-
1
-
-
84880055872
-
Scenarios for cyber-physical systems integration in construction
-
Akanmu A., Anumba C., Messner J. Scenarios for cyber-physical systems integration in construction. J. Inf. Technol. Constr. 2013, 18:240-260.
-
(2013)
J. Inf. Technol. Constr.
, vol.18
, pp. 240-260
-
-
Akanmu, A.1
Anumba, C.2
Messner, J.3
-
2
-
-
29144432257
-
A formalism for utilization of sensor systems and integrated project models for active construction quality control
-
Akinci B., Boukamp F., Gordon C., Huber D., Lyons C., Park K. A formalism for utilization of sensor systems and integrated project models for active construction quality control. Autom. Constr. 2006, 15(2):124-138.
-
(2006)
Autom. Constr.
, vol.15
, Issue.2
, pp. 124-138
-
-
Akinci, B.1
Boukamp, F.2
Gordon, C.3
Huber, D.4
Lyons, C.5
Park, K.6
-
3
-
-
79951665541
-
Assessment of quality of as-is Building Information Models generated from point clouds using deviation analysis
-
Electronics Imaging Science and Technology Conference (IS&T)
-
Anil E.B., Tang P., Akinci B., Huber D. Assessment of quality of as-is Building Information Models generated from point clouds using deviation analysis. Proceedings of the SPIE 2011, vol. 7864A. Electronics Imaging Science and Technology Conference (IS&T).
-
(2011)
Proceedings of the SPIE
, vol.7864A
-
-
Anil, E.B.1
Tang, P.2
Akinci, B.3
Huber, D.4
-
4
-
-
84884502984
-
Deviation analysis method for the assessment of the quality of the as-is Building Information Models generated from point cloud data
-
Anil E.B., Tang P., Akinci B., Huber D. Deviation analysis method for the assessment of the quality of the as-is Building Information Models generated from point cloud data. Autom. Constr. 2013, 35:507-516.
-
(2013)
Autom. Constr.
, vol.35
, pp. 507-516
-
-
Anil, E.B.1
Tang, P.2
Akinci, B.3
Huber, D.4
-
5
-
-
34249724458
-
An approach for real world data modelling with the 3D terrestrial laser scanner for built environment
-
Arayici Y. An approach for real world data modelling with the 3D terrestrial laser scanner for built environment. Autom. Constr. 2007, 16(6):816-829.
-
(2007)
Autom. Constr.
, vol.16
, Issue.6
, pp. 816-829
-
-
Arayici, Y.1
-
6
-
-
78649315598
-
A framework for an automated and integrated project monitoring and control system for steel fabrication projects
-
Azimi R., Lee S., AbouRizk S.M., Alvanchi A. A framework for an automated and integrated project monitoring and control system for steel fabrication projects. Autom. Constr. 2011, 20(1):88-97.
-
(2011)
Autom. Constr.
, vol.20
, Issue.1
, pp. 88-97
-
-
Azimi, R.1
Lee, S.2
AbouRizk, S.M.3
Alvanchi, A.4
-
7
-
-
78049300426
-
Application of geographic information systems in construction safety planning
-
Bansal V. Application of geographic information systems in construction safety planning. Int. J. Proj. Manag. 2011, 29(1):66-77.
-
(2011)
Int. J. Proj. Manag.
, vol.29
, Issue.1
, pp. 66-77
-
-
Bansal, V.1
-
8
-
-
45749120776
-
Generating, evaluating, and visualizing construction schedule with geographic information systems
-
Bansal V., Pal M. Generating, evaluating, and visualizing construction schedule with geographic information systems. J. Comput. Civil Eng. ASCE 2008, 22(4):233-242.
-
(2008)
J. Comput. Civil Eng. ASCE
, vol.22
, Issue.4
, pp. 233-242
-
-
Bansal, V.1
Pal, M.2
-
9
-
-
67349093494
-
Construction schedule review in GIS with a navigable 3D animation of project activities
-
Bansal V., Pal M. Construction schedule review in GIS with a navigable 3D animation of project activities. Int. J. Proj. Manag. 2009, 27(5):532-542.
-
(2009)
Int. J. Proj. Manag.
, vol.27
, Issue.5
, pp. 532-542
-
-
Bansal, V.1
Pal, M.2
-
10
-
-
84865435484
-
Evaluation of accuracy of 'as-built' 3D modeling from photos taken by handheld digital cameras
-
Bhatla A., Choe S.Y., Fierro O., Leite F. Evaluation of accuracy of 'as-built' 3D modeling from photos taken by handheld digital cameras. Autom. Constr. 2012, 28:116-127.
-
(2012)
Autom. Constr.
, vol.28
, pp. 116-127
-
-
Bhatla, A.1
Choe, S.Y.2
Fierro, O.3
Leite, F.4
-
11
-
-
84900462381
-
Automating surface flatness control using terrestrial laser scanning and building information models
-
Bosché F., Guenet E. Automating surface flatness control using terrestrial laser scanning and building information models. Autom. Constr. 2014, 44:212-226.
