메뉴 건너뛰기




Volumn 31, Issue , 2013, Pages 241-254

Integrating BIM and GIS to improve the visual monitoring of construction supply chain management

Author keywords

BIM; Construction Supply Chain Management; GIS; Interoperability; Logistics; Procurements

Indexed keywords

ARCHITECTURAL DESIGN; GEOGRAPHIC INFORMATION SYSTEMS; INFORMATION MANAGEMENT; INTEROPERABILITY; LOGISTICS;

EID: 84872313658     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2012.12.005     Document Type: Article
Times cited : (373)

References (43)
  • 1
    • 33747090241 scopus 로고    scopus 로고
    • Material delivery problems in construction projects: A possible solution
    • DOI 10.1016/j.ijpe.2004.12.027, PII S0925527305000393, Strategic Issues and Innovation in Production Economics
    • T. Ala-Risku, and M. Karkkainen Material delivery problems in construction projects: a possible solution International Journal of Production Economics 104 1 2006 19 29 (Pubitemid 44223995)
    • (2006) International Journal of Production Economics , vol.104 , Issue.1 , pp. 19-29
    • Ala-Risku, T.1    Karkkainen, M.2
  • 4
    • 79952291359 scopus 로고    scopus 로고
    • Use of GIS and topology in the identification and resolution of space conflicts
    • V.K. Bansal Use of GIS and topology in the identification and resolution of space conflicts Journal of Computing in Civil Engineering 25 2 2011 159 171
    • (2011) Journal of Computing in Civil Engineering , vol.25 , Issue.2 , pp. 159-171
    • Bansal, V.K.1
  • 5
    • 34247134446 scopus 로고    scopus 로고
    • Supply chain optimization tool for purchasing decisions in B2B construction marketplaces
    • DOI 10.1016/j.autcon.2006.08.005, PII S0926580506000847
    • D. Castro-Lacouture, A.L. Medaglia, and M. Skibniewski Supply chain optimization tool for purchasing decisions in B2B construction marketplaces Automation in Construction 16 5 2007 569 575 (Pubitemid 46584785)
    • (2007) Automation in Construction , vol.16 , Issue.5 , pp. 569-575
    • Castro-Lacouture, D.1    Medaglia, A.L.2    Skibniewski, M.3
  • 10
    • 80052866929 scopus 로고    scopus 로고
    • Integrated visualized time control system for repetitive construction projects
    • E. Elbeltagi, and M. Dawood Integrated visualized time control system for repetitive construction projects Automation in Construction 20 7 2011 940 953
    • (2011) Automation in Construction , vol.20 , Issue.7 , pp. 940-953
    • Elbeltagi, E.1    Dawood, M.2
  • 11
    • 38149114087 scopus 로고    scopus 로고
    • Formalization of the flow of component-related information in precast concrete supply chains
    • E. Ergen, and B. Akinci Formalization of the flow of component-related information in precast concrete supply chains Journal of Construction Engineering and Management 134 2 2008 112 121
    • (2008) Journal of Construction Engineering and Management , vol.134 , Issue.2 , pp. 112-121
    • Ergen, E.1    Akinci, B.2
  • 12
    • 33846821572 scopus 로고    scopus 로고
    • Tracking and locating components in a precast storage yard utilizing radio frequency identification technology and GPS
    • DOI 10.1016/j.autcon.2006.07.004, PII S0926580506000574
    • E. Ergen, B. Akinci, and R. Sacks Tracking and locating components in a precast storage yard utilizing radio frequency identification technology and GPS Automation in Construction 16 3 2007 354 367 (Pubitemid 46205287)
    • (2007) Automation in Construction , vol.16 , Issue.3 , pp. 354-367
    • Ergen, E.1    Akinci, B.2    Sacks, R.3
  • 14
    • 45749088540 scopus 로고    scopus 로고
    • Integrating construction process documentation into building information modeling
    • J.D. Goedert, and P. Meadati Integrating construction process documentation into building information modeling Journal of Construction Engineering and Management 134 7 2008 509 516
    • (2008) Journal of Construction Engineering and Management , vol.134 , Issue.7 , pp. 509-516
    • Goedert, J.D.1    Meadati, P.2
  • 17
    • 84867859668 scopus 로고    scopus 로고
    • Optimizing location of tower cranes on construction sites through GIS and BIM integration
    • J. Irizarry, and E.P. Karan Optimizing location of tower cranes on construction sites through GIS and BIM integration Journal of Information Technology in Construction (itcon) 17 2012 351 366
    • (2012) Journal of Information Technology in Construction (Itcon) , vol.17 , pp. 351-366
    • Irizarry, J.1    Karan, E.P.2
  • 18
    • 53349153997 scopus 로고    scopus 로고
    • An investigation into the applicability of building information models in geospatial environment in support of site selection and fire response management processes
    • U. Isikdag, J. Underwood, and G. Aouad An investigation into the applicability of building information models in geospatial environment in support of site selection and fire response management processes Advanced Engineering Informatics 22 4 2008 504 519
    • (2008) Advanced Engineering Informatics , vol.22 , Issue.4 , pp. 504-519
    • Isikdag, U.1    Underwood, J.2    Aouad, G.3
