-
1
-
-
77955858911
-
A critical look at integrating people, process and information technology within the construction industry
-
", P. Tzortzopoulos and M. Kagioglou, eds., University of Salford, Manchester
-
Dave, B., Koskela, L., Kagioglou, M., and Bertelsen, S. (2008). " A critical look at integrating people, process and information technology within the construction industry." Proc., 16th Annual Conf. of the Int. Group for Lean Construction IGLC16, P. Tzortzopoulos, and, M. Kagioglou, eds., University of Salford, Manchester, 795-808.
-
(2008)
Proc., 16th Annual Conf. of the Int. Group for Lean Construction IGLC16
, pp. 795-808
-
-
Dave, B.1
Koskela, L.2
Kagioglou, M.3
Bertelsen, S.4
-
2
-
-
46349106070
-
An evaluation model for ICT investments in construction projects
-
Dehlin, S., and Olofsson, T. (2008). " An evaluation model for ICT investments in construction projects." ITcon Special Issue-Case Studies of BIM Use, 13, 343-361.
-
(2008)
ITcon Special Issue-Case Studies of BIM Use
, vol.13
, pp. 343-361
-
-
Dehlin, S.1
Olofsson, T.2
-
3
-
-
0003964033
-
-
Massachusetts Institute of Technology, Cambridge, Mass
-
Deming, W. E. (1982). Out of the crisis, Massachusetts Institute of Technology, Cambridge, Mass.
-
(1982)
Out of the Crisis
-
-
Deming, W.E.1
-
4
-
-
70349429622
-
Automatic rule-based checking of building designs
-
" AUCOES 0926-5805, 10.1016/j.autcon.2009.07.002
-
Eastman, C., Lee, J.-m., Jeong, Y.-s., and Lee, J.-k. (2009). " Automatic rule-based checking of building designs." Autom. Constr. AUCOES 0926-5805, 18 (8), 1011-1033. 10.1016/j.autcon.2009.07.002
-
(2009)
Autom. Constr.
, vol.18
, Issue.8
, pp. 1011-1033
-
-
Eastman, C.1
Lee, J.-M.2
Jeong, Y.-S.3
Lee, J.-K.4
-
5
-
-
38649094993
-
-
Wiley, Hoboken, N.J
-
Eastman, C. M., Teicholz, P., Sacks, R., and Liston, K. (2008). BIM handbook: A guide to building information modeling for owners, managers, architects, engineers, contractors, and fabricators, Wiley, Hoboken, N.J.
-
(2008)
BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Architects, Engineers, Contractors, and Fabricators
-
-
Eastman, C.M.1
Teicholz, P.2
Sacks, R.3
Liston, K.4
-
7
-
-
70349782422
-
Information technology as boundary object for transformational learning
-
Forgues, D., Koskela, L., and Lejeune, A. (2009). " Information technology as boundary object for transformational learning." ITcon Special Issue Technology Strategies for Collaborative Working, 14, 48-58.
-
(2009)
ITcon Special Issue Technology Strategies for Collaborative Working
, vol.14
, pp. 48-58
-
-
Forgues, D.1
Koskela, L.2
Lejeune, A.3
-
8
-
-
55549092076
-
Evaluating potential investments in new technologies: Balancing assessments of potential benefits with assessments of potential disbenefits, reliability and utilization
-
ZZZZZZ 1045-2354, 10.1016/j.cpa.2007.11.002
-
Fox, S. (2008). " Evaluating potential investments in new technologies: Balancing assessments of potential benefits with assessments of potential disbenefits, reliability and utilization." Crit. Perspect. Account. ZZZZZZ 1045-2354, 19 (8), 1197-1218. 10.1016/j.cpa.2007.11.002
-
(2008)
Crit. Perspect. Account.
, vol.19
, Issue.8
, pp. 1197-1218
-
-
Fox, S.1
-
9
-
-
0029386597
-
Towards integrated, "intelligent," and compliant computer modeling of buildings
-
AUCOES 0926-5805, 10.1016/0926-5805(95)00004-K
-
Galle, P. (1995). " Towards integrated, "intelligent," and compliant computer modeling of buildings." Autom. Constr. AUCOES 0926-5805, 4, 189-211. 10.1016/0926-5805(95)00004-K
-
(1995)
Autom. Constr.
