메뉴 건너뛰기




Volumn 33, Issue 6, 2015, Pages 1405-1416

Bridging BIM and building: From a literature review to an integrated conceptual framework

Author keywords

Building Information Modeling (BIM); Conceptual framework; Construction project management; Information and communication technologies; Literature review

Indexed keywords

ARTIFICIAL INTELLIGENCE; BUILDINGS; DECISION SUPPORT SYSTEMS; INFORMATION THEORY; PROJECT MANAGEMENT; STRESS CORROSION CRACKING;

EID: 84930762229     PISSN: 02637863     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijproman.2015.03.006     Document Type: Article
Times cited : (176)

References (95)
  • 1
    • 84880055872 scopus 로고    scopus 로고
    • Scenarios for cyber-physical systems integration in construction
    • Akanmu A., Anumba C., Messner J. Scenarios for cyber-physical systems integration in construction. J. Inf. Technol. Constr. 2013, 18:240-260.
    • (2013) J. Inf. Technol. Constr. , vol.18 , pp. 240-260
    • Akanmu, A.1    Anumba, C.2    Messner, J.3
  • 2
    • 29144432257 scopus 로고    scopus 로고
    • A formalism for utilization of sensor systems and integrated project models for active construction quality control
    • Akinci B., Boukamp F., Gordon C., Huber D., Lyons C., Park K. A formalism for utilization of sensor systems and integrated project models for active construction quality control. Autom. Constr. 2006, 15(2):124-138.
    • (2006) Autom. Constr. , vol.15 , Issue.2 , pp. 124-138
    • Akinci, B.1    Boukamp, F.2    Gordon, C.3    Huber, D.4    Lyons, C.5    Park, K.6
  • 3
    • 79951665541 scopus 로고    scopus 로고
    • Assessment of quality of as-is Building Information Models generated from point clouds using deviation analysis
    • Electronics Imaging Science and Technology Conference (IS&T)
    • Anil E.B., Tang P., Akinci B., Huber D. Assessment of quality of as-is Building Information Models generated from point clouds using deviation analysis. Proceedings of the SPIE 2011, vol. 7864A. Electronics Imaging Science and Technology Conference (IS&T).
    • (2011) Proceedings of the SPIE , vol.7864A
    • Anil, E.B.1    Tang, P.2    Akinci, B.3    Huber, D.4
  • 4
    • 84884502984 scopus 로고    scopus 로고
    • Deviation analysis method for the assessment of the quality of the as-is Building Information Models generated from point cloud data
    • Anil E.B., Tang P., Akinci B., Huber D. Deviation analysis method for the assessment of the quality of the as-is Building Information Models generated from point cloud data. Autom. Constr. 2013, 35:507-516.
    • (2013) Autom. Constr. , vol.35 , pp. 507-516
    • Anil, E.B.1    Tang, P.2    Akinci, B.3    Huber, D.4
  • 5
    • 34249724458 scopus 로고    scopus 로고
    • An approach for real world data modelling with the 3D terrestrial laser scanner for built environment
    • Arayici Y. An approach for real world data modelling with the 3D terrestrial laser scanner for built environment. Autom. Constr. 2007, 16(6):816-829.
    • (2007) Autom. Constr. , vol.16 , Issue.6 , pp. 816-829
    • Arayici, Y.1
  • 6
    • 78649315598 scopus 로고    scopus 로고
    • A framework for an automated and integrated project monitoring and control system for steel fabrication projects
    • Azimi R., Lee S., AbouRizk S.M., Alvanchi A. A framework for an automated and integrated project monitoring and control system for steel fabrication projects. Autom. Constr. 2011, 20(1):88-97.
    • (2011) Autom. Constr. , vol.20 , Issue.1 , pp. 88-97
    • Azimi, R.1    Lee, S.2    AbouRizk, S.M.3    Alvanchi, A.4
  • 7
    • 78049300426 scopus 로고    scopus 로고
    • Application of geographic information systems in construction safety planning
    • Bansal V. Application of geographic information systems in construction safety planning. Int. J. Proj. Manag. 2011, 29(1):66-77.
    • (2011) Int. J. Proj. Manag. , vol.29 , Issue.1 , pp. 66-77
    • Bansal, V.1
  • 8
    • 45749120776 scopus 로고    scopus 로고
    • Generating, evaluating, and visualizing construction schedule with geographic information systems
    • Bansal V., Pal M. Generating, evaluating, and visualizing construction schedule with geographic information systems. J. Comput. Civil Eng. ASCE 2008, 22(4):233-242.
    • (2008) J. Comput. Civil Eng. ASCE , vol.22 , Issue.4 , pp. 233-242
    • Bansal, V.1    Pal, M.2
  • 9
    • 67349093494 scopus 로고    scopus 로고
    • Construction schedule review in GIS with a navigable 3D animation of project activities
    • Bansal V., Pal M. Construction schedule review in GIS with a navigable 3D animation of project activities. Int. J. Proj. Manag. 2009, 27(5):532-542.
