메뉴 건너뛰기




Volumn 70, Issue , 2016, Pages 128-142

Integrating work sequences and temporary structures into safety planning: Automated scaffolding-related safety hazard identification and prevention in BIM

Author keywords

BIM; Construction planning; Safety; Scaffolding; Temporary structures

Indexed keywords

ACCIDENT PREVENTION; HAZARDS; SCAFFOLDS;

EID: 84982847693     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2016.06.012     Document Type: Article
Times cited : (148)

References (24)
  • 1
    • 84964215307 scopus 로고    scopus 로고
    • Commonly Used Statistics
    • (accessed January 17, 2015)
    • [1] OSHA, Commonly Used Statistics. https://www.osha.gov/oshstats/commonstats.html, 2014 (accessed January 17, 2015).
    • (2014)
    • OSHA1
  • 2
    • 84982834429 scopus 로고    scopus 로고
    • Fatal Occupational Injuries by Event or Exposure for All Fatalities and Major Private Industry Sector, All United States
    • (accessed January 17, 2015)
    • [2] BLS, Fatal Occupational Injuries by Event or Exposure for All Fatalities and Major Private Industry Sector, All United States. http://www.bls.gov/iif/oshwc/cfoi/cftb0249.pdf, 2009 (accessed January 17, 2015).
    • (2009)
    • BLS1
  • 3
    • 0043194336 scopus 로고    scopus 로고
    • Safety with access scaffolds: development of a prototype decision aid based on accident analysis
    • [3] Whitaker, S.M., Graves, R.J., James, M., McCann, P., Safety with access scaffolds: development of a prototype decision aid based on accident analysis. J. Saf. Res. 34 (2003), 249–261, 10.1016/S0022-4375(03)00025-2.
    • (2003) J. Saf. Res. , vol.34 , pp. 249-261
    • Whitaker, S.M.1    Graves, R.J.2    James, M.3    McCann, P.4
  • 4
    • 78049300426 scopus 로고    scopus 로고
    • Application of geographic information systems in construction safety planning
    • [4] Bansal, V.K., Application of geographic information systems in construction safety planning. Int. J. Proj. Manag. 29 (2011), 66–77, 10.1016/j.ijproman.2010.01.007.
    • (2011) Int. J. Proj. Manag. , vol.29 , pp. 66-77
    • Bansal, V.K.1
  • 5
    • 84869092675 scopus 로고    scopus 로고
    • Building information modeling (BIM) and safety: automatic safety checking of construction models and schedules
    • [5] Zhang, S., Teizer, J., Lee, J.K., Eastman, C.M., Venugopal, M., Building information modeling (BIM) and safety: automatic safety checking of construction models and schedules. Autom. Constr. 29 (2013), 183–195, 10.1016/j.autcon.2012.05.006.
    • (2013) Autom. Constr. , vol.29 , pp. 183-195
    • Zhang, S.1    Teizer, J.2    Lee, J.K.3    Eastman, C.M.4    Venugopal, M.5
  • 6
    • 27544478622 scopus 로고    scopus 로고
    • Linking construction fatalities to the design for construction safety concept
    • [6] Behm, M., Linking construction fatalities to the design for construction safety concept. Saf. Sci. 43 (2005), 589–611, 10.1016/j.ssci.2005.04.002.
    • (2005) Saf. Sci. , vol.43 , pp. 589-611
    • Behm, M.1
  • 8
    • 11144345771 scopus 로고    scopus 로고
    • Handbook of Temporary Structures in Construction
    • McGraw-Hill Professional
    • [8] Ratay, R., Handbook of Temporary Structures in Construction. 1996, McGraw-Hill Professional.
    • (1996)
    • Ratay, R.1
  • 9
    • 84961199018 scopus 로고    scopus 로고
    • Top 10 Most Frequently Cited Standards
    • [9] OSHA, Top 10 Most Frequently Cited Standards. https://www.osha.gov/Top_Ten_Standards.html, 2014.
    • (2014)
    • OSHA1
  • 10
    • 84976447532 scopus 로고    scopus 로고
    • Scaffolding eTool
    • (accessed January 17, 2015)
    • [10] OSHA, Scaffolding eTool. https://www.osha.gov/SLTC/etools/scaffolding/overview.html, 2003 (accessed January 17, 2015).
    • (2003)
    • OSHA1
  • 11
    • 2642514012 scopus 로고    scopus 로고
    • An evaluation of scaffold safety at construction sites
    • [11] Halperin, K.M., McCann, M., An evaluation of scaffold safety at construction sites. J. Saf. Res. 35 (2004), 141–150, 10.1016/j.jsr.2003.11.004.
    • (2004) J. Saf. Res. , vol.35 , pp. 141-150
    • Halperin, K.M.1    McCann, M.2
  • 12
    • 0035391255 scopus 로고    scopus 로고
    • Development of causal model of construction accident causation
    • [12] Suraji, A., Duff, A., Peckitt, S., Development of causal model of construction accident causation. J. Constr. Eng. Manag. 127 (2001), 337–344, 10.1061/(ASCE)0733-9364(2001)127:4(337).
    • (2001) J. Constr. Eng. Manag. , vol.127 , pp. 337-344
    • Suraji, A.1    Duff, A.2    Peckitt, S.3
  • 13
    • 84936884954 scopus 로고    scopus 로고
    • Semiautomated scaffolding planning: development of the feature lexicon for computer application