, vol.4
, pp. 189-211
-
-
Galle, P.1
-
11
-
-
51849161652
-
-
Technical Re No. 171, Center for Integrated Facility Engineering, Stanford Univ., Stanford, Calif
-
Gilligan, B., and Kunz, J. (2007). " VDC use in 2007: Significant value, dramatic growth, and apparent business opportunity." Technical Rep. No. 171, Center for Integrated Facility Engineering, Stanford Univ., Stanford, Calif.
-
(2007)
VDC Use in 2007: Significant Value, Dramatic Growth, and Apparent Business Opportunity
-
-
Gilligan, B.1
Kunz, J.2
-
12
-
-
65449156899
-
A novel solution for construction on-site communication-The information booth
-
CJCEB8 0315-1468, 10.1139/L09-026
-
Hewage, K. N., and Ruwanpura, J. Y. (2009). " A novel solution for construction on-site communication-The information booth." Can. J. Civ. Eng. CJCEB8 0315-1468, 36 (4), 659-671. 10.1139/L09-026
-
(2009)
Can. J. Civ. Eng.
, vol.36
, Issue.4
, pp. 659-671
-
-
Hewage, K.N.1
Ruwanpura, J.Y.2
-
14
-
-
0142006777
-
Surveys of IT in the construction industry and experience of the IT barometer in Scandinavia
-
Howard, R., Kiviniemi, A., and Samuelson, O. (1998). " Surveys of IT in the construction industry and experience of the IT barometer in Scandinavia." ITcon, 3, 47-59.
-
(1998)
ITcon
, vol.3
, pp. 47-59
-
-
Howard, R.1
Kiviniemi, A.2
Samuelson, O.3
-
15
-
-
0031674973
-
Manufacturing control with a push-pull approach
-
IJPRB8 0020-7543, 10.1080/002075498194038
-
Huang, C.-C., and Kusiak, A. (1998). " Manufacturing control with a push-pull approach." Int. J. Prod. Res. IJPRB8 0020-7543, 36 (1), 251-276. 10.1080/002075498194038
-
(1998)
Int. J. Prod. Res.
, vol.36
, Issue.1
, pp. 251-276
-
-
Huang, C.-C.1
Kusiak, A.2
-
16
-
-
0345471791
-
-
Thomas Telford, London
-
Kamara, J. M., Anumba, C. J., and Evbuomwan, N. F. O. (2002). Capturing client requirements in construction projects, Thomas Telford, London.
-
(2002)
Capturing Client Requirements in Construction Projects
-
-
Kamara, J.M.1
Anumba, C.J.2
Evbuomwan, N.F.O.3
-
17
-
-
84866126106
-
Case study of the implementation of the lean project delivery system (LPDS) using virtual building technologies on a large healthcare project
-
", R. Kenley, ed., UNSW, Sydney, Australia
-
Khanzode, A., Fischer, M., and Reed, D. (2005). " Case study of the implementation of the lean project delivery system (LPDS) using virtual building technologies on a large healthcare project." Proc., 13th Conf. of the Int. Group for Lean Construction, R. Kenley, ed., UNSW, Sydney, Australia, 153-160.
-
(2005)
Proc., 13th Conf. of the Int. Group for Lean Construction
, pp. 153-160
-
-
Khanzode, A.1
Fischer, M.2
Reed, D.3
-
18
-
-
46349088624
-
Benefits and lessons learned of implementing building virtual design and construction (VDC) technologies for coordination of mechanical, electrical, and plumbing (MEP) systems on a large healthcare project
-
Khanzode, A., Fischer, M., and Reed, D. (2008). " Benefits and lessons learned of implementing building virtual design and construction (VDC) technologies for coordination of mechanical, electrical, and plumbing (MEP) systems on a large healthcare project." ITcon Special Issue-Case studies of BIM use, 13, 324-342.
-
(2008)
ITcon Special Issue-Case Studies of BIM Use
, vol.13
, pp. 324-342
-
-
Khanzode, A.1
Fischer, M.2
Reed, D.3
-
19
-
-
77955881137
-
-
CIFE, Stanford University, Palo Alto, Calif
-
Khanzode, A., Fischer, M., Reed, D., and Ballard, G. (2006). A guide to applying the principles of virtual design & construction (VDC) to the lean project delivery process, CIFE, Stanford University, Palo Alto, Calif.
