메뉴 건너뛰기




Volumn 46, Issue , 2014, Pages 82-93

Building Information Modeling (BIM) application framework: The process of expanding from 3D to computable nD

Author keywords

3D; BIM; Computable; Modeling; nD

Indexed keywords

ARCHITECTURAL DESIGN; CONSTRUCTION INDUSTRY; DECISION MAKING; ENVIRONMENTAL MANAGEMENT; MODELS; NEODYMIUM;

EID: 84907426904     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2014.04.009     Document Type: Article
Times cited : (274)

References (111)
  • 1
    • 79551688640 scopus 로고    scopus 로고
    • Teaching construction project management with BIM support: Experience and lessons learned
    • Forest Petersona, Timo Hartmannb, Renate Fruchtera, and Martin Fischer Teaching construction project management with BIM support: experience and lessons learned Autom. Constr. 20 2011 115 125
    • (2011) Autom. Constr. , vol.20 , pp. 115-125
    • Petersona, F.1    Hartmannb, T.2    Fruchtera, R.3    Fischer, M.4
  • 2
    • 77955883757 scopus 로고    scopus 로고
    • Interaction of lean and building information modeling in construction
    • R. Sacks, L. Koskela, B. Dave, and R. Owen Interaction of lean and building information modeling in construction J. Constr. Eng. Manag. 136 9 2010 968 980
    • (2010) J. Constr. Eng. Manag. , vol.136 , Issue.9 , pp. 968-980
    • Sacks, R.1    Koskela, L.2    Dave, B.3    Owen, R.4
  • 3
    • 80053141965 scopus 로고    scopus 로고
    • Benefits of implementing building information modeling for healthcare facility commissioning
    • C. Chen, H. Dib, and G. Lasker Benefits of implementing building information modeling for healthcare facility commissioning J. Comput. Civ. Eng. 2011 578 585
    • (2011) J. Comput. Civ. Eng. , pp. 578-585
    • Chen, C.1    Dib, H.2    Lasker, G.3
  • 4
    • 84860281943 scopus 로고    scopus 로고
    • How to measure the benefits of BIM - A case study approach
    • Kristen Barlish, and Kenneth Sullivan How to measure the benefits of BIM - a case study approach Autom. Constr. 24 2012 149 159
    • (2012) Autom. Constr. , vol.24 , pp. 149-159
    • Barlish, K.1    Sullivan, K.2
  • 5
    • 84885416092 scopus 로고    scopus 로고
    • Current status of BIM benefits, challenges, and the future potential for the structural discipline
    • R. Solnosky Current status of BIM benefits, challenges, and the future potential for the structural discipline Structures Congress 2013 2013 849 859
    • (2013) Structures Congress 2013 , pp. 849-859
    • Solnosky, R.1
  • 6
    • 84890525940 scopus 로고    scopus 로고
    • Building Information Modeling (BIM) for existing buildings-Literature review and future needs
    • R. Volk, J. Stengel, and F. Schultmann Building Information Modeling (BIM) for existing buildings-Literature review and future needs Autom. Constr. 38 2014 109 127
    • (2014) Autom. Constr. , vol.38 , pp. 109-127
    • Volk, R.1    Stengel, J.2    Schultmann, F.3
  • 8
    • 33751501800 scopus 로고    scopus 로고
    • Supporting the constructability review with 3D/4D models
    • DOI 10.1080/09613210600942218, PII NU6071P73H7T2004
    • T. Hartmann, and M. Fischer Supporting the constructability review with 3D/4D models Build. Res. Inf. 35 1 2007 70 80 (Pubitemid 44838090)
    • (2007) Building Research and Information , vol.35 , Issue.1 , pp. 70-80
    • Hartmann, T.1    Fischer, M.2
  • 9
    • 80053608291 scopus 로고    scopus 로고
    • Designing a BIM-based serious game for fire safety evacuation simulations
    • Uwe Rüppel, and Kristian Schatz Designing a BIM-based serious game for fire safety evacuation simulations Adv. Eng. Inform. 25 2011 600 611
    • (2011) Adv. Eng. Inform. , vol.25 , pp. 600-611
    • Rüppel, U.1    Schatz, K.2
  • 10
    • 84878576285 scopus 로고    scopus 로고
    • Application of 4D visualization technology for safety management in metro construction
    • Y. Zhou, L.Y. Ding, and L.J. Chen Application of 4D visualization technology for safety management in metro construction Autom. Constr. 34 2013 25 36
    • (2013) Autom. Constr. , vol.34 , pp. 25-36
    • Zhou, Y.1    Ding, L.Y.2    Chen, L.J.3
  • 11
    • 79952302557 scopus 로고    scopus 로고
    • 3D/4D CAD applicability for life-cycle facility management
    • Jungjun Park, Byungil Kim, Changyoon Kim, and Hyoungkwan Kim 3D/4D CAD applicability for life-cycle facility management J. Comput. Civ. Eng. 25 2011 129 138
    • (2011) J. Comput. Civ. Eng. , vol.25 , pp. 129-138
    • Park, J.1    Kim, B.2    Kim, C.3    Kim, H.4
