1
-
-
77956838319
-
Role of simulation in construction engineering and management
-
S. AbouRizk Role of simulation in construction engineering and management J. Constr. Eng. Manag. 136 10 2010 1140 1153
-
(2010)
J. Constr. Eng. Manag.
, vol.136
, Issue.10
, pp. 1140-1153
-
-
Abourizk, S.1
-
2
-
-
81855184582
-
Research in modeling and simulation for improving construction engineering operations
-
S. AbouRizk, D. Halpin, Y. Mohamed, and U. Hermann Research in modeling and simulation for improving construction engineering operations J. Constr. Eng. Manag. 137 SPECIAL ISSUE: Construction Engineering: Opportunity and Vision for Education, Practice, and Research 2011 843 852
-
(2011)
J. Constr. Eng. Manag.
, vol.137
, Issue.SPECIAL ISSUE
, pp. 843-852
-
-
Abourizk, S.1
Halpin, D.2
Mohamed, Y.3
Hermann, U.4
-
3
-
-
84867902122
-
Construction processes configuration using process patterns
-
A. Benevolenskiy, K. Roos, P. Katranuschkov, and R.J. Scherer Construction processes configuration using process patterns Adv. Eng. Inform. 26 4 2012 727 736
-
(2012)
Adv. Eng. Inform.
, vol.26
, Issue.4
, pp. 727-736
-
-
Benevolenskiy, A.1
Roos, K.2
Katranuschkov, P.3
Scherer, R.J.4
-
4
-
-
33749826089
-
Generation of a construction planning from a 3D CAD model
-
B. De Vries, and J. Harink Generation of a construction planning from a 3D CAD model Autom. Constr. 16 1 2007 13 18
-
(2007)
Autom. Constr.
, vol.16
, Issue.1
, pp. 13-18
-
-
De Vries, B.1
Harink, J.2
-
5
-
-
14544269170
-
4D dynamic construction management and visualization software: 1. Development
-
K.W. Chau, M. Anson, and J.P. Zhang 4D dynamic construction management and visualization software: 1. Development Autom. Constr. 14 2005 512 524
-
(2005)
Autom. Constr.
, vol.14
, pp. 512-524
-
-
Chau, K.W.1
Anson, M.2
Zhang, J.P.3
-
6
-
-
84884500472
-
A framework for an automated and integrated project scheduling and management system
-
S.M. Chen, F.H. Griffis, P.H. Chen, and L.M. Chang A framework for an automated and integrated project scheduling and management system Autom. Constr. 35 2013 89 110
-
(2013)
Autom. Constr.
, vol.35
, pp. 89-110
-
-
Chen, S.M.1
Griffis, F.H.2
Chen, P.H.3
Chang, L.M.4
-
8
-
-
84882727368
-
20-Swarm intelligence for large-scale optimization in construction management
-
E. Elbeltagi 20-Swarm intelligence for large-scale optimization in construction management Metaheuristic Appl. Struct. Infrastruct. 2013 479 495
-
(2013)
Metaheuristic Appl. Struct. Infrastruct.
, pp. 479-495
-
-
Elbeltagi, E.1
-
9
-
-
0000693991
-
Scheduling with computer-interpretable construction method models
-
M. Fischer, and F. Aalami Scheduling with computer-interpretable construction method models J. Constr. Eng. Manag. 122 4 1995 337 347
-
(1995)
J. Constr. Eng. Manag.
, vol.122
, Issue.4
, pp. 337-347
-
-
Fischer, M.1
Aalami, F.2
-
10
-
-
84959948615
-
"intelligent" construction time and cost analysis
-
C. Gray "Intelligent" construction time and cost analysis Constr. Manag. Econ. 4 2 1986 135 150
-
(1986)
Constr. Manag. Econ.
