메뉴 건너뛰기




Volumn 39, Issue , 2014, Pages 93-105

Development of a schedule-workspace interference management system simultaneously considering the overlap level of parallel schedules and workspaces

Author keywords

4D CAD; BIM (building information modeling); Location constraint genetic algorithm; Schedule overlap; Schedule space conflict impact factor; Workspace interference

Indexed keywords


EID: 84894901111     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2013.06.001     Document Type: Article
Times cited : (68)

References (33)
  • 1
    • 0041805006 scopus 로고    scopus 로고
    • Automated generation of work spaces required by construction activities
    • DOI 10.1061/(ASCE)0733-9364(2002)128:4(306)
    • B. Akinci, M. Fischer, and J. Kunz Automated generation of work spaces required by construction activities Journal of Construction Engineering and Management 128 4 2002 306 315 (Pubitemid 40265535)
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.4 , pp. 306-315
    • Akinci, B.1    Fischer, M.2    Kunz, J.3
  • 2
    • 79952291359 scopus 로고    scopus 로고
    • Use of GIS and topology in the identification and resolution of space conflicts
    • V. Bansal Use of GIS and topology in the identification and resolution of space conflicts Journal of Computing in Civil Engineering 25 2 2010 159 171
    • (2010) Journal of Computing in Civil Engineering , vol.25 , Issue.2 , pp. 159-171
    • Bansal, V.1
  • 3
    • 75149127614 scopus 로고    scopus 로고
    • An integrated safety management with construction management using 4D CAD model
    • V. Benjaoran, and S. Bhokha An integrated safety management with construction management using 4D CAD model Safety Science 48 3 2010 395 403
    • (2010) Safety Science , vol.48 , Issue.3 , pp. 395-403
    • Benjaoran, V.1    Bhokha, S.2
  • 4
    • 84867883768 scopus 로고    scopus 로고
    • Construction workspace management: The development and application of a novel nD planning approach and tool
    • R. Chavada, N. Dawood, and M. Kassem Construction workspace management: the development and application of a novel nD planning approach and tool Journal of Information Technology in Construction (ITcon) 17 2012 213 236
    • (2012) Journal of Information Technology in Construction (ITcon) , vol.17 , pp. 213-236
    • Chavada, R.1    Dawood, N.2    Kassem, M.3
  • 5
    • 0036028136 scopus 로고    scopus 로고
    • Site pre-cast yard layout arrangement through genetic algorithms
    • S.O. Cheung, T.K.L. Tong, and C.M. Tam Site pre-cast yard layout arrangement through genetic algorithms Automation in Construction 11 1 2002 35 46
    • (2002) Automation in Construction , vol.11 , Issue.1 , pp. 35-46
    • Cheung, S.O.1    Tong, T.K.L.2    Tam, C.M.3
  • 6
    • 33746778753 scopus 로고    scopus 로고
    • Construction workspace planning: Assignment and analysis utilizing 4D visualization technologies
    • DOI 10.1111/j.1467-8667.2006.00454.x
    • N. Dawood, and Z. Mallasi Construction workspace planning: assignment and analysis utilizing 4D visualization technologies Computer Aided Civil and Infrastructure Engineering 21 7 2006 498 513 (Pubitemid 44165263)
    • (2006) Computer-Aided Civil and Infrastructure Engineering , vol.21 , Issue.7 , pp. 498-513
    • Dawood, N.1    Mallasi, Z.2
  • 8
    • 13944281386 scopus 로고    scopus 로고
    • Dynamic layout of construction temporary facilities considering safety
    • DOI 10.1061/(ASCE)0733-9364(2004)130:4(534)
    • E. Elbeltagi, T. Hegazy, and A. Eldosouky Dynamic layout of construction temporary facilities considering safety Journal of Construction Engineering and Management 130 4 2004 534 541 (Pubitemid 40265350)
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.4 , pp. 534-541
