메뉴 건너뛰기




Volumn 53, Issue , 2015, Pages 29-43

BIM-based integrated approach for detailed construction scheduling under resource constraints

Author keywords

Building information modeling; Detailed scheduling; Integrated approach; Particle swarm optimization algorithm; Process simulation model; Work package information

Indexed keywords

CONSTRUCTION; ENGINEERING RESEARCH; FLOW MEASUREMENT; INFORMATION THEORY; INTEGRATED CONTROL; PARTICLE SWARM OPTIMIZATION (PSO); SCHEDULING;

EID: 84925161573     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2015.03.008     Document Type: Article
Times cited : (161)

References (32)
  • 1
    • 77956838319 scopus 로고    scopus 로고
    • Role of simulation in construction engineering and management
    • S. AbouRizk Role of simulation in construction engineering and management J. Constr. Eng. Manag. 136 10 2010 1140 1153
    • (2010) J. Constr. Eng. Manag. , vol.136 , Issue.10 , pp. 1140-1153
    • Abourizk, S.1
  • 2
    • 81855184582 scopus 로고    scopus 로고
    • Research in modeling and simulation for improving construction engineering operations
    • S. AbouRizk, D. Halpin, Y. Mohamed, and U. Hermann Research in modeling and simulation for improving construction engineering operations J. Constr. Eng. Manag. 137 SPECIAL ISSUE: Construction Engineering: Opportunity and Vision for Education, Practice, and Research 2011 843 852
    • (2011) J. Constr. Eng. Manag. , vol.137 , Issue.SPECIAL ISSUE , pp. 843-852
    • Abourizk, S.1    Halpin, D.2    Mohamed, Y.3    Hermann, U.4
  • 4
    • 33749826089 scopus 로고    scopus 로고
    • Generation of a construction planning from a 3D CAD model
    • B. De Vries, and J. Harink Generation of a construction planning from a 3D CAD model Autom. Constr. 16 1 2007 13 18
    • (2007) Autom. Constr. , vol.16 , Issue.1 , pp. 13-18
    • De Vries, B.1    Harink, J.2
  • 5
    • 14544269170 scopus 로고    scopus 로고
    • 4D dynamic construction management and visualization software: 1. Development
    • K.W. Chau, M. Anson, and J.P. Zhang 4D dynamic construction management and visualization software: 1. Development Autom. Constr. 14 2005 512 524
    • (2005) Autom. Constr. , vol.14 , pp. 512-524
    • Chau, K.W.1    Anson, M.2    Zhang, J.P.3
  • 6
    • 84884500472 scopus 로고    scopus 로고
    • A framework for an automated and integrated project scheduling and management system
    • S.M. Chen, F.H. Griffis, P.H. Chen, and L.M. Chang A framework for an automated and integrated project scheduling and management system Autom. Constr. 35 2013 89 110
    • (2013) Autom. Constr. , vol.35 , pp. 89-110
    • Chen, S.M.1    Griffis, F.H.2    Chen, P.H.3    Chang, L.M.4
  • 8
    • 84882727368 scopus 로고    scopus 로고
    • 20-Swarm intelligence for large-scale optimization in construction management
    • E. Elbeltagi 20-Swarm intelligence for large-scale optimization in construction management Metaheuristic Appl. Struct. Infrastruct. 2013 479 495
    • (2013) Metaheuristic Appl. Struct. Infrastruct. , pp. 479-495
    • Elbeltagi, E.1
  • 9
    • 0000693991 scopus 로고
    • Scheduling with computer-interpretable construction method models
    • M. Fischer, and F. Aalami Scheduling with computer-interpretable construction method models J. Constr. Eng. Manag. 122 4 1995 337 347
    • (1995) J. Constr. Eng. Manag. , vol.122 , Issue.4 , pp. 337-347
    • Fischer, M.1    Aalami, F.2
  • 10
    • 84959948615 scopus 로고
    • "intelligent" construction time and cost analysis
    • C. Gray "Intelligent" construction time and cost analysis Constr. Manag. Econ. 4 2 1986 135 150
    • (1986) Constr. Manag. Econ. , vol.4 , Issue.2 , pp. 135-150
    • Gray, C.1
  • 12
    • 79959412033 scopus 로고    scopus 로고
    • Simulation-based schedule estimation model for ACS-based core wall construction of high-rise building
    • T. Hong, K. Cho, C. Hyun, and S. Han Simulation-based schedule estimation model for ACS-based core wall construction of high-rise building J. Constr. Eng. Manag. 137 6 2011 393 402
    • (2011) J. Constr. Eng. Manag. , vol.137 , Issue.6 , pp. 393-402
    • Hong, T.1    Cho, K.2    Hyun, C.3    Han, S.4
  • 13
    • 40849134303 scopus 로고    scopus 로고
    • Building information modelling: Experts' views on standardisation and industry deployment
    • R. Howard, and B.C. Björk Building information modelling: experts' views on standardisation and industry deployment Adv. Eng. Inform. 28 2 2008 271 280
    • (2008) Adv. Eng. Inform. , vol.28 , Issue.2 , pp. 271-280
    • Howard, R.1    Björk, B.C.2
  • 14
    • 47749155626 scopus 로고    scopus 로고
    • Automated generation of construction plans from primitive geometries
    • M. Kataoka Automated generation of construction plans from primitive geometries J. Constr. Eng. Manag. 134 8 2008 592 600
    • (2008) J. Constr. Eng. Manag. , vol.134 , Issue.8 , pp. 592-600
    • Kataoka, M.1
  • 15
    • 84884500391 scopus 로고    scopus 로고
