.4
  • 144
    • 84899811696 scopus 로고    scopus 로고
    • An explanatory case study on cloud computing applications in the built environment
    • [144] Chong, H.-Y., Wong, J.S., Wang, X., An explanatory case study on cloud computing applications in the built environment. Autom. Constr. 44 (2014), 152–162, 10.1016/j.autcon.2014.04.010.
    • (2014) Autom. Constr. , vol.44 , pp. 152-162
    • Chong, H.-Y.1    Wong, J.S.2    Wang, X.3
  • 145
    • 84901590349 scopus 로고    scopus 로고
    • Asynchronous online collaboration in BIM generation using hybrid client-server and P2P network
    • [145] Chen, H.-M., Hou, C.-C., Asynchronous online collaboration in BIM generation using hybrid client-server and P2P network. Autom. Constr. 45 (2014), 72–85, 10.1016/j.autcon.2014.05.007.
    • (2014) Autom. Constr. , vol.45 , pp. 72-85
    • Chen, H.-M.1    Hou, C.-C.2
  • 146
    • 84938348521 scopus 로고    scopus 로고
    • Real time progress management: re-engineering processes for cloud-based BIM in construction
    • [146] Matthews, J., Love, P.E.D., Heinemann, S., Chandler, R., Rumsey, C., Olatunj, O., Real time progress management: re-engineering processes for cloud-based BIM in construction. Autom. Constr. 58 (2015), 38–47, 10.1016/j.autcon.2015.07.004.
    • (2015) Autom. Constr. , vol.58 , pp. 38-47
    • Matthews, J.1    Love, P.E.D.2    Heinemann, S.3    Chandler, R.4    Rumsey, C.5    Olatunj, O.6
  • 147
    • 84927719293 scopus 로고    scopus 로고
    • Governance model for cloud computing in building information management
    • [147] Beach, T., Rana, O., Rezgui, Y., Parashar, M., Governance model for cloud computing in building information management. IEEE Trans. Serv. Comput. 8:2 (2015), 314–327, 10.1109/tsc.2013.50.
    • (2015) IEEE Trans. Serv. Comput. , vol.8 , Issue.2 , pp. 314-327
    • Beach, T.1    Rana, O.2    Rezgui, Y.3    Parashar, M.4
  • 148
    • 78649333572 scopus 로고    scopus 로고
    • An object-based 3D walk-through model for interior construction progress monitoring
    • [148] Roh, S., Aziz, Z., Pena-Mora, F., An object-based 3D walk-through model for interior construction progress monitoring. Autom. Constr. 20:1 (2011), 66–75, 10.1016/j.autcon.2010.07.003.
    • (2011) Autom. Constr. , vol.20 , Issue.1 , pp. 66-75
    • Roh, S.1    Aziz, Z.2    Pena-Mora, F.3
  • 149
    • 84884273197 scopus 로고    scopus 로고
    • Real-time drill monitoring and control using building information models augmented with 3D imaging data
    • [149] Akula, M., Lipman, R.R., Franaszek, M., Saidi, K.S., Cheok, G.S., Kamat, V.R., Real-time drill monitoring and control using building information models augmented with 3D imaging data. Autom. Constr. 36 (2013), 1–15, 10.1016/j.autcon.2013.08.010.
    • (2013) Autom. Constr. , vol.36 , pp. 1-15
    • Akula, M.1    Lipman, R.R.2    Franaszek, M.3    Saidi, K.S.4    Cheok, G.S.5    Kamat, V.R.6
  • 150
    • 81355161549 scopus 로고    scopus 로고
    • Imaged-based verification of as-built documentation of operational buildings
    • [150] Klein, L., Li, N., Becerik-Gerber, B., Imaged-based verification of as-built documentation of operational buildings. Autom. Constr. 21 (2012), 161–171, 10.1016/j.autcon.2011.05.023.
    • (2012) Autom. Constr. , vol.21 , pp. 161-171
    • Klein, L.1    Li, N.2    Becerik-Gerber, B.3
  • 151
    • 84897450439 scopus 로고    scopus 로고
    • Knowledge-assisted BIM-based visual analytics for failure root cause detection in facilities management
    • [151] Motamedi, A., Hammad, A., Asen, Y., Knowledge-assisted BIM-based visual analytics for failure root cause detection in facilities management. Autom. Constr. 43 (2014), 73–83, 10.1016/j.autcon.2014.03.012.