-
(2014)
Autom. Constr.
, vol.44
, pp. 212-226
-
-
Bosché, F.1
Guenet, E.2
-
13
-
-
38649103110
-
Automated retrieval of 3D CAD model objects in construction range images
-
Bosché F., Haas C. Automated retrieval of 3D CAD model objects in construction range images. Autom. Constr. 2008, 17(4):499-512.
-
(2008)
Autom. Constr.
, vol.17
, Issue.4
, pp. 499-512
-
-
Bosché, F.1
Haas, C.2
-
14
-
-
70350064472
-
Automated recognition of 3D CAD objects in site laser scans for project 3D status visualization and performance control
-
Bosché F., Haas C.T., Akinci B. Automated recognition of 3D CAD objects in site laser scans for project 3D status visualization and performance control. J. Comput. Civil Eng. ASCE 2009, 23(6):311-318.
-
(2009)
J. Comput. Civil Eng. ASCE
, vol.23
, Issue.6
, pp. 311-318
-
-
Bosché, F.1
Haas, C.T.2
Akinci, B.3
-
15
-
-
84902449757
-
Tracking the built status of MEP works: assessing the value of a scan-vs.-BIM system
-
Bosché F., Guillemet A., Turkan Y., Haas C.T.C.T., Haas R. Tracking the built status of MEP works: assessing the value of a scan-vs.-BIM system. Journal of Computing in Civil Engineering ASCE 2013, 28(4):05014004-1.
-
(2013)
Journal of Computing in Civil Engineering ASCE
, vol.28
, Issue.4
, pp. 05014004-05014011
-
-
Bosché, F.1
Guillemet, A.2
Turkan, Y.3
Haas, C.T.C.T.4
Haas, R.5
-
16
-
-
34547670382
-
Automated processing of construction specifications to support inspection and quality control
-
Boukamp F., Akinci B. Automated processing of construction specifications to support inspection and quality control. Autom. Constr. 2007, 17(1):90-106.
-
(2007)
Autom. Constr.
, vol.17
, Issue.1
, pp. 90-106
-
-
Boukamp, F.1
Akinci, B.2
-
17
-
-
80052835631
-
Progressive 3D reconstruction of infrastructure with videogrammetry
-
Brilakis I., Fathi H., Rashidi A. Progressive 3D reconstruction of infrastructure with videogrammetry. Autom. Constr. 2011, 20(7):884-895.
-
(2011)
Autom. Constr.
, vol.20
, Issue.7
, pp. 884-895
-
-
Brilakis, I.1
Fathi, H.2
Rashidi, A.3
-
18
-
-
84881611317
-
The project benefits of Building Information Modelling (BIM)
-
Bryde D., Broquetas M., Volm J.M. The project benefits of Building Information Modelling (BIM). Int. J. Proj. Manag. 2013, 31(7):971-980.
-
(2013)
Int. J. Proj. Manag.
, vol.31
, Issue.7
, pp. 971-980
-
-
Bryde, D.1
Broquetas, M.2
Volm, J.M.3
-
19
-
-
84878579790
-
Real-time resource location data collection and visualization technology for construction safety and activity monitoring applications
-
Cheng T., Teizer J. Real-time resource location data collection and visualization technology for construction safety and activity monitoring applications. Autom. Constr. 2013, 34:3-15.
-
(2013)
Autom. Constr.
, vol.34
, pp. 3-15
-
-
Cheng, T.1
Teizer, J.2
-
20
-
-
39349114541
-
RFID+ 4D CAD for progress management of structural steel works in high-rise buildings
-
Chin S., Yoon S., Choi C., Cho C. RFID+ 4D CAD for progress management of structural steel works in high-rise buildings. Journal of Computing in Civil Engineering ASCE 2008, 22(2):74-89.
-
(2008)
Journal of Computing in Civil Engineering ASCE
, vol.22
, Issue.2
, pp. 74-89
-
-
Chin, S.1
Yoon, S.2
Choi, C.3
Cho, C.4
-
22
-
-
75649083155
-
Assessing the accuracy of applying photogrammetry to take geometric measurements on building products
-
Dai F., Lu M. Assessing the accuracy of applying photogrammetry to take geometric measurements on building products. J. Constr. Eng. Manage. ASCE 2010, 136(2):242-250.
-
(2010)
J. Constr. Eng. Manage. ASCE
, vol.136
, Issue.2
, pp. 242-250
-
-
Dai, F.1
Lu, M.2
-
23
-
-
84872744697
-
Comparison of image-based and time-of-flight-based technologies for three-dimensional reconstruction of infrastructure
-
Dai F., Rashidi A., Brilakis I., Vela P. Comparison of image-based and time-of-flight-based technologies for three-dimensional reconstruction of infrastructure. Journal of Construction Engineering and Management ASCE 2012, 139(1):69-79.