    • Generating construction schedules through automatic data extraction using open BIM (building information modeling) technology
    • H. Kim, K. Anderson, S. Lee, and J. Hildreth Generating construction schedules through automatic data extraction using open BIM (building information modeling) technology Autom. Constr. 35 2013 285 295
    • (2013) Autom. Constr. , vol.35 , pp. 285-295
    • Kim, H.1    Anderson, K.2    Lee, S.3    Hildreth, J.4
  • 17
    • 6344232286 scopus 로고    scopus 로고
    • Simplified discrete-event simulation approach for construction simulation
    • M. Lu Simplified discrete-event simulation approach for construction simulation J. Constr. Eng. Manag. ASCE 129 5 2003 537 546
    • (2003) J. Constr. Eng. Manag. ASCE , vol.129 , Issue.5 , pp. 537-546
    • Lu, M.1
  • 18
    • 41749098857 scopus 로고    scopus 로고
    • Resource-constrained critical path analysis based on discrete event simulation and particle swarm optimization
    • M. Lu, H. Lam, and F. Dai Resource-constrained critical path analysis based on discrete event simulation and particle swarm optimization Autom. Constr. 17 6 2008 670 681
    • (2008) Autom. Constr. , vol.17 , Issue.6 , pp. 670-681
    • Lu, M.1    Lam, H.2    Dai, F.3
  • 19
    • 33745767770 scopus 로고    scopus 로고
    • A particle swarm optimization-based approach to tackling simulation optimization of stochastic, large-scale and complex systems
    • M. Lu, D. Wu, and J. Zhang A particle swarm optimization-based approach to tackling simulation optimization of stochastic, large-scale and complex systems Adv. Mach. Learn. Cybern. Lect. Notes Comp. Sci. 3930 2006 528 537
    • (2006) Adv. Mach. Learn. Cybern. Lect. Notes Comp. Sci. , vol.3930 , pp. 528-537
    • Lu, M.1    Wu, D.2    Zhang, J.3
  • 20
    • 65449170044 scopus 로고    scopus 로고
    • Integration of four-dimensional computer-aided design modeling and three-dimensional animation of operations simulation for visualizing construction of the main stadium for the Beijing 2008 Olympic games
    • M. Lu, Y. Zhang, J. Zhang, Z. Hu, and J. Li Integration of four-dimensional computer-aided design modeling and three-dimensional animation of operations simulation for visualizing construction of the main stadium for the Beijing 2008 Olympic games Can. J. Civ. Eng. 36 3 2009 473 479
    • (2009) Can. J. Civ. Eng. , vol.36 , Issue.3 , pp. 473-479
    • Lu, M.1    Zhang, Y.2    Zhang, J.3    Hu, Z.4    Li, J.5
  • 22
    • 84928035423 scopus 로고    scopus 로고
    • BIM-based construction scheduling method using optimization theory for reducing activity overlaps
    • 10.1061/(ASCE) CP.1943-5487.0000342
    • H. Moon, H. Kim, V. Kamat, and L. Kang BIM-based construction scheduling method using optimization theory for reducing activity overlaps J. Comput. Civ. Eng. Jul. 10 2013 10.1061/(ASCE) CP.1943-5487.0000342
    • (2013) J. Comput. Civ. Eng.
    • Moon, H.1    Kim, H.2    Kamat, V.3    Kang, L.4
  • 25
    • 84894487522 scopus 로고    scopus 로고
    • A simulation-based multi-agent approach for scheduling modular construction
    • H. Taghaddos, U. Hermann, S. AbouRizk, and Y. Mohamed A simulation-based multi-agent approach for scheduling modular construction J. Comput. Civ. Eng. 28 2 2012 263 274
    • (2012) J. Comput. Civ. Eng. , vol.28 , Issue.2 , pp. 263-274
    • Taghaddos, H.1    Hermann, U.2    Abourizk, S.3    Mohamed, Y.4
  • 27
    • 0037058296 scopus 로고    scopus 로고
    • Particle swarm optimization for task assignment problem
    • A. Salman, I. Ahmad, and S. Al-Madani Particle swarm optimization for task assignment problem Microprocess. Microsyst. 26 8 2002 363 371
    • (2002) Microprocess. Microsyst. , vol.26 , Issue.8 , pp. 363-371
    • Salman, A.1    Ahmad, I.2    Al-Madani, S.3
  • 30
    • 84887850438 scopus 로고    scopus 로고
    • Integrating building information models with construction process simulations for project scheduling support
    • W.C. Wang, S.W. Weng, S.H. Wang, and C.Y. Chen Integrating building information models with construction process simulations for project scheduling support Autom. Constr. 37 2014 68 80
    • (2014) Autom. Constr. , vol.37 , pp. 68-80
    • Wang, W.C.1    Weng, S.W.2    Wang, S.H.3    Chen, C.Y.4
  • 31
    • 13244273704 scopus 로고    scopus 로고
    • Particle swarm optimization-based schemes for resource-constrained project scheduling
    • H. Zhang, X. Li, H. Li, and F. Huang Particle swarm optimization-based schemes for resource-constrained project scheduling Autom. Constr. 14 3 2006 393 404
    • (2006) Autom. Constr. , vol.14 , Issue.3 , pp. 393-404
    • Zhang, H.1    Li, X.2    Li, H.3    Huang, F.4
  • 32
    • 1642432959 scopus 로고    scopus 로고
    • Simulation-based methodology for project scheduling
    • H. Zhang, C.M. Tam, and J.J. Shi Simulation-based methodology for project scheduling Constr. Manag. Econ. 20 2002 667 678
    • (2002) Constr. Manag. Econ. , vol.20 , pp. 667-678
    • Zhang, H.1    Tam, C.M.2    Shi, J.J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.