    • (2009) Int. J. Proj. Manag. , vol.27 , Issue.5 , pp. 532-542
    • Bansal, V.1    Pal, M.2
  • 10
    • 84865435484 scopus 로고    scopus 로고
    • Evaluation of accuracy of 'as-built' 3D modeling from photos taken by handheld digital cameras
    • Bhatla A., Choe S.Y., Fierro O., Leite F. Evaluation of accuracy of 'as-built' 3D modeling from photos taken by handheld digital cameras. Autom. Constr. 2012, 28:116-127.
    • (2012) Autom. Constr. , vol.28 , pp. 116-127
    • Bhatla, A.1    Choe, S.Y.2    Fierro, O.3    Leite, F.4
  • 11
    • 84900462381 scopus 로고    scopus 로고
    • Automating surface flatness control using terrestrial laser scanning and building information models
    • Bosché F., Guenet E. Automating surface flatness control using terrestrial laser scanning and building information models. Autom. Constr. 2014, 44:212-226.
    • (2014) Autom. Constr. , vol.44 , pp. 212-226
    • Bosché, F.1    Guenet, E.2
  • 13
    • 38649103110 scopus 로고    scopus 로고
    • Automated retrieval of 3D CAD model objects in construction range images
    • Bosché F., Haas C. Automated retrieval of 3D CAD model objects in construction range images. Autom. Constr. 2008, 17(4):499-512.
    • (2008) Autom. Constr. , vol.17 , Issue.4 , pp. 499-512
    • Bosché, F.1    Haas, C.2
  • 14
    • 70350064472 scopus 로고    scopus 로고
    • Automated recognition of 3D CAD objects in site laser scans for project 3D status visualization and performance control
    • Bosché F., Haas C.T., Akinci B. Automated recognition of 3D CAD objects in site laser scans for project 3D status visualization and performance control. J. Comput. Civil Eng. ASCE 2009, 23(6):311-318.
    • (2009) J. Comput. Civil Eng. ASCE , vol.23 , Issue.6 , pp. 311-318
    • Bosché, F.1    Haas, C.T.2    Akinci, B.3
  • 16
    • 34547670382 scopus 로고    scopus 로고
    • Automated processing of construction specifications to support inspection and quality control
    • Boukamp F., Akinci B. Automated processing of construction specifications to support inspection and quality control. Autom. Constr. 2007, 17(1):90-106.
    • (2007) Autom. Constr. , vol.17 , Issue.1 , pp. 90-106
    • Boukamp, F.1    Akinci, B.2
  • 17
    • 80052835631 scopus 로고    scopus 로고
    • Progressive 3D reconstruction of infrastructure with videogrammetry
    • Brilakis I., Fathi H., Rashidi A. Progressive 3D reconstruction of infrastructure with videogrammetry. Autom. Constr. 2011, 20(7):884-895.
    • (2011) Autom. Constr. , vol.20 , Issue.7 , pp. 884-895
    • Brilakis, I.1    Fathi, H.2    Rashidi, A.3
  • 18
    • 84881611317 scopus 로고    scopus 로고
    • The project benefits of Building Information Modelling (BIM)
    • Bryde D., Broquetas M., Volm J.M. The project benefits of Building Information Modelling (BIM). Int. J. Proj. Manag. 2013, 31(7):971-980.
    • (2013) Int. J. Proj. Manag. , vol.31 , Issue.7 , pp. 971-980
    • Bryde, D.1    Broquetas, M.2    Volm, J.M.3
  • 19
    • 84878579790 scopus 로고    scopus 로고
    • Real-time resource location data collection and visualization technology for construction safety and activity monitoring applications
    • Cheng T., Teizer J. Real-time resource location data collection and visualization technology for construction safety and activity monitoring applications. Autom. Constr. 2013, 34:3-15.
    • (2013) Autom. Constr. , vol.34 , pp. 3-15
    • Cheng, T.1    Teizer, J.2
  • 20
    • 39349114541 scopus 로고    scopus 로고
    • RFID+ 4D CAD for progress management of structural steel works in high-rise buildings
    • Chin S., Yoon S., Choi C., Cho C. RFID+ 4D CAD for progress management of structural steel works in high-rise buildings. Journal of Computing in Civil Engineering ASCE 2008, 22(2):74-89.
    • (2008) Journal of Computing in Civil Engineering ASCE , vol.22 , Issue.2 , pp. 74-89
    • Chin, S.1    Yoon, S.2    Choi, C.3    Cho, C.4
  • 22
    • 75649083155 scopus 로고    scopus 로고
    • Assessing the accuracy of applying photogrammetry to take geometric measurements on building products
    • Dai F., Lu M. Assessing the accuracy of applying photogrammetry to take geometric measurements on building products. J. Constr. Eng. Manage. ASCE 2010, 136(2):242-250.