-
(2012)
Journal of Construction Engineering and Management ASCE
, vol.139
, Issue.1
, pp. 69-79
-
-
Dai, F.1
Rashidi, A.2
Brilakis, I.3
Vela, P.4
-
25
-
-
0020951903
-
The OSI reference model
-
Day J.D., Zimmermann H. The OSI reference model. Proc. IEEE 1983, 71(12):1334-1340.
-
(1983)
Proc. IEEE
, vol.71
, Issue.12
, pp. 1334-1340
-
-
Day, J.D.1
Zimmermann, H.2
-
26
-
-
84884559870
-
Real-time safety early warning system for cross passage construction in Yangtze Riverbed Metro Tunnel based on the Internet of Things
-
Ding L., Zhou C., Deng Q., Luo H., Ye X., Ni Y., Guo P. Real-time safety early warning system for cross passage construction in Yangtze Riverbed Metro Tunnel based on the Internet of Things. Autom. Constr. 2013, 36:25-37.
-
(2013)
Autom. Constr.
, vol.36
, pp. 25-37
-
-
Ding, L.1
Zhou, C.2
Deng, Q.3
Luo, H.4
Ye, X.5
Ni, Y.6
Guo, P.7
-
27
-
-
84907426904
-
Building Information Modeling (BIM) application framework: the process of expanding from 3D to computable nD
-
Ding L., Zhou Y., Akinci B. Building Information Modeling (BIM) application framework: the process of expanding from 3D to computable nD. Autom. Constr. 2014, 46:82-93.
-
(2014)
Autom. Constr.
, vol.46
, pp. 82-93
-
-
Ding, L.1
Zhou, Y.2
Akinci, B.3
-
28
-
-
38649094993
-
-
John Wiley and Sons, NY
-
Eastman C., Teicholz P., Sacks R., Liston K. BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors 2008, John Wiley and Sons, NY.
-
(2008)
BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors
-
-
Eastman, C.1
Teicholz, P.2
Sacks, R.3
Liston, K.4
-
29
-
-
49349100565
-
Integrating 3D laser scanning and photogrammetry for progress measurement of construction work
-
El-Omari S., Moselhi O. Integrating 3D laser scanning and photogrammetry for progress measurement of construction work. Autom. Constr. 2008, 18(1):1-9.
-
(2008)
Autom. Constr.
, vol.18
, Issue.1
, pp. 1-9
-
-
El-Omari, S.1
Moselhi, O.2
-
30
-
-
70350151227
-
Data acquisition from construction sites for tracking purposes
-
El-Omari S., Moselhi O. Data acquisition from construction sites for tracking purposes. Eng. Constr. Archit. Manag. 2009, 16(5):490-503.
-
(2009)
Eng. Constr. Archit. Manag.
, vol.16
, Issue.5
, pp. 490-503
-
-
El-Omari, S.1
Moselhi, O.2
-
31
-
-
79960638196
-
Integrating automated data acquisition technologies for progress reporting of construction projects
-
El-Omari S., Moselhi O. Integrating automated data acquisition technologies for progress reporting of construction projects. Autom. Constr. 2011, 20(6):699-705.
-
(2011)
Autom. Constr.
, vol.20
, Issue.6
, pp. 699-705
-
-
El-Omari, S.1
Moselhi, O.2
-
36
-
-
70350060197
-
Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs
-
Golparvar-Fard M., Peña-Mora F., Arboleda C.A., Lee S. Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs. Journal of Computing in Civil Engineering ASCE 2009, 23(6):391-404.
-
(2009)
Journal of Computing in Civil Engineering ASCE
, vol.23
, Issue.6
, pp. 391-404
-
-
Golparvar-Fard, M.1
Peña-Mora, F.2
Arboleda, C.A.3
Lee, S.4
-
37
-
-
51849166450
-
RFID-based wireless manufacturing for real-time management of job shop WIP inventories
-
Huang G.Q., Zhang Y.F., Jiang P.Y. RFID-based wireless manufacturing for real-time management of job shop WIP inventories. Int. J. Adv. Manuf. Technol. 2008, 36(7-8):752-764.
-
(2008)
Int. J. Adv. Manuf. Technol.
, vol.36
, Issue.7-8
, pp. 752-764
-
-
Huang, G.Q.1
Zhang, Y.F.2
Jiang, P.Y.3
-
38
-
-
79957646837
-
RFID-enabled gateway product service system for collaborative manufacturing alliances
-
Huang G.Q., Qu T., Fang M.J., Bramley A.N. RFID-enabled gateway product service system for collaborative manufacturing alliances. CIRP Ann. Manuf. Technol. 2011, 60(1):465-468.
-
(2011)
CIRP Ann. Manuf. Technol.
, vol.60
, Issue.1
, pp. 465-468
-
-
Huang, G.Q.1
Qu, T.2
Fang, M.J.3
Bramley, A.N.4
-
39
-
-
84867859668
-
Optimizing location of tower cranes on construction sites through GIS and BIM integration
-
Irizarry J., Karan E.P. Optimizing location of tower cranes on construction sites through GIS and BIM integration. J. Inf. Technol. Constr. 2012, 17:351-366.