-
(2006)
A Guide to Applying the Principles of Virtual Design & Construction (VDC) to the Lean Project Delivery Process
-
-
Khanzode, A.1
Fischer, M.2
Reed, D.3
Ballard, G.4
-
21
-
-
70350550329
-
A qualitative evaluation of implementing virtual prototyping in construction
-
IEEE Computer Society, Barcelona, Spain
-
Kong, S. C. W., and Li, H. (2009). " A qualitative evaluation of implementing virtual prototyping in construction." Int. Conf. in Visualisation, IEEE Computer Society, Barcelona, Spain, 121-126.
-
(2009)
Int. Conf. in Visualisation
, pp. 121-126
-
-
Kong, S.C.W.1
Li, H.2
-
22
-
-
0003656231
-
-
Technical Re No. 72, Center for Integrated Facility Engineering, Dept. of Civil Engineering, Stanford Univ., Stanford, Calif
-
Koskela, L. (1992). " Application of the new production philosophy to construction." Technical Rep. No. 72, Center for Integrated Facility Engineering, Dept. of Civil Engineering, Stanford Univ., Stanford, Calif.
-
(1992)
Application of the New Production Philosophy to Construction
-
-
Koskela, L.1
-
24
-
-
34250664260
-
Making do - The eighth category of waste
-
C. T. Formoso and S. Bertelsen, eds., Lean Construction-DK, Elsinore, Denmark
-
Koskela, L. (2004a). " Making do-the eighth category of waste." Proc., 12th Annual Conf. on Lean Construction, C. T. Formoso, and, S. Bertelsen, eds., Lean Construction-DK, Elsinore, Denmark.
-
(2004)
Proc., 12th Annual Conf. on Lean Construction
-
-
Koskela, L.1
-
25
-
-
84987668103
-
Moving-on-beyond lean thinking
-
Koskela, L. (2004b). " Moving-on-beyond lean thinking." Lean Construction Journal, 1 (1), 24-37.
-
(2004)
Lean Construction Journal
, vol.1
, Issue.1
, pp. 24-37
-
-
Koskela, L.1
-
26
-
-
0013200087
-
Information technology in construction: How to realize the benefits?
-
E. C. S. Clarke, M. G. Hunter, A. Wenn, eds., Idea Group, Inc. (IGI), Hershey, Pa
-
Koskela, L., and Kazi, A. S. (2003). " Information technology in construction: How to realize the benefits? " Socio-technical and human cognition elements of information systems, E. C. S. Clarke, M. G. Hunter, A. Wenn, eds., Idea Group, Inc. (IGI), Hershey, Pa., 295.
-
(2003)
Socio-technical and Human Cognition Elements of Information Systems
, pp. 295
-
-
Koskela, L.1
Kazi, A.S.2
-
27
-
-
67949100453
-
Optimizing construction planning schedules by virtual prototyping enabled resource analysis
-
" AUCOES 0926-5805, 10.1016/j.autcon.2009.04.002
-
Li, H., Chan, N., Huang, T., Guo, H. L., Lu, W., and Skitmore, M. (2009). " Optimizing construction planning schedules by virtual prototyping enabled resource analysis." Autom. Constr. AUCOES 0926-5805, 18 (7), 912-918. 10.1016/j.autcon.2009.04.002
-
(2009)
Autom. Constr.
, vol.18
, Issue.7
, pp. 912-918
-
-
Li, H.1
Chan, N.2
Huang, T.3
Guo, H.L.4
Lu, W.5
Skitmore, M.6
-
29
-
-
1442360886
-
Focused sharing of information for multidisciplinary decision making by project teams
-
Liston, K., Fischer, M., and Winograd, T. (2001). " Focused sharing of information for multidisciplinary decision making by project teams." ITcon, 6, 69-82.
-
(2001)
ITcon
, vol.6
, pp. 69-82
-
-
Liston, K.1
Fischer, M.2
Winograd, T.3
-
30
-
-
77955908801
-
Case studies in BIM implementation for programming of healthcare facilities
-
Manning, R., and Messner, J. (2008). " Case studies in BIM implementation for programming of healthcare facilities." ITcon special issue-Case studies of BIM use, 13, 246-257.
-
(2008)
ITcon Special Issue-Case Studies of BIM Use
, vol.13
, pp. 246-257
-
-
Manning, R.1
Messner, J.2
-
31
-
-
77949699575
-
-
" Ph.D. dissertation, University of California, Berkeley, Calif., p
-
Milberg, C. T., (2006). " Application of tolerance management to civil systems." Ph.D. dissertation, University of California, Berkeley, Calif., 377 pp.