    • (2010) J. Constr. Eng. Manage. ASCE , vol.136 , Issue.2 , pp. 242-250
    • Dai, F.1    Lu, M.2
  • 23
    • 84872744697 scopus 로고    scopus 로고
    • Comparison of image-based and time-of-flight-based technologies for three-dimensional reconstruction of infrastructure
    • Dai F., Rashidi A., Brilakis I., Vela P. Comparison of image-based and time-of-flight-based technologies for three-dimensional reconstruction of infrastructure. Journal of Construction Engineering and Management ASCE 2012, 139(1):69-79.
    • (2012) Journal of Construction Engineering and Management ASCE , vol.139 , Issue.1 , pp. 69-79
    • Dai, F.1    Rashidi, A.2    Brilakis, I.3    Vela, P.4
  • 25
    • 0020951903 scopus 로고
    • The OSI reference model
    • Day J.D., Zimmermann H. The OSI reference model. Proc. IEEE 1983, 71(12):1334-1340.
    • (1983) Proc. IEEE , vol.71 , Issue.12 , pp. 1334-1340
    • Day, J.D.1    Zimmermann, H.2
  • 26
    • 84884559870 scopus 로고    scopus 로고
    • Real-time safety early warning system for cross passage construction in Yangtze Riverbed Metro Tunnel based on the Internet of Things
    • Ding L., Zhou C., Deng Q., Luo H., Ye X., Ni Y., Guo P. Real-time safety early warning system for cross passage construction in Yangtze Riverbed Metro Tunnel based on the Internet of Things. Autom. Constr. 2013, 36:25-37.
    • (2013) Autom. Constr. , vol.36 , pp. 25-37
    • Ding, L.1    Zhou, C.2    Deng, Q.3    Luo, H.4    Ye, X.5    Ni, Y.6    Guo, P.7
  • 27
    • 84907426904 scopus 로고    scopus 로고
    • Building Information Modeling (BIM) application framework: the process of expanding from 3D to computable nD
    • Ding L., Zhou Y., Akinci B. Building Information Modeling (BIM) application framework: the process of expanding from 3D to computable nD. Autom. Constr. 2014, 46:82-93.
    • (2014) Autom. Constr. , vol.46 , pp. 82-93
    • Ding, L.1    Zhou, Y.2    Akinci, B.3
  • 29
    • 49349100565 scopus 로고    scopus 로고
    • Integrating 3D laser scanning and photogrammetry for progress measurement of construction work
    • El-Omari S., Moselhi O. Integrating 3D laser scanning and photogrammetry for progress measurement of construction work. Autom. Constr. 2008, 18(1):1-9.
    • (2008) Autom. Constr. , vol.18 , Issue.1 , pp. 1-9
    • El-Omari, S.1    Moselhi, O.2
  • 30
    • 70350151227 scopus 로고    scopus 로고
    • Data acquisition from construction sites for tracking purposes
    • El-Omari S., Moselhi O. Data acquisition from construction sites for tracking purposes. Eng. Constr. Archit. Manag. 2009, 16(5):490-503.
    • (2009) Eng. Constr. Archit. Manag. , vol.16 , Issue.5 , pp. 490-503
    • El-Omari, S.1    Moselhi, O.2
  • 31
    • 79960638196 scopus 로고    scopus 로고
    • Integrating automated data acquisition technologies for progress reporting of construction projects
    • El-Omari S., Moselhi O. Integrating automated data acquisition technologies for progress reporting of construction projects. Autom. Constr. 2011, 20(6):699-705.
    • (2011) Autom. Constr. , vol.20 , Issue.6 , pp. 699-705
    • El-Omari, S.1    Moselhi, O.2
  • 35
    • 45749088540 scopus 로고    scopus 로고
    • Integrating construction process documentation into building information modeling
    • Goedert J.D., Meadati P. Integrating construction process documentation into building information modeling. Journal of Construction Engineering and Management ASCE 2008, 134(7):509-516.
    • (2008) Journal of Construction Engineering and Management ASCE , vol.134 , Issue.7 , pp. 509-516
    • Goedert, J.D.1    Meadati, P.2
  • 36
    • 70350060197 scopus 로고    scopus 로고
    • Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs
    • Golparvar-Fard M., Peña-Mora F., Arboleda C.A., Lee S. Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs. Journal of Computing in Civil Engineering ASCE 2009, 23(6):391-404.
    • (2009) Journal of Computing in Civil Engineering ASCE , vol.23 , Issue.6 , pp. 391-404
    • Golparvar-Fard, M.1    Peña-Mora, F.2    Arboleda, C.A.3    Lee, S.4
  • 37
    • 51849166450 scopus 로고    scopus 로고
    • RFID-based wireless manufacturing for real-time management of job shop WIP inventories
    • Huang G.Q., Zhang Y.F., Jiang P.Y. RFID-based wireless manufacturing for real-time management of job shop WIP inventories. Int. J. Adv. Manuf. Technol. 2008, 36(7-8):752-764.
