메뉴 건너뛰기




Volumn 80, Issue , 2017, Pages 37-47

A scientometric review of global BIM research: Analysis and visualization

Author keywords

Building information modeling; Co citation; Research trend; Scientometrics; Visualization

Indexed keywords

AUGMENTED REALITY; BIBLIOGRAPHIC RETRIEVAL SYSTEMS; CONSTRUCTION; CONSTRUCTION INDUSTRY; FLOW VISUALIZATION; INFORMATION ANALYSIS; INFORMATION THEORY; LASER SAFETY; VISUALIZATION; WEB CRAWLER;

EID: 85017102724     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2017.04.002     Document Type: Review
Times cited : (344)

References (74)
  • 1
    • 85017148891 scopus 로고    scopus 로고
    • ISO 29481-1: 2016 Building Information Models - Information Delivery Manual - Part 1: Methodology and Format
    • International Organization for Standardization Geneva, Switzerland
    • [1] ISO, ISO 29481-1: 2016 Building Information Models - Information Delivery Manual - Part 1: Methodology and Format. 2016, International Organization for Standardization, Geneva, Switzerland.
    • (2016)
    • ISO1
  • 2
    • 79960269657 scopus 로고    scopus 로고
    • Building information modeling (BIM): trends, benefits, risks, and challenges for the AEC industry
    • [2] Azhar, S., Building information modeling (BIM): trends, benefits, risks, and challenges for the AEC industry. Leadersh. Manag. Eng. 11:3 (2011), 241–252.
    • (2011) Leadersh. Manag. Eng. , vol.11 , Issue.3 , pp. 241-252
    • Azhar, S.1
  • 3
    • 59049095324 scopus 로고    scopus 로고
    • Building information modelling framework: a research and delivery foundation for industry stakeholders
    • [3] Succar, B., Building information modelling framework: a research and delivery foundation for industry stakeholders. Autom. Constr. 18:3 (2009), 357–375.
    • (2009) Autom. Constr. , vol.18 , Issue.3 , pp. 357-375
    • Succar, B.1
  • 5
    • 84881611317 scopus 로고    scopus 로고
    • The project benefits of building information modelling (BIM)
    • [5] Bryde, D., Broquetas, M., Volm, J.M., The project benefits of building information modelling (BIM). Int. J. Proj. Manag. 31:7 (2013), 971–980.
    • (2013) Int. J. Proj. Manag. , vol.31 , Issue.7 , pp. 971-980
    • Bryde, D.1    Broquetas, M.2    Volm, J.M.3
  • 6
    • 84947079358 scopus 로고    scopus 로고
    • The Business Value of BIM in Australia and New Zealand
    • McGraw Hill Construction Bedford, MA
    • [6] McGraw Hill Construction, The Business Value of BIM in Australia and New Zealand. 2014, McGraw Hill Construction, Bedford, MA.
    • (2014)
    • McGraw Hill Construction1
  • 7
    • 84985919945 scopus 로고    scopus 로고
    • The potential of Building Information Modelling (BIM) for improving productivity in Singapore construction
    • A.B. Raidén E. Aboagye-Nimo Association of Researchers in Construction Management Lincoln, UK
    • [7] Teo, E.A.L., Ofori, G., Tjandra, I.K., Kim, H., The potential of Building Information Modelling (BIM) for improving productivity in Singapore construction. Raidén, A.B., Aboagye-Nimo, E., (eds.) 31st Annual ARCOM Conference, 2015, Association of Researchers in Construction Management, Lincoln, UK, 661–670.
    • (2015) 31st Annual ARCOM Conference , pp. 661-670
    • Teo, E.A.L.1    Ofori, G.2    Tjandra, I.K.3    Kim, H.4
  • 8
    • 84862026653 scopus 로고    scopus 로고
    • Building information modelling (BIM) implementation and remote construction projects: issues, challenges, and critiques
    • [8] Arayici, Y., Egbu, C., Coates, P., Building information modelling (BIM) implementation and remote construction projects: issues, challenges, and critiques. J. Inf. Technol. Constr. 17 (2012), 75–92.