-
(2006)
Application of Tolerance Management to Civil Systems
, pp. 377
-
-
Milberg, C.T.1
-
32
-
-
84866094800
-
Exploration of set-based design for reinforced concrete structures
-
", C. Pasquire and P. Tzortzopoulous, eds., Michigan State University, East Lansing, Mich
-
Parrish, K., Wong, J.-M., Tommelein, I. D., and Stojadinovic, B. (2007). " Exploration of set-based design for reinforced concrete structures." Proc., 15th Conf. of the Int. Group for Lean Construction, C. Pasquire, and, P. Tzortzopoulous, eds., Michigan State University, East Lansing, Mich., 213-222.
-
(2007)
Proc., 15th Conf. of the Int. Group for Lean Construction
, pp. 213-222
-
-
Parrish, K.1
Wong, J.-M.2
Tommelein, I.D.3
Stojadinovic, B.4
-
33
-
-
33645158837
-
Improving value generation in the design process of industrial projects using CAVT
-
" JMENEA 0742-597X, 10.1061/(ASCE)0742-597X(2006)22:2(52)
-
Rischmoller, L., Alarcon, L. F., and Koskela, L. (2006). " Improving value generation in the design process of industrial projects using CAVT." J. Manage. Eng. JMENEA 0742-597X, 22 (2), 52-60. 10.1061/(ASCE)0742-597X(2006) 22:2(52)
-
(2006)
J. Manage. Eng.
, vol.22
, Issue.2
, pp. 52-60
-
-
Rischmoller, L.1
Alarcon, L.F.2
Koskela, L.3
-
34
-
-
0011879319
-
A survey on the impact of information technology in the Canadian architecture, engineering and construction industry
-
Rivard, H. (2000). " A survey on the impact of information technology in the Canadian architecture, engineering and construction industry." ITcon, 5, 37-56.
-
(2000)
ITcon
, vol.5
, pp. 37-56
-
-
Rivard, H.1
-
35
-
-
38649099349
-
Impact of three-dimensional parametric modeling of buildings on productivity in structural engineering practice
-
DOI 10.1016/j.autcon.2007.08.003, PII S0926580507001082
-
Sacks, R., and Barak, R. (2008). " Impact of three-dimensional parametric modeling of buildings on productivity in structural engineering practice." Autom. Constr. AUCOES 0926-5805, 17, 439-449. 10.1016/j.autcon.2007.08.003 (Pubitemid 351173669)
-
(2008)
Automation in Construction
, vol.17
, Issue.4
, pp. 439-449
-
-
Sacks, R.1
Barak, R.2
-
36
-
-
1642618587
-
Parametric 3D modeling in building construction with examples from precast concrete
-
" AUCOES 0926-5805, 10.1016/S0926-5805(03)00043-8
-
Sacks, R., Eastman, C. M., and Lee, G. (2004). " Parametric 3D modeling in building construction with examples from precast concrete." Autom. Constr. AUCOES 0926-5805, 13, 291-312. 10.1016/S0926-5805(03)00043-8
-
(2004)
Autom. Constr.
, vol.13
, pp. 291-312
-
-
Sacks, R.1
Eastman, C.M.2
Lee, G.3
-
37
-
-
34247279276
-
Lean management model for construction of high-rise apartment buildings
-
DOI 10.1061/(ASCE)0733-9364(2007)133:5(374)
-
Sacks, R., and Goldin, M. (2007). " Lean management model for construction of high-rise apartment buildings." J. Constr. Eng. Manage. JCEMD4 0733-9364, 133 (5), 374-384. 10.1061/(ASCE)0733-9364(2007)133:5(374) (Pubitemid 46610041)
-
(2007)
Journal of Construction Engineering and Management
, vol.133
, Issue.5
, pp. 374-384
-
-
Sacks, R.1
Goldin, M.2
-
38
-
-
77955687856
-
Requirements for building information modeling based lean production management systems for construction
-
" AUCOES 0926-5805
-
Sacks, R., Radosavljevic, M., and Barak, R. (2010). " Requirements for building information modeling based lean production management systems for construction." Autom. Constr. AUCOES 0926-5805, 19 (5), 641-655.
-
(2010)
Autom. Constr.