, vol.4
, Issue.2
, pp. 135-150
-
-
Gray, C.1
-
11
-
-
77956323515
-
State-based simulation mechanism for facilitating project schedule updating
-
D. Hu, and Y. Mohamed State-based simulation mechanism for facilitating project schedule updating Proceedings, Construction Research Congress, ASCE, Banff, AB, Canada, May 8-10 2010 369 378
-
(2010)
Proceedings, Construction Research Congress, ASCE, Banff, AB, Canada, May 8-10
, pp. 369-378
-
-
Hu, D.1
Mohamed, Y.2
-
12
-
-
79959412033
-
Simulation-based schedule estimation model for ACS-based core wall construction of high-rise building
-
T. Hong, K. Cho, C. Hyun, and S. Han Simulation-based schedule estimation model for ACS-based core wall construction of high-rise building J. Constr. Eng. Manag. 137 6 2011 393 402
-
(2011)
J. Constr. Eng. Manag.
, vol.137
, Issue.6
, pp. 393-402
-
-
Hong, T.1
Cho, K.2
Hyun, C.3
Han, S.4
-
13
-
-
40849134303
-
Building information modelling: Experts' views on standardisation and industry deployment
-
R. Howard, and B.C. Björk Building information modelling: experts' views on standardisation and industry deployment Adv. Eng. Inform. 28 2 2008 271 280
-
(2008)
Adv. Eng. Inform.
, vol.28
, Issue.2
, pp. 271-280
-
-
Howard, R.1
Björk, B.C.2
-
14
-
-
47749155626
-
Automated generation of construction plans from primitive geometries
-
M. Kataoka Automated generation of construction plans from primitive geometries J. Constr. Eng. Manag. 134 8 2008 592 600
-
(2008)
J. Constr. Eng. Manag.
, vol.134
, Issue.8
, pp. 592-600
-
-
Kataoka, M.1
-
15
-
-
84884500391
-
Generating construction schedules through automatic data extraction using open BIM (building information modeling) technology
-
H. Kim, K. Anderson, S. Lee, and J. Hildreth Generating construction schedules through automatic data extraction using open BIM (building information modeling) technology Autom. Constr. 35 2013 285 295
-
(2013)
Autom. Constr.
, vol.35
, pp. 285-295
-
-
Kim, H.1
Anderson, K.2
Lee, S.3
Hildreth, J.4
-
16
-
-
84874676470
-
Intelligent BIM-based construction scheduling using discrete event simulation
-
M. Konig, I. Habenicht, C. Koch, and S. Spieckermann Intelligent BIM-based construction scheduling using discrete event simulation Proceedings, Winter Simulation Conference, Berlin, Germany, Dec. 9-12 2012 662 673
-
(2012)
Proceedings, Winter Simulation Conference, Berlin, Germany, Dec. 9-12
, pp. 662-673
-
-
Konig, M.1
Habenicht, I.2
Koch, C.3
Spieckermann, S.4
-
17
-
-
6344232286
-
Simplified discrete-event simulation approach for construction simulation
-
M. Lu Simplified discrete-event simulation approach for construction simulation J. Constr. Eng. Manag. ASCE 129 5 2003 537 546
-
(2003)
J. Constr. Eng. Manag. ASCE
, vol.129
, Issue.5
, pp. 537-546
-
-
Lu, M.1
-
18
-
-
41749098857
-
Resource-constrained critical path analysis based on discrete event simulation and particle swarm optimization
-
M. Lu, H. Lam, and F. Dai Resource-constrained critical path analysis based on discrete event simulation and particle swarm optimization Autom. Constr. 17 6 2008 670 681
-
(2008)
Autom. Constr.
, vol.17
, Issue.6
, pp. 670-681
-
-
Lu, M.1
Lam, H.2
Dai, F.3
-
19
-
-
33745767770
-
A particle swarm optimization-based approach to tackling simulation optimization of stochastic, large-scale and complex systems
-
M. Lu, D. Wu, and J. Zhang A particle swarm optimization-based approach to tackling simulation optimization of stochastic, large-scale and complex systems Adv. Mach. Learn. Cybern. Lect. Notes Comp. Sci. 3930 2006 528 537
-
(2006)
Adv. Mach. Learn. Cybern. Lect. Notes Comp. Sci.
, vol.3930
, pp. 528-537
-
-
Lu, M.1
Wu, D.2
Zhang, J.3
-
20
-
-
65449170044
-
Integration of four-dimensional computer-aided design modeling and three-dimensional animation of operations simulation for visualizing construction of the main stadium for the Beijing 2008 Olympic games
-
M. Lu, Y. Zhang, J. Zhang, Z. Hu, and J. Li Integration of four-dimensional computer-aided design modeling and three-dimensional animation of operations simulation for visualizing construction of the main stadium for the Beijing 2008 Olympic games Can. J. Civ. Eng. 36 3 2009 473 479
-
(2009)
Can. J. Civ. Eng.