    • (2012) J. Inf. Technol. Constr. , vol.17 , pp. 75-92
    • Arayici, Y.1    Egbu, C.2    Coates, P.3
  • 9
    • 84964911316 scopus 로고    scopus 로고
    • A critical review of the use of 3-D printing in the construction industry
    • [9] Wu, P., Wang, J., Wang, X., A critical review of the use of 3-D printing in the construction industry. Autom. Constr. 68 (2016), 21–31.
    • (2016) Autom. Constr. , vol.68 , pp. 21-31
    • Wu, P.1    Wang, J.2    Wang, X.3
  • 10
    • 84894906223 scopus 로고    scopus 로고
    • Providing real-estate services through the integration of 3D laser scanning and building information modelling
    • [10] Mahdjoubi, L., Moobela, C., Laing, R., Providing real-estate services through the integration of 3D laser scanning and building information modelling. Comput. Ind. 64:9 (2013), 1272–1281.
    • (2013) Comput. Ind. , vol.64 , Issue.9 , pp. 1272-1281
    • Mahdjoubi, L.1    Moobela, C.2    Laing, R.3
  • 11
    • 84878587673 scopus 로고    scopus 로고
    • A conceptual framework for integrating building information modeling with augmented reality
    • [11] Wang, X., Love, P.E., Kim, M.J., Park, C.-S., Sing, C.-P., Hou, L., A conceptual framework for integrating building information modeling with augmented reality. Autom. Constr. 34 (2013), 37–44.
    • (2013) Autom. Constr. , vol.34 , pp. 37-44
    • Wang, X.1    Love, P.E.2    Kim, M.J.3    Park, C.-S.4    Sing, C.-P.5    Hou, L.6
  • 12
    • 77956619234 scopus 로고    scopus 로고
    • Automatic reconstruction of as-built building information models from laser-scanned point clouds: a review of related techniques
    • [12] Tang, P., Huber, D., Akinci, B., Lipman, R., Lytle, A., Automatic reconstruction of as-built building information models from laser-scanned point clouds: a review of related techniques. Autom. Constr. 19:7 (2010), 829–843.
    • (2010) Autom. Constr. , vol.19 , Issue.7 , pp. 829-843
    • Tang, P.1    Huber, D.2    Akinci, B.3    Lipman, R.4    Lytle, A.5
  • 13
    • 79954424532 scopus 로고    scopus 로고
    • A review and outlook for a ‘Building Information Model’(BIM): a multi-standpoint framework for technological development
    • [13] Cerovsek, T., A review and outlook for a ‘Building Information Model’(BIM): a multi-standpoint framework for technological development. Adv. Eng. Inform. 25:2 (2011), 224–244.
    • (2011) Adv. Eng. Inform. , vol.25 , Issue.2 , pp. 224-244
    • Cerovsek, T.1
  • 14
    • 84890525940 scopus 로고    scopus 로고
    • Building Information Modeling (BIM) for existing buildings—literature review and future needs
    • [14] Volk, R., Stengel, J., Schultmann, F., Building Information Modeling (BIM) for existing buildings—literature review and future needs. Autom. Constr. 38 (2014), 109–127.
    • (2014) Autom. Constr. , vol.38 , pp. 109-127
    • Volk, R.1    Stengel, J.2    Schultmann, F.3
  • 15
    • 0004066691 scopus 로고    scopus 로고
    • Science Studies: An Advanced Introduction
    • New York University Press New York, NY
    • [15] Hess, D.J., Science Studies: An Advanced Introduction. 1997, New York University Press, New York, NY.
    • (1997)
    • Hess, D.J.1
  • 17
    • 78650995185 scopus 로고    scopus 로고
    • Scientometrics of a pandemic: HIV/AIDS research in South Africa and the world
    • [17] Pouris, A., Pouris, A., Scientometrics of a pandemic: HIV/AIDS research in South Africa and the world. Scientometrics 86:2 (2011), 541–552.
    • (2011) Scientometrics , vol.86 , Issue.2 , pp. 541-552
    • Pouris, A.1    Pouris, A.2
  • 18
    • 84961786938 scopus 로고    scopus 로고
    • A review of emerging trends in global PPP research: analysis and visualization
    • [18] Song, J., Zhang, H., Dong, W., A review of emerging trends in global PPP research: analysis and visualization. Scientometrics 107:3 (2016), 1111–1147.
