1
-
-
51849088974
-
Areas of application for 3D and 4D models on construction projects
-
T. Hartmann, J. Gao, and M. Fisher Areas of application for 3D and 4D models on construction projects J. Constr. Eng. Manag. 134 10 2008 776 785
-
(2008)
J. Constr. Eng. Manag.
, vol.134
, Issue.10
, pp. 776-785
-
-
Hartmann, T.1
Gao, J.2
Fisher, M.3
-
2
-
-
0034227635
-
Feasibility study of 4D CAD in commercial construction
-
B. Koo, and M. Fisher Feasibility study of 4D CAD in commercial construction J. Constr. Eng. Manag. 126 4 2000 251 260
-
(2000)
J. Constr. Eng. Manag.
, vol.126
, Issue.4
, pp. 251-260
-
-
Koo, B.1
Fisher, M.2
-
3
-
-
0742285899
-
Virtual building for construction projects
-
L.M. Sheppard Virtual building for construction projects IEEE Comput. Graph. Appl. 24 1 2004 6 12
-
(2004)
IEEE Comput. Graph. Appl.
, vol.24
, Issue.1
, pp. 6-12
-
-
Sheppard, L.M.1
-
4
-
-
10444242643
-
Moving beyond the fourth dimension with an IFC-based single project
-
A.M. Tanyer, and G. Aouad Moving beyond the fourth dimension with an IFC-based single project Autom. Constr. 14 1 2005 15 32
-
(2005)
Autom. Constr.
, vol.14
, Issue.1
, pp. 15-32
-
-
Tanyer, A.M.1
Aouad, G.2
-
5
-
-
70350060197
-
Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs
-
M. Golparvar-Fard, F. Peña-Mora, C.A. Arboleda, and S. Lee Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs J. Comput. Civ. Eng. 23 6 2009 391 404
-
(2009)
J. Comput. Civ. Eng.
, vol.23
, Issue.6
, pp. 391-404
-
-
Golparvar-Fard, M.1
Peña-Mora, F.2
Arboleda, C.A.3
Lee, S.4
-
6
-
-
76549114928
-
An evaluation of the applicability of 4D CAD on construction projects
-
A. Mahalingam, R. Kashyap, and C. Mahajan An evaluation of the applicability of 4D CAD on construction projects Autom. Constr. 19 2010 148 159
-
(2010)
Autom. Constr.
, vol.19
, pp. 148-159
-
-
Mahalingam, A.1
Kashyap, R.2
Mahajan, C.3
-
7
-
-
79551684087
-
BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies
-
J.P. Zhang, and Z.Z. Hu BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies Autom. Constr. 20 2011 155 166
-
(2011)
Autom. Constr.
, vol.20
, pp. 155-166
-
-
Zhang, J.P.1
Hu, Z.Z.2
-
8
-
-
77949485153
-
The use of a virtual building design and construction model for developing an effective project concept in 5D environment
-
V. Popov, V. Juocevicius, D. Migilinskas, L. Ustinovichius, and S. Mikalauskas The use of a virtual building design and construction model for developing an effective project concept in 5D environment Autom. Constr. 19 1 2010 66 72
-
(2010)
Autom. Constr.
, vol.19
, Issue.1
, pp. 66-72
-
-
Popov, V.1
Juocevicius, V.2
Migilinskas, D.3
Ustinovichius, L.4
Mikalauskas, S.5
-
9
-
-
77949484698
-
Using the MD CAS model to develop the time-cost integrated schedule for construction projects
-
C.W. Feng, Y.J. Chen, and J.R. Huang Using the MD CAS model to develop the time-cost integrated schedule for construction projects Autom. Constr. 19 2010 347 356
-
(2010)
Autom. Constr.
, vol.19
, pp. 347-356
-
-
Feng, C.W.1
Chen, Y.J.2
Huang, J.R.3
-
10
-
-
38649094993
-
-
second ed. John Wiley & Sons, Inc. New Jersey
-
C. Eastman, P. Teicholz, R. Sacks, and K. Liston BIM Handbook, a Guide to Building Information Modeling for Owners, Managers, Designers, Engineers, and Contractors second ed. 2011 John Wiley & Sons, Inc. New Jersey
-
(2011)
BIM Handbook, A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers, and Contractors
-
-
Eastman, C.1
Teicholz, P.2
Sacks, R.3
Liston, K.4
-
12
-
-
65449170044
-
Integration of four-dimensional computer-aided design modeling and three-dimensional animation of operations simulation for visualizing construction of the main stadium for the Beijing 2008 Olympic games
-
M. Lu, Y. Zhang, J.P. Zhang, Z.Z. Hu, and J.L. Li Integration of four-dimensional computer-aided design modeling and three-dimensional animation of operations simulation for visualizing construction of the main stadium for the Beijing 2008 Olympic games Can. J. Civ. Eng. 36 3 2009 473 479
-
(2009)
Can. J. Civ. Eng.
