메뉴 건너뛰기




Volumn 53, Issue , 2015, Pages 1-12

Extending BIM interoperability to preconstruction operations using geospatial analyses and semantic web services

Author keywords

BIM; GIS; Semantic interoperability; Semantic web technology

Indexed keywords

DATA HANDLING; GEOGRAPHIC INFORMATION SYSTEMS; INTEGRATION; INTEROPERABILITY; LIFE CYCLE; QUERY LANGUAGES; QUERY PROCESSING; SEMANTIC WEB; SOCIAL NETWORKING (ONLINE); WEB SERVICES;

EID: 84924971295     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2015.02.012     Document Type: Article
Times cited : (127)

References (55)
  • 2
    • 38149133860 scopus 로고    scopus 로고
    • Collaborative project information management in a semantic web environment
    • C. Anumba, J. Pan, R. Issa, and I. Mutis Collaborative project information management in a semantic web environment Eng. Constr. Archit. Manag. 15 1 2008 78 94
    • (2008) Eng. Constr. Archit. Manag. , vol.15 , Issue.1 , pp. 78-94
    • Anumba, C.1    Pan, J.2    Issa, R.3    Mutis, I.4
  • 4
    • 78049300426 scopus 로고    scopus 로고
    • Application of geographic information systems in construction safety planning
    • V.K. Bansal Application of geographic information systems in construction safety planning Int. J. Proj. Manag. 29 1 2011 66 77
    • (2011) Int. J. Proj. Manag. , vol.29 , Issue.1 , pp. 66-77
    • Bansal, V.K.1
  • 8
    • 0031843005 scopus 로고    scopus 로고
    • Overcoming the semantic and other barriers to GIS interoperability
    • Y. Bishr Overcoming the semantic and other barriers to GIS interoperability Int. J. Geogr. Inf. Sci. 12 4 1998 299 314
    • (1998) Int. J. Geogr. Inf. Sci. , vol.12 , Issue.4 , pp. 299-314
    • Bishr, Y.1
  • 11
    • 5244248406 scopus 로고    scopus 로고
    • ArcSite: Enhanced GIS for construction site layout
    • M. Cheng, and J. O'Connor ArcSite: enhanced GIS for construction site layout J. Constr. Eng. Manag. 122 4 1996 329 336
    • (1996) J. Constr. Eng. Manag. , vol.122 , Issue.4 , pp. 329-336
    • Cheng, M.1    O'Connor, J.2
  • 12
    • 84872170327 scopus 로고    scopus 로고
    • Incorporation of database approach into contractual issues: Methodology and practical guide for organizations
    • H.-Y. Chong, and T.-H. Phuah Incorporation of database approach into contractual issues: methodology and practical guide for organizations Autom. Constr. 31 0 2013 149 157
    • (2013) Autom. Constr. , vol.31 , Issue.0 , pp. 149-157
    • Chong, H.-Y.1    Phuah, T.-H.2
  • 13
    • 84921643579 scopus 로고    scopus 로고
    • Processing of topological BIM queries using boundary representation based methods
    • S. Daum, and A. Borrmann Processing of topological BIM queries using boundary representation based methods Adv. Eng. Inform. 28 2014 272 286
    • (2014) Adv. Eng. Inform. , vol.28 , pp. 272-286
    • Daum, S.1    Borrmann, A.2
  • 17
    • 26644458833 scopus 로고    scopus 로고
    • Domain taxonomy for construction concepts: Toward a formal ontology for construction knowledge
    • T. El-Diraby, C. Lima, and B. Feis Domain taxonomy for construction concepts: toward a formal ontology for construction knowledge J. Comput. Civ. Eng. 19 4 2005 394 406
    • (2005) J. Comput. Civ. Eng. , vol.19 , Issue.4 , pp. 394-406
    • El-Diraby, T.1    Lima, C.2    Feis, B.3
  • 18
    • 85067710357 scopus 로고    scopus 로고
    • Open Source Geospatial Foundation
    • GeoTools, GeoTools vol. 2013 2013 Open Source Geospatial Foundation
    • (2013) GeoTools, GeoTools , vol.2013
  • 19
    • 10444262909 scopus 로고    scopus 로고
    • Enhancing the prime contractor's pre-construction planning
    • K. Gidado Enhancing the prime contractor's pre-construction planning J. Constr. Res. 5 01 2004 87 106
    • (2004) J. Constr. Res. , vol.5 , Issue.1 , pp. 87-106
    • Gidado, K.1
  • 23
    • 84867859668 scopus 로고    scopus 로고
    • Optimizing location of tower cranes on construction sites through GIS and BIM integration
    • J. Irizarry, and E.P. Karan Optimizing location of tower cranes on construction sites through GIS and BIM integration J. Inf. Technol. Constr. 17 2012 351 366
    • (2012) J. Inf. Technol. Constr. , vol.17 , pp. 351-366
    • Irizarry, J.1    Karan, E.P.2
  • 24