    • (2016) Scientometrics , vol.107 , Issue.3 , pp. 1111-1147
    • Song, J.1    Zhang, H.2    Dong, W.3
  • 19
    • 84977267497 scopus 로고    scopus 로고
    • Review of the application of social network analysis (SNA) in construction project management research
    • [19] Zheng, X., Le, Y., Chan, A.P.C., Hu, Y., Li, Y., Review of the application of social network analysis (SNA) in construction project management research. Int. J. Proj. Manag. 34:7 (2016), 1214–1225.
    • (2016) Int. J. Proj. Manag. , vol.34 , Issue.7 , pp. 1214-1225
    • Zheng, X.1    Le, Y.2    Chan, A.P.C.3    Hu, Y.4    Li, Y.5
  • 20
    • 84894422581 scopus 로고    scopus 로고
    • Critical review of labor productivity research in construction journals
    • [20] Yi, W., Chan, A.P.C., Critical review of labor productivity research in construction journals. J. Manag. Eng. 30:2 (2013), 214–225.
    • (2013) J. Manag. Eng. , vol.30 , Issue.2 , pp. 214-225
    • Yi, W.1    Chan, A.P.C.2
  • 21
    • 70349324673 scopus 로고    scopus 로고
    • Research trend of public-private partnership in construction journals
    • [21] Ke, Y., Wang, S., Chan, A.P.C., Cheung, E., Research trend of public-private partnership in construction journals. J. Constr. Eng. Manag. 135:10 (2009), 1076–1086.
    • (2009) J. Constr. Eng. Manag. , vol.135 , Issue.10 , pp. 1076-1086
    • Ke, Y.1    Wang, S.2    Chan, A.P.C.3    Cheung, E.4
  • 22
    • 60950607737 scopus 로고    scopus 로고
    • Brace for BIM - the arrival of building information modeling seems inevitable. Are US architects ready for a revolution?
    • [22] Sullivan, C.C., Brace for BIM - the arrival of building information modeling seems inevitable. Are US architects ready for a revolution?. Architecture 94:4 (2005), 77–78.
    • (2005) Architecture , vol.94 , Issue.4 , pp. 77-78
    • Sullivan, C.C.1
  • 23
    • 85017124005 scopus 로고    scopus 로고
    • CiteSpace: A Practical Guide for Mapping Scientific Literature
    • Nova Science Publishers
    • [23] Chen, C., CiteSpace: A Practical Guide for Mapping Scientific Literature. 2016, Nova Science Publishers.
    • (2016)
    • Chen, C.1
  • 24
    • 84982499114 scopus 로고
    • Toward a new horizon in information science: domain-analysis
    • [24] Hjørland, B., Albrechtsen, H., Toward a new horizon in information science: domain-analysis. J. Assoc. Inf. Sci. Technol. 46:6 (1995), 400–425.
    • (1995) J. Assoc. Inf. Sci. Technol. , vol.46 , Issue.6 , pp. 400-425
    • Hjørland, B.1    Albrechtsen, H.2
  • 25
  • 27
    • 78649612624 scopus 로고    scopus 로고
    • Visualizing evolving networks: Minimum spanning trees versus pathfinder networks
    • IEEE Seattle, WA
    • [27] Chen, C., Morris, S., Visualizing evolving networks: Minimum spanning trees versus pathfinder networks. IEEE Symposium on Information Visualization 2003, 2003, IEEE, Seattle, WA, 67–74.
    • (2003) IEEE Symposium on Information Visualization 2003 , pp. 67-74
    • Chen, C.1    Morris, S.2
  • 28
    • 84865730611 scopus 로고
    • A set of measures of centrality based on betweenness
    • [28] Freeman, L.C., A set of measures of centrality based on betweenness. Sociometry 40 (1977), 35–41.
    • (1977) Sociometry , vol.40 , pp. 35-41
    • Freeman, L.C.1
  • 29
    • 0037062448 scopus 로고    scopus 로고
    • Community structure in social and biological networks
    • [29] Girvan, M., Newman, M.E., Community structure in social and biological networks. Proc. Natl. Acad. Sci. 99:12 (2002), 7821–7826.
