메뉴 건너뛰기




Volumn 139, Issue 4, 2013, Pages 423-433

Toward automated earned value tracking using 3D imaging tools

Author keywords

Building information models (BIM); Construction progress control; Cost codes; Earned value; Five dimensional; Four dimensional; Laser scanning; Object recognition

Indexed keywords

BUILDING INFORMATION MODEL - BIM; CONSTRUCTION PROGRESS; EARNED VALUE; FIVE-DIMENSIONAL; FOUR-DIMENSIONAL; LASER SCANNING;

EID: 84875026723     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000629     Document Type: Article
Times cited : (91)

References (39)
  • 1
    • 84875040934 scopus 로고    scopus 로고
    • How earned value got to primetime: A short look back and a glance ahead
    • College of Performance Management, Alexandria, VA.
    • Abba, W. (2001). " How earned value got to primetime: A short look back and a glance ahead." The Measurable News, College of Performance Management, Alexandria, VA.
    • (2001) The Measurable News
    • Abba, W.1
  • 2
    • 0041825827 scopus 로고    scopus 로고
    • Photo-net II: A computer-based monitoring system applied to project management
    • " AUCOES 0926-5805 10.1016/S0926-5805(03)00042-6
    • Abeid, J., Allouche, E., Arditi, D., and, Hayman, M. (2003). " Photo-net II: A computer-based monitoring system applied to project management." Autom. Constr., 12 (5), 603-616. AUCOES 0926-5805 10.1016/S0926-5805(03)00042-6
    • (2003) Autom. Constr. , vol.12 , Issue.5 , pp. 603-616
    • Abeid, J.1    Allouche, E.2    Arditi, D.3    Hayman, M.4
  • 3
    • 3242668644 scopus 로고    scopus 로고
    • Photo-net: An integrated system for controlling construction progress
    • 0969-9988 10.1108/09699980310478412
    • Abeid, J., and, Arditi, D. (2003). " Photo-net: An integrated system for controlling construction progress." Eng., Constr. Architect. Manage., 10 (3), 162-171. 0969-9988 10.1108/09699980310478412
    • (2003) Eng., Constr. Architect. Manage. , vol.10 , Issue.3 , pp. 162-171
    • Abeid, J.1    Arditi, D.2
  • 5
    • 72149104769 scopus 로고    scopus 로고
    • Automated recognition of 3D CAD model objects and calculation of as-built dimensions for dimensional compliance control in construction
    • 1474-0346 10.1016/j.aei.2009.08.006
    • Bosché, F. (2010). " Automated recognition of 3D CAD model objects and calculation of as-built dimensions for dimensional compliance control in construction." Adv. Eng. Inform., 24 (1), 107-118. 1474-0346 10.1016/j.aei.2009.08.006
    • (2010) Adv. Eng. Inform. , vol.24 , Issue.1 , pp. 107-118
    • Bosché, F.1
  • 6
    • 83555160969 scopus 로고    scopus 로고
    • Plane-based registration of construction laser scans with 3D/4D building models
    • 1474-0346 10.1016/j.aei.2011.08.009
    • Bosché, F. (2012). " Plane-based registration of construction laser scans with 3D/4D building models." Adv. Eng. Inform., 26 (1), 90-102. 1474-0346 10.1016/j.aei.2011.08.009
    • (2012) Adv. Eng. Inform. , vol.26 , Issue.1 , pp. 90-102
    • Bosché, F.1
  • 7
    • 38649103110 scopus 로고    scopus 로고
    • Automated retrieval of 3D CAD model objects in construction range images
    • AUCOES 0926-5805 10.1016/j.autcon.2007.09.001
    • Bosché, F., and, Haas, C. T. (2008). " Automated retrieval of 3D CAD model objects in construction range images." Automat. Constr., 17 (4), 499-512. AUCOES 0926-5805 10.1016/j.autcon.2007.09.001
    • (2008) Automat. Constr. , vol.17 , Issue.4 , pp. 499-512
    • Bosché, F.1    Haas, C.T.2
  • 8
    • 70350064472 scopus 로고    scopus 로고
    • Performance of a new approach for automated 3D project performance tracking