, vol.36
, Issue.3
, pp. 473-479
-
-
Lu, M.1
Zhang, Y.2
Zhang, J.P.3
Hu, Z.Z.4
Li, J.L.5
-
13
-
-
84887836018
-
Integration of BIM and construction simulation for scheduling
-
M.T. Lee, C.Y. Chen, S.W. Weng, S.H. Wang, W.C. Wang, J.J. Liu, Y.Y. Cheng, M.F. Yeh, B.Y. Lin, and C.J. Kung Integration of BIM and construction simulation for scheduling Proceedings of the 12th International Conference on Construction Applications of Virtual Reality, November 1-2, Taipei, Taiwan 2012
-
(2012)
Proceedings of the 12th International Conference on Construction Applications of Virtual Reality, November 1-2, Taipei, Taiwan
-
-
Lee, M.T.1
Chen, C.Y.2
Weng, S.W.3
Wang, S.H.4
Wang, W.C.5
Liu, J.J.6
Cheng, Y.Y.7
Yeh, M.F.8
Lin, B.Y.9
Kung, C.J.10
-
14
-
-
77957259807
-
A three-stage framework for introducing a 4D tool in large consulting firms
-
M.H. Tsai, S.C. Kang, and S.H. Hsieh A three-stage framework for introducing a 4D tool in large consulting firms Adv. Eng. Inform. 24 2010 476 489
-
(2010)
Adv. Eng. Inform.
, vol.24
, pp. 476-489
-
-
Tsai, M.H.1
Kang, S.C.2
Hsieh, S.H.3
-
17
-
-
13244275240
-
Application of 4D for dynamic site layout and management of construction projects
-
DOI 10.1016/j.autcon.2004.08.011, PII S0926580504001104, International Conference for Construction Information Technology
-
Z. Ma, Q. Shen, and J. Zhang Application of 4D for dynamic site layout and management of construction projects Autom. Constr. 14 3 2005 369 381 (Pubitemid 40183428)
-
(2005)
Automation in Construction
, vol.14
, Issue.3
, pp. 369-381
-
-
Ma, Z.1
Shen, Q.2
Zhang, J.3
-
18
-
-
33746364173
-
Dynamic quantification and analysis of the construction workspace congestion utilising 4D visualisation
-
DOI 10.1016/j.autcon.2005.08.005, PII S092658050500124X
-
Z. Mallasi Dynamic quantification and analysis of the construction workspace congestion utilising 4D visualization Autom. Constr. 15 2006 640 655 (Pubitemid 44118734)
-
(2006)
Automation in Construction
, vol.15
, Issue.5
, pp. 640-655
-
-
Mallasi, Z.1
-
19
-
-
3142565144
-
4D dynamic management for construction planning and resource utilization
-
H.J. Wang, J.P. Zhang, K.W. Chau, and M. Anson 4D dynamic management for construction planning and resource utilization Autom. Constr. 13 5 2004 575 589
-
(2004)
Autom. Constr.
, vol.13
, Issue.5
, pp. 575-589
-
-
Wang, H.J.1
Zhang, J.P.2
Chau, K.W.3
Anson, M.4
-
20
-
-
75149127614
-
An integrated safety management with construction management
-
V. Benjaoran, and S. Bhokha An integrated safety management with construction management Autom. Constr. 48 2010 395 403
-
(2010)
Autom. Constr.
, vol.48
, pp. 395-403
-
-
Benjaoran, V.1
Bhokha, S.2
-
21
-
-
77957287318
-
Knowledge-based schedule generation and evaluation
-
E. Mikulakova, M. König, E. Tauscher, and K. Beucke Knowledge-based schedule generation and evaluation Adv. Eng. Inform. 24 4 2010 389 403
-
(2010)
Adv. Eng. Inform.
, vol.24
, Issue.4
, pp. 389-403
-
-
Mikulakova, E.1
König, M.2
Tauscher, E.3
Beucke, K.4
-
23
-
-
0034322953
-
Simplifying simulation modeling through integration with 3D CAD
-
DOI 10.1061/(ASCE)0733-9364(2000)126:6(475)
-
S. AbouRizk, and K. Mather Simplifying simulation modeling through integration with 3D CAD J. Constr. Eng. Manag. 126 6 2000 475 483 (Pubitemid 32022001)
-
(2000)
Journal of Construction Engineering and Management
, vol.126
, Issue.6
, pp. 475-483
-
-
AbouRizk, S.1
Mather, K.2
-
28
-
-
34848867519
-
Generic representation of 3D motion paths in dynamic animations of simulated construction processes
-
DOI 10.1016/j.autcon.2007.04.002, PII S092658050700060X
-
V.R. Kamat, and J.C. Martinez Generic representation of 3D motion paths in dynamic animations of simulated construction processes Autom. Constr. 12 2008 188 200 (Pubitemid 47489769)
-
(2008)
Automation in Construction
, vol.17
, Issue.2
, pp. 188-200
-
-
Kamat, V.R.1
Martinez, J.C.2
-
29
-
-
70350060196
-
Three-dimensional simulation and visualization of crane-assisted construction erection processes
-
S.C. Kang, H.L. Chi, and E. Miranda Three-dimensional simulation and visualization of crane-assisted construction erection processes J. Comput. Civ. Eng. 23 6 2009 363 371
-
(2009)