    • (2002) Proc. Natl. Acad. Sci. , vol.99 , Issue.12 , pp. 7821-7826
    • Girvan, M.1    Newman, M.E.2
  • 30
    • 33644531603 scopus 로고    scopus 로고
    • CiteSpace II: detecting and visualizing emerging trends and transient patterns in scientific literature
    • [30] Chen, C., CiteSpace II: detecting and visualizing emerging trends and transient patterns in scientific literature. J. Am. Soc. Inf. Sci. Technol. 57:3 (2006), 359–377.
    • (2006) J. Am. Soc. Inf. Sci. Technol. , vol.57 , Issue.3 , pp. 359-377
    • Chen, C.1
  • 31
    • 38649094993 scopus 로고    scopus 로고
    • BIM Handbook—A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers, and Contractors
    • second ed. John Wiley & Sons Hoboken, NJ
    • [31] Eastman, C., Teicholz, P., Sacks, R., Liston, K., BIM Handbook—A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers, and Contractors. second ed., 2011, John Wiley & Sons, Hoboken, NJ.
    • (2011)
    • Eastman, C.1    Teicholz, P.2    Sacks, R.3    Liston, K.4
  • 32
    • 84859575621 scopus 로고    scopus 로고
    • Application areas and data requirements for BIM-enabled facilities management
    • [32] Becerik-Gerber, B., Jazizadeh, F., Li, N., Calis, G., Application areas and data requirements for BIM-enabled facilities management. J. Constr. Eng. Manag. 138:3 (2011), 431–442.
    • (2011) J. Constr. Eng. Manag. , vol.138 , Issue.3 , pp. 431-442
    • Becerik-Gerber, B.1    Jazizadeh, F.2    Li, N.3    Calis, G.4
  • 33
    • 84934988457 scopus 로고    scopus 로고
    • Integration of building information modeling and economic and environmental impact analysis to support sustainable building design
    • [33] Inyim, P., Rivera, J., Zhu, Y., Integration of building information modeling and economic and environmental impact analysis to support sustainable building design. J. Manag. Eng., 31(1), 2014, A4014002.
    • (2014) J. Manag. Eng. , vol.31 , Issue.1
    • Inyim, P.1    Rivera, J.2    Zhu, Y.3
  • 34
    • 84901916702 scopus 로고    scopus 로고
    • The importance of use and end-of-life phases to the life cycle greenhouse gas (GHG) emissions of concrete - a review
    • [34] Wu, P., Xia, B., Zhao, X., The importance of use and end-of-life phases to the life cycle greenhouse gas (GHG) emissions of concrete - a review. Renew. Sust. Energ. Rev. 37 (2014), 360–369.
    • (2014) Renew. Sust. Energ. Rev. , vol.37 , pp. 360-369
    • Wu, P.1    Xia, B.2    Zhao, X.3
  • 35
    • 84899505463 scopus 로고    scopus 로고
    • The past, present and future of carbon labelling for construction materials-a review
    • [35] Wu, P., Xia, B., Pienaar, J., Zhao, X., The past, present and future of carbon labelling for construction materials-a review. Build. Environ. 77 (2014), 160–168.
    • (2014) Build. Environ. , vol.77 , pp. 160-168
    • Wu, P.1    Xia, B.2    Pienaar, J.3    Zhao, X.4
  • 36
    • 79551681843 scopus 로고    scopus 로고
    • Building information modeling for sustainable design and LEED® rating analysis
    • [36] Azhar, S., Carlton, W.A., Olsen, D., Ahmad, I., Building information modeling for sustainable design and LEED® rating analysis. Autom. Constr. 20:2 (2011), 217–224.
    • (2011) Autom. Constr. , vol.20 , Issue.2 , pp. 217-224
    • Azhar, S.1    Carlton, W.A.2    Olsen, D.3    Ahmad, I.4
  • 37
    • 84929874350 scopus 로고    scopus 로고
    • Green building projects: schedule performance, influential factors and solutions
    • [37] Hwang, B.G., Zhao, X., Tan, L.L.G., Green building projects: schedule performance, influential factors and solutions. Eng. Constr. Archit. Manag. 22:3 (2015), 327–346.