    • " JCCEE5 0887-3801 10.1061/(ASCE)0887-3801(2009)23:6(311)
    • Bosché, F., Haas, C. T., and, Akinci, B. (2009). " Performance of a new approach for automated 3D project performance tracking." J. Comput. Civ. Eng., 23 (6), 311-318. JCCEE5 0887-3801 10.1061/(ASCE)0887-3801(2009)23:6(311)
    • (2009) J. Comput. Civ. Eng. , vol.23 , Issue.6 , pp. 311-318
    • Bosché, F.1    Haas, C.T.2    Akinci, B.3
  • 11
    • 77957258776 scopus 로고    scopus 로고
    • Toward automated generation of parametric BIMs based on hybrid video and laser scanning data
    • et al. " " 1474-0346 10.1016/j.aei.2010.06.006
    • Brilakis, I., et al. (2010). " Toward automated generation of parametric BIMs based on hybrid video and laser scanning data." Adv. Eng. Inform., 24 (4), 456-465. 1474-0346 10.1016/j.aei.2010.06.006
    • (2010) Adv. Eng. Inform. , vol.24 , Issue.4 , pp. 456-465
    • Brilakis, I.1
  • 12
    • 0033703954 scopus 로고    scopus 로고
    • Ladars for construction assessment and update
    • " AUCOES 0926-5805 10.1016/S0926-5805(00)00058-3
    • Cheok, G. S., Stone, W. C., Lipman, R. R., and, Witzgall, C. (2000). " Ladars for construction assessment and update." Autom. Constr., 9 (5-6), 463-477. AUCOES 0926-5805 10.1016/S0926-5805(00)00058-3
    • (2000) Autom. Constr. , vol.9 , Issue.56 , pp. 463-477
    • Cheok, G.S.1    Stone, W.C.2    Lipman, R.R.3    Witzgall, C.4
  • 13
    • 79960638196 scopus 로고    scopus 로고
    • Integrating automated data acquisition technologies for progress reporting of construction projects
    • AUCOES 0926-5805 10.1016/j.autcon.2010.12.001
    • El-Omari, S., and, Moselhi, O. (2011). " Integrating automated data acquisition technologies for progress reporting of construction projects." Autom. Constr., 20 (6), 699-705. AUCOES 0926-5805 10.1016/j.autcon.2010.12.001
    • (2011) Autom. Constr. , vol.20 , Issue.6 , pp. 699-705
    • El-Omari, S.1    Moselhi, O.2
  • 14
    • 70350060197 scopus 로고    scopus 로고
    • Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs
    • (a). " " JCCEE5 0887-3801 10.1061/(ASCE)0887-3801(2009)23: 6(391)
    • Golparvar-Fard, M., Peña-Mora, F., Arboleda, C. A., and, Lee, S. H. (2009 a). " Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs." J. Comput. Civ. Eng., 23 (6), 391-404. JCCEE5 0887-3801 10.1061/(ASCE)0887-3801(2009)23:6(391)
    • (2009) J. Comput. Civ. Eng. , vol.23 , Issue.6 , pp. 391-404
    • Golparvar-Fard, M.1    Peña-Mora, F.2    Arboleda, C.A.3    Lee, S.H.4
  • 15
    • 70350154917 scopus 로고    scopus 로고
    • Application of D4AR - A 4-dimensional augmented reality model for automating construction progress monitoring data collection, processing and communication
    • Golparvar-Fard, M., Peña-Mora, F., and, Savarese, S. (2009 b). " Application of D4AR-A 4-dimensional augmented reality model for automating construction progress monitoring data collection, processing and communication." ITcon, 14, 129-153.
    • (2009) ITcon , vol.14 , pp. 129-153
    • Golparvar-Fard, M.1    Peña-Mora, F.2    Savarese, S.3
  • 19
    • 84920815816 scopus 로고    scopus 로고
    • Automated progress monitoring using unordered daily construction photographs and IFC-based building information models
    • " JCCEE5 0887-3801 10.1061/(ASCE)CP.1943-5487.0000205
    • Golparvar-Fard, M., Peña-Mora, F., and, Savarese, S. (2012). " Automated progress monitoring using unordered daily construction photographs and IFC-based building information models." J. Comput. Civ. Eng., 137 (12), 1099. JCCEE5 0887-3801 10.1061/(ASCE)CP.1943-5487.0000205
    • (2012) J. Comput. Civ. Eng. , vol.137 , Issue.12 , pp. 1099