J. Comput. Civ. Eng.
, vol.23
, Issue.6
, pp. 363-371
-
-
Kang, S.C.1
Chi, H.L.2
Miranda, E.3
-
30
-
-
58849155935
-
A new 4D management approach to construction planning and site space utilization
-
J.P. Zhang, M. Anson, and Q. Wang A new 4D management approach to construction planning and site space utilization Proceedings of the 8th International Conference on Computing in Civil and Building Engineering (ICCCBE-VIII) 2000 Stanford 15 22 (Pubitemid 35213164)
-
(2000)
Computing in Civil and Building Engineering
, vol.1
, pp. 15-22
-
-
Zhang, J.-P.1
Anson, M.2
Wang, Q.3
-
31
-
-
6344232286
-
Simplified discrete-event simulation approach for construction simulation
-
DOI 10.1061/(ASCE)0733-9364(2003)129:5(537)
-
M. Lu Simplified discrete-event simulation approach for construction simulation J. Constr. Eng. Manag. 129 5 2003 537 546 (Pubitemid 40265441)
-
(2003)
Journal of Construction Engineering and Management
, vol.129
, Issue.5
, pp. 537-546
-
-
Lu, M.1
-
32
-
-
35348876020
-
Generic process mapping and simulation methodology for integrating site layout and operations planning in construction
-
DOI 10.1061/(ASCE)0887-3801(2007)21:6(453)
-
M. Lu, W.H. Chan, J.P. Zhang, and M. Cao Generic process mapping and simulation methodology for integrating site layout and operations planning in construction J. Comput. Civ. Eng. 21 6 2007 453 462 (Pubitemid 47587962)
-
(2007)
Journal of Computing in Civil Engineering
, vol.21
, Issue.6
, pp. 453-462
-
-
Lu, M.1
Chan, W.-H.2
Zhang, J.-P.3
Cao, M.4
-
33
-
-
77957282618
-
Bridge construction schedule generation with pattern-based construction methods and constraint-based simulation
-
I.C. Wu, A. Borrmann, U. Beisert, M. König, and E. Rank Bridge construction schedule generation with pattern-based construction methods and constraint-based simulation Adv. Eng. Inform. 24 2010 379 388
-
(2010)
Adv. Eng. Inform.
, vol.24
, pp. 379-388
-
-
Wu, I.C.1
Borrmann, A.2
Beisert, U.3
König, M.4
Rank, E.5
-
35
-
-
79952306806
-
Discrete-event simulation based virtual reality environments for construction operations: A technology introduction
-
P.V. Rekapalli, and J.C. Martinez Discrete-event simulation based virtual reality environments for construction operations: a technology introduction J. Constr. Eng. Manag. 137 3 2011 214 224
-
(2011)
J. Constr. Eng. Manag.
, vol.137
, Issue.3
, pp. 214-224
-
-
Rekapalli, P.V.1
Martinez, J.C.2
-
36
-
-
79954462583
-
Integrated information modeling and visual simulation of engineering operations using dynamic augmented reality scene graphs
-
A.H. Behzadan, and V.R. Kamat Integrated information modeling and visual simulation of engineering operations using dynamic augmented reality scene graphs Electron. J. Inf. Technol. Constr. 16 2011 259 278
-
(2011)
Electron. J. Inf. Technol. Constr.
, vol.16
, pp. 259-278
-
-
Behzadan, A.H.1
Kamat, V.R.2
-
37
-
-
84878418673
-
3D AR-based modeling for discrete-event simulation of transport operations in construction
-
H.M. Chen, and P.H. Huang 3D AR-based modeling for discrete-event simulation of transport operations in construction Autom. Constr. 33 2013 123 136
-
(2013)
Autom. Constr.
, vol.33
, pp. 123-136
-
-
Chen, H.M.1
Huang, P.H.2
-
38
-
-
84887835524
-
-
Computer Integrated Construction (cic) Research Program Pennsylvania State University PA, USA
-
CIC, Computer Integrated Construction (CIC) Research Program BIM Project Execution Planning Guide - Version 2.1 2011 Pennsylvania State University PA, USA
-
(2011)
BIM Project Execution Planning Guide - Version 2.1
-
-
-
39
-
-
84887837595
-
-
Autodesk http://usa.autodesk.com/ 2012
-
(2012)
-
-
Autodesk1
|