-
2
-
-
41449083858
-
Preparing project managers to deal with complexity - Advanced project management education
-
Excellence in Teaching & Learning for Project Management 101016/jijproman200801001 0263-7863
-
J. Thomas, and T. Mengel Preparing project managers to deal with complexity - advanced project management education Issue 3 Excellence in Teaching & Learning for Project Management International Journal of Project Management 0263-7863 vol. 26 April 2008 304 315 10.1016/j.ijproman.2008.01.001 http://www.sciencedirect.com/science/article/B6V9V-4S26K50-1/2/ afe84e67f2ba2b40e03c48588d1526d9
-
(2008)
International Journal of Project Management
, vol.26
, pp. 304-315
-
-
Thomas, J.1
Mengel, T.2
-
6
-
-
56749092458
-
-
American Institute of Architects
-
Integrated Project Delivery Guide: version 1 2007 American Institute of Architects http://www.aia.org/contractdocs/AIAS077630
-
(2007)
Integrated Project Delivery Guide: Version 1
-
-
-
8
-
-
0000507077
-
In search of relevance: Project management in drifting environments
-
L. Kreiner In search of relevance: project management in drifting environments Scandinavian Journal of Management 11:4 1995 335 346
-
(1995)
Scandinavian Journal of Management
, vol.114
, pp. 335-346
-
-
Kreiner, L.1
-
10
-
-
0003605655
-
-
Harvard University Press. Translated by Cole, M., & John-Steiner, V.
-
L.S. Vygotski, Mind in society: The development of higher psychological processes: Harvard University Press. Translated by Cole, M., & John-Steiner, V., 1978. pp 101.
-
(1978)
Mind in Society: The Development of Higher Psychological Processes
, pp. 101
-
-
Vygotski, L.S.1
-
12
-
-
72149131504
-
Integrated Scope-schedule-cost model system for civil works
-
F. Peterson, M. Fischer, and T. Tutti Integrated Scope-schedule-cost model system for civil works K. Belloni, J. Kojima, I. Seppä, VTT Symposium 258: 1st International Conference on Improving Construction and Use Through Integrated Design Solutions 2009 Julkaisija - Utgivare Helsinki, Finland 978-951-38-6341-8 176 199 http://www.vtt.fi/inf/pdf/symposiums/2009/S259.pdf
-
(2009)
VTT Symposium 258: 1st International Conference on Improving Construction and Use Through Integrated Design Solutions
, pp. 176-199
-
-
Peterson, F.1
Fischer, M.2
Tutti, T.3
-
14
-
-
0035613406
-
Dimensions of teamwork education
-
R. Fruchter Dimensions of teamwork education International Journal of Engineering Education vol. 17 Nos. 4 and 5 2001 426 430 http://www.akademik. unsri.ac.id/download/journal/files/ijee/IJEE1222.pdf
-
(2001)
International Journal of Engineering Education
, vol.17
, Issue.4-5
, pp. 426-430
-
-
Fruchter, R.1
-
15
-
-
33749552228
-
-
10.1016/j.autcon.2005.10.003 CAAD Futures, 2005, January 2007, Pages 28-36, ISSN 0926-5805, DOI
-
J. Plume and J. Mitchell, Collaborative design using a shared IFC building model - learning from experience, Automation in Construction, Volume 16, Issue 1, CAAD Futures, 2005, January 2007, Pages 28-36, ISSN 0926-5805, DOI: 10.1016/j.autcon.2005.10.003, http://www.sciencedirect.com/science/article/ B6V20-4HNYMGD-4/2/5cdbee78b977373b0e1dd3e26e5606f3 ).