  • 20
    • 79957567251 scopus 로고    scopus 로고
    • Analysis of modeling effort and impact of different levels of detail in building information models
    • F. Leite, A. Akcamete, B. Akinci, G. Atasoy, and S. Kiziltas Analysis of modeling effort and impact of different levels of detail in building information models Automation in Construction 20 5 2011 601 609
    • (2011) Automation in Construction , vol.20 , Issue.5 , pp. 601-609
    • Leite, F.1    Akcamete, A.2    Akinci, B.3    Atasoy, G.4    Kiziltas, S.5
  • 21
    • 13244273271 scopus 로고    scopus 로고
    • Internet-based geographical information systems system for E-commerce application in construction material procurement
    • DOI 10.1061/(ASCE)0733-9364(2003)129:6(689)
    • H. Li, C.W. Kong, Y.C. Pang, W.Z. Shi, and L. Yu Internet-Based Geographical Information Systems System for E-Commerce Application in Construction Material Procurement Journal of Construction Engineering and Management 129 6 2003 689 697 (Pubitemid 40265429)
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.6 , pp. 689-697
    • Li, H.1    Kong, C.W.2    Pang, Y.C.3    Shi, W.Z.4    Yu, L.5
  • 22
    • 0035576510 scopus 로고    scopus 로고
    • An industrial organization economic supply chain approach for the construction industry: A review
    • DOI 10.1080/01446190110081699
    • K.A. London, and R. Kenley An industrial organization economic supply chain approach for the construction industry: a review Construction Management and Economics 19 8 2001 777 788 (Pubitemid 33109654)
    • (2001) Construction Management and Economics , vol.19 , Issue.8 , pp. 777-788
    • London, K.A.1    Kenley, R.2
  • 23
    • 13244275240 scopus 로고    scopus 로고
    • Application of 4D for dynamic site layout and management of construction projects
    • DOI 10.1016/j.autcon.2004.08.011, PII S0926580504001104, International Conference for Construction Information Technology
    • Z. Ma, Q. Shen, and J. Zhang Application of 4D for dynamic site layout and management of construction projects Automation in Construction 14 3 2005 369 381 (Pubitemid 40183428)
    • (2005) Automation in Construction , vol.14 , Issue.3 , pp. 369-381
    • Ma, Z.1    Shen, Q.2    Zhang, J.3
  • 26
    • 33746951436 scopus 로고    scopus 로고
    • An automated model for materials management and control
    • DOI 10.1080/01446190500435671, PII QT7832K22P446U54
    • R. Navon, and O. Berkovich An automated model for materials management and control Construction Management and Economics 24 6 2006 635 646 (Pubitemid 44202819)
    • (2006) Construction Management and Economics , vol.24 , Issue.6 , pp. 635-646
    • Navon, R.1    Berkovich, O.2
  • 28
    • 70350650478 scopus 로고    scopus 로고
    • OGC Open Geospatial Consortium G. Gröger, T.H. Kolbe, A. Czerwinski, C. Nageland, ((accessed May 2012))
    • OGC Open Geospatial Consortium OpenGIS® City Geography Markup Language (CityGML) Encoding Standard G. Gröger, T.H. Kolbe, A. Czerwinski, C. Nageland, 2008 (https://portal.opengeospatial.org/files/?artifact-id=28802 (accessed May 2012))
    • (2008) OpenGIS® City Geography Markup Language (CityGML) Encoding Standard
  • 31
    • 0036337777 scopus 로고    scopus 로고
    • A review of the progress towards the adoption of supply chain management (SCM) relationships in construction
    • M. Saad, M. Jones, and P. James A review of the progress towards the adoption of supply chain management (SCM) relationships in construction European Journal of Purchasing and Supply Management 8 3 2002 173 183
    • (2002) European Journal of Purchasing and Supply Management , vol.8 , Issue.3 , pp. 173-183
    • Saad, M.1    Jones, M.2    James, P.3
  • 33
  • 38
    • 84872361233 scopus 로고    scopus 로고
    • Vela
    • Vela Vela Field BIM®, Vol. 2012 2012
    • (2012) Vela Field BIM® , vol.2012
  • 42
    • 13244265793 scopus 로고    scopus 로고
    • An agent-based framework for supply chain coordination in construction
    • DOI 10.1016/j.autcon.2004.08.010, PII S0926580504001141, International Conference for Construction Information Technology
    • X. Xue, X. Li, Q. Shen, and Y. Wang An agent-based framework for supply chain coordination in construction Automation in Construction 14 3 2005 413 430 (Pubitemid 40183432)
    • (2005) Automation in Construction , vol.14 , Issue.3 , pp. 413-430
    • Xue, X.1    Li, X.2    Shen, Q.3    Wang, Y.4
  • 43
    • 83755178369 scopus 로고    scopus 로고
    • Improving Construction Supply Network Visibility by Using Automated Materials Locating and Tracking Technology
    • D.A. Young, C.T. Haas, P.M. Goodrum, and C.H. Caldas Improving Construction Supply Network Visibility by Using Automated Materials Locating and Tracking Technology Journal of Construction Engineering and Management 137 11 2011 976 984
    • (2011) Journal of Construction Engineering and Management , vol.137 , Issue.11 , pp. 976-984
    • Young, D.A.1    Haas, C.T.2    Goodrum, P.M.3    Caldas, C.H.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.