  • 12
    • 79957580713 scopus 로고    scopus 로고
    • The business value of BIM: Getting building information modeling to the bottom line premier
    • McGraw-Hill Construction New York
    • N.W. Young Jr., S.A. Jones, H.M. Berstein, and J.E. Gudgel The business value of BIM: getting building information modeling to the bottom line premier Smart Market Rep. 2009 McGraw-Hill Construction New York
    • (2009) Smart Market Rep.
    • Young, Jr.N.W.1    Jones, S.A.2    Berstein, H.M.3    Gudgel, J.E.4
  • 14
    • 74349102919 scopus 로고    scopus 로고
    • Evaluating industry perceptions of building information modeling (BIM) impact on construction
    • Patrick C. Suermann, and Raja R.A. Issa Evaluating industry perceptions of building information modeling (BIM) impact on construction J. Inf. Technol. Constr. 14 2009 574 594
    • (2009) J. Inf. Technol. Constr. , vol.14 , pp. 574-594
    • Suermann, P.C.1    Issa, R.R.A.2
  • 17
    • 58849151313 scopus 로고    scopus 로고
    • Construction management pull for 4D CAD
    • ASCE Reston, Va
    • P. Barrett Construction management pull for 4D CAD Proceeding of Construction Congress VI 2000 ASCE Reston, Va 977 983
    • (2000) Proceeding of Construction Congress VI , pp. 977-983
    • Barrett, P.1
  • 18
    • 51849088974 scopus 로고    scopus 로고
    • Areas of application for 3D and 4D models on construction project
    • Timo Hartmann, Ju Gao, and Martin Fischer Areas of application for 3D and 4D models on construction project J. Constr. Eng. Manag. 134 2008 776 785
    • (2008) J. Constr. Eng. Manag. , vol.134 , pp. 776-785
    • Hartmann, T.1    Gao, J.2    Fischer, M.3
  • 21
    • 0034325024 scopus 로고    scopus 로고
    • From CAD to virtual reality: Modelling approaches; Data exchange and interactive 3D building design tools
    • J. Whyte, N. Bouchlaghem, A. Thorpe, and R. McCaffer From CAD to virtual reality: modelling approaches; data exchange and interactive 3D building design tools Autom. Constr. 10 2000 43 55
    • (2000) Autom. Constr. , vol.10 , pp. 43-55
    • Whyte, J.1    Bouchlaghem, N.2    Thorpe, A.3    McCaffer, R.4
  • 24
    • 83555162497 scopus 로고    scopus 로고
    • Construction industry offsite production: A virtual reality interactive training environment prototype [J]
    • J. Goulding, W. Nadim, and P. Petridis et al. Construction industry offsite production: a virtual reality interactive training environment prototype [J] Adv. Eng. Inform. 26 1 2012 103 116
    • (2012) Adv. Eng. Inform. , vol.26 , Issue.1 , pp. 103-116
    • Goulding, J.1    Nadim, W.2    Petridis, P.3
  • 25
    • 0034227635 scopus 로고    scopus 로고
    • Feasibility study of 4D CAD in commercial construction
    • Bonsang Koo, and Martin Fischer Feasibility study of 4D CAD in commercial construction J. Constr. Eng. Manag., ASCE 126 4 2000 251 260
    • (2000) J. Constr. Eng. Manag., ASCE , vol.126 , Issue.4 , pp. 251-260
    • Koo, B.1    Fischer, M.2
  • 26
    • 33746777647 scopus 로고    scopus 로고
    • (accessed May 02, 2013)
    • M. Fischer Introduction to 4D research (Available from) http://www.stanford.edu/group/4D/ 2001 (accessed May 02, 2013)
    • (2001) Introduction to 4D Research
    • Fischer, M.1
  • 27
    • 58849093542 scopus 로고    scopus 로고
    • 4D WorkPlanner; A prototype system for automated time-space conflicts analysis
    • ASCE
    • Burcu Akinci, and Martin Fischer 4D WorkPlanner; a prototype system for automated time-space conflicts analysis Proceedings of the ICCCBE-VIII, Stanford, California August 14-17 2000 ASCE 740 751
    • (2000) Proceedings of the ICCCBE-VIII, Stanford, California , vol.14 , pp. 740-751
    • Akinci, B.1    Fischer, M.2
  • 28
    • 75149127614 scopus 로고    scopus 로고
    • An integrated safety management with construction management using 4D CAD model
    • V. Benjaoran, and S. Bhokha An integrated safety management with construction management using 4D CAD model J. Saf. Sci. 48 3 2010 395 403
    • (2010) J. Saf. Sci. , vol.48 , Issue.3 , pp. 395-403
    • Benjaoran, V.1    Bhokha, S.2
  • 30
    • 46349088624 scopus 로고    scopus 로고
    • Benefits and lessons learned of implementing building virtual design and construction (VDC) technologies for coordination of mechanical, electrical, and plumbing (MEP) systems on a large healthcare project
    • (Special Issue Case studies of BIM use:)
