메뉴 건너뛰기




Volumn 141, Issue 9, 2015, Pages

Project quality and change performance differences associated with the use of building information modeling in design and construction projects: Univariate and multivariate analyses

Author keywords

Information technologies

Indexed keywords

CONSTRUCTION; INFORMATION TECHNOLOGY; INFORMATION THEORY; MULTIVARIANT ANALYSIS;

EID: 84939536302     PISSN: 07339364     EISSN: 19437862     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000992     Document Type: Article
Times cited : (25)

References (25)
  • 1
    • 79960269657 scopus 로고    scopus 로고
    • Building information modeling (BIM): Trends, benefits, risks, and challenges for the AEC industry
    • Azhar, S. (2011). " Building information modeling (BIM): Trends, benefits, risks, and challenges for the AEC industry." Leadership Manage. Eng., 10.1061/(ASCE)LM.1943-5630.0000127, 241-252. LMEEAZ 1532-6748
    • (2011) Leadership Manage. Eng. , pp. 241-252
    • Azhar, S.1
  • 2
    • 84860281943 scopus 로고    scopus 로고
    • How to measure the benefits of BIM - A case study approach
    • Barlish, K., and, Sullivan, K. (2012). " How to measure the benefits of BIM-A case study approach." Autom. Constr., 24, 149-159. 10.1016/j.autcon.2012.02.008 AUCOES 0926-5805
    • (2012) Autom. Constr. , vol.24 , pp. 149-159
    • Barlish, K.1    Sullivan, K.2
  • 4
    • 77953601354 scopus 로고    scopus 로고
    • The perceived value of building information modeling in the US building industry
    • Becerik-Gerber, B., and, Rice, S. (2010). " The perceived value of building information modeling in the US building industry." J. Inf. Technol. Constr., 15, 185-201. 1874-4753
    • (2010) J. Inf. Technol. Constr. , vol.15 , pp. 185-201
    • Becerik-Gerber, B.1    Rice, S.2
  • 5
    • 84887835524 scopus 로고    scopus 로고
    • BuildingSMART Alliance. "." The Computer Integrated Construction Program, Pennsylvania State Univ. University Park, PA
    • BuildingSMART Alliance. (2011). " BIM project execution planning guide." The Computer Integrated Construction Program, Pennsylvania State Univ., University Park, PA.
    • (2011) BIM Project Execution Planning Guide
  • 6
    • 84872739967 scopus 로고    scopus 로고
    • Building information modeling in support of sustainable design and construction
    • Bynum, P., Issa, R. R., and, Olbina, S. (2013). " Building information modeling in support of sustainable design and construction." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000560, 24-34. JCEMD4 0733-9364
    • (2013) J. Constr. Eng. Manage. , pp. 24-34
    • Bynum, P.1    Issa, R.R.2    Olbina, S.3
  • 7
    • 0004603683 scopus 로고    scopus 로고
    • A quantitative study of post contract award design changes in construction
    • Cox, I., Morris, J., Rogerson, J., and, Jared, G. (1999). " A quantitative study of post contract award design changes in construction." J. Constr. Manage. Econ., 17 (4) 427-439. 10.1080/014461999371358
    • (1999) J. Constr. Manage. Econ. , vol.17 , Issue.4 , pp. 427-439
    • Cox, I.1    Morris, J.2    Rogerson, J.3    Jared, G.4
  • 10
    • 84886568744 scopus 로고    scopus 로고
    • Quantifying performance for the integrated project delivery system as compared to established delivery systems
    • El Asmar, M., Hanna, A., and, Loh, W. (2013). " Quantifying performance for the integrated project delivery system as compared to established delivery systems." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000744, 04013012. JCEMD4 0733-9364
    • (2013) J. Constr. Eng. Manage. , pp. 04013012
    • El Asmar, M.1    Hanna, A.2    Loh, W.3
  • 12
    • 84921381102 scopus 로고    scopus 로고
    • BIM return on investment: A case study
    • Giel, B., and, Issa, R. R. A. (2011). " BIM return on investment: A case study." J. Build. Inf. Model, 24-27.
    • (2011) J. Build. Inf. Model , pp. 24-27
    • Giel, B.1    Issa, R.R.A.2
  • 13
    • 84884616342 scopus 로고    scopus 로고
    • State of practice of building information modeling in mechanical and electrical construction industries
    • Hanna, A., Boodai, F., and, El Asmar, M. (2013). " State of practice of building information modeling in mechanical and electrical construction industries." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000747, 04013009. JCEMD4 0733-9364
    • (2013) J. Constr. Eng. Manage. , pp. 04013009
    • Hanna, A.1    Boodai, F.2    El Asmar, M.3
  • 14
    • 67349247794 scopus 로고    scopus 로고
    • Modeling building projects as a basis for change control
    • Isaac, S., and, Navon, R. (2009). " Modeling building projects as a basis for change control." Autom. Constr., 18 (5), 656-664. 10.1016/j.autcon.2009.01.001 AUCOES 0926-5805
    • (2009) Autom. Constr. , vol.18 , Issue.5 , pp. 656-664
    • Isaac, S.1    Navon, R.2
  • 15
    • 74349102919 scopus 로고    scopus 로고
    • Evaluating industry perceptions of building information modeling (BIM) impact on construction
    • Issa, R. R., and, Suermann, P. (2009). " Evaluating industry perceptions of building information modeling (BIM) impact on construction." J. Inf. Technol. Constr., 14, 574-594. 1874-4753
    • (2009) J. Inf. Technol. Constr. , vol.14 , pp. 574-594
    • Issa, R.R.1    Suermann, P.2
  • 24
    • 33846862012 scopus 로고    scopus 로고
    • An integrated system for change management in construction
    • Motawa, I., Anumba, C., Lee, S., and, Pena-Mora, F. (2007). " An integrated system for change management in construction." Autom. Constr., 16 (3), 368-377. 10.1016/j.autcon.2006.07.005 AUCOES 0926-5805
    • (2007) Autom. Constr. , vol.16 , Issue.3 , pp. 368-377
    • Motawa, I.1    Anumba, C.2    Lee, S.3    Pena-Mora, F.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.