    • 84872313658 scopus 로고    scopus 로고
    • Integrating BIM and GIS to improve the visual monitoring of construction supply chain management
    • J. Irizarry, E.P. Karan, and F. Jalaei Integrating BIM and GIS to improve the visual monitoring of construction supply chain management Autom. Constr. 31 2013 241 254
    • (2013) Autom. Constr. , vol.31 , pp. 241-254
    • Irizarry, J.1    Karan, E.P.2    Jalaei, F.3
  • 26
    • 84973549224 scopus 로고    scopus 로고
    • A study on the lightweight BIM shape format (LBSF) structure development to represent the large volume BIM geometry objects based on GIS as the viewpoint of the building facility management
    • T.W. Kang, and C.H. Hong A study on the lightweight BIM shape format (LBSF) structure development to represent the large volume BIM geometry objects based on GIS as the viewpoint of the building facility management J. Korea Spat. Inf. Soc. 21 3 2013 79 87
    • (2013) J. Korea Spat. Inf. Soc. , vol.21 , Issue.3 , pp. 79-87
    • Kang, T.W.1    Hong, C.H.2
  • 27
    • 84894485363 scopus 로고    scopus 로고
    • Digital modeling of construction site terrain using remotely sensed data and geographic information systems analyses
    • E. Karan, R. Sivakumar, J. Irizarry, and S. Guhathakurta Digital modeling of construction site terrain using remotely sensed data and geographic information systems analyses J. Constr. Eng. Manag. 140 3 2014 04013067
    • (2014) J. Constr. Eng. Manag. , vol.140 , Issue.3 , pp. 04013067
    • Karan, E.1    Sivakumar, R.2    Irizarry, J.3    Guhathakurta, S.4
  • 30
    • 84884500391 scopus 로고    scopus 로고
    • Generating construction schedules through automatic data extraction using open BIM (building information modeling) technology
    • H. Kim, K. Anderson, S. Lee, and J. Hildreth Generating construction schedules through automatic data extraction using open BIM (building information modeling) technology Autom. Constr. 35 0 2013 285 295
    • (2013) Autom. Constr. , vol.35 , Issue.0 , pp. 285-295
    • Kim, H.1    Anderson, K.2    Lee, S.3    Hildreth, J.4
  • 31
    • 84857367856 scopus 로고    scopus 로고
    • Integrated energy monitoring and visualization system for Smart Green City development: Designing a spatial information integrated energy monitoring model in the context of massive data management on a web based platform
    • S.A. Kim, D. Shin, Y. Choe, T. Seibert, and S.P. Walz Integrated energy monitoring and visualization system for Smart Green City development: designing a spatial information integrated energy monitoring model in the context of massive data management on a web based platform Autom. Constr. 22 0 2012 51 59
    • (2012) Autom. Constr. , vol.22 , Issue.0 , pp. 51-59
    • Kim, S.A.1    Shin, D.2    Choe, Y.3    Seibert, T.4    Walz, S.P.5
  • 32
    • 85119987955 scopus 로고    scopus 로고
    • Integration of BIM and GIS: The Development of the CityGML GeoBIM Extension
    • T.H.K. Kolbe, G. C. Nagel
    • R. de Laat, and L. van Berlo Integration of BIM and GIS: The Development of the CityGML GeoBIM Extension T.H.K. Kolbe, G. C. Nagel, Advances in 3D Geo-Information Sciences, Berlin, Germany 2011 211 225
    • (2011) Advances in 3D Geo-Information Sciences, Berlin, Germany , pp. 211-225
    • De Laat, R.1    Van Berlo, L.2
  • 33
    • 60749089719 scopus 로고    scopus 로고
    • Using Open Web Services for Urban Data Management: A Testbed Resulting from an OGC Initiative for Offering Standard CAD/GIS/BIM Services
    • M. Rumor, V. Coors, I. Fendel, S. Zlatanova
    • A. Lapierre, and P. Cote Using Open Web Services for Urban Data Management: A Testbed Resulting from an OGC Initiative for Offering Standard CAD/GIS/BIM Services M. Rumor, V. Coors, I. Fendel, S. Zlatanova, Urban and Regional Data Management. Annual Symposium of the Urban Data Management Society, Stuttgart, Germany 2007 381 393
    • (2007) Urban and Regional Data Management. Annual Symposium of the Urban Data Management Society, Stuttgart, Germany , pp. 381-393
    • Lapierre, A.1    Cote, P.2
  • 40
    • 33644681211 scopus 로고    scopus 로고
    • An ontological engineering approach for integrating CAD and GIS in support of infrastructure management