    • (2015) Eng. Constr. Archit. Manag. , vol.22 , Issue.3 , pp. 327-346
    • Hwang, B.G.1    Zhao, X.2    Tan, L.L.G.3
  • 38
    • 84926394140 scopus 로고    scopus 로고
    • Use of BIM approach to enhance construction interface management: a case study
    • [38] Lin, Y.-C., Use of BIM approach to enhance construction interface management: a case study. J. Civ. Eng. Manag. 21:2 (2015), 201–217.
    • (2015) J. Civ. Eng. Manag. , vol.21 , Issue.2 , pp. 201-217
    • Lin, Y.-C.1
  • 39
    • 84945280951 scopus 로고    scopus 로고
    • The use of a BIM-based framework to support safe facility management processes
    • [39] Wetzel, E.M., Thabet, W.Y., The use of a BIM-based framework to support safe facility management processes. Autom. Constr. 60 (2015), 12–24.
    • (2015) Autom. Constr. , vol.60 , pp. 12-24
    • Wetzel, E.M.1    Thabet, W.Y.2
  • 40
    • 84944441544 scopus 로고    scopus 로고
    • Vision guided autonomous robotic assembly and as-built scanning on unstructured construction sites
    • [40] Feng, C., Xiao, Y., Willette, A., McGee, W., Kamat, V.R., Vision guided autonomous robotic assembly and as-built scanning on unstructured construction sites. Autom. Constr. 59 (2015), 128–138.
    • (2015) Autom. Constr. , vol.59 , pp. 128-138
    • Feng, C.1    Xiao, Y.2    Willette, A.3    McGee, W.4    Kamat, V.R.5
  • 41
    • 0015640298 scopus 로고
    • Co-citation in the scientific literature: a new measure of the relationship between two documents
    • [41] Small, H., Co-citation in the scientific literature: a new measure of the relationship between two documents. J. Assoc. Inf. Sci. Technol. 24:4 (1973), 265–269.
    • (1973) J. Assoc. Inf. Sci. Technol. , vol.24 , Issue.4 , pp. 265-269
    • Small, H.1
  • 42
    • 40849134303 scopus 로고    scopus 로고
    • Building information modelling–Experts’ views on standardisation and industry deployment
    • [42] Howard, R., Björk, B.-C., Building information modelling–Experts’ views on standardisation and industry deployment. Adv. Eng. Inform. 22:2 (2008), 271–280.
    • (2008) Adv. Eng. Inform. , vol.22 , Issue.2 , pp. 271-280
    • Howard, R.1    Björk, B.-C.2
  • 43
    • 78149283543 scopus 로고    scopus 로고
    • Understanding and facilitating BIM adoption in the AEC industry
    • [43] Gu, N., London, K., Understanding and facilitating BIM adoption in the AEC industry. Autom. Constr. 19:8 (2010), 988–999.
    • (2010) Autom. Constr. , vol.19 , Issue.8 , pp. 988-999
    • Gu, N.1    London, K.2
  • 44
    • 38649094993 scopus 로고    scopus 로고
    • BIM Handbook—A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers, and Contractors
    • second ed. John Wiley & Sons Hoboken, NJ
    • [44] Eastman, C., Teicholz, P., Sacks, R., Liston, K., BIM Handbook—A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers, and Contractors. second ed., 2008, John Wiley & Sons, Hoboken, NJ.
    • (2008)
    • Eastman, C.1    Teicholz, P.2    Sacks, R.3    Liston, K.4
  • 45
    • 84878418504 scopus 로고    scopus 로고
    • A framework for proactive construction defect management using BIM, augmented reality and ontology-based data collection template
    • [45] Park, C.-S., Lee, D.-Y., Kwon, O.-S., Wang, X., A framework for proactive construction defect management using BIM, augmented reality and ontology-based data collection template. Autom. Constr. 33 (2013), 61–71.
    • (2013) Autom. Constr. , vol.33 , pp. 61-71
    • Park, C.-S.1    Lee, D.-Y.2    Kwon, O.-S.3    Wang, X.4
  • 46
    • 79551688323 scopus 로고    scopus 로고
    • Building information modelling (BIM) framework for practical implementation
    • [46] Jung, Y., Joo, M., Building information modelling (BIM) framework for practical implementation. Autom. Constr. 20:2 (2011), 126–133.