, vol.36
, Issue.3
, pp. 473-479
-
-
Lu, M.1
Zhang, Y.2
Zhang, J.3
Hu, Z.4
Li, J.5
-
21
-
-
0034430715
-
Simphony: An integrated environment for construction simulation
-
Y. Mohamed, and S. AbouRizk Simphony: an integrated environment for construction simulation Proceedings, Winter Simulation Conference, Orlando, FL, USA, Dec. 10-13 2000 1907 1914
-
(2000)
Proceedings, Winter Simulation Conference, Orlando, FL, USA, Dec. 10-13
, pp. 1907-1914
-
-
Mohamed, Y.1
Abourizk, S.2
-
22
-
-
84928035423
-
BIM-based construction scheduling method using optimization theory for reducing activity overlaps
-
10.1061/(ASCE) CP.1943-5487.0000342
-
H. Moon, H. Kim, V. Kamat, and L. Kang BIM-based construction scheduling method using optimization theory for reducing activity overlaps J. Comput. Civ. Eng. Jul. 10 2013 10.1061/(ASCE) CP.1943-5487.0000342
-
(2013)
J. Comput. Civ. Eng.
-
-
Moon, H.1
Kim, H.2
Kamat, V.3
Kang, L.4
-
24
-
-
69949090029
-
Integrating simulation-based scheduling for module assembly yard
-
H. Taghaddos, S. AbouRizk, Y. Mohamed, and R. Hermann Integrating simulation-based scheduling for module assembly yard Proceedings, Construction Research Congress, Seattle, WA, USA, Apr. 5-7 2009 1270 1279
-
(2009)
Proceedings, Construction Research Congress, Seattle, WA, USA, Apr. 5-7
, pp. 1270-1279
-
-
Taghaddos, H.1
Abourizk, S.2
Mohamed, Y.3
Hermann, R.4
-
25
-
-
84894487522
-
A simulation-based multi-agent approach for scheduling modular construction
-
H. Taghaddos, U. Hermann, S. AbouRizk, and Y. Mohamed A simulation-based multi-agent approach for scheduling modular construction J. Comput. Civ. Eng. 28 2 2012 263 274
-
(2012)
J. Comput. Civ. Eng.
, vol.28
, Issue.2
, pp. 263-274
-
-
Taghaddos, H.1
Hermann, U.2
Abourizk, S.3
Mohamed, Y.4
-
27
-
-
0037058296
-
Particle swarm optimization for task assignment problem
-
A. Salman, I. Ahmad, and S. Al-Madani Particle swarm optimization for task assignment problem Microprocess. Microsyst. 26 8 2002 363 371
-
(2002)
Microprocess. Microsyst.
, vol.26
, Issue.8
, pp. 363-371
-
-
Salman, A.1
Ahmad, I.2
Al-Madani, S.3
-
30
-
-
84887850438
-
Integrating building information models with construction process simulations for project scheduling support
-
W.C. Wang, S.W. Weng, S.H. Wang, and C.Y. Chen Integrating building information models with construction process simulations for project scheduling support Autom. Constr. 37 2014 68 80
-
(2014)
Autom. Constr.
, vol.37
, pp. 68-80
-
-
Wang, W.C.1
Weng, S.W.2
Wang, S.H.3
Chen, C.Y.4
-
31
-
-
13244273704
-
Particle swarm optimization-based schemes for resource-constrained project scheduling
-
H. Zhang, X. Li, H. Li, and F. Huang Particle swarm optimization-based schemes for resource-constrained project scheduling Autom. Constr. 14 3 2006 393 404
-
(2006)
Autom. Constr.
, vol.14
, Issue.3
, pp. 393-404
-
-
Zhang, H.1
Li, X.2
Li, H.3
Huang, F.4
-
32
-
-
1642432959
-
Simulation-based methodology for project scheduling
-
H. Zhang, C.M. Tam, and J.J. Shi Simulation-based methodology for project scheduling Constr. Manag. Econ. 20 2002 667 678
-
(2002)
Constr. Manag. Econ.
, vol.20
, pp. 667-678
-
-
Zhang, H.1
Tam, C.M.2
Shi, J.J.3
|