메뉴 건너뛰기




Volumn 22, Issue , 2012, Pages 577-586

D 3 City project - Economic impact of BIM-assisted design validation

Author keywords

Building information modeling (BIM); Design validation; Return on investment (ROI)

Indexed keywords

AVOIDANCE COST; BUILDING INFORMATION MODELING; DESIGN ERRORS; DESIGN VALIDATION; ECONOMIC IMPACTS; POTENTIAL IMPACTS; RETURN ON INVESTMENTS; REWORK COSTS; ROI ANALYSIS; SCHEDULE DELAY; SEOUL , KOREA;

EID: 84857371393     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2011.12.003     Document Type: Conference Paper
Times cited : (107)

References (20)
  • 2
    • 77953601354 scopus 로고    scopus 로고
    • The perceived value of building information modeling in the U.S. building industry
    • B. Becerik-Gerber, and S. Rice The perceived value of building information modeling in the U.S. building industry ITcon 15 2010 185 201
    • (2010) ITcon , vol.15 , pp. 185-201
    • Becerik-Gerber, B.1    Rice, S.2
  • 6
    • 51849161652 scopus 로고    scopus 로고
    • VDC use in 2007: Significant value, dramatic growth, and apparent business opportunity
    • Stanford University Stanford, CA
    • B. Gilligan, and J. Kunz VDC use in 2007: significant value, dramatic growth, and apparent business opportunity CIFE Technical Report CIFE 2007 Stanford University Stanford, CA 40
    • (2007) CIFE Technical Report CIFE , pp. 40
    • Gilligan, B.1    Kunz, J.2
  • 7
    • 43949138221 scopus 로고    scopus 로고
    • Case study and statistical analysis of utility conflicts on construction roadway projects and best practices in their avoidance
    • P. Goodrum, A. Smith, B. Slaughter, and F. Kari Case study and statistical analysis of utility conflicts on construction roadway projects and best practices in their avoidance Journal of Urban Planning and Development 134 2 2008 63 70
    • (2008) Journal of Urban Planning and Development , vol.134 , Issue.2 , pp. 63-70
    • Goodrum, P.1    Smith, A.2    Slaughter, B.3    Kari, F.4
  • 14
    • 38649099349 scopus 로고    scopus 로고
    • Impact of three-dimensional parametric modeling of buildings on productivity in structural engineering practice
    • R. Sacks, and R. Barak Impact of three-dimensional parametric modeling of buildings on productivity in structural engineering practice Automation in Construction 17 4 2008 439 449
    • (2008) Automation in Construction , vol.17 , Issue.4 , pp. 439-449
    • Sacks, R.1    Barak, R.2
  • 15
    • 0038543086 scopus 로고    scopus 로고
    • Process improvements in precast concrete construction using top-down parametric 3-D computer-modeling
    • R. Sacks, C.M. Eastman, and G. Lee Process improvements in precast concrete construction using top-down parametric 3-D computer-modeling Journal of the Precast/Prestressed Concrete Institute 48 3 2003 46 55
    • (2003) Journal of the Precast/Prestressed Concrete Institute , vol.48 , Issue.3 , pp. 46-55
    • Sacks, R.1    Eastman, C.M.2    Lee, G.3
  • 18
    • 67349175338 scopus 로고    scopus 로고
    • Taxonomy for change causes and effects in construction projects
    • M. Sun, and X. Meng Taxonomy for change causes and effects in construction projects International Journal of Project Management 27 6 2009 560 572
    • (2009) International Journal of Project Management , vol.27 , Issue.6 , pp. 560-572
    • Sun, M.1    Meng, X.2
  • 19
    • 73949126742 scopus 로고    scopus 로고
    • Building information modeling (BIM) - Transforming design and construction to achieve greater industry productivity
    • McGraw Hill Construction Bedford, MA
    • N.W. Young Jr., S.A. Jones, and H.M. Bernstein Building information modeling (BIM) - transforming design and construction to achieve greater industry productivity SmartMarket Report 2008 McGraw Hill Construction Bedford, MA 48
    • (2008) SmartMarket Report , pp. 48
    • Young, Jr.N.W.1    Jones, S.A.2    Bernstein, H.M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.