    • (2014) Autom. Constr. , vol.43 , pp. 73-83
    • Motamedi, A.1    Hammad, A.2    Asen, Y.3
  • 152
    • 84893782757 scopus 로고    scopus 로고
    • Vision-based material recognition for automated monitoring of construction progress and generating building information modeling from unordered site image collections
    • [152] Dimitrov, A., Golparvar-Fard, M., Vision-based material recognition for automated monitoring of construction progress and generating building information modeling from unordered site image collections. Adv. Eng. Inform. 28:1 (2014), 37–49, 10.1016/j.aei.2013.11.002.
    • (2014) Adv. Eng. Inform. , vol.28 , Issue.1 , pp. 37-49
    • Dimitrov, A.1    Golparvar-Fard, M.2
  • 153
    • 84920815816 scopus 로고    scopus 로고
    • Automated progress monitoring using unordered daily construction photographs and IFC-based building information models
    • [153] Golparvar-Fard, M., Pena-Mora, F., Savarese, S., Automated progress monitoring using unordered daily construction photographs and IFC-based building information models. J. Comput. Civ. Eng., 29(1), 2015, 10.1061/(asce)cp.1943-5487.0000205.
    • (2015) J. Comput. Civ. Eng. , vol.29 , Issue.1
    • Golparvar-Fard, M.1    Pena-Mora, F.2    Savarese, S.3
  • 154
    • 77957258776 scopus 로고    scopus 로고
    • Toward automated generation of parametric BIMs based on hybrid video and laser scanning data
    • [154] Brilakis, I., Manolis, L., Sacks, R., Savarese, S., Christodoulou, S., Teizer, J., Makhmalbaf, A., Toward automated generation of parametric BIMs based on hybrid video and laser scanning data. Adv. Eng. Inform. 24:4 (2010), 456–465, 10.1016/j.aei.2010.06.006.
    • (2010) Adv. Eng. Inform. , vol.24 , Issue.4 , pp. 456-465
    • Brilakis, I.1    Manolis, L.2    Sacks, R.3    Savarese, S.4    Christodoulou, S.5    Teizer, J.6    Makhmalbaf, A.7
  • 155
    • 84873283130 scopus 로고    scopus 로고
    • Automatic creation of semantically rich 3D building models from laser scanner data
    • [155] Xiong, X., Adan, A., Akinci, B., Huber, D., Automatic creation of semantically rich 3D building models from laser scanner data. Autom. Constr. 31 (2013), 325–337, 10.1016/j.autcon.2012.10.006.
    • (2013) Autom. Constr. , vol.31 , pp. 325-337
    • Xiong, X.1    Adan, A.2    Akinci, B.3    Huber, D.4
  • 156
    • 77956619234 scopus 로고    scopus 로고
    • Automatic reconstruction of as-built building information models from laser-scanned point clouds: a review of related techniques
    • [156] Tang, P., Huber, D., Akinci, B., Lipman, R., Lytle, A., Automatic reconstruction of as-built building information models from laser-scanned point clouds: a review of related techniques. Autom. Constr. 19:7 (2010), 829–843, 10.1016/j.autcon.2010.06.007.
    • (2010) Autom. Constr. , vol.19 , Issue.7 , pp. 829-843
    • Tang, P.1    Huber, D.2    Akinci, B.3    Lipman, R.4    Lytle, A.5
  • 157
    • 84888338413 scopus 로고    scopus 로고
    • Non-destructive approach for the generation and thermal characterization of an as-built BIM
    • [157] Lagueela, S., Diaz-Vilarino, L., Armesto, J., Arias, P., Non-destructive approach for the generation and thermal characterization of an as-built BIM. Constr. Build. Mater. 51 (2014), 55–61, 10.1016/j.conbuildmat.2013.11.021.
    • (2014) Constr. Build. Mater. , vol.51 , pp. 55-61
    • Lagueela, S.1    Diaz-Vilarino, L.2    Armesto, J.3    Arias, P.4
  • 158
    • 84894906223 scopus 로고    scopus 로고
    • Providing real-estate services through the integration of 3D laser scanning and building information modelling
    • [158] Mahdjoubi, L., Moobela, C., Laing, R., Providing real-estate services through the integration of 3D laser scanning and building information modelling. Comput. Ind. 64:9 (2013), 1272–1281, 10.1016/j.compind.2013.09.003.