    • Elbeltagi, E.1    Hegazy, T.2    Eldosouky, A.3
  • 9
    • 58149229057 scopus 로고    scopus 로고
    • Hybrid time-cost optimization of nonserial repetitive construction projects
    • A.S. Ezeldin, and A. Soliman Hybrid time-cost optimization of nonserial repetitive construction projects Journal of Construction Engineering and Management 135 1 2009 42 55
    • (2009) Journal of Construction Engineering and Management , vol.135 , Issue.1 , pp. 42-55
    • Ezeldin, A.S.1    Soliman, A.2
  • 13
    • 12744251346 scopus 로고    scopus 로고
    • Distributed scheduling model for infrastructure networks
    • DOI 10.1061/(ASCE)0733-9364(2004)130:2(160)
    • T. Hegazy, A. Elhakeem, and E. Elbeltagi Distributed scheduling model for infrastructure networks Journal of Construction Engineering and Management 130 2 2004 160 167 (Pubitemid 40265382)
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.2 , pp. 160-167
    • Hegazy, T.1    Elhakeem, A.2    Elbeltagi, E.3
  • 14
    • 6344281398 scopus 로고    scopus 로고
    • Resource optimization using combined simulation and genetic algorithms
    • DOI 10.1061/(ASCE)0733-9364(2003)129:6(698)
    • T. Hegazy, and M. Kassab Resource optimization using combined simulation and genetic algorithms Journal of Construction Engineering and Management 129 6 2003 698 705 (Pubitemid 40265430)
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.6 , pp. 698-705
    • Hegazy, T.1    Kassab, M.2
  • 15
    • 84855937977 scopus 로고    scopus 로고
    • Multiobjective optimization of resource leveling and allocation during construction scheduling
    • D.H. Jun, and K. El-Rayes Multiobjective optimization of resource leveling and allocation during construction scheduling Journal of Construction Engineering and Management 137 12 2011 1080 1088
    • (2011) Journal of Construction Engineering and Management , vol.137 , Issue.12 , pp. 1080-1088
    • Jun, D.H.1    El-Rayes, K.2
  • 16
    • 78149283314 scopus 로고    scopus 로고
    • Development of methodology and virtual system for optimised simulation of road design data
    • L.S. Kang, H.S. Moon, N. Dawood, and M.S. Kang Development of methodology and virtual system for optimised simulation of road design data Automation in Construction 19 8 2010 1000 1015
    • (2010) Automation in Construction , vol.19 , Issue.8 , pp. 1000-1015
    • Kang, L.S.1    Moon, H.S.2    Dawood, N.3    Kang, M.S.4
  • 17
    • 78049472053 scopus 로고    scopus 로고
    • Improved link system between schedule data and 3D object in 4D CAD system by using WBS code
    • L.S. Kang, H.S. Moon, S.Y. Park, C.H. Kim, and T.S. Lee Improved link system between schedule data and 3D object in 4D CAD system by using WBS code KSCE Journal of Civil Engineering 14 6 2010 803 814
    • (2010) KSCE Journal of Civil Engineering , vol.14 , Issue.6 , pp. 803-814
    • Kang, L.S.1    Moon, H.S.2    Park, S.Y.3    Kim, C.H.4    Lee, T.S.5
  • 18
    • 0011466189 scopus 로고    scopus 로고
    • Adaptability of information classification systems for civil works
    • L.S. Kang, and B.C. Paulson Adaptability of information classification systems for civil works Journal of Construction Engineering and Management 123 4 1997 419 426 (Pubitemid 127590584)
    • (1997) Journal of Construction Engineering and Management , vol.123 , Issue.4 , pp. 419-426
    • Kang, L.S.1    Paulson, B.C.2
  • 20
    • 4344695708 scopus 로고    scopus 로고
    • Genetic algorithms for construction site layout in project planning
    • DOI 10.1061/(ASCE)0733-9364(2002)128:5(418)
    • M.J. Mawdesley, S.H. Al-Jibouri, and H. Yang Genetic algorithms for construction site layout in project planning Journal of Construction Engineering and Management 128 5 2002 418 426 (Pubitemid 40265526)