    • (2008) Int. J. Adv. Manuf. Technol. , vol.36 , Issue.7-8 , pp. 752-764
    • Huang, G.Q.1    Zhang, Y.F.2    Jiang, P.Y.3
  • 38
    • 79957646837 scopus 로고    scopus 로고
    • RFID-enabled gateway product service system for collaborative manufacturing alliances
    • Huang G.Q., Qu T., Fang M.J., Bramley A.N. RFID-enabled gateway product service system for collaborative manufacturing alliances. CIRP Ann. Manuf. Technol. 2011, 60(1):465-468.
    • (2011) CIRP Ann. Manuf. Technol. , vol.60 , Issue.1 , pp. 465-468
    • Huang, G.Q.1    Qu, T.2    Fang, M.J.3    Bramley, A.N.4
  • 39
    • 84867859668 scopus 로고    scopus 로고
    • Optimizing location of tower cranes on construction sites through GIS and BIM integration
    • Irizarry J., Karan E.P. Optimizing location of tower cranes on construction sites through GIS and BIM integration. J. Inf. Technol. Constr. 2012, 17:351-366.
    • (2012) J. Inf. Technol. Constr. , vol.17 , pp. 351-366
    • Irizarry, J.1    Karan, E.P.2
  • 40
    • 84878380661 scopus 로고    scopus 로고
    • InfoSPOT: a mobile Augmented Reality method for accessing building information through a situation awareness approach
    • Irizarry J., Gheisari M., Williams G., Walker B.N. InfoSPOT: a mobile Augmented Reality method for accessing building information through a situation awareness approach. Autom. Constr. 2013, 33:11-23.
    • (2013) Autom. Constr. , vol.33 , pp. 11-23
    • Irizarry, J.1    Gheisari, M.2    Williams, G.3    Walker, B.N.4
  • 41
    • 84872313658 scopus 로고    scopus 로고
    • Integrating BIM and GIS to improve the visual monitoring of construction supply chain management
    • Irizarry J., Karan E.P., Jalaei F. Integrating BIM and GIS to improve the visual monitoring of construction supply chain management. Autom. Constr. 2013, 31:241-254.
    • (2013) Autom. Constr. , vol.31 , pp. 241-254
    • Irizarry, J.1    Karan, E.P.2    Jalaei, F.3
  • 42
    • 84878418975 scopus 로고    scopus 로고
    • Towards cloud Augmented Reality for construction application by BIM and SNS integration
    • Jiao Y., Zhang S., Li Y., Wang Y., Yang B. Towards cloud Augmented Reality for construction application by BIM and SNS integration. Autom. Constr. 2013, 33:37-47.
    • (2013) Autom. Constr. , vol.33 , pp. 37-47
    • Jiao, Y.1    Zhang, S.2    Li, Y.3    Wang, Y.4    Yang, B.5
  • 43
    • 84896541031 scopus 로고    scopus 로고
    • Productive modeling for development of 'as-built' BIM of existing indoor structures
    • Jung J., Hong S., Jeong S., Kim S., Cho H., Hong S., Heo J. Productive modeling for development of 'as-built' BIM of existing indoor structures. Autom. Constr. 2014, 42:68-77.
    • (2014) Autom. Constr. , vol.42 , pp. 68-77
    • Jung, J.1    Hong, S.2    Jeong, S.3    Kim, S.4    Cho, H.5    Hong, S.6    Heo, J.7
  • 45
    • 23744484214 scopus 로고    scopus 로고
    • Rapid, on-site spatial information acquisition and its use for infrastructure operation and maintenance
    • Kim C., Haas C.T., Liapi K.A. Rapid, on-site spatial information acquisition and its use for infrastructure operation and maintenance. Autom. Constr. 2005, 14(5):666-684.
    • (2005) Autom. Constr. , vol.14 , Issue.5 , pp. 666-684
    • Kim, C.1    Haas, C.T.2    Liapi, K.A.3
  • 46
    • 84884502256 scopus 로고    scopus 로고
    • 4D CAD model updating using image processing-based construction progress monitoring
    • Kim C., Kim B., Kim H. 4D CAD model updating using image processing-based construction progress monitoring. Autom. Constr. 2013, 35:44-52.
    • (2013) Autom. Constr. , vol.35 , pp. 44-52
    • Kim, C.1    Kim, B.2    Kim, H.3
  • 47
    • 81355161549 scopus 로고    scopus 로고
    • Imaged-based verification of 'as-built' documentation of operational buildings
    • Klein L., Li N., Becerik-Gerber B. Imaged-based verification of 'as-built' documentation of operational buildings. Autom. Constr. 2012, 21:161-171.