    • Golparvar-Fard, M.1    Peña-Mora, F.2    Savarese, S.3
  • 21
    • 84855191266 scopus 로고    scopus 로고
    • 3D laser scanning market red hot: 2006 industry revenues - 253 million, 43% growth
    • Greaves, T., and, Jenkins, B. (2007). " 3D laser scanning market red hot: 2006 industry revenues-253 million, 43% growth." SparView, 5 (7).
    • (2007) SparView , vol.5 , Issue.7
    • Greaves, T.1    Jenkins, B.2
  • 22
    • 0006891334 scopus 로고    scopus 로고
    • Construction progress control." Prentice Hall, Upper Saddle River, NJ.
    • Hegazy, T. (2002). " Construction progress control." Computer-based construction project management, Prentice Hall, Upper Saddle River, NJ, 289-316.
    • (2002) Computer-based Construction Project Management , pp. 289-316
    • Hegazy, T.1
  • 24
    • 57549093466 scopus 로고    scopus 로고
    • Towards automated progress assessment of work package components in construction projects using computer vision
    • " 1474-0346 10.1016/j.aei.2008.07.002
    • Ibrahim, Y. M., Lukins, T. C., Zhang, X., Trucco, E., and, Kaka, A. P. (2009). " Towards automated progress assessment of work package components in construction projects using computer vision." Adv. Eng. Inform., 23 (1), 93-103. 1474-0346 10.1016/j.aei.2008.07.002
    • (2009) Adv. Eng. Inform. , vol.23 , Issue.1 , pp. 93-103
    • Ibrahim, Y.M.1    Lukins, T.C.2    Zhang, X.3    Trucco, E.4    Kaka, A.P.5
  • 25
    • 14544302767 scopus 로고    scopus 로고
    • Improving transportation projects using laser scanning
    • " JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2005)131:3(377)
    • Jaselskis, E., Gao, Z., and, Walters, R. C. (2005). " Improving transportation projects using laser scanning." J. Constr. Eng. Manage., 131 (3), 377-384. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2005)131:3(377)
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.3 , pp. 377-384
    • Jaselskis, E.1    Gao, Z.2    Walters, R.C.3
  • 26
    • 0347411213 scopus 로고    scopus 로고
    • Fitting range data to primitives for rapid local 3D modeling using sparse range point clouds
    • " AUCOES 0926-5805 10.1016/j.autcon.2003.08.007
    • Kwon, S. W., Bosche, F., Kim, C., Haas, C. T., and, Liapi, K. A. (2004). " Fitting range data to primitives for rapid local 3D modeling using sparse range point clouds." Autom. Constr., 13 (1), 67-81. AUCOES 0926-5805 10.1016/j.autcon.2003.08.007
    • (2004) Autom. Constr. , vol.13 , Issue.1 , pp. 67-81
    • Kwon, S.W.1    Bosche, F.2    Kim, C.3    Haas, C.T.4    Liapi, K.A.5
  • 27
    • 84855983657 scopus 로고    scopus 로고
    • Project Management Institute. 4th Ed. Project Management Institute (PMI), Newtown Square, PA.
    • Project Management Institute. (2008). A guide to the project management body of knowledge (PMBOK Guide), 4th Ed., Project Management Institute (PMI), Newtown Square, PA.
    • (2008) A Guide to the Project Management Body of Knowledge (PMBOK Guide)
  • 28
    • 84875043018 scopus 로고    scopus 로고
    • Portlands Energy Centre Newsroom. (May 24, 2011).
    • Portlands Energy Centre Newsroom. (2008). (May 24, 2011).
    • (2008)
  • 29
    • 30844462121 scopus 로고    scopus 로고
    • 3D scan information management system for construction management
    • JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2006)132:2(134)
    • Shih, N. J., and, Huang, S. T. (2006). " 3D scan information management system for construction management." J. Constr. Eng. Manage., 132 (2), 134-142. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2006)132:2(134)
    • (2006) J. Constr. Eng. Manage. , vol.132 , Issue.2 , pp. 134-142
