-
1
-
-
0041805006
-
Automated generation of work spaces required by construction activities
-
DOI 10.1061/(ASCE)0733-9364(2002)128:4(306)
-
B. Akinci, M. Fischer, and J. Kunz Automated generation of work spaces required by construction activities Journal of Construction Engineering and Management 128 4 2002 306 315 (Pubitemid 40265535)
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.4
, pp. 306-315
-
-
Akinci, B.1
Fischer, M.2
Kunz, J.3
-
2
-
-
79952291359
-
Use of GIS and topology in the identification and resolution of space conflicts
-
V. Bansal Use of GIS and topology in the identification and resolution of space conflicts Journal of Computing in Civil Engineering 25 2 2010 159 171
-
(2010)
Journal of Computing in Civil Engineering
, vol.25
, Issue.2
, pp. 159-171
-
-
Bansal, V.1
-
3
-
-
75149127614
-
An integrated safety management with construction management using 4D CAD model
-
V. Benjaoran, and S. Bhokha An integrated safety management with construction management using 4D CAD model Safety Science 48 3 2010 395 403
-
(2010)
Safety Science
, vol.48
, Issue.3
, pp. 395-403
-
-
Benjaoran, V.1
Bhokha, S.2
-
4
-
-
84867883768
-
Construction workspace management: The development and application of a novel nD planning approach and tool
-
R. Chavada, N. Dawood, and M. Kassem Construction workspace management: the development and application of a novel nD planning approach and tool Journal of Information Technology in Construction (ITcon) 17 2012 213 236
-
(2012)
Journal of Information Technology in Construction (ITcon)
, vol.17
, pp. 213-236
-
-
Chavada, R.1
Dawood, N.2
Kassem, M.3
-
5
-
-
0036028136
-
Site pre-cast yard layout arrangement through genetic algorithms
-
S.O. Cheung, T.K.L. Tong, and C.M. Tam Site pre-cast yard layout arrangement through genetic algorithms Automation in Construction 11 1 2002 35 46
-
(2002)
Automation in Construction
, vol.11
, Issue.1
, pp. 35-46
-
-
Cheung, S.O.1
Tong, T.K.L.2
Tam, C.M.3
-
6
-
-
33746778753
-
Construction workspace planning: Assignment and analysis utilizing 4D visualization technologies
-
DOI 10.1111/j.1467-8667.2006.00454.x
-
N. Dawood, and Z. Mallasi Construction workspace planning: assignment and analysis utilizing 4D visualization technologies Computer Aided Civil and Infrastructure Engineering 21 7 2006 498 513 (Pubitemid 44165263)
-
(2006)
Computer-Aided Civil and Infrastructure Engineering
, vol.21
, Issue.7
, pp. 498-513
-
-
Dawood, N.1
Mallasi, Z.2
-
8
-
-
13944281386
-
Dynamic layout of construction temporary facilities considering safety
-
DOI 10.1061/(ASCE)0733-9364(2004)130:4(534)
-
E. Elbeltagi, T. Hegazy, and A. Eldosouky Dynamic layout of construction temporary facilities considering safety Journal of Construction Engineering and Management 130 4 2004 534 541 (Pubitemid 40265350)
-
(2004)
Journal of Construction Engineering and Management
, vol.130
, Issue.4
, pp. 534-541
-
-
Elbeltagi, E.1
Hegazy, T.2
Eldosouky, A.3
-
14
-
-
6344281398
-
Resource optimization using combined simulation and genetic algorithms
-
DOI 10.1061/(ASCE)0733-9364(2003)129:6(698)
-
T. Hegazy, and M. Kassab Resource optimization using combined simulation and genetic algorithms Journal of Construction Engineering and Management 129 6 2003 698 705 (Pubitemid 40265430)
-
(2003)
Journal of Construction Engineering and Management
, vol.129
, Issue.6
, pp. 698-705
-
-
Hegazy, T.1
Kassab, M.2
-
15
-
-
84855937977
-
Multiobjective optimization of resource leveling and allocation during construction scheduling
-
D.H. Jun, and K. El-Rayes Multiobjective optimization of resource leveling and allocation during construction scheduling Journal of Construction Engineering and Management 137 12 2011 1080 1088
-
(2011)
Journal of Construction Engineering and Management
, vol.137
, Issue.12
, pp. 1080-1088
-
-
Jun, D.H.1
El-Rayes, K.2
-
16
-
-
78149283314
-
Development of methodology and virtual system for optimised simulation of road design data
-
L.S. Kang, H.S. Moon, N. Dawood, and M.S. Kang Development of methodology and virtual system for optimised simulation of road design data Automation in Construction 19 8 2010 1000 1015
-
(2010)
Automation in Construction
, vol.19
, Issue.8
, pp. 1000-1015
-
-
Kang, L.S.1
Moon, H.S.2
Dawood, N.3
Kang, M.S.4
-
17
-
-
78049472053
-
Improved link system between schedule data and 3D object in 4D CAD system by using WBS code
-
L.S. Kang, H.S. Moon, S.Y. Park, C.H. Kim, and T.S. Lee Improved link system between schedule data and 3D object in 4D CAD system by using WBS code KSCE Journal of Civil Engineering 14 6 2010 803 814
-
(2010)
KSCE Journal of Civil Engineering
, vol.14