    • (2012) Autom. Constr. , vol.21 , pp. 161-171
    • Klein, L.1    Li, N.2    Becerik-Gerber, B.3
  • 49
    • 84907434477 scopus 로고    scopus 로고
    • A defect management system for reinforced concrete work utilizing BIM, image-matching and augmented reality
    • Kwon O.S., Park C.S., Lim C.R. A defect management system for reinforced concrete work utilizing BIM, image-matching and augmented reality. Autom. Constr. 2014, 46:74-81.
    • (2014) Autom. Constr. , vol.46 , pp. 74-81
    • Kwon, O.S.1    Park, C.S.2    Lim, C.R.3
  • 50
    • 84872298921 scopus 로고    scopus 로고
    • Automatic thermographic and RGB texture of 'as-built' BIM for energy rehabilitation purposes
    • Lagüela S., Díaz-Vilariño L., Martínez J., Armesto J. Automatic thermographic and RGB texture of 'as-built' BIM for energy rehabilitation purposes. Autom. Constr. 2013, 31:230-240.
    • (2013) Autom. Constr. , vol.31 , pp. 230-240
    • Lagüela, S.1    Díaz-Vilariño, L.2    Martínez, J.3    Armesto, J.4
  • 52
    • 84871020668 scopus 로고    scopus 로고
    • An integrated approach to intelligent urban facilities management for real-time emergency response
    • Lee J., Jeong Y., Oh Y.S., Lee J.C., Ahn N., Lee J., Yoon S.H. An integrated approach to intelligent urban facilities management for real-time emergency response. Autom. Constr. 2013, 30:256-264.
    • (2013) Autom. Constr. , vol.30 , pp. 256-264
    • Lee, J.1    Jeong, Y.2    Oh, Y.S.3    Lee, J.C.4    Ahn, N.5    Lee, J.6    Yoon, S.H.7
  • 53
    • 84884499636 scopus 로고    scopus 로고
    • Skeleton-based 3D reconstruction of 'as-built' pipelines from laser-scan data
    • Lee J., Son H., Kim C., Kim C. Skeleton-based 3D reconstruction of 'as-built' pipelines from laser-scan data. Autom. Constr. 2013, 35:199-207.
    • (2013) Autom. Constr. , vol.35 , pp. 199-207
    • Lee, J.1    Son, H.2    Kim, C.3    Kim, C.4
  • 54
    • 67650337837 scopus 로고    scopus 로고
    • Rethinking project management and exploring virtual design and construction as a potential solution
    • Li H., Lu W.S., Huang T. Rethinking project management and exploring virtual design and construction as a potential solution. Constr. Manage. Econ. 2009, 27(4):363-371.
    • (2009) Constr. Manage. Econ. , vol.27 , Issue.4 , pp. 363-371
    • Li, H.1    Lu, W.S.2    Huang, T.3
  • 55
    • 79551658669 scopus 로고    scopus 로고
    • Scenarios for applying RFID technology in construction project management
    • Lu W.S., Huang G.Q., Li H. Scenarios for applying RFID technology in construction project management. Autom. Constr. 2011, 20(2):101-106.
    • (2011) Autom. Constr. , vol.20 , Issue.2 , pp. 101-106
    • Lu, W.S.1    Huang, G.Q.2    Li, H.3
  • 58
    • 70350139502 scopus 로고    scopus 로고
    • Lifecycle management of facilities components using radio frequency identification and building information model
    • Motamedi A., Hammad A. Lifecycle management of facilities components using radio frequency identification and building information model. J. Inf. Technol. Constr. 2009, 14(Special Issue):238-262.
    • (2009) J. Inf. Technol. Constr. , vol.14 , pp. 238-262
    • Motamedi, A.1    Hammad, A.2
  • 59
    • 84857367913 scopus 로고    scopus 로고
    • Method to produce field instructions from product and process models for cast-in-place concrete operations
    • Mourgues C., Fischer M., Kunz J. Method to produce field instructions from product and process models for cast-in-place concrete operations. Autom. Constr. 2012, 22:233-246.
    • (2012) Autom. Constr. , vol.22 , pp. 233-246
    • Mourgues, C.1    Fischer, M.2    Kunz, J.3
  • 61
    • 84865332778 scopus 로고    scopus 로고
    • Construction worker detection in video frames for initializing vision trackers
    • Park M.W., Brilakis I. Construction worker detection in video frames for initializing vision trackers. Autom. Constr. 2012, 28:15-25.
    • (2012) Autom. Constr. , vol.28 , pp. 15-25
    • Park, M.W.1    Brilakis, I.2
  • 62
    • 84878412814 scopus 로고    scopus 로고
    • A framework for construction safety management and visualization system
    • Park C.S., Kim H.J. A framework for construction safety management and visualization system. Autom. Constr. 2013, 33:95-103.