    • (2013) Comput. Ind. , vol.64 , Issue.9 , pp. 1272-1281
    • Mahdjoubi, L.1    Moobela, C.2    Laing, R.3
  • 159
    • 84875026723 scopus 로고    scopus 로고
    • Toward automated earned value tracking using 3D imaging tools
    • [159] Turkan, Y., Bosche, F., Haas, C.T., Haas, R., Toward automated earned value tracking using 3D imaging tools. J. Constr. Eng. Manag.-ASCE 139:4 (2013), 423–433, 10.1061/(asce)co.1943-7862.0000629.
    • (2013) J. Constr. Eng. Manag.-ASCE , vol.139 , Issue.4 , pp. 423-433
    • Turkan, Y.1    Bosche, F.2    Haas, C.T.3    Haas, R.4
  • 160
    • 84902449757 scopus 로고    scopus 로고
    • Tracking the built status of MEP works: assessing the value of a scan-vs.-BIM system
    • [160] Bosche, F., Guillemet, A., Turkan, Y., Haas, C.T., Haas, R., Tracking the built status of MEP works: assessing the value of a scan-vs.-BIM system. J. Comput. Civ. Eng., 28(4), 2014, 10.1061/(asce)cp.1943-5487.0000343.
    • (2014) J. Comput. Civ. Eng. , vol.28 , Issue.4
    • Bosche, F.1    Guillemet, A.2    Turkan, Y.3    Haas, C.T.4    Haas, R.5
  • 161
    • 84892371440 scopus 로고    scopus 로고
    • Combined 3D building surveying techniques — Terrestrial Laser Scanning (TLS) and total station surveying for BIM data management purposes
    • [161] Mill, T., Alt, A., Liias, R., Combined 3D building surveying techniques — Terrestrial Laser Scanning (TLS) and total station surveying for BIM data management purposes. J. Civ. Eng. Manag. 19 (2013), S23–S32, 10.3846/13923730.2013.795187.
    • (2013) J. Civ. Eng. Manag. , vol.19 , pp. S23-S32
    • Mill, T.1    Alt, A.2    Liias, R.3
  • 162
    • 84896541031 scopus 로고    scopus 로고
    • Productive modeling for development of as-built BIM of existing indoor structures
    • [162] Jung, J., Hong, S., Jeong, S., Kim, S., Cho, H., Hong, S., Heo, J., Productive modeling for development of as-built BIM of existing indoor structures. Autom. Constr. 42 (2014), 68–77, 10.1016/j.autcon.2014.02.021.
    • (2014) Autom. Constr. , vol.42 , pp. 68-77
    • Jung, J.1    Hong, S.2    Jeong, S.3    Kim, S.4    Cho, H.5    Hong, S.6    Heo, J.7
  • 163
    • 83555160969 scopus 로고    scopus 로고
    • Plane-based registration of construction laser scans with 3D/4D building models
    • [163] Bosche, F., Plane-based registration of construction laser scans with 3D/4D building models. Adv. Eng. Inform. 26:1 (2012), 90–102, 10.1016/j.aei.2011.08.009.
    • (2012) Adv. Eng. Inform. , vol.26 , Issue.1 , pp. 90-102
    • Bosche, F.1
  • 164
    • 84884502984 scopus 로고    scopus 로고
    • Deviation analysis method for the assessment of the quality of the as-is building information models generated from point cloud data
    • [164] Anil, E.B., Tang, P., Akinci, B., Huber, D., Deviation analysis method for the assessment of the quality of the as-is building information models generated from point cloud data. Autom. Constr. 35 (2013), 507–516, 10.1016/j.autcon.2013.06.003.
    • (2013) Autom. Constr. , vol.35 , pp. 507-516
    • Anil, E.B.1    Tang, P.2    Akinci, B.3    Huber, D.4
  • 165
    • 84900462381 scopus 로고    scopus 로고
    • Automating surface flatness control using terrestrial laser scanning and building information models
    • [165] Bosche, F., Guenet, E., Automating surface flatness control using terrestrial laser scanning and building information models. Autom. Constr. 44 (2014), 212–226, 10.1016/j.autcon.2014.03.028.
    • (2014) Autom. Constr. , vol.44 , pp. 212-226
    • Bosche, F.1    Guenet, E.2
  • 166
    • 84878587673 scopus 로고    scopus 로고
    • A conceptual framework for integrating building information modeling with augmented reality
    • [166] Wang, X., Love, P.E.D., Kim, M.J., Park, C.-S., Sing, C.-P., Hou, L., A conceptual framework for integrating building information modeling with augmented reality. Autom. Constr. 34 (2013), 37–44, 10.1016/j.autcon.2012.10.012.