    • (2011) Autom. Constr. , vol.20 , Issue.2 , pp. 126-133
    • Jung, Y.1    Joo, M.2
  • 47
    • 84872313658 scopus 로고    scopus 로고
    • Integrating BIM and GIS to improve the visual monitoring of construction supply chain management
    • [47] Irizarry, J., Karan, E.P., Jalaei, F., Integrating BIM and GIS to improve the visual monitoring of construction supply chain management. Autom. Constr. 31 (2013), 241–254.
    • (2013) Autom. Constr. , vol.31 , pp. 241-254
    • Irizarry, J.1    Karan, E.P.2    Jalaei, F.3
  • 48
    • 77955883757 scopus 로고    scopus 로고
    • Interaction of lean and building information modeling in construction
    • [48] Sacks, R., Koskela, L., Dave, B.A., Owen, R., Interaction of lean and building information modeling in construction. J. Constr. Eng. Manag. 136:9 (2010), 968–980.
    • (2010) J. Constr. Eng. Manag. , vol.136 , Issue.9 , pp. 968-980
    • Sacks, R.1    Koskela, L.2    Dave, B.A.3    Owen, R.4
  • 49
    • 77955687856 scopus 로고    scopus 로고
    • Requirements for building information modeling based lean production management systems for construction
    • [49] Sacks, R., Radosavljevic, M., Barak, R., Requirements for building information modeling based lean production management systems for construction. Autom. Constr. 19:5 (2010), 641–655.
    • (2010) Autom. Constr. , vol.19 , Issue.5 , pp. 641-655
    • Sacks, R.1    Radosavljevic, M.2    Barak, R.3
  • 50
    • 84884502984 scopus 로고    scopus 로고
    • Deviation analysis method for the assessment of the quality of the as-is Building Information Models generated from point cloud data
    • [50] Anil, E.B., Tang, P., Akinci, B., Huber, D., Deviation analysis method for the assessment of the quality of the as-is Building Information Models generated from point cloud data. Autom. Constr. 35 (2013), 507–516.
    • (2013) Autom. Constr. , vol.35 , pp. 507-516
    • Anil, E.B.1    Tang, P.2    Akinci, B.3    Huber, D.4
  • 51
    • 1642618587 scopus 로고    scopus 로고
    • Parametric 3D modeling in building construction with examples from precast concrete
    • [51] Sacks, R., Eastman, C.M., Lee, G., Parametric 3D modeling in building construction with examples from precast concrete. Autom. Constr. 13:3 (2004), 291–312.
    • (2004) Autom. Constr. , vol.13 , Issue.3 , pp. 291-312
    • Sacks, R.1    Eastman, C.M.2    Lee, G.3
  • 52
    • 84943429235 scopus 로고    scopus 로고
    • The CiteSpace Manual
    • (available from)
    • [52] Chen, C., The CiteSpace Manual. (available from) http://cluster.ischool.drexel.edu/~cchen/citespace/CiteSpaceManual.pdf, 2014.
    • (2014)
    • Chen, C.1
  • 53
    • 0023453329 scopus 로고
    • Silhouettes: a graphical aid to the interpretation and validation of cluster analysis
    • [53] Rousseeuw, P.J., Silhouettes: a graphical aid to the interpretation and validation of cluster analysis. J. Comput. Appl. Math. 20 (1987), 53–65.
    • (1987) J. Comput. Appl. Math. , vol.20 , pp. 53-65
    • Rousseeuw, P.J.1
  • 54
    • 84860295399 scopus 로고    scopus 로고
    • Exploring how information exchanges can be enhanced through Cloud BIM
    • [54] Redmond, A., Hore, A., Alshawi, M., West, R., Exploring how information exchanges can be enhanced through Cloud BIM. Autom. Constr. 24 (2012), 175–183.
    • (2012) Autom. Constr. , vol.24 , pp. 175-183
    • Redmond, A.1    Hore, A.2    Alshawi, M.3    West, R.4
  • 55
    • 79551689722 scopus 로고    scopus 로고
    • A theoretical framework of a BIM-based multi-disciplinary collaboration platform
    • [55] Singh, V., Gu, N., Wang, X., A theoretical framework of a BIM-based multi-disciplinary collaboration platform. Autom. Constr. 20:2 (2011), 134–144.