-
(2012)
J. Inf. Technol. Constr.
, vol.17
, pp. 351-366
-
-
Irizarry, J.1
Karan, E.P.2
-
40
-
-
84878380661
-
InfoSPOT: a mobile Augmented Reality method for accessing building information through a situation awareness approach
-
Irizarry J., Gheisari M., Williams G., Walker B.N. InfoSPOT: a mobile Augmented Reality method for accessing building information through a situation awareness approach. Autom. Constr. 2013, 33:11-23.
-
(2013)
Autom. Constr.
, vol.33
, pp. 11-23
-
-
Irizarry, J.1
Gheisari, M.2
Williams, G.3
Walker, B.N.4
-
41
-
-
84872313658
-
Integrating BIM and GIS to improve the visual monitoring of construction supply chain management
-
Irizarry J., Karan E.P., Jalaei F. Integrating BIM and GIS to improve the visual monitoring of construction supply chain management. Autom. Constr. 2013, 31:241-254.
-
(2013)
Autom. Constr.
, vol.31
, pp. 241-254
-
-
Irizarry, J.1
Karan, E.P.2
Jalaei, F.3
-
42
-
-
84878418975
-
Towards cloud Augmented Reality for construction application by BIM and SNS integration
-
Jiao Y., Zhang S., Li Y., Wang Y., Yang B. Towards cloud Augmented Reality for construction application by BIM and SNS integration. Autom. Constr. 2013, 33:37-47.
-
(2013)
Autom. Constr.
, vol.33
, pp. 37-47
-
-
Jiao, Y.1
Zhang, S.2
Li, Y.3
Wang, Y.4
Yang, B.5
-
43
-
-
84896541031
-
Productive modeling for development of 'as-built' BIM of existing indoor structures
-
Jung J., Hong S., Jeong S., Kim S., Cho H., Hong S., Heo J. Productive modeling for development of 'as-built' BIM of existing indoor structures. Autom. Constr. 2014, 42:68-77.
-
(2014)
Autom. Constr.
, vol.42
, pp. 68-77
-
-
Jung, J.1
Hong, S.2
Jeong, S.3
Kim, S.4
Cho, H.5
Hong, S.6
Heo, J.7
-
44
-
-
81855193663
-
Research in visualization techniques for field construction
-
Kamat V.R., Martinez J.C., Fischer M., Golparvar-Fard M., Peña-Mora F., Savarese S. Research in visualization techniques for field construction. Journal of Construction Engineering and Management ASCE 2010, 137(10):853-862.
-
(2010)
Journal of Construction Engineering and Management ASCE
, vol.137
, Issue.10
, pp. 853-862
-
-
Kamat, V.R.1
Martinez, J.C.2
Fischer, M.3
Golparvar-Fard, M.4
Peña-Mora, F.5
Savarese, S.6
-
45
-
-
23744484214
-
Rapid, on-site spatial information acquisition and its use for infrastructure operation and maintenance
-
Kim C., Haas C.T., Liapi K.A. Rapid, on-site spatial information acquisition and its use for infrastructure operation and maintenance. Autom. Constr. 2005, 14(5):666-684.
-
(2005)
Autom. Constr.
, vol.14
, Issue.5
, pp. 666-684
-
-
Kim, C.1
Haas, C.T.2
Liapi, K.A.3
-
46
-
-
84884502256
-
4D CAD model updating using image processing-based construction progress monitoring
-
Kim C., Kim B., Kim H. 4D CAD model updating using image processing-based construction progress monitoring. Autom. Constr. 2013, 35:44-52.
-
(2013)
Autom. Constr.
, vol.35
, pp. 44-52
-
-
Kim, C.1
Kim, B.2
Kim, H.3
-
47
-
-
81355161549
-
Imaged-based verification of 'as-built' documentation of operational buildings
-
Klein L., Li N., Becerik-Gerber B. Imaged-based verification of 'as-built' documentation of operational buildings. Autom. Constr. 2012, 21:161-171.
-
(2012)
Autom. Constr.
, vol.21
, pp. 161-171
-
-
Klein, L.1
Li, N.2
Becerik-Gerber, B.3
-
49
-
-
84907434477
-
A defect management system for reinforced concrete work utilizing BIM, image-matching and augmented reality
-
Kwon O.S., Park C.S., Lim C.R. A defect management system for reinforced concrete work utilizing BIM, image-matching and augmented reality. Autom. Constr. 2014, 46:74-81.
-
(2014)
Autom. Constr.
, vol.46
, pp. 74-81
-
-
Kwon, O.S.1
Park, C.S.2
Lim, C.R.3
-
50
-
-
84872298921
-
Automatic thermographic and RGB texture of 'as-built' BIM for energy rehabilitation purposes
-
Lagüela S., Díaz-Vilariño L., Martínez J., Armesto J. Automatic thermographic and RGB texture of 'as-built' BIM for energy rehabilitation purposes. Autom. Constr. 2013, 31:230-240.