    • (2013) Autom. Constr. , vol.34 , pp. 37-44
    • Wang, X.1    Love, P.E.D.2    Kim, M.J.3    Park, C.-S.4    Sing, C.-P.5    Hou, L.6
  • 167
    • 84894209434 scopus 로고    scopus 로고
    • Integrating augmented reality with building information modeling: onsite construction process controlling for liquefied natural gas industry
    • [167] Wang, X., Truijens, M., Hou, L., Wang, Y., Zhou, Y., Integrating augmented reality with building information modeling: onsite construction process controlling for liquefied natural gas industry. Autom. Constr. 40 (2014), 96–105, 10.1016/j.autcon.2013.12.003.
    • (2014) Autom. Constr. , vol.40 , pp. 96-105
    • Wang, X.1    Truijens, M.2    Hou, L.3    Wang, Y.4    Zhou, Y.5
  • 168
    • 84861145569 scopus 로고    scopus 로고
    • On-site building information retrieval by using projection-based augmented reality
    • [168] Yeh, K.C., Tsai, M.H., Kang, S.C., On-site building information retrieval by using projection-based augmented reality. J. Comput. Civ. Eng. 26:3 (2012), 342–355, 10.1061/(asce)cp.1943-5487.0000156.
    • (2012) J. Comput. Civ. Eng. , vol.26 , Issue.3 , pp. 342-355
    • Yeh, K.C.1    Tsai, M.H.2    Kang, S.C.3
  • 169
    • 84896538255 scopus 로고    scopus 로고
    • Component based engineering of a mobile BIM-based augmented reality system
    • [169] Meza, S., Turk, Z., Dolenc, M., Component based engineering of a mobile BIM-based augmented reality system. Autom. Constr. 42 (2014), 1–12, 10.1016/j.autcon.2014.02.011.
    • (2014) Autom. Constr. , vol.42 , pp. 1-12
    • Meza, S.1    Turk, Z.2    Dolenc, M.3
  • 170
    • 79954599428 scopus 로고    scopus 로고
    • Augmented reality-based computational fieldwork support for equipment operations and maintenance
    • [170] Lee, S., Akin, O., Augmented reality-based computational fieldwork support for equipment operations and maintenance. Autom. Constr. 20:4 (2011), 338–352, 10.1016/j.autcon.2010.11.004.
    • (2011) Autom. Constr. , vol.20 , Issue.4 , pp. 338-352
    • Lee, S.1    Akin, O.2
  • 171
    • 84878418504 scopus 로고    scopus 로고
    • A framework for proactive construction defect management using BIM, augmented reality and ontology-based data collection template
    • [171] Park, C.-S., Lee, D.-Y., Kwon, O.-S., Wang, X., A framework for proactive construction defect management using BIM, augmented reality and ontology-based data collection template. Autom. Constr. 33 (2013), 61–71, 10.1016/j.autcon.2012.09.010.
    • (2013) Autom. Constr. , vol.33 , pp. 61-71
    • Park, C.-S.1    Lee, D.-Y.2    Kwon, O.-S.3    Wang, X.4
  • 172
    • 84877903070 scopus 로고    scopus 로고
    • A comprehensive method for environmentally sensitive and behavioral microscopic egress analysis in case of fire in buildings
    • [172] Abolghasemzadeh, P., A comprehensive method for environmentally sensitive and behavioral microscopic egress analysis in case of fire in buildings. Saf. Sci. 59 (2013), 1–9, 10.1016/j.ssci.2013.04.008.
    • (2013) Saf. Sci. , vol.59 , pp. 1-9
    • Abolghasemzadeh, P.1
  • 173
    • 84896520582 scopus 로고    scopus 로고
    • A BIM centered indoor localization algorithm to support building fire emergency response operations
    • [173] Li, N., Becerik-Gerber, B., Krishnamachari, B., Soibelman, L., A BIM centered indoor localization algorithm to support building fire emergency response operations. Autom. Constr. 42 (2014), 78–89, 10.1016/j.autcon.2014.02.019.