    • (2013) Autom. Constr. , vol.33 , pp. 95-103
    • Park, C.S.1    Kim, H.J.2
  • 63
    • 84878418504 scopus 로고    scopus 로고
    • A framework for proactive construction defect management using BIM, augmented reality and ontology-based data collection template
    • Park C.S., Lee D.Y., Kwon O.S., Wang X. A framework for proactive construction defect management using BIM, augmented reality and ontology-based data collection template. Autom. Constr. 2013, 33:61-71.
    • (2013) Autom. Constr. , vol.33 , pp. 61-71
    • Park, C.S.1    Lee, D.Y.2    Kwon, O.S.3    Wang, X.4
  • 64
    • 33747360709 scopus 로고    scopus 로고
    • Construction scheduling and progress control using geographical information systems
    • Poku S.E., Arditi D. Construction scheduling and progress control using geographical information systems. Journal of Computing in Civil Engineering ASCE 2006, 20(5):351-360.
    • (2006) Journal of Computing in Civil Engineering ASCE , vol.20 , Issue.5 , pp. 351-360
    • Poku, S.E.1    Arditi, D.2
  • 65
    • 6344258575 scopus 로고    scopus 로고
    • Extension of ISO 10303, the STEP standard, for the exchange of procedural shape models
    • IEEE
    • Pratt M.J. Extension of ISO 10303, the STEP standard, for the exchange of procedural shape models. Proceedings of Shape Modeling Applications 2004, 317-326. IEEE.
    • (2004) Proceedings of Shape Modeling Applications , pp. 317-326
    • Pratt, M.J.1
  • 66
    • 81855196055 scopus 로고    scopus 로고
    • Construction engineering requirements for integrating laser scanning technology and building information modeling
    • Randall T. Construction engineering requirements for integrating laser scanning technology and building information modeling. Journal of Construction Engineering and Management ASCE 2011, 137(10):797-805.
    • (2011) Journal of Construction Engineering and Management ASCE , vol.137 , Issue.10 , pp. 797-805
    • Randall, T.1
  • 67
    • 78149285142 scopus 로고    scopus 로고
    • Multisensor data fusion for on-site materials tracking in construction
    • Razavi S.N., Haas C.T. Multisensor data fusion for on-site materials tracking in construction. Autom. Constr. 2010, 19(8):1037-1046.
    • (2010) Autom. Constr. , vol.19 , Issue.8 , pp. 1037-1046
    • Razavi, S.N.1    Haas, C.T.2
  • 68
    • 84901938850 scopus 로고    scopus 로고
    • CoSMoS: a BIM and wireless sensor based integrated solution for worker safety in confined spaces
    • Riaz Z., Arslan M., Kiani A.K., Azhar S. CoSMoS: a BIM and wireless sensor based integrated solution for worker safety in confined spaces. Autom. Constr. 2014, 45:96-106.
    • (2014) Autom. Constr. , vol.45 , pp. 96-106
    • Riaz, Z.1    Arslan, M.2    Kiani, A.K.3    Azhar, S.4
  • 69
    • 78649333572 scopus 로고    scopus 로고
    • An object-based 3D walk-through model for interior construction progress monitoring
    • Roh S., Aziz Z., Peña-Mora F. An object-based 3D walk-through model for interior construction progress monitoring. Autom. Constr. 2011, 20(1):66-75.
    • (2011) Autom. Constr. , vol.20 , Issue.1 , pp. 66-75
    • Roh, S.1    Aziz, Z.2    Peña-Mora, F.3
  • 70
    • 84870770628 scopus 로고    scopus 로고
    • Onsite 3D marking for construction activity tracking
    • Shahi A., West J.S., Haas C.T. Onsite 3D marking for construction activity tracking. Autom. Constr. 2013, 30:136-143.
    • (2013) Autom. Constr. , vol.30 , pp. 136-143
    • Shahi, A.1    West, J.S.2    Haas, C.T.3
  • 71
    • 84861811470 scopus 로고    scopus 로고
    • A loosely coupled system integration approach for decision support in facility management and maintenance
    • Shen W., Hao Q., Xue Y. A loosely coupled system integration approach for decision support in facility management and maintenance. Autom. Constr. 2012, 25:41-48.
    • (2012) Autom. Constr. , vol.25 , pp. 41-48
    • Shen, W.1    Hao, Q.2    Xue, Y.3
  • 73
    • 1342309160 scopus 로고    scopus 로고
    • Building theories of project management: past research, questions for the future
    • Söderlund J. Building theories of project management: past research, questions for the future. Int. J. Proj. Manag. 2004, 22:183-191.
    • (2004) Int. J. Proj. Manag. , vol.22 , pp. 183-191
    • Söderlund, J.1
  • 74
    • 77956612137 scopus 로고    scopus 로고
    • 3D structural component recognition and modeling method using color and 3D data for construction progress monitoring
    • Son H., Kim C. 3D structural component recognition and modeling method using color and 3D data for construction progress monitoring. Autom. Constr. 2010, 19(7):844-854.