, Issue.6
, pp. 803-814
-
-
Kang, L.S.1
Moon, H.S.2
Park, S.Y.3
Kim, C.H.4
Lee, T.S.5
-
18
-
-
0011466189
-
Adaptability of information classification systems for civil works
-
L.S. Kang, and B.C. Paulson Adaptability of information classification systems for civil works Journal of Construction Engineering and Management 123 4 1997 419 426 (Pubitemid 127590584)
-
(1997)
Journal of Construction Engineering and Management
, vol.123
, Issue.4
, pp. 419-426
-
-
Kang, L.S.1
Paulson, B.C.2
-
20
-
-
4344695708
-
Genetic algorithms for construction site layout in project planning
-
DOI 10.1061/(ASCE)0733-9364(2002)128:5(418)
-
M.J. Mawdesley, S.H. Al-Jibouri, and H. Yang Genetic algorithms for construction site layout in project planning Journal of Construction Engineering and Management 128 5 2002 418 426 (Pubitemid 40265526)
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.5
, pp. 418-426
-
-
Mawdesley, M.J.1
Al-jibouri, S.H.2
Yang, H.3
-
21
-
-
84893784635
-
Interactive 4D-CAD
-
K. McKinney, J. Kim, M. Fischer, and C. Howard Interactive 4D-CAD Proceedings of the third Congress on Computing in Civil Engineering, ASCE, Anaheim, CA, June, 1996 1996 17 19
-
(1996)
Proceedings of the Third Congress on Computing in Civil Engineering, ASCE, Anaheim, CA, June, 1996
, pp. 17-19
-
-
McKinney, K.1
Kim, J.2
Fischer, M.3
Howard, C.4
-
23
-
-
57649149304
-
Visualizing high-rise building construction strategies using linear scheduling and 4D CAD
-
A. Russell, S. Staub-French, N. Tran, and W. Wong Visualizing high-rise building construction strategies using linear scheduling and 4D CAD Automation in Construction 18 2 2009 219 236
-
(2009)
Automation in Construction
, vol.18
, Issue.2
, pp. 219-236
-
-
Russell, A.1
Staub-French, S.2
Tran, N.3
Wong, W.4
-
26
-
-
13944251756
-
Use of genetic algorithms in resource scheduling of construction projects
-
DOI 10.1061/(ASCE)0733-9364(2004)130:6(869)
-
A.B. Senouci, and N.N. Eldin Use of genetic algorithms in resource scheduling of construction projects Journal of Construction Engineering and Management 130 6 2004 869 877 (Pubitemid 40265320)
-
(2004)
Journal of Construction Engineering and Management
, vol.130
, Issue.6
, pp. 869-877
-
-
Senouci, A.B.1
Eldin, N.N.2
-
27
-
-
0030825017
-
SCaRC: Space-Constrained Resource-Constrained scheduling system
-
W.Y. Thabet, and Y.J. Beliveau SCaRC: space-constrained resource-constrained scheduling system Journal of Computing in Civil Engineering 11 1 1997 48 59 (Pubitemid 127627307)
-
(1997)
Journal of Computing in Civil Engineering
, vol.11
, Issue.1
, pp. 48-59
-
-
Thabet, W.Y.1
Beliveau, Y.J.2
-
29
-
-
3142565144
-
4D dynamic management for construction planning and resource utilization
-
H. Wang, J. Zhang, K. Chau, and M. Anson 4D dynamic management for construction planning and resource utilization Automation in Construction 13 5 2004 575 589
-
(2004)
Automation in Construction
, vol.13
, Issue.5
, pp. 575-589
-
-
Wang, H.1
Zhang, J.2
Chau, K.3
Anson, M.4
-
30
-
-
84870712321
-
Ant colony optimization for multimode resource-constrained project scheduling
-
H. Zhang Ant colony optimization for multimode resource-constrained project scheduling Journal of Management in Engineering 28 2 2012 150 159
-
(2012)
Journal of Management in Engineering
, vol.28
, Issue.2
, pp. 150-159
-
-
Zhang, H.1
-
31
-
-
49749097235
-
Particle swarm optimization for construction site unequal-area layout
-
H. Zhang, and J.Y. Wang Particle swarm optimization for construction site unequal-area layout Journal of Construction Engineering and Management 134 9 2008 739 748
-
(2008)
Journal of Construction Engineering and Management
, vol.134
, Issue.9
, pp. 739-748
-
-
Zhang, H.1
Wang, J.Y.2
-
32
-
-
2342444431
-
Genetic algorithm for solving site layout problem with unequal-size and constrained facilities
-
DOI 10.1061/(ASCE)0887-3801(2002)16:2(143)
-
P. Zouein, H. Harmanani, and A. Hajar Genetic algorithm for solving site layout problem with unequal-size and constrained facilities Journal of Computing in Civil Engineering 16 2 2002 143 151 (Pubitemid 40475289)
-
(2002)
Journal of Computing in Civil Engineering
, vol.16
, Issue.2
, pp. 143-151
-
-
Zouein, P.P.1
Harmanani, H.2
Hajar, A.3
-
33
-
-
0035278754
-
Improvement algorithm for limited space scheduling
-
DOI 10.1061/(ASCE)0733-9364(2001)127:2(116)
-
P. Zouein, and I. Tommelein Improvement algorithm for limited space scheduling Journal of Construction Engineering and Management 127 2 2001 116 124 (Pubitemid 32297259)
-
(2001)
Journal of Construction Engineering and Management
, vol.127
, Issue.2
, pp. 116-124
-
-
Zouein, P.P.1
Tommelein, I.D.2
|