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.5 , pp. 418-426
    • Mawdesley, M.J.1    Al-jibouri, S.H.2    Yang, H.3
  • 23
    • 57649149304 scopus 로고    scopus 로고
    • Visualizing high-rise building construction strategies using linear scheduling and 4D CAD
    • A. Russell, S. Staub-French, N. Tran, and W. Wong Visualizing high-rise building construction strategies using linear scheduling and 4D CAD Automation in Construction 18 2 2009 219 236
    • (2009) Automation in Construction , vol.18 , Issue.2 , pp. 219-236
    • Russell, A.1    Staub-French, S.2    Tran, N.3    Wong, W.4
  • 26
    • 13944251756 scopus 로고    scopus 로고
    • Use of genetic algorithms in resource scheduling of construction projects
    • DOI 10.1061/(ASCE)0733-9364(2004)130:6(869)
    • A.B. Senouci, and N.N. Eldin Use of genetic algorithms in resource scheduling of construction projects Journal of Construction Engineering and Management 130 6 2004 869 877 (Pubitemid 40265320)
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.6 , pp. 869-877
    • Senouci, A.B.1    Eldin, N.N.2
  • 27
    • 0030825017 scopus 로고    scopus 로고
    • SCaRC: Space-Constrained Resource-Constrained scheduling system
    • W.Y. Thabet, and Y.J. Beliveau SCaRC: space-constrained resource-constrained scheduling system Journal of Computing in Civil Engineering 11 1 1997 48 59 (Pubitemid 127627307)
    • (1997) Journal of Computing in Civil Engineering , vol.11 , Issue.1 , pp. 48-59
    • Thabet, W.Y.1    Beliveau, Y.J.2
  • 29
    • 3142565144 scopus 로고    scopus 로고
    • 4D dynamic management for construction planning and resource utilization
    • H. Wang, J. Zhang, K. Chau, and M. Anson 4D dynamic management for construction planning and resource utilization Automation in Construction 13 5 2004 575 589
    • (2004) Automation in Construction , vol.13 , Issue.5 , pp. 575-589
    • Wang, H.1    Zhang, J.2    Chau, K.3    Anson, M.4
  • 30
    • 84870712321 scopus 로고    scopus 로고
    • Ant colony optimization for multimode resource-constrained project scheduling
    • H. Zhang Ant colony optimization for multimode resource-constrained project scheduling Journal of Management in Engineering 28 2 2012 150 159
    • (2012) Journal of Management in Engineering , vol.28 , Issue.2 , pp. 150-159
    • Zhang, H.1
  • 31
    • 49749097235 scopus 로고    scopus 로고
    • Particle swarm optimization for construction site unequal-area layout
    • H. Zhang, and J.Y. Wang Particle swarm optimization for construction site unequal-area layout Journal of Construction Engineering and Management 134 9 2008 739 748
    • (2008) Journal of Construction Engineering and Management , vol.134 , Issue.9 , pp. 739-748
    • Zhang, H.1    Wang, J.Y.2
  • 32
    • 2342444431 scopus 로고    scopus 로고
    • Genetic algorithm for solving site layout problem with unequal-size and constrained facilities
    • DOI 10.1061/(ASCE)0887-3801(2002)16:2(143)
    • P. Zouein, H. Harmanani, and A. Hajar Genetic algorithm for solving site layout problem with unequal-size and constrained facilities Journal of Computing in Civil Engineering 16 2 2002 143 151 (Pubitemid 40475289)
    • (2002) Journal of Computing in Civil Engineering , vol.16 , Issue.2 , pp. 143-151
    • Zouein, P.P.1    Harmanani, H.2    Hajar, A.3
  • 33
    • 0035278754 scopus 로고    scopus 로고
    • Improvement algorithm for limited space scheduling
    • DOI 10.1061/(ASCE)0733-9364(2001)127:2(116)
    • P. Zouein, and I. Tommelein Improvement algorithm for limited space scheduling Journal of Construction Engineering and Management 127 2 2001 116 124 (Pubitemid 32297259)
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.2 , pp. 116-124
    • Zouein, P.P.1    Tommelein, I.D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.