-
(2013)
Autom. Constr.
, vol.31
, pp. 230-240
-
-
Lagüela, S.1
Díaz-Vilariño, L.2
Martínez, J.3
Armesto, J.4
-
51
-
-
84861121878
-
RFID-based real-time locating system for construction safety management
-
Lee H.S., Lee K.P., Park M., Baek Y., Lee S. RFID-based real-time locating system for construction safety management. Journal of Computing in Civil Engineering ASCE 2011, 26(3):366-377.
-
(2011)
Journal of Computing in Civil Engineering ASCE
, vol.26
, Issue.3
, pp. 366-377
-
-
Lee, H.S.1
Lee, K.P.2
Park, M.3
Baek, Y.4
Lee, S.5
-
52
-
-
84871020668
-
An integrated approach to intelligent urban facilities management for real-time emergency response
-
Lee J., Jeong Y., Oh Y.S., Lee J.C., Ahn N., Lee J., Yoon S.H. An integrated approach to intelligent urban facilities management for real-time emergency response. Autom. Constr. 2013, 30:256-264.
-
(2013)
Autom. Constr.
, vol.30
, pp. 256-264
-
-
Lee, J.1
Jeong, Y.2
Oh, Y.S.3
Lee, J.C.4
Ahn, N.5
Lee, J.6
Yoon, S.H.7
-
53
-
-
84884499636
-
Skeleton-based 3D reconstruction of 'as-built' pipelines from laser-scan data
-
Lee J., Son H., Kim C., Kim C. Skeleton-based 3D reconstruction of 'as-built' pipelines from laser-scan data. Autom. Constr. 2013, 35:199-207.
-
(2013)
Autom. Constr.
, vol.35
, pp. 199-207
-
-
Lee, J.1
Son, H.2
Kim, C.3
Kim, C.4
-
54
-
-
67650337837
-
Rethinking project management and exploring virtual design and construction as a potential solution
-
Li H., Lu W.S., Huang T. Rethinking project management and exploring virtual design and construction as a potential solution. Constr. Manage. Econ. 2009, 27(4):363-371.
-
(2009)
Constr. Manage. Econ.
, vol.27
, Issue.4
, pp. 363-371
-
-
Li, H.1
Lu, W.S.2
Huang, T.3
-
55
-
-
79551658669
-
Scenarios for applying RFID technology in construction project management
-
Lu W.S., Huang G.Q., Li H. Scenarios for applying RFID technology in construction project management. Autom. Constr. 2011, 20(2):101-106.
-
(2011)
Autom. Constr.
, vol.20
, Issue.2
, pp. 101-106
-
-
Lu, W.S.1
Huang, G.Q.2
Li, H.3
-
56
-
-
84873329256
-
A generic model for measuring benefits of BIM as a learning tool in construction tasks
-
Lu W.S., Peng Y., Shen Q.P., Li H. A generic model for measuring benefits of BIM as a learning tool in construction tasks. Journal of Construction Engineering and Management ASCE 2013, 139(2):195-203.
-
(2013)
Journal of Construction Engineering and Management ASCE
, vol.139
, Issue.2
, pp. 195-203
-
-
Lu, W.S.1
Peng, Y.2
Shen, Q.P.3
Li, H.4
-
58
-
-
70350139502
-
Lifecycle management of facilities components using radio frequency identification and building information model
-
Motamedi A., Hammad A. Lifecycle management of facilities components using radio frequency identification and building information model. J. Inf. Technol. Constr. 2009, 14(Special Issue):238-262.
-
(2009)
J. Inf. Technol. Constr.
, vol.14
, pp. 238-262
-
-
Motamedi, A.1
Hammad, A.2
-
59
-
-
84857367913
-
Method to produce field instructions from product and process models for cast-in-place concrete operations
-
Mourgues C., Fischer M., Kunz J. Method to produce field instructions from product and process models for cast-in-place concrete operations. Autom. Constr. 2012, 22:233-246.
-
(2012)
Autom. Constr.
, vol.22
, pp. 233-246
-
-
Mourgues, C.1
Fischer, M.2
Kunz, J.3
-
61
-
-
84865332778
-
Construction worker detection in video frames for initializing vision trackers
-
Park M.W., Brilakis I. Construction worker detection in video frames for initializing vision trackers. Autom. Constr. 2012, 28:15-25.
-
(2012)
Autom. Constr.
, vol.28
, pp. 15-25
-
-
Park, M.W.1
Brilakis, I.2
-
62
-
-
84878412814
-
A framework for construction safety management and visualization system
-
Park C.S., Kim H.J. A framework for construction safety management and visualization system. Autom. Constr. 2013, 33:95-103.
-
(2013)
Autom. Constr.
, vol.33
, pp. 95-103
-
-
Park, C.S.1
Kim, H.J.2
-
63
-
-
84878418504
-
A framework for proactive construction defect management using BIM, augmented reality and ontology-based data collection template
-
Park C.S., Lee D.Y., Kwon O.S., Wang X. A framework for proactive construction defect management using BIM, augmented reality and ontology-based data collection template. Autom. Constr. 2013, 33:61-71.