    • (2010) Autom. Constr. , vol.19 , Issue.7 , pp. 844-854
    • Son, H.1    Kim, C.2
  • 75
    • 77956617735 scopus 로고    scopus 로고
    • Rapid 3D object detection and modeling using range data from 3D range imaging camera for heavy equipment operation
    • Son H., Kim C., Choi K. Rapid 3D object detection and modeling using range data from 3D range imaging camera for heavy equipment operation. Autom. Constr. 2010, 19(7):898-906.
    • (2010) Autom. Constr. , vol.19 , Issue.7 , pp. 898-906
    • Son, H.1    Kim, C.2    Choi, K.3
  • 76
    • 70350154933 scopus 로고    scopus 로고
    • Prototype development of an ICT system to support construction management based on virtual models and RFID
    • Sørensen K.B., Christiansson P., Svidt K. Prototype development of an ICT system to support construction management based on virtual models and RFID. J. Inf. Technol. Constr. 2009, 14(Special Issue):263-288.
    • (2009) J. Inf. Technol. Constr. , vol.14 , pp. 263-288
    • Sørensen, K.B.1    Christiansson, P.2    Svidt, K.3
  • 77
    • 33751274763 scopus 로고    scopus 로고
    • Integration of construction 'as-built' data via laser scanning with geotechnical monitoring of urban excavation
    • Su Y., Hashash Y., Liu L. Integration of construction 'as-built' data via laser scanning with geotechnical monitoring of urban excavation. Journal of Construction Engineering and Management ASCE 2006, 132(12):1234-1241.
    • (2006) Journal of Construction Engineering and Management ASCE , vol.132 , Issue.12 , pp. 1234-1241
    • Su, Y.1    Hashash, Y.2    Liu, L.3
  • 79
    • 77956619234 scopus 로고    scopus 로고
    • Automatic reconstruction of 'as-built' building information models from laser-scanned point clouds: a review of related techniques
    • Tang P., Huber D., Akinci B., Lipman R., Lytle A. Automatic reconstruction of 'as-built' building information models from laser-scanned point clouds: a review of related techniques. Autom. Constr. 2010, 19(7):829-843.
    • (2010) Autom. Constr. , vol.19 , Issue.7 , pp. 829-843
    • Tang, P.1    Huber, D.2    Akinci, B.3    Lipman, R.4    Lytle, A.5
  • 80
    • 35348874797 scopus 로고    scopus 로고
    • Real-time three-dimensional occupancy grid modeling for the detection and tracking of construction resources
    • Teizer J., Caldas C.H., Haas C.T. Real-time three-dimensional occupancy grid modeling for the detection and tracking of construction resources. Journal of Construction Engineering and Management ASCE 2007, 133(11):880-888.
    • (2007) Journal of Construction Engineering and Management ASCE , vol.133 , Issue.11 , pp. 880-888
    • Teizer, J.1    Caldas, C.H.2    Haas, C.T.3
  • 81
    • 84884502878 scopus 로고    scopus 로고
    • Location tracking and data visualization technology to advance construction ironworkers' education and training in safety and productivity
    • Teizer J., Cheng T., Fang Y. Location tracking and data visualization technology to advance construction ironworkers' education and training in safety and productivity. Autom. Constr. 2013, 35:53-68.
    • (2013) Autom. Constr. , vol.35 , pp. 53-68
    • Teizer, J.1    Cheng, T.2    Fang, Y.3
  • 82
    • 58149259941 scopus 로고    scopus 로고
    • Methodology for automating the identification and localization of construction components on industrial projects
    • Torrent D.G., Caldas C.H. Methodology for automating the identification and localization of construction components on industrial projects. Journal of Computing in Civil Engineering ASCE 2009, 23(1):3-13.
    • (2009) Journal of Computing in Civil Engineering ASCE , vol.23 , Issue.1 , pp. 3-13
    • Torrent, D.G.1    Caldas, C.H.2
  • 83
    • 84857370632 scopus 로고    scopus 로고
    • Automated progress tracking using 4D schedule and 3D sensing technologies
    • Turkan Y., Bosché F., Haas C.T., Haas R. Automated progress tracking using 4D schedule and 3D sensing technologies. Autom. Constr. 2012, 22:414-421.
    • (2012) Autom. Constr. , vol.22 , pp. 414-421
    • Turkan, Y.1    Bosché, F.2    Haas, C.T.3    Haas, R.4
  • 85
    • 84887445707 scopus 로고    scopus 로고
    • Extending automation of building construction-survey on potential sensor technologies and robotic applications
    • Vähä P., Heikkilä T., Kilpeläinen P., Järviluoma M., Gambao E. Extending automation of building construction-survey on potential sensor technologies and robotic applications. Autom. Constr. 2013, 36:168-178.