, vol.19
, Issue.5
, pp. 641-655
-
-
Sacks, R.1
Radosavljevic, M.2
Barak, R.3
-
39
-
-
70450209479
-
Visualization of work flow to support lean construction
-
" JCEMD4 0733-9364, 10.1061/(ASCE)CO.1943-7862.0000102
-
Sacks, R., Treckmann, M., and Rozenfeld, O. (2009). " Visualization of work flow to support lean construction." J. Constr. Eng. Manage. JCEMD4 0733-9364, 135 (12), 1307-1315. 10.1061/(ASCE)CO.1943-7862.0000102
-
(2009)
J. Constr. Eng. Manage.
, vol.135
, Issue.12
, pp. 1307-1315
-
-
Sacks, R.1
Treckmann, M.2
Rozenfeld, O.3
-
42
-
-
2942750055
-
Multi-constraint information management and visualisation for collaborative planning and control in construction
-
Sriprasert, E., and Dawood, N. (2003). " Multi-constraint information management and visualisation for collaborative planning and control in construction." ITcon-IT in Construction, 8, 341-366.
-
(2003)
ITcon-IT in Construction
, vol.8
, pp. 341-366
-
-
Sriprasert, E.1
Dawood, N.2
-
43
-
-
84970642045
-
Institutional ecology, translations' and boundary objects: Amateurs and professionals in Berkeley's Museum of Vertebrate Zoology, 1907-39
-
10.1177/030631289019003001 0306-3127
-
Star, S. L., and Griesemer, J. R. (1989). " Institutional ecology, translations' and boundary objects: Amateurs and professionals in Berkeley's Museum of Vertebrate Zoology, 1907-39." Social Studies of Science, 19 (3), 387-420. 10.1177/030631289019003001 0306-3127
-
(1989)
Social Studies of Science
, vol.19
, Issue.3
, pp. 387-420
-
-
Star, S.L.1
Griesemer, J.R.2
-
44
-
-
0003735084
-
-
Prentice-Hall, London
-
Stevens, R., Brook, P., Jackson, K., and Arnold, S. (1998). Systems engineering: Coping with complexity, Prentice-Hall, London.
-
(1998)
Systems Engineering: Coping with Complexity
-
-
Stevens, R.1
Brook, P.2
Jackson, K.3
Arnold, S.4
-
46
-
-
67649182576
-
-
Ph.D., Stanford Univ., Stanford, Calif
-
Taylor, J. (2005). " Three perspectives on innovation in interorganizational networks: Systemic innovation, boundary object change, and the alignment of innovations and networks." Ph.D., Stanford Univ., Stanford, Calif.
-
(2005)
Three Perspectives on Innovation in Interorganizational Networks: Systemic Innovation, Boundary Object Change, and the Alignment of Innovations and Networks
-
-
Taylor, J.1
-
49
-
-
0033075833
-
Product modeling standards for the building and construction industry: Past, present and future
-
AUCOES 0926-5805, 10.1016/S0926-5805(98)00073-9
-
Tolman, F. P. (1999). " Product modeling standards for the building and construction industry: Past, present and future." Autom. Constr. AUCOES 0926-5805, 8, 227-235. 10.1016/S0926-5805(98)00073-9
-
(1999)
Autom. Constr.
, vol.8
, pp. 227-235
-
-
Tolman, F.P.1
-
50
-
-
13944269909
-
Work structuring to achieve integrated product-process design
-
DOI 10.1061/(ASCE)0733-9364(2004)130:6(780)
-
Tsao, C. C. Y., Tommelein, I. D., Swanlund, E. S., and Howell, G. A. (2004). " Work structuring to achieve integrated product-Process design." J. Constr. Eng. Manage. JCEMD4 0733-9364, 130 (6), 780-789. 10.1061/(ASCE)0733-9364(2004)130:6(780) (Pubitemid 40265310)
-
(2004)
Journal of Construction Engineering and Management
, vol.130
, Issue.6
, pp. 780-789
-
-
Tsao, C.C.Y.1
Tommelein, I.D.2
Swanlund, E.S.3
Howell, G.A.4
-
51
-
-
0028516078
-
Object-oriented modeling of design system for RC buildings
-
" JCCEE5 0887-3801, 10.1061/(ASCE)0887-3801(1994)8:4(436)
-
Turk, Z., Isakovic, T., and Fischinger, M. (1994). " Object-oriented modeling of design system for RC buildings." J. Comput. Civ. Eng. JCCEE5 0887-3801, 8 (4), 436-453. 10.1061/(ASCE)0887-3801(1994)8:4(436)
-
(1994)
J. Comput. Civ. Eng.
, vol.8
, Issue.4
, pp. 436-453
-
-
Turk, Z.1
Isakovic, T.2
Fischinger, M.3
|