    • (2014) Autom. Constr. , vol.42 , pp. 78-89
    • Li, N.1    Becerik-Gerber, B.2    Krishnamachari, B.3    Soibelman, L.4
  • 174
    • 79551683997 scopus 로고    scopus 로고
    • BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 2. Development and site trials
    • [174] Hu, Z., Zhang, J., BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 2. Development and site trials. Autom. Constr. 20:2 (2011), 167–180, 10.1016/j.autcon.2010.09.014.
    • (2011) Autom. Constr. , vol.20 , Issue.2 , pp. 167-180
    • Hu, Z.1    Zhang, J.2
  • 175
    • 79551684087 scopus 로고    scopus 로고
    • BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies
    • [175] Zhang, J.P., Hu, Z.Z., BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies. Autom. Constr. 20:2 (2011), 155–166, 10.1016/j.autcon2010.09.013.
    • (2011) Autom. Constr. , vol.20 , Issue.2 , pp. 155-166
    • Zhang, J.P.1    Hu, Z.Z.2
  • 176
    • 84878412814 scopus 로고    scopus 로고
    • A framework for construction safety management and visualization system
    • [176] Park, C.S., Kim, H.J., A framework for construction safety management and visualization system. Autom. Constr. 33 (2013), 95–103, 10.1016/j.autcon.2012.09.012.
    • (2013) Autom. Constr. , vol.33 , pp. 95-103
    • Park, C.S.1    Kim, H.J.2
  • 177
    • 84945144919 scopus 로고    scopus 로고
    • Workforce location tracking to model, visualize and analyze workspace requirements in building information models for construction safety planning
    • [177] Zhang, S.J., Teizer, J., Pradhananga, N., Eastman, C.M., Workforce location tracking to model, visualize and analyze workspace requirements in building information models for construction safety planning. Autom. Constr. 60 (2015), 74–86, 10.1016/j.autcon.2015.09.009.
    • (2015) Autom. Constr. , vol.60 , pp. 74-86
    • Zhang, S.J.1    Teizer, J.2    Pradhananga, N.3    Eastman, C.M.4
  • 178
    • 84944442108 scopus 로고    scopus 로고
    • A BIM-based approach for automated tower crane layout planning
    • [178] Wang, J., Zhang, X.D., Shou, W.C., Wang, X.Y., Xu, B., Kim, M.J., Wu, P., A BIM-based approach for automated tower crane layout planning. Autom. Constr. 59 (2015), 168–178, 10.1016/j.autcon.2015.05.006.
    • (2015) Autom. Constr. , vol.59 , pp. 168-178
    • Wang, J.1    Zhang, X.D.2    Shou, W.C.3    Wang, X.Y.4    Xu, B.5    Kim, M.J.6    Wu, P.7
  • 179
    • 84901938850 scopus 로고    scopus 로고
    • CoSMoS: a BIM and wireless sensor based integrated solution for worker safety in confined spaces
    • [179] Riaz, Z., Arslan, M., Kiani, A.K., Azhar, S., CoSMoS: a BIM and wireless sensor based integrated solution for worker safety in confined spaces. Autom. Constr. 45 (2014), 96–106, 10.1016/j.autcon.2014.05.010.
    • (2014) Autom. Constr. , vol.45 , pp. 96-106
    • Riaz, Z.1    Arslan, M.2    Kiani, A.K.3    Azhar, S.4
  • 180
    • 84868232967 scopus 로고    scopus 로고
    • A knowledge-based BIM system for building maintenance
    • [180] Motawa, I., Almarshad, A., A knowledge-based BIM system for building maintenance. Autom. Constr. 29 (2013), 173–182, 10.1016/j.autcon.2012.09.008.
    • (2013) Autom. Constr. , vol.29 , pp. 173-182
    • Motawa, I.1    Almarshad, A.2
  • 181
    • 84872481466 scopus 로고    scopus 로고
    • An object-oriented model to support healthcare facility information management
    • [181] Lucas, J., Bulbul, T., Thabet, W., An object-oriented model to support healthcare facility information management. Autom. Constr. 31 (2013), 281–291, 10.1016/j.autcon.2012.12.014.
    • (2013) Autom. Constr. , vol.31 , pp. 281-291
    • Lucas, J.1    Bulbul, T.2    Thabet, W.3
  • 182
    • 84899618073 scopus 로고    scopus 로고
    • Building information modeling and discrete event simulation: towards an integrated framework
    • [182] Lu, W., Olofsson, T., Building information modeling and discrete event simulation: towards an integrated framework. Autom. Constr. 44 (2014), 73–83, 10.1016/j.autcon.2014.04.001.