    • Shih, N.J.1    Huang, S.T.2
  • 30
    • 84875012916 scopus 로고    scopus 로고
    • LADAR sensing applications for construction." NIST, Gaithersburg, MD.
    • Stone, W., and, Cheok, G. (2001). " LADAR sensing applications for construction." Building and fire research, NIST, Gaithersburg, MD.
    • (2001) Building and Fire Research
    • Stone, W.1    Cheok, G.2
  • 32
    • 77956619234 scopus 로고    scopus 로고
    • Automatic reconstruction of as-built building information models from laser-scanned point clouds: A review of related techniques
    • " AUCOES 0926-5805 10.1016/j.autcon.2010.06.007
    • Tang, P., Huber, D., Akinci, B., Lipman, R., and, Lytle, A. (2010). " Automatic reconstruction of as-built building information models from laser-scanned point clouds: A review of related techniques." Autom. Constr., 19 (7), 829-843. AUCOES 0926-5805 10.1016/j.autcon.2010.06.007
    • (2010) Autom. Constr. , vol.19 , Issue.7 , pp. 829-843
    • Tang, P.1    Huber, D.2    Akinci, B.3    Lipman, R.4    Lytle, A.5
  • 33
    • 35348874797 scopus 로고    scopus 로고
    • Real-time three-dimensional occupancy grid modeling for the detection and tracking of construction resources
    • " JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2007)133:11(880)
    • Teizer, J., Caldas, C. H., and, Haas, C. T. (2007). " Real-time three-dimensional occupancy grid modeling for the detection and tracking of construction resources." J. Constr. Eng. Manage., 133 (11), 880-888. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2007)133:11(880)
    • (2007) J. Constr. Eng. Manage. , vol.133 , Issue.11 , pp. 880-888
    • Teizer, J.1    Caldas, C.H.2    Haas, C.T.3
  • 35
    • 84875018514 scopus 로고    scopus 로고
    • University of Waterloo to celebrate opening of Engineering 5 building
    • (May 25, 2011).
    • Truemner, C., and, Morris, J. (2010). " University of Waterloo to celebrate opening of Engineering 5 building." University of Waterloo News Release. (May 25, 2011).
    • (2010) University of Waterloo News Release
    • Truemner, C.1    Morris, J.2
  • 37
    • 84857370632 scopus 로고    scopus 로고
    • Automated progress tracking using 4D models and 3D sensing technologies
    • " AUCOES 0926-5805 10.1016/j.autcon.2008.09.004
    • Turkan, Y., Bosché, F., Haas, C. T., and, Haas, R. G. (2011). " Automated progress tracking using 4D models and 3D sensing technologies." Autom. Constr., 22, 414-421. AUCOES 0926-5805 10.1016/j.autcon.2008.09.004
    • (2011) Autom. Constr. , vol.22 , pp. 414-421
    • Turkan, Y.1    Bosché, F.2    Haas, C.T.3    Haas, R.G.4
  • 38
    • 73349118434 scopus 로고    scopus 로고
    • Object recognition in construction-site images using 3D CAD-based filtering
    • " JCCEE5 0887-3801 10.1061/(ASCE)0887-3801(2010)24:1(56)
    • Wu, Y., Kim, H., Kim, C., and, Han, S. H. (2010). " Object recognition in construction-site images using 3D CAD-based filtering." J. Comput. Civ. Eng., 24 (1), 56-64. JCCEE5 0887-3801 10.1061/(ASCE)0887-3801(2010) 24:1(56)
    • (2010) J. Comput. Civ. Eng. , vol.24 , Issue.1 , pp. 56-64
    • Wu, Y.1    Kim, H.2    Kim, C.3    Han, S.H.4
  • 39
    • 58949088479 scopus 로고    scopus 로고
    • Automating progress measurement of construction projects
    • et al. " " AUCOES 0926-5805 10.1016/j.autcon.2008.09.004
    • Zhang, X., et al. (2009). " Automating progress measurement of construction projects." Autom. Constr., 18 (3), 294-301. AUCOES 0926-5805 10.1016/j.autcon.2008.09.004
    • (2009) Autom. Constr. , vol.18 , Issue.3 , pp. 294-301
    • Zhang, X.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.