-
(2013)
Autom. Constr.
, vol.33
, pp. 61-71
-
-
Park, C.S.1
Lee, D.Y.2
Kwon, O.S.3
Wang, X.4
-
64
-
-
33747360709
-
Construction scheduling and progress control using geographical information systems
-
Poku S.E., Arditi D. Construction scheduling and progress control using geographical information systems. Journal of Computing in Civil Engineering ASCE 2006, 20(5):351-360.
-
(2006)
Journal of Computing in Civil Engineering ASCE
, vol.20
, Issue.5
, pp. 351-360
-
-
Poku, S.E.1
Arditi, D.2
-
65
-
-
6344258575
-
Extension of ISO 10303, the STEP standard, for the exchange of procedural shape models
-
IEEE
-
Pratt M.J. Extension of ISO 10303, the STEP standard, for the exchange of procedural shape models. Proceedings of Shape Modeling Applications 2004, 317-326. IEEE.
-
(2004)
Proceedings of Shape Modeling Applications
, pp. 317-326
-
-
Pratt, M.J.1
-
66
-
-
81855196055
-
Construction engineering requirements for integrating laser scanning technology and building information modeling
-
Randall T. Construction engineering requirements for integrating laser scanning technology and building information modeling. Journal of Construction Engineering and Management ASCE 2011, 137(10):797-805.
-
(2011)
Journal of Construction Engineering and Management ASCE
, vol.137
, Issue.10
, pp. 797-805
-
-
Randall, T.1
-
67
-
-
78149285142
-
Multisensor data fusion for on-site materials tracking in construction
-
Razavi S.N., Haas C.T. Multisensor data fusion for on-site materials tracking in construction. Autom. Constr. 2010, 19(8):1037-1046.
-
(2010)
Autom. Constr.
, vol.19
, Issue.8
, pp. 1037-1046
-
-
Razavi, S.N.1
Haas, C.T.2
-
68
-
-
84901938850
-
CoSMoS: a BIM and wireless sensor based integrated solution for worker safety in confined spaces
-
Riaz Z., Arslan M., Kiani A.K., Azhar S. CoSMoS: a BIM and wireless sensor based integrated solution for worker safety in confined spaces. Autom. Constr. 2014, 45:96-106.
-
(2014)
Autom. Constr.
, vol.45
, pp. 96-106
-
-
Riaz, Z.1
Arslan, M.2
Kiani, A.K.3
Azhar, S.4
-
69
-
-
78649333572
-
An object-based 3D walk-through model for interior construction progress monitoring
-
Roh S., Aziz Z., Peña-Mora F. An object-based 3D walk-through model for interior construction progress monitoring. Autom. Constr. 2011, 20(1):66-75.
-
(2011)
Autom. Constr.
, vol.20
, Issue.1
, pp. 66-75
-
-
Roh, S.1
Aziz, Z.2
Peña-Mora, F.3
-
70
-
-
84870770628
-
Onsite 3D marking for construction activity tracking
-
Shahi A., West J.S., Haas C.T. Onsite 3D marking for construction activity tracking. Autom. Constr. 2013, 30:136-143.
-
(2013)
Autom. Constr.
, vol.30
, pp. 136-143
-
-
Shahi, A.1
West, J.S.2
Haas, C.T.3
-
71
-
-
84861811470
-
A loosely coupled system integration approach for decision support in facility management and maintenance
-
Shen W., Hao Q., Xue Y. A loosely coupled system integration approach for decision support in facility management and maintenance. Autom. Constr. 2012, 25:41-48.
-
(2012)
Autom. Constr.
, vol.25
, pp. 41-48
-
-
Shen, W.1
Hao, Q.2
Xue, Y.3
-
73
-
-
1342309160
-
Building theories of project management: past research, questions for the future
-
Söderlund J. Building theories of project management: past research, questions for the future. Int. J. Proj. Manag. 2004, 22:183-191.
-
(2004)
Int. J. Proj. Manag.
, vol.22
, pp. 183-191
-
-
Söderlund, J.1
-
74
-
-
77956612137
-
3D structural component recognition and modeling method using color and 3D data for construction progress monitoring
-
Son H., Kim C. 3D structural component recognition and modeling method using color and 3D data for construction progress monitoring. Autom. Constr. 2010, 19(7):844-854.
-
(2010)
Autom. Constr.
, vol.19
, Issue.7
, pp. 844-854
-
-
Son, H.1
Kim, C.2
-
75
-
-
77956617735
-
Rapid 3D object detection and modeling using range data from 3D range imaging camera for heavy equipment operation
-
Son H., Kim C., Choi K. Rapid 3D object detection and modeling using range data from 3D range imaging camera for heavy equipment operation. Autom. Constr. 2010, 19(7):898-906.
-
(2010)
Autom. Constr.