    • R. Peachavanish, H.A. Karimi, B. Akinci, and F. Boukamp An ontological engineering approach for integrating CAD and GIS in support of infrastructure management Adv. Eng. Inform. 20 1 2006 71 88
    • (2006) Adv. Eng. Inform. , vol.20 , Issue.1 , pp. 71-88
    • Peachavanish, R.1    Karimi, H.A.2    Akinci, B.3    Boukamp, F.4
  • 41
    • 0032390942 scopus 로고    scopus 로고
    • Promoting general metacognitive awareness
    • G. Schraw Promoting general metacognitive awareness Instr. Sci. 26 1-2 1998 113 125
    • (1998) Instr. Sci. , vol.26 , Issue.1-2 , pp. 113-125
    • Schraw, G.1
  • 43
    • 84858303047 scopus 로고    scopus 로고
    • Potential application of GIS to layout of construction temporary facilities
    • M.H. Sebt, E.P. Karan, and M.R. Delavar Potential application of GIS to layout of construction temporary facilities Int. J. Civ. Eng. 6 4 2008 235 245
    • (2008) Int. J. Civ. Eng. , vol.6 , Issue.4 , pp. 235-245
    • Sebt, M.H.1    Karan, E.P.2    Delavar, M.R.3
  • 44
    • 2342435265 scopus 로고    scopus 로고
    • Site layout planning using nonstructural fuzzy decision support system
    • C. Tam, T.K. Tong, A.W. Leung, and G.W. Chiu Site layout planning using nonstructural fuzzy decision support system J. Constr. Eng. Manag. 128 3 2002 220 231
    • (2002) J. Constr. Eng. Manag. , vol.128 , Issue.3 , pp. 220-231
    • Tam, C.1    Tong, T.K.2    Leung, A.W.3    Chiu, G.W.4
  • 47
    • 77958067462 scopus 로고    scopus 로고
    • Effects of constructing versus playing an educational game on student motivation and deep learning strategy use
    • N. Vos, H. van der Meijden, and E. Denessen Effects of constructing versus playing an educational game on student motivation and deep learning strategy use Comput. Educ. 56 1 2011 127 137
    • (2011) Comput. Educ. , vol.56 , Issue.1 , pp. 127-137
    • Vos, N.1    Van Der Meijden, H.2    Denessen, E.3
  • 48
    • 0037332769 scopus 로고    scopus 로고
    • A virtual construction environment for preconstruction planning
    • A.F. Waly, and W.Y. Thabet A virtual construction environment for preconstruction planning Autom. Constr. 12 2 2003 139 154
    • (2003) Autom. Constr. , vol.12 , Issue.2 , pp. 139-154
    • Waly, A.F.1    Thabet, W.Y.2
  • 50
    • 34948882357 scopus 로고    scopus 로고
    • Transformation from IFC data model to GML data model: Methodology and tool development
    • I.C. Wu, and S.H. Hsieh Transformation from IFC data model to GML data model: methodology and tool development J. Chin. Inst. Eng. 30 6 2007 1085 1090
    • (2007) J. Chin. Inst. Eng. , vol.30 , Issue.6 , pp. 1085-1090
    • Wu, I.C.1    Hsieh, S.H.2
  • 51
    • 33748294176 scopus 로고    scopus 로고
    • Semantic interoperability in building design: Methods and tools
    • Q. Yang, and Y. Zhang Semantic interoperability in building design: methods and tools Comput. Aided Des. 38 10 2006 1099 1112
    • (2006) Comput. Aided Des. , vol.38 , Issue.10 , pp. 1099-1112
    • Yang, Q.1    Zhang, Y.2
  • 52
    • 38549179388 scopus 로고    scopus 로고
    • Geospatial data sharing based on geospatial semantic web technologies
    • C. Zhang, W. Li, and T. Zhao Geospatial data sharing based on geospatial semantic web technologies J. Spat. Sci. 52 2 2007 35 49
    • (2007) J. Spat. Sci. , vol.52 , Issue.2 , pp. 35-49
    • Zhang, C.1    Li, W.2    Zhao, T.3
  • 53
    • 79551684087 scopus 로고    scopus 로고
    • BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies
    • J.P. Zhang, and Z.Z. Hu BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies Autom. Constr. 20 2 2011 155 166
    • (2011) Autom. Constr. , vol.20 , Issue.2 , pp. 155-166
    • Zhang, J.P.1    Hu, Z.Z.2
  • 55
    • 13944278488 scopus 로고    scopus 로고
    • Geographic information system-based visual simulation methodology and its application in concrete dam construction processes
    • D. Zhong, J. Li, H. Zhu, and L. Song Geographic information system-based visual simulation methodology and its application in concrete dam construction processes J. Constr. Eng. Manag. 130 5 2004 742 750
    • (2004) J. Constr. Eng. Manag. , vol.130 , Issue.5 , pp. 742-750
    • Zhong, D.1    Li, J.2    Zhu, H.3    Song, L.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.