    • (2011) Autom. Constr. , vol.20 , Issue.2 , pp. 134-144
    • Singh, V.1    Gu, N.2    Wang, X.3
  • 56
    • 72149104769 scopus 로고    scopus 로고
    • Automated recognition of 3D CAD model objects in laser scans and calculation of as-built dimensions for dimensional compliance control in construction
    • [56] Bosché, F., Automated recognition of 3D CAD model objects in laser scans and calculation of as-built dimensions for dimensional compliance control in construction. Adv. Eng. Inform. 24:1 (2010), 107–118.
    • (2010) Adv. Eng. Inform. , vol.24 , Issue.1 , pp. 107-118
    • Bosché, F.1
  • 57
    • 84873283130 scopus 로고    scopus 로고
    • Automatic creation of semantically rich 3D building models from laser scanner data
    • [57] Xiong, X.H., Adan, A., Akinci, B., Huber, D., Automatic creation of semantically rich 3D building models from laser scanner data. Autom. Constr. 31 (2013), 325–337.
    • (2013) Autom. Constr. , vol.31 , pp. 325-337
    • Xiong, X.H.1    Adan, A.2    Akinci, B.3    Huber, D.4
  • 58
    • 70349429622 scopus 로고    scopus 로고
    • Automatic rule-based checking of building designs
    • [58] Eastman, C., Lee, J.-m., Jeong, Y.-s., Lee, J.-k., Automatic rule-based checking of building designs. Autom. Constr. 18:8 (2009), 1011–1033.
    • (2009) Autom. Constr. , vol.18 , Issue.8 , pp. 1011-1033
    • Eastman, C.1    Lee, J.-M.2    Jeong, Y.-S.3    Lee, J.-K.4
  • 59
    • 45749088540 scopus 로고    scopus 로고
    • Integrating construction process documentation into building information modeling
    • [59] Goedert, J.D., Meadati, P., Integrating construction process documentation into building information modeling. J. Constr. Eng. Manag. 134:7 (2008), 509–516.
    • (2008) J. Constr. Eng. Manag. , vol.134 , Issue.7 , pp. 509-516
    • Goedert, J.D.1    Meadati, P.2
  • 60
    • 77949691000 scopus 로고    scopus 로고
    • Organizational divisions in BIM-enabled commercial construction
    • [60] Dossick, C.S., Neff, G., Organizational divisions in BIM-enabled commercial construction. J. Constr. Eng. Manag. 136:4 (2010), 459–467.
    • (2010) J. Constr. Eng. Manag. , vol.136 , Issue.4 , pp. 459-467
    • Dossick, C.S.1    Neff, G.2
  • 61
    • 57649104678 scopus 로고    scopus 로고
    • Component-oriented decomposition for multidisciplinary design optimization in building design
    • [61] Geyer, P., Component-oriented decomposition for multidisciplinary design optimization in building design. Adv. Eng. Inform. 23:1 (2009), 12–31.
    • (2009) Adv. Eng. Inform. , vol.23 , Issue.1 , pp. 12-31
    • Geyer, P.1
  • 62
    • 84869092675 scopus 로고    scopus 로고
    • Building Information Modeling (BIM) and safety: automatic safety checking of construction models and schedules
    • [62] Zhang, S.J., Teizer, J., Lee, J.K., Eastman, C.M., Venugopal, M., Building Information Modeling (BIM) and safety: automatic safety checking of construction models and schedules. Autom. Constr. 29 (2013), 183–195.
    • (2013) Autom. Constr. , vol.29 , pp. 183-195
    • Zhang, S.J.1    Teizer, J.2    Lee, J.K.3    Eastman, C.M.4    Venugopal, M.5
  • 63
    • 84859575621 scopus 로고    scopus 로고
    • Application areas and data requirements for BIM-enabled facilities management
    • [63] Becerik-Gerber, B., Jazizadeh, F., Li, N., Calis, G., Application areas and data requirements for BIM-enabled facilities management. J. Constr. Eng. Manag. 138:3 (2012), 431–442.
    • (2012) J. Constr. Eng. Manag. , vol.138 , Issue.3 , pp. 431-442
    • Becerik-Gerber, B.1    Jazizadeh, F.2    Li, N.3    Calis, G.4
  • 64
    • 33748134686 scopus 로고    scopus 로고
    • Specifying parametric building object behavior (BOB) for a building information modeling system
    • [64] Lee, G., Sacks, R., Eastman, C.M., Specifying parametric building object behavior (BOB) for a building information modeling system. Autom. Constr. 15:6 (2006), 758–776.