    • [13] Kim, J., Fischer, M., Kunz, J., Levitt, R., Semiautomated scaffolding planning: development of the feature lexicon for computer application. J. Comput. Civ. Eng., 2014.
    • (2014) J. Comput. Civ. Eng.
    • Kim, J.1    Fischer, M.2    Kunz, J.3    Levitt, R.4
  • 14
    • 84893800019 scopus 로고    scopus 로고
    • Automatic design and planning of scaffolding systems using building information modeling
    • [14] Kim, K., Teizer, J., Automatic design and planning of scaffolding systems using building information modeling. Adv. Eng. Inform. 28 (2014), 66–80.
    • (2014) Adv. Eng. Inform. , vol.28 , pp. 66-80
    • Kim, K.1    Teizer, J.2
  • 15
    • 85016410234 scopus 로고    scopus 로고
    • A Guide to Scaffolding Use in the Construction Industry
    • (accessed January 17, 2015)
    • [15] OSHA, A Guide to Scaffolding Use in the Construction Industry. https://www.osha.gov/Publications/osha3150.pdf, 2002 (accessed January 17, 2015).
    • (2002)
    • OSHA1
  • 16
    • 84982819295 scopus 로고    scopus 로고
    • Nemetschek, Scia Scaffolding: Providing an Accurate Design and Time-Saving Workflow, (n.d.). (accessed January 17,
    • [16] Nemetschek, Scia Scaffolding: Providing an Accurate Design and Time-Saving Workflow, (n.d.). http://www.scia-online.com/www/websiteUS.nsf/0/e87baaf3b09f3439c125758a004a411a/$FILE/Scia-Scaffolding.pdf (accessed January 17, 2015).
    • (2015)
  • 17
    • 84982805162 scopus 로고    scopus 로고
    • Smart Scaffolder, Exploit the benefits of BIM (Building Information Modelling)ss, (n.d.). (accessed January 17,
    • [17] Smart Scaffolder, Exploit the benefits of BIM (Building Information Modelling)ss, (n.d.). http://www.smartscaffolder.com (accessed January 17, 2015).
    • (2015)
  • 18
    • 84878419205 scopus 로고    scopus 로고
    • 4D-BIM for Construction Safety Planning
    • ()
    • [18] Sulankivi, K., Kähkönen, K., 4D-BIM for Construction Safety Planning. Proc. W099- …., 2010, 117 ( http://cibworld.xs4all.nl/dl/publications/w099_pub357.pdf#page=122).
    • (2010) Proc. W099- …. , pp. 117
    • Sulankivi, K.1    Kähkönen, K.2
  • 19
    • 41749088228 scopus 로고    scopus 로고
    • Quantitative analysis of workflow, temporary structure usage, and productivity using 4D models
    • [19] Jongeling, R., Kim, J., Fischer, M., Mourgues, C., Olofsson, T., Quantitative analysis of workflow, temporary structure usage, and productivity using 4D models. Autom. Constr. 17 (2008), 780–791, 10.1016/j.autcon.2008.02.006.
    • (2008) Autom. Constr. , vol.17 , pp. 780-791
    • Jongeling, R.1    Kim, J.2    Fischer, M.3    Mourgues, C.4    Olofsson, T.5
  • 20
    • 0041805006 scopus 로고    scopus 로고
    • Automated generation of work spaces required by construction activities
    • [20] Akinci, B., Fischer, M., Kunz, J., Automated generation of work spaces required by construction activities. J. Constr. Eng. Manag. 128 (2002), 306–315, 10.1061/(ASCE)0733-9364(2002)128:4(306).
    • (2002) J. Constr. Eng. Manag. , vol.128 , pp. 306-315
    • Akinci, B.1    Fischer, M.2    Kunz, J.3
  • 21
    • 84924423510 scopus 로고    scopus 로고
    • Ontology-based semantic modeling of construction safety knowledge: towards automated safety planning for job hazard analysis (JHA)
    • [21] Zhang, S., Frank, B., Jochen, T., Ontology-based semantic modeling of construction safety knowledge: towards automated safety planning for job hazard analysis (JHA). Autom. Constr. 52 (2015), 29–41.
    • (2015) Autom. Constr. , vol.52 , pp. 29-41
    • Zhang, S.1    Frank, B.2    Jochen, T.3
  • 22
    • 84893794692 scopus 로고    scopus 로고
    • Development of workspace conflict visualization system using 4D object of work schedule
    • [22] Moon, H., Dawood, N., Kang, L., Development of workspace conflict visualization system using 4D object of work schedule. Adv. Eng. Inform. 28 (2014), 50–65, 10.1016/j.aei.2013.12.001.
    • (2014) Adv. Eng. Inform. , vol.28 , pp. 50-65
    • Moon, H.1    Dawood, N.2    Kang, L.3
  • 23
    • 61549129644 scopus 로고    scopus 로고
    • The Construction Chart Book
    • fifth ed. Center for Construction Research and Training Silver Spring, MD
    • [23] CPWR, The Construction Chart Book. fifth ed., 2013, Center for Construction Research and Training, Silver Spring, MD.
    • (2013)
    • CPWR1
  • 24
    • 84893765638 scopus 로고    scopus 로고
    • Playbook of Leading Industry Practices for Estimating, Controlling, and Managing Indirect Construction Cost
    • [24] Construction Industry Institute, Playbook of Leading Industry Practices for Estimating, Controlling, and Managing Indirect Construction Cost. 2012.
    • (2012)
    • Construction Industry Institute1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.