, vol.19
, Issue.7
, pp. 898-906
-
-
Son, H.1
Kim, C.2
Choi, K.3
-
76
-
-
70350154933
-
Prototype development of an ICT system to support construction management based on virtual models and RFID
-
Sørensen K.B., Christiansson P., Svidt K. Prototype development of an ICT system to support construction management based on virtual models and RFID. J. Inf. Technol. Constr. 2009, 14(Special Issue):263-288.
-
(2009)
J. Inf. Technol. Constr.
, vol.14
, pp. 263-288
-
-
Sørensen, K.B.1
Christiansson, P.2
Svidt, K.3
-
77
-
-
33751274763
-
Integration of construction 'as-built' data via laser scanning with geotechnical monitoring of urban excavation
-
Su Y., Hashash Y., Liu L. Integration of construction 'as-built' data via laser scanning with geotechnical monitoring of urban excavation. Journal of Construction Engineering and Management ASCE 2006, 132(12):1234-1241.
-
(2006)
Journal of Construction Engineering and Management ASCE
, vol.132
, Issue.12
, pp. 1234-1241
-
-
Su, Y.1
Hashash, Y.2
Liu, L.3
-
78
-
-
81855193654
-
Sensing and field data capture for construction and facility operations
-
Taneja S., Akinci B., Garrett J.H., Soibelman L., Ergen E., Pradhan A., Liu X. Sensing and field data capture for construction and facility operations. Journal of Construction Engineering and Management ASCE 2010, 137(10):870-881.
-
(2010)
Journal of Construction Engineering and Management ASCE
, vol.137
, Issue.10
, pp. 870-881
-
-
Taneja, S.1
Akinci, B.2
Garrett, J.H.3
Soibelman, L.4
Ergen, E.5
Pradhan, A.6
Liu, X.7
-
79
-
-
77956619234
-
Automatic reconstruction of 'as-built' building information models from laser-scanned point clouds: a review of related techniques
-
Tang P., Huber D., Akinci B., Lipman R., Lytle A. Automatic reconstruction of 'as-built' building information models from laser-scanned point clouds: a review of related techniques. Autom. Constr. 2010, 19(7):829-843.
-
(2010)
Autom. Constr.
, vol.19
, Issue.7
, pp. 829-843
-
-
Tang, P.1
Huber, D.2
Akinci, B.3
Lipman, R.4
Lytle, A.5
-
80
-
-
35348874797
-
Real-time three-dimensional occupancy grid modeling for the detection and tracking of construction resources
-
Teizer J., Caldas C.H., Haas C.T. Real-time three-dimensional occupancy grid modeling for the detection and tracking of construction resources. Journal of Construction Engineering and Management ASCE 2007, 133(11):880-888.
-
(2007)
Journal of Construction Engineering and Management ASCE
, vol.133
, Issue.11
, pp. 880-888
-
-
Teizer, J.1
Caldas, C.H.2
Haas, C.T.3
-
81
-
-
84884502878
-
Location tracking and data visualization technology to advance construction ironworkers' education and training in safety and productivity
-
Teizer J., Cheng T., Fang Y. Location tracking and data visualization technology to advance construction ironworkers' education and training in safety and productivity. Autom. Constr. 2013, 35:53-68.
-
(2013)
Autom. Constr.
, vol.35
, pp. 53-68
-
-
Teizer, J.1
Cheng, T.2
Fang, Y.3
-
82
-
-
58149259941
-
Methodology for automating the identification and localization of construction components on industrial projects
-
Torrent D.G., Caldas C.H. Methodology for automating the identification and localization of construction components on industrial projects. Journal of Computing in Civil Engineering ASCE 2009, 23(1):3-13.
-
(2009)
Journal of Computing in Civil Engineering ASCE
, vol.23
, Issue.1
, pp. 3-13
-
-
Torrent, D.G.1
Caldas, C.H.2
-
83
-
-
84857370632
-
Automated progress tracking using 4D schedule and 3D sensing technologies
-
Turkan Y., Bosché F., Haas C.T., Haas R. Automated progress tracking using 4D schedule and 3D sensing technologies. Autom. Constr. 2012, 22:414-421.
-
(2012)
Autom. Constr.
, vol.22
, pp. 414-421
-
-
Turkan, Y.1
Bosché, F.2
Haas, C.T.3
Haas, R.4
-
84
-
-
84875026723
-
Toward automated earned value tracking using 3D imaging tools
-
Turkan Y., Bosché F., Haas C.T., Haas R. Toward automated earned value tracking using 3D imaging tools. Journal of Construction Engineering and Management ASCE 2012, 139(4):423-433.
-
(2012)
Journal of Construction Engineering and Management ASCE
, vol.139
, Issue.4
, pp. 423-433
-
-
Turkan, Y.1
Bosché, F.2
Haas, C.T.3
Haas, R.4
-
85
-
-
84887445707
-
Extending automation of building construction-survey on potential sensor technologies and robotic applications
-
Vähä P., Heikkilä T., Kilpeläinen P., Järviluoma M., Gambao E. Extending automation of building construction-survey on potential sensor technologies and robotic applications. Autom. Constr. 2013, 36:168-178.