    • (2006) Autom. Constr. , vol.15 , Issue.6 , pp. 758-776
    • Lee, G.1    Sacks, R.2    Eastman, C.M.3
  • 65
    • 62549091452 scopus 로고    scopus 로고
    • Paradigm trajectories of building information modeling practice in project networks
    • [65] Taylor, J.E., Bernstein, P.G., Paradigm trajectories of building information modeling practice in project networks. J. Manag. Eng. 25:2 (2009), 69–76.
    • (2009) J. Manag. Eng. , vol.25 , Issue.2 , pp. 69-76
    • Taylor, J.E.1    Bernstein, P.G.2
  • 67
    • 79551683997 scopus 로고    scopus 로고
    • BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies
    • [67] Zhang, J.P., Hu, Z.Z., BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies. Autom. Constr. 20:2 (2011), 167–180.
    • (2011) Autom. Constr. , vol.20 , Issue.2 , pp. 167-180
    • Zhang, J.P.1    Hu, Z.Z.2
  • 68
    • 84857357646 scopus 로고    scopus 로고
    • Aligning building information model tools and construction management methods
    • [68] Hartmann, T., van Meerveld, H., Vossebeld, N., Adriaanse, A., Aligning building information model tools and construction management methods. Autom. Constr. 22 (2012), 605–613.
    • (2012) Autom. Constr. , vol.22 , pp. 605-613
    • Hartmann, T.1    van Meerveld, H.2    Vossebeld, N.3    Adriaanse, A.4
  • 69
    • 77955711321 scopus 로고    scopus 로고
    • Value proposition on interoperability of BIM and collaborative working environments
    • [69] Grilo, A., Jardim-Goncalves, R., Value proposition on interoperability of BIM and collaborative working environments. Autom. Constr. 19:5 (2010), 522–530.
    • (2010) Autom. Constr. , vol.19 , Issue.5 , pp. 522-530
    • Grilo, A.1    Jardim-Goncalves, R.2
  • 70
    • 63749129585 scopus 로고    scopus 로고
    • Benchmark tests for BIM data exchanges of precast concrete
    • [70] Jeong, Y.S., Eastman, C.M., Sacks, R., Kaner, I., Benchmark tests for BIM data exchanges of precast concrete. Autom. Constr. 18:4 (2009), 469–484.
    • (2009) Autom. Constr. , vol.18 , Issue.4 , pp. 469-484
    • Jeong, Y.S.1    Eastman, C.M.2    Sacks, R.3    Kaner, I.4
  • 71
    • 84860281943 scopus 로고    scopus 로고
    • How to measure the benefits of BIM - a case study approach
    • [71] Barlish, K., Sullivan, K., How to measure the benefits of BIM - a case study approach. Autom. Constr. 24 (2012), 149–159.
    • (2012) Autom. Constr. , vol.24 , pp. 149-159
    • Barlish, K.1    Sullivan, K.2
  • 72
    • 84870828103 scopus 로고    scopus 로고
    • Application of life-cycle assessment to early stage building design for reduced embodied environmental impacts
    • [72] Basbagill, J., Flager, F., Lepech, M., Fischer, M., Application of life-cycle assessment to early stage building design for reduced embodied environmental impacts. Build. Environ. 60 (2013), 81–92.
    • (2013) Build. Environ. , vol.60 , pp. 81-92
    • Basbagill, J.1    Flager, F.2    Lepech, M.3    Fischer, M.4
  • 74
    • 33746778753 scopus 로고    scopus 로고
    • Construction workspace planning: assignment and analysis utilizing 4D visualization technologies
    • [74] Dawood, N., Mallasi, Z., Construction workspace planning: assignment and analysis utilizing 4D visualization technologies. J. Comput. Aided Civ. Infrastruct. Eng. 21:7 (2006), 498–513.
    • (2006) J. Comput. Aided Civ. Infrastruct. Eng. , vol.21 , Issue.7 , pp. 498-513
    • Dawood, N.1    Mallasi, Z.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.