    • (2014) Autom. Constr. , vol.44 , pp. 73-83
    • Lu, W.1    Olofsson, T.2
  • 183
    • 84925669627 scopus 로고    scopus 로고
    • Rapid structural condition assessment using radio frequency identification (RFID) based wireless strain sensor
    • [183] Zhang, Y.F., Bai, L.J., Rapid structural condition assessment using radio frequency identification (RFID) based wireless strain sensor. Autom. Constr. 54 (2015), 1–11, 10.1016/j.autcon.2015.02.013.
    • (2015) Autom. Constr. , vol.54 , pp. 1-11
    • Zhang, Y.F.1    Bai, L.J.2
  • 184
    • 45749088540 scopus 로고    scopus 로고
    • Integrating construction process documentation into building information modeling
    • [184] Goedert, J.D., Meadati, P., Integrating construction process documentation into building information modeling. J. Constr. Eng. Manag.-ASCE 134:7 (2008), 509–516, 10.1061/(asce)0733-9364(2008)134:7(509).
    • (2008) J. Constr. Eng. Manag.-ASCE , vol.134 , Issue.7 , pp. 509-516
    • Goedert, J.D.1    Meadati, P.2
  • 185
    • 84868453811 scopus 로고    scopus 로고
    • Development of a BIM-based structural framework optimization and simulation system for building construction
    • [185] Song, S., Yang, J., Kim, N., Development of a BIM-based structural framework optimization and simulation system for building construction. Comput. Ind. 63:9 (2012), 895–912, 10.1016/j.compind.2012.08.013.
    • (2012) Comput. Ind. , vol.63 , Issue.9 , pp. 895-912
    • Song, S.1    Yang, J.2    Kim, N.3
  • 186
    • 84884500472 scopus 로고    scopus 로고
    • A framework for an automated and integrated project scheduling and management system
    • [186] Chen, S.-M., Griffis, F.H., Chen, P.-H., Chang, L.-M., A framework for an automated and integrated project scheduling and management system. Autom. Constr. 35 (2013), 89–110, 10.1016/j.autcon.2013.04.002.
    • (2013) Autom. Constr. , vol.35 , pp. 89-110
    • Chen, S.-M.1    Griffis, F.H.2    Chen, P.-H.3    Chang, L.-M.4
  • 187
    • 84894901111 scopus 로고    scopus 로고
    • Development of a schedule-workspace interference management system simultaneously considering the overlap level of parallel schedules and workspaces
    • [187] Moon, H., Kim, H., Kim, C., Kang, L., Development of a schedule-workspace interference management system simultaneously considering the overlap level of parallel schedules and workspaces. Autom. Constr. 39 (2014), 93–105, 10.1016/j.autcon.2013.06.001.
    • (2014) Autom. Constr. , vol.39 , pp. 93-105
    • Moon, H.1    Kim, H.2    Kim, C.3    Kang, L.4
  • 188
    • 84904159684 scopus 로고    scopus 로고
    • Construction scheduling using genetic algorithm based on building information model
    • [188] Faghihi, V., Reinschmidt, K.F., Kang, J.H., Construction scheduling using genetic algorithm based on building information model. Expert Syst. Appl. 41:16 (2014), 7565–7578, 10.1016/j.eswa.2014.05.047.
    • (2014) Expert Syst. Appl. , vol.41 , Issue.16 , pp. 7565-7578
    • Faghihi, V.1    Reinschmidt, K.F.2    Kang, J.H.3
  • 189
    • 84871764113 scopus 로고    scopus 로고
    • Automated construction progress measurement using a 4D building information model and 3D data
    • [189] Kim, C., Son, H., Kim, C., Automated construction progress measurement using a 4D building information model and 3D data. Autom. Constr. 31 (2013), 75–82, 10.1016/j.autcon.2012.11.041.
    • (2013) Autom. Constr. , vol.31 , pp. 75-82
    • Kim, C.1    Son, H.2    Kim, C.3
  • 190
    • 84884500391 scopus 로고    scopus 로고
    • Generating construction schedules through automatic data extraction using open BIM (building information modeling) technology
    • [190] Kim, H., Anderson, K., Lee, S., Hildreth, J., Generating construction schedules through automatic data extraction using open BIM (building information modeling) technology. Autom. Constr. 35 (2013), 285–295, 10.1016/j.autcon2013.05.020.