-
(2013)
Autom. Constr.
, vol.36
, pp. 168-178
-
-
Vähä, P.1
Heikkilä, T.2
Kilpeläinen, P.3
Järviluoma, M.4
Gambao, E.5
-
86
-
-
49549122201
-
IFC and building lifecycle management
-
Vanlande R., Nicolle C., Cruz C. IFC and building lifecycle management. Autom. Constr. 2008, 18(1):70-78.
-
(2008)
Autom. Constr.
, vol.18
, Issue.1
, pp. 70-78
-
-
Vanlande, R.1
Nicolle, C.2
Cruz, C.3
-
87
-
-
84878587673
-
A conceptual framework for integrating building information modeling with augmented reality
-
Wang X., Love P.E., Kim M.J., Park C.S., Sing C.P., Hou L. A conceptual framework for integrating building information modeling with augmented reality. Autom. Constr. 2013, 34:37-44.
-
(2013)
Autom. Constr.
, vol.34
, pp. 37-44
-
-
Wang, X.1
Love, P.E.2
Kim, M.J.3
Park, C.S.4
Sing, C.P.5
Hou, L.6
-
88
-
-
84894209434
-
Integrating Augmented Reality with Building Information Modeling: onsite construction process controlling for liquefied natural gas industry
-
Wang X., Truijens M., Hou L., Wang Y., Zhou Y. Integrating Augmented Reality with Building Information Modeling: onsite construction process controlling for liquefied natural gas industry. Autom. Constr. 2014, 40:96-105.
-
(2014)
Autom. Constr.
, vol.40
, pp. 96-105
-
-
Wang, X.1
Truijens, M.2
Hou, L.3
Wang, Y.4
Zhou, Y.5
-
89
-
-
84902124617
-
An innovative method for project control in LNG project through 5D CAD: a case study
-
Wang X., Yung P., Luo H., Truijens M. An innovative method for project control in LNG project through 5D CAD: a case study. Autom. Constr. 2014, 45:126-135.
-
(2014)
Autom. Constr.
, vol.45
, pp. 126-135
-
-
Wang, X.1
Yung, P.2
Luo, H.3
Truijens, M.4
-
90
-
-
79954557707
-
Using rfid and real-time virtual reality simulation for optimization in steel construction
-
Xie H., Shi W., Issa R.R. Using rfid and real-time virtual reality simulation for optimization in steel construction. J. Inf. Technol. Constr. 2011, 16:291-308.
-
(2011)
J. Inf. Technol. Constr.
, vol.16
, pp. 291-308
-
-
Xie, H.1
Shi, W.2
Issa, R.R.3
-
91
-
-
84873283130
-
Automatic creation of semantically rich 3D building models from laser scanner data
-
Xiong X., Adan A., Akinci B., Huber D. Automatic creation of semantically rich 3D building models from laser scanner data. Autom. Constr. 2013, 31:325-337.
-
(2013)
Autom. Constr.
, vol.31
, pp. 325-337
-
-
Xiong, X.1
Adan, A.2
Akinci, B.3
Huber, D.4
-
92
-
-
84861145569
-
On-site building information retrieval by using projection-based augmented reality
-
Yeh K.C., Tsai M.H., Kang S.C. On-site building information retrieval by using projection-based augmented reality. Journal of Computing in Civil Engineering ASCE 2012, 26(3):342-355.
-
(2012)
Journal of Computing in Civil Engineering ASCE
, vol.26
, Issue.3
, pp. 342-355
-
-
Yeh, K.C.1
Tsai, M.H.2
Kang, S.C.3
-
93
-
-
84884571181
-
Automated progress control using laser scanning technology
-
Zhang C., Arditi D. Automated progress control using laser scanning technology. Autom. Constr. 2013, 36:108-116.
-
(2013)
Autom. Constr.
, vol.36
, pp. 108-116
-
-
Zhang, C.1
Arditi, D.2
-
94
-
-
84878576285
-
Application of 4D visualization technology for safety management in metro construction
-
Zhou Y., Ding L.Y., Chen L.J. Application of 4D visualization technology for safety management in metro construction. Autom. Constr. 2013, 34:25-36.
-
(2013)
Autom. Constr.
, vol.34
, pp. 25-36
-
-
Zhou, Y.1
Ding, L.Y.2
Chen, L.J.3
-
95
-
-
65249118876
-
Comparison of optical sensor-based spatial data collection techniques for civil infrastructure modeling
-
Zhu Z., Brilakis I. Comparison of optical sensor-based spatial data collection techniques for civil infrastructure modeling. Journal of Computing in Civil Engineering ASCE 2009, 23(3):170-177.
-
(2009)
Journal of Computing in Civil Engineering ASCE
, vol.23
, Issue.3
, pp. 170-177
-
-
Zhu, Z.1
Brilakis, I.2
|