    • (2013) Autom. Constr. , vol.36 , pp. 168-178
    • Vähä, P.1    Heikkilä, T.2    Kilpeläinen, P.3    Järviluoma, M.4    Gambao, E.5
  • 86
    • 49549122201 scopus 로고    scopus 로고
    • IFC and building lifecycle management
    • Vanlande R., Nicolle C., Cruz C. IFC and building lifecycle management. Autom. Constr. 2008, 18(1):70-78.
    • (2008) Autom. Constr. , vol.18 , Issue.1 , pp. 70-78
    • Vanlande, R.1    Nicolle, C.2    Cruz, C.3
  • 87
    • 84878587673 scopus 로고    scopus 로고
    • A conceptual framework for integrating building information modeling with augmented reality
    • Wang X., Love P.E., Kim M.J., Park C.S., Sing C.P., Hou L. A conceptual framework for integrating building information modeling with augmented reality. Autom. Constr. 2013, 34:37-44.
    • (2013) Autom. Constr. , vol.34 , pp. 37-44
    • Wang, X.1    Love, P.E.2    Kim, M.J.3    Park, C.S.4    Sing, C.P.5    Hou, L.6
  • 88
    • 84894209434 scopus 로고    scopus 로고
    • Integrating Augmented Reality with Building Information Modeling: onsite construction process controlling for liquefied natural gas industry
    • Wang X., Truijens M., Hou L., Wang Y., Zhou Y. Integrating Augmented Reality with Building Information Modeling: onsite construction process controlling for liquefied natural gas industry. Autom. Constr. 2014, 40:96-105.
    • (2014) Autom. Constr. , vol.40 , pp. 96-105
    • Wang, X.1    Truijens, M.2    Hou, L.3    Wang, Y.4    Zhou, Y.5
  • 89
    • 84902124617 scopus 로고    scopus 로고
    • An innovative method for project control in LNG project through 5D CAD: a case study
    • Wang X., Yung P., Luo H., Truijens M. An innovative method for project control in LNG project through 5D CAD: a case study. Autom. Constr. 2014, 45:126-135.
    • (2014) Autom. Constr. , vol.45 , pp. 126-135
    • Wang, X.1    Yung, P.2    Luo, H.3    Truijens, M.4
  • 90
    • 79954557707 scopus 로고    scopus 로고
    • Using rfid and real-time virtual reality simulation for optimization in steel construction
    • Xie H., Shi W., Issa R.R. Using rfid and real-time virtual reality simulation for optimization in steel construction. J. Inf. Technol. Constr. 2011, 16:291-308.
    • (2011) J. Inf. Technol. Constr. , vol.16 , pp. 291-308
    • Xie, H.1    Shi, W.2    Issa, R.R.3
  • 91
    • 84873283130 scopus 로고    scopus 로고
    • Automatic creation of semantically rich 3D building models from laser scanner data
    • Xiong X., Adan A., Akinci B., Huber D. Automatic creation of semantically rich 3D building models from laser scanner data. Autom. Constr. 2013, 31:325-337.
    • (2013) Autom. Constr. , vol.31 , pp. 325-337
    • Xiong, X.1    Adan, A.2    Akinci, B.3    Huber, D.4
  • 92
    • 84861145569 scopus 로고    scopus 로고
    • On-site building information retrieval by using projection-based augmented reality
    • Yeh K.C., Tsai M.H., Kang S.C. On-site building information retrieval by using projection-based augmented reality. Journal of Computing in Civil Engineering ASCE 2012, 26(3):342-355.
    • (2012) Journal of Computing in Civil Engineering ASCE , vol.26 , Issue.3 , pp. 342-355
    • Yeh, K.C.1    Tsai, M.H.2    Kang, S.C.3
  • 93
    • 84884571181 scopus 로고    scopus 로고
    • Automated progress control using laser scanning technology
    • Zhang C., Arditi D. Automated progress control using laser scanning technology. Autom. Constr. 2013, 36:108-116.
    • (2013) Autom. Constr. , vol.36 , pp. 108-116
    • Zhang, C.1    Arditi, D.2
  • 94
    • 84878576285 scopus 로고    scopus 로고
    • Application of 4D visualization technology for safety management in metro construction
    • Zhou Y., Ding L.Y., Chen L.J. Application of 4D visualization technology for safety management in metro construction. Autom. Constr. 2013, 34:25-36.
    • (2013) Autom. Constr. , vol.34 , pp. 25-36
    • Zhou, Y.1    Ding, L.Y.2    Chen, L.J.3
  • 95
    • 65249118876 scopus 로고    scopus 로고
    • Comparison of optical sensor-based spatial data collection techniques for civil infrastructure modeling
    • Zhu Z., Brilakis I. Comparison of optical sensor-based spatial data collection techniques for civil infrastructure modeling. Journal of Computing in Civil Engineering ASCE 2009, 23(3):170-177.
    • (2009) Journal of Computing in Civil Engineering ASCE , vol.23 , Issue.3 , pp. 170-177
    • Zhu, Z.1    Brilakis, I.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.