    • (2013) Autom. Constr. , vol.35 , pp. 285-295
    • Kim, H.1    Anderson, K.2    Lee, S.3    Hildreth, J.4
  • 191
    • 84907448543 scopus 로고    scopus 로고
    • A BIM-based construction quality management model and its applications
    • [191] Chen, L., Luo, H., A BIM-based construction quality management model and its applications. Autom. Constr. 46 (2014), 64–73, 10.1016/j.autcon.2014.05.009.
    • (2014) Autom. Constr. , vol.46 , pp. 64-73
    • Chen, L.1    Luo, H.2
  • 192
    • 77955710066 scopus 로고    scopus 로고
    • Integrating resource production and construction using BIM
    • [192] Babic, N.C., Podbreznik, P., Rebolj, D., Integrating resource production and construction using BIM. Autom. Constr. 19:5 (2010), 539–543, 10.1016/j.autcon.2009.11.005.
    • (2010) Autom. Constr. , vol.19 , Issue.5 , pp. 539-543
    • Babic, N.C.1    Podbreznik, P.2    Rebolj, D.3
  • 193
    • 84897449909 scopus 로고    scopus 로고
    • Automated multi-objective construction logistics optimization system
    • [193] Said, H., El-Rayes, K., Automated multi-objective construction logistics optimization system. Autom. Constr. 43 (2014), 110–122, 10.1016/j.autcon.2014.03.017.
    • (2014) Autom. Constr. , vol.43 , pp. 110-122
    • Said, H.1    El-Rayes, K.2
  • 194
    • 84884498519 scopus 로고    scopus 로고
    • A survey on modeling guidelines for quantity takeoff-oriented BIM-based design
    • [194] Monteiro, A., Martins, J.P., A survey on modeling guidelines for quantity takeoff-oriented BIM-based design. Autom. Constr. 35 (2013), 238–253, 10.1016/j.autcon.2013.05.005.
    • (2013) Autom. Constr. , vol.35 , pp. 238-253
    • Monteiro, A.1    Martins, J.P.2
  • 195
    • 84863674891 scopus 로고    scopus 로고
    • Early stage multi-level cost estimation for schematic BIM models
    • [195] Cheung, F.K.T., Rihan, J., Tah, J., Duce, D., Kurul, E., Early stage multi-level cost estimation for schematic BIM models. Autom. Constr. 27 (2012), 67–77, 10.1016/j.autcon.2012.05.008.
    • (2012) Autom. Constr. , vol.27 , pp. 67-77
    • Cheung, F.K.T.1    Rihan, J.2    Tah, J.3    Duce, D.4    Kurul, E.5
  • 196
    • 84857357646 scopus 로고    scopus 로고
    • Aligning building information model tools and construction management methods
    • [196] Hartmann, T., van Meerveld, H., Vossebeld, N., Adriaanse, A., Aligning building information model tools and construction management methods. Autom. Constr. 22 (2012), 605–613, 10.1016/j.autcon.2011.12.011.
    • (2012) Autom. Constr. , vol.22 , pp. 605-613
    • Hartmann, T.1    van Meerveld, H.2    Vossebeld, N.3    Adriaanse, A.4
  • 197
    • 77949485153 scopus 로고    scopus 로고
    • The use of a virtual building design and construction model for developing an effective project concept in 5D environment
    • [197] Popov, V., Juocevicius, V., Migilinskas, D., Ustinovichius, L., Mikalauskas, S., The use of a virtual building design and construction model for developing an effective project concept in 5D environment. Autom. Constr. 19:3 (2010), 357–367, 10.1016/j.autcon.2009.12.005.
    • (2010) Autom. Constr. , vol.19 , Issue.3 , pp. 357-367
    • Popov, V.1    Juocevicius, V.2    Migilinskas, D.3    Ustinovichius, L.4    Mikalauskas, S.5
  • 198
    • 84870848003 scopus 로고    scopus 로고
    • Semi-automatic and specification-compliant cost estimation for tendering of building projects based on IFC data of design model
    • [198] Ma, Z., Wei, Z., Zhang, X., Semi-automatic and specification-compliant cost estimation for tendering of building projects based on IFC data of design model. Autom. Constr. 30 (2013), 126–135, 10.1016/j.autcon.2012.11.020.