-
Collaborative Design Using A Shared IFC Building Model - Learning from Experience, Automation in Construction
, vol.16
, Issue.1
-
-
Plume, J.1
Mitchell, J.2
-
16
-
-
0036462648
-
Virtual construction of architecture using 3D CAD and simulation
-
101016/S0926-58050000100-X 0926-5805
-
M.J. Clayton, R.B. Warden, and T.W. Parker Virtual construction of architecture using 3D CAD and simulation Automation in Construction 0926-5805 Volume 11 Issue 2 February 2002 227 235 10.1016/S0926-5805(00)00100-X http://www.sciencedirect.com/science/article/B6V20-448Y6N4-B/2/ 1d649edf8e0b36f5b1d977615ee5bd01
-
(2002)
Automation in Construction
, vol.11
, Issue.2
, pp. 227-235
-
-
Clayton, M.J.1
Warden, R.B.2
Parker, T.W.3
-
18
-
-
1842831431
-
-
S. Staub, and M. Fischer The practical need of integrating scope, cost, and time, durability of building materials and components M.A. Lacasse, D.J. Vanier, 1999 Institute for Research in Construction Ottawa ON, K1A 0R6, Canada 2888 2898
-
(1999)
The Practical Need of Integrating Scope, Cost, and Time, Durability of Building Materials and Components
, pp. 2888-2898
-
-
Staub, S.1
Fischer, M.2
-
24
-
-
33846023352
-
A method for planning of work-flow by combined use of location-based scheduling and 4D CAD
-
R. Jongeling, and T. Olofsson A method for planning of work-flow by combined use of location-based scheduling and 4D CAD Automation in Construction 16:2 2007 189 198
-
(2007)
Automation in Construction
, vol.162
, pp. 189-198
-
-
Jongeling, R.1
Olofsson, T.2
-
26
-
-
0033206630
-
Architecture/engineering/construction teamwork: A collaborative design and learning space
-
R. Fruchter Architecture/engineering/construction teamwork: a collaborative design and learning space Journal of Computing in Civil Engineering vol. 13 No. 4 October 1999 261 270
-
(1999)
Journal of Computing in Civil Engineering
, vol.13
, Issue.4
, pp. 261-270
-
-
Fruchter, R.1
-
28
-
-
79551682835
-
Teaching integrated scope-cost methods with model-based tools
-
F. Peterson, M. Fischer, O. Seppänen, T. Tutti, R. See, and T. Wingate Teaching integrated scope-cost methods with model-based tools A. Dikbas, E. Ergen, H. Giritli, Proceedings of the 26th International Conference on Managing IT in Construction/Managing Construction for Tomorrow 2009 2010 Taylor & Francis Group London, UK 978-0-415-56744-2 63 73 http://w78.civil.aau.dk/ program-ws/2009-istanbul/w78-istanbul-content.pdf
-
(2009)
Proceedings of the 26th International Conference on Managing IT in Construction/Managing Construction for Tomorrow
, pp. 63-73
-
-
Peterson, F.1
Fischer, M.2
Seppänen, O.3
Tutti, T.4
See, R.5
Wingate, T.6
-
33
-
-
38649094993
-
-
John Riley and Sons Hoboken, New Jersey
-
C. Eastman, P. Teicholz, R. Sacks, and K. Liston BIM Handbook: a Guide to Building Information Modeling for Owners, Managers, Designers, Engineers, and Contractors 2008 John Riley and Sons Hoboken, New Jersey 220 http://books.google.com/books?hl=en&lr=&id=IioygN0nYzMC&oi= fnd&pg=PR7&dq=C+Eastman+2008&ots=rQj-2Eap-8&sig= wDVCUWKLOjKGb-eSJd-aBZKruQI
-
(2008)
BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers, and Contractors
, pp. 220
-
-
Eastman, C.1
Teicholz, P.2
Sacks, R.3
Liston, K.4
-
34
-
-
33751501800
-
Supporting the constructability review with 3D/4D models
-
T. Hartmann, and M. Fischer Supporting the constructability review with 3D/4D models Building Research & Information 35:1 2007 70 80
-
(2007)
Building Research & Information
, vol.351
, pp. 70-80
-
-
Hartmann, T.1
Fischer, M.2
|