메뉴 건너뛰기




Volumn 31, Issue , 2013, Pages 75-82

Automated construction progress measurement using a 4D building information model and 3D data

Author keywords

3D data; 4D building information model; As built status revision; Construction automation; Construction progress measurement; Keywords

Indexed keywords

3D DATA; AS-BUILT STATUS REVISION; BUILDING INFORMATION MODEL - BIM; CONSTRUCTION AUTOMATION; KEYWORDS; PROGRESS MEASUREMENT;

EID: 84871764113     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2012.11.041     Document Type: Article
Times cited : (250)

References (31)
  • 1
    • 0021197256 scopus 로고
    • Managing software development projects for maximum productivity
    • N.R. Howes Managing software development projects for maximum productivity IEEE Transactions on Software Engineering 10 1 1984 27 35
    • (1984) IEEE Transactions on Software Engineering , vol.10 , Issue.1 , pp. 27-35
    • Howes, N.R.1
  • 2
    • 43049090853 scopus 로고    scopus 로고
    • Minimum performance bounds for evaluating contractors performance during construction of highway pavement projects
    • M. Ahmed, and A. Abdel Minimum performance bounds for evaluating contractors performance during construction of highway pavement projects Construction Management and Economics 26 5 2008 507 529
    • (2008) Construction Management and Economics , vol.26 , Issue.5 , pp. 507-529
    • Ahmed, M.1    Abdel, A.2
  • 3
    • 84871919654 scopus 로고    scopus 로고
    • Identifying the critical factors affecting schedule performance of public housing projects
    • doi:10.1016/j.habitatint.2012.06.008
    • B.G. Hwang, X. Zhao, S.Y. Ng, Identifying the critical factors affecting schedule performance of public housing projects, Habitat International, http://dx.doi.org/10.1016/j.habitatint.2012.06.008.
    • Habitat International
    • Hwang, B.G.1    Zhao, X.2    Ng, S.Y.3
  • 4
    • 84857370632 scopus 로고    scopus 로고
    • Automated progress tracking using 4D schedule and 3D sensing technologies
    • Y. Turkan, F. Bosché, C.T. Haas, and R. Haas Automated progress tracking using 4D schedule and 3D sensing technologies Automation in Construction 22 2012 414 421
    • (2012) Automation in Construction , vol.22 , pp. 414-421
    • Turkan, Y.1    Bosché, F.2    Haas, C.T.3    Haas, R.4
  • 5
    • 0032835860 scopus 로고    scopus 로고
    • An information sharing, internet-based, system for project control
    • M. Abdelsayed, and R. Navon An information sharing, internet-based, system for project control Civil Engineering and Environmental Systems 16 3 1999 211 233
    • (1999) Civil Engineering and Environmental Systems , vol.16 , Issue.3 , pp. 211-233
    • Abdelsayed, M.1    Navon, R.2
  • 6
    • 67449138612 scopus 로고    scopus 로고
    • Construction rescheduling based on a manufacturing rescheduling framework
    • S.-S. Liu, and K.-C. Shih Construction rescheduling based on a manufacturing rescheduling framework Automation in Construction 18 6 2009 715 723
    • (2009) Automation in Construction , vol.18 , Issue.6 , pp. 715-723
    • Liu, S.-S.1    Shih, K.-C.2
  • 7
    • 14744303360 scopus 로고    scopus 로고
    • Point-cloud-based comparison between construction schedule and as-built progress: Long-range three-dimensional laser scanner's approach
    • DOI 10.1061/(ASCE)1076-0431(2004)10:3(98)
    • N.-J. Shih, and P.-H. Wang Point-cloud-based comparison between construction schedule and as-built progress: long-range three-dimensional laser scanner's approach Journal of Architectural Engineering 10 3 2004 98 102 (Pubitemid 40329484)
    • (2004) Journal of Architectural Engineering , vol.10 , Issue.3 , pp. 98-102
    • Shih, N.-J.1    Wang, P.-H.2
  • 8
    • 72149104769 scopus 로고    scopus 로고
    • Automated recognition of 3D CAD model objects in laser scans and calculation of as-built dimensions for dimensional compliance control in construction
    • F. Bosché Automated recognition of 3D CAD model objects in laser scans and calculation of as-built dimensions for dimensional compliance control in construction Advanced Engineering Informatics 24 1 2010 107 118
    • (2010) Advanced Engineering Informatics , vol.24 , Issue.1 , pp. 107-118
    • Bosché, F.1
  • 9
    • 77956612137 scopus 로고    scopus 로고
    • 3D structural component recognition and modeling method using color and 3D data for construction progress monitoring
    • H. Son, and C. Kim 3D structural component recognition and modeling method using color and 3D data for construction progress monitoring Automation in Construction 19 7 2010 844 854
    • (2010) Automation in Construction , vol.19 , Issue.7 , pp. 844-854
    • Son, H.1    Kim, C.2
  • 10
    • 84920815816 scopus 로고    scopus 로고
    • Automated progress monitoring using unordered daily construction photographs and IFC-based building information models
    • doi:10.1061/(ASCE)CP.1943-5487.0000205 (in press)
    • M. Golparvar-Fard, F. Peña-Mora, S. Savarese, Automated progress monitoring using unordered daily construction photographs and IFC-based building information models, Journal of Computing in Civil Engineering (in press), http://dx.doi.org/10.1061/(ASCE)CP.1943-5487.0000205.