    • (2013) Autom. Constr. , vol.30 , pp. 126-135
    • Ma, Z.1    Wei, Z.2    Zhang, X.3
  • 199
    • 53349153997 scopus 로고    scopus 로고
    • An investigation into the applicability of building information models in geospatial environment in support of site selection and fire response management processes
    • [199] Isikdag, U., Underwood, J., Aouad, G., An investigation into the applicability of building information models in geospatial environment in support of site selection and fire response management processes. Adv. Eng. Inform. 22:4 (2008), 504–519, 10.1016/j.aei.2008.06.001.
    • (2008) Adv. Eng. Inform. , vol.22 , Issue.4 , pp. 504-519
    • Isikdag, U.1    Underwood, J.2    Aouad, G.3
  • 200
    • 80052866929 scopus 로고    scopus 로고
    • Integrated visualized time control system for repetitive construction projects
    • [200] Elbeltagi, E., Dawood, M., Integrated visualized time control system for repetitive construction projects. Autom. Constr. 20:7 (2011), 940–953, 10.1016/j.autcon.2011.03.012.
    • (2011) Autom. Constr. , vol.20 , Issue.7 , pp. 940-953
    • Elbeltagi, E.1    Dawood, M.2
  • 201
    • 79952291359 scopus 로고    scopus 로고
    • Use of GIS and topology in the identification and resolution of space conflicts
    • [201] Bansal, V.K., Use of GIS and topology in the identification and resolution of space conflicts. J. Comput. Civ. Eng. 25:2 (2011), 159–171, 10.1061/(asce)cp.1943-5487.0000075.
    • (2011) J. Comput. Civ. Eng. , vol.25 , Issue.2 , pp. 159-171
    • Bansal, V.K.1
  • 202
    • 84872313658 scopus 로고    scopus 로고
    • Integrating BIM and GIS to improve the visual monitoring of construction supply chain management
    • [202] Irizarry, J., Karan, E.P., Jalaei, F., Integrating BIM and GIS to improve the visual monitoring of construction supply chain management. Autom. Constr. 31 (2013), 241–254, 10.1016/j.autcon.2012.12.005.
    • (2013) Autom. Constr. , vol.31 , pp. 241-254
    • Irizarry, J.1    Karan, E.P.2    Jalaei, F.3
  • 203
    • 84908099373 scopus 로고    scopus 로고
    • Merging BIM and GIS using ontologies application to urban facility management in ACTIVe3D
    • [203] Mignard, C., Nicolle, C., Merging BIM and GIS using ontologies application to urban facility management in ACTIVe3D. Comput. Ind. 65:9 (2014), 1276–1290, 10.1016/j.compind.2014.07.008.
    • (2014) Comput. Ind. , vol.65 , Issue.9 , pp. 1276-1290
    • Mignard, C.1    Nicolle, C.2
  • 204
    • 84862125657 scopus 로고    scopus 로고
    • A BIM- and sensor-based tower crane navigation system for blind lifts
    • [204] Lee, G., Cho, J., Ham, S., Lee, T., Lee, G., Yun, S.-H., Yang, H.-J., A BIM- and sensor-based tower crane navigation system for blind lifts. Autom. Constr. 26 (2012), 1–10, 10.1016/j.autcon.2012.05.002.
    • (2012) Autom. Constr. , vol.26 , pp. 1-10
    • Lee, G.1    Cho, J.2    Ham, S.3    Lee, T.4    Lee, G.5    Yun, S.-H.6    Yang, H.-J.7
  • 205
    • 79960929332 scopus 로고    scopus 로고
    • Developing a topological information extraction model for space syntax analysis
    • [205] Jeong, S.-K., Ban, Y.-U., Developing a topological information extraction model for space syntax analysis. Build. Environ. 46:12 (2011), 2442–2453, 10.1016/j.buildenv.2011.05.024.
    • (2011) Build. Environ. , vol.46 , Issue.12 , pp. 2442-2453
    • Jeong, S.-K.1    Ban, Y.-U.2
  • 206
    • 84887988783 scopus 로고    scopus 로고
    • Graph-based retrieval of building information models for supporting the early design stages
    • [206] Langenhan, C., Weber, M., Liwicki, M., Petzold, F., Dengel, A., Graph-based retrieval of building information models for supporting the early design stages. Adv. Eng. Inform. 27:4 (2013), 413–426, 10.1016/j.aei.2013.04.005.
    • (2013) Adv. Eng. Inform. , vol.27 , Issue.4 , pp. 413-426
    • Langenhan, C.1    Weber, M.2    Liwicki, M.3    Petzold, F.4    Dengel, A.5


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.