    • Journal of Computing in Civil Engineering
    • M. Golparvar-Fard1
  • 11
    • 0041825827 scopus 로고    scopus 로고
    • PHOTO-NET II: A computer-based monitoring system applied to project management
    • J. Abeid, E. Allouche, D. Arditi, and M. Hayman PHOTO-NET II: a computer-based monitoring system applied to project management Automation in Construction 12 5 2003 603 616
    • (2003) Automation in Construction , vol.12 , Issue.5 , pp. 603-616
    • Abeid, J.1    Allouche, E.2    Arditi, D.3    Hayman, M.4
  • 12
    • 33845966046 scopus 로고    scopus 로고
    • Research in automated measurement of project performance indicators
    • DOI 10.1016/j.autcon.2006.03.003, PII S0926580506000136
    • R. Navon Research in automated measurement of project performance indicators Automation in Construction 16 2 2007 176 188 (Pubitemid 46053760)
    • (2007) Automation in Construction , vol.16 , Issue.2 , pp. 176-188
    • Navon, R.1
  • 13
    • 41749109303 scopus 로고    scopus 로고
    • Using a real-time integrated communication system to monitor the progress and quality of construction works
    • S.-W. Leung, S. Mak, and B.L.P. Lee Using a real-time integrated communication system to monitor the progress and quality of construction works Automation in Construction 17 6 2008 749 757
    • (2008) Automation in Construction , vol.17 , Issue.6 , pp. 749-757
    • Leung, S.-W.1    Mak, S.2    Lee, B.L.P.3
  • 15
    • 73349118434 scopus 로고    scopus 로고
    • Object recognition in construction-site images using 3D CAD-based filtering
    • Y. Wu, H. Kim, C. Kim, and S.H. Han Object recognition in construction-site images using 3D CAD-based filtering Journal of Computing in Civil Engineering 24 1 2010 56 64
    • (2010) Journal of Computing in Civil Engineering , vol.24 , Issue.1 , pp. 56-64
    • Wu, Y.1    Kim, H.2    Kim, C.3    Han, S.H.4
  • 16
    • 84861110538 scopus 로고    scopus 로고
    • Automated color-model-based concrete detection in construction site images using machine learning algorithms
    • H. Son, C. Kim, and C. Kim Automated color-model-based concrete detection in construction site images using machine learning algorithms Journal of Computing in Civil Engineering 26 3 2012 421 433
    • (2012) Journal of Computing in Civil Engineering , vol.26 , Issue.3 , pp. 421-433
    • Son, H.1    Kim, C.2    Kim, C.3
  • 20
    • 0345377801 scopus 로고    scopus 로고
    • Robust registration of 2D and 3D point sets
    • A.W. Fitzgibbon Robust registration of 2D and 3D point sets Image and Vision Computing 21 13-14 2003 1145 1153
    • (2003) Image and Vision Computing , vol.21 , Issue.1314 , pp. 1145-1153
    • Fitzgibbon, A.W.1
  • 25
    • 33751221647 scopus 로고    scopus 로고
    • Natural terrain classification using three-dimensional ladar data for ground robot mobility
    • DOI 10.1002/rob.20134
    • J.-F. Lalonde, N. Vandapel, D.F. Huber, and M. Hebert Natural terrain classification using three-dimensional ladar data for ground robot mobility Journal of Field Robotics 23 1 2006 839 861 (Pubitemid 44782740)
    • (2006) Journal of Field Robotics , vol.23 , Issue.10 , pp. 839-861
    • Lalonde, J.-F.1    Vandapel, N.2    Huber, D.F.3    Hebert, M.4
  • 29
    • 38649138750 scopus 로고    scopus 로고
    • Forecasting financial condition of Chinese listed companies based on support vector machine
    • DOI 10.1016/j.eswa.2007.06.037, PII S0957417407002382
    • Y. Ding, X. Song, and Y. Zen Forecasting financial condition of Chinese listed companies based on support vector machine Expert Systems with Applications 34 4 2008 3081 3089 (Pubitemid 351173811)
    • (2008) Expert Systems with Applications , vol.34 , Issue.4 , pp. 3081-3089
    • Ding, Y.1    Song, X.2    Zen, Y.3
  • 30
    • 34047126555 scopus 로고    scopus 로고
    • Credit scoring with a data mining approach based on support vector machines
    • DOI 10.1016/j.eswa.2006.07.007, PII S095741740600217X
    • C.-L. Huang, M.-C. Chen, and C.-J. Wang Credit scoring with a data mining approach based on support vector machines Expert Systems with Applications 33 4 2007 847 856 (Pubitemid 46522466)
    • (2007) Expert Systems with Applications , vol.33 , Issue.4 , pp. 847-856
    • Huang, C.-L.1    Chen, M.-C.2    Wang, C.-J.3
  • 31
    • 33750481498 scopus 로고    scopus 로고
    • Combination of independent component analysis and support vector machines for intelligent faults diagnosis of induction motors
    • DOI 10.1016/j.eswa.2005.11.031, PII S0957417405003398
    • A. Widodo, B.-S. Yang, and T. Han Combination of independent component analysis and support vector machines for intelligent faults diagnosis of induction motors Expert Systems with Applications 32 2 2007 299 312 (Pubitemid 44647799)
    • (2007) Expert Systems with Applications , vol.32 , Issue.2 , pp. 299-312
    • Widodo, A.1    Yang, B.-S.2    Han, T.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.