    • A. Khanzode, M. Fischer, and D. Reed Benefits and lessons learned of implementing building virtual design and construction (VDC) technologies for coordination of mechanical, electrical, and plumbing (MEP) systems on a large healthcare project IT Con. 13 2008 324 342 (Special Issue Case studies of BIM use: http://www.itcon.org/2008/22)
    • (2008) IT Con. , vol.13 , pp. 324-342
    • Khanzode, A.1    Fischer, M.2    Reed, D.3
  • 31
    • 84878742679 scopus 로고    scopus 로고
    • Prospective validation of virtual design and construction methods
    • P. Yee, M. Fischer, and C. Kam Prospective validation of virtual design and construction methods ITcon 18 2013 214 239 (http://www.itcon.org/2013/11)
    • (2013) ITcon , vol.18 , pp. 214-239
    • Yee, P.1    Fischer, M.2    Kam, C.3
  • 32
    • 21344433208 scopus 로고    scopus 로고
    • From 3D to nD modelling
    • (Special Issue From 3D to nD modelling)
    • G. Aound, A. Lee, and S. Wu From 3D to nD modelling (Special Issue From 3D to nD modelling) ITcon 10 2005 15 16 (http://www.itcon.org/2005/2)
    • (2005) ITcon , vol.10 , pp. 15-16
    • Aound, G.1    Lee, A.2    Wu, S.3
  • 33
    • 29144527545 scopus 로고    scopus 로고
    • IFC model viewer to support nD model application
    • DOI 10.1016/j.autcon.2005.04.002, PII S0926580505000610
    • Changfeng Fu, Ghassan Aouad, Angela Lee, Amanda Mashall-Ponting, and Song Wu IFC model viewer to support nD model application Autom. Constr. 15 2006 178 185 (Pubitemid 41817146)
    • (2006) Automation in Construction , vol.15 , Issue.2 , pp. 178-185
    • Fu, C.1    Aouad, G.2    Lee, A.3    Mashall-Ponting, A.4    Wu, S.5
  • 35
    • 34447279048 scopus 로고    scopus 로고
    • Computer integrated construction: A review and proposals for future direction
    • DOI 10.1016/j.advengsoft.2006.10.007, PII S096599780600175X
    • Stefan Boddy, Yacine Rezgui, Grahame Cooper, and Matthew Wetherill "Computer integrated construction: a review and proposals for future direction" Adv. Eng. Softw. 38 10 2007 677 687 (Pubitemid 47043446)
    • (2007) Advances in Engineering Software , vol.38 , Issue.10 , pp. 677-687
    • Boddy, S.1    Rezgui, Y.2    Cooper, G.3    Wetherill, M.4
  • 40
    • 59049095324 scopus 로고    scopus 로고
    • Building information modeling framework: A research and delivery foundation for industry stakeholders
    • Bilal Succar "Building information modeling framework: a research and delivery foundation for industry stakeholders" Autom. Constr. 18 2009 357 375
    • (2009) Autom. Constr. , vol.18 , pp. 357-375
    • Succar, B.1
  • 42
    • 0034227635 scopus 로고    scopus 로고
    • Feasibility study of 4D CAD in commercial construction
    • B. Koo, and M. Fischer Feasibility study of 4D CAD in commercial construction J. Constr. Eng. Manag. 126 4 2000 251 260
    • (2000) J. Constr. Eng. Manag. , vol.126 , Issue.4 , pp. 251-260
    • Koo, B.1    Fischer, M.2
  • 43
    • 33746364173 scopus 로고    scopus 로고
    • Dynamic quantification and analysis of the construction workspace congestion utilising 4D visualisation
    • DOI 10.1016/j.autcon.2005.08.005, PII S092658050500124X
    • Z. Mallasi Dynamic quantification and analysis of the construction workspace congestion utilising 4D visualization Autom. Constr. 15 5 2006 640 655 (Pubitemid 44118734)
    • (2006) Automation in Construction , vol.15 , Issue.5 , pp. 640-655
    • Mallasi, Z.1
  • 44
    • 34248575853 scopus 로고    scopus 로고
    • Empirical study on the merit of web-based 4D visualization in collaborative construction planning and scheduling
    • DOI 10.1061/(ASCE)0733-9364(2007)133:6(447)
    • J.H. Kang, S.D. Anderson, and M.J. Clayton Empirical study on the merit of web-based 4D visualization in collaborative construction planning and scheduling J. Constr. Eng. Manag. 133 6 2007 447 461 (Pubitemid 46753484)
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.6 , pp. 447-461
    • Kang, J.H.1    Anderson, S.D.2    Clayton, M.J.3
  • 45
    • 0037332742 scopus 로고    scopus 로고
    • Development of an integrated information resource base for 4D/VR construction processes simulation
    • DOI 10.1016/S0926-5805(02)00045-6, PII S0926580502000456
    • N. Dawood, E. Sriprasert, Z. Mallasi, and B. Hobbs Development of an integrated information resource base for 4D/VR construction processes simulation Autom. Constr. 12 2 2003 123 131 (Pubitemid 35349796)
    • (2003) Automation in Construction , vol.12 , Issue.2 , pp. 123-131
    • Dawood, N.1    Sriprasert, E.2    Mallasi, Z.3    Hobbs, B.4
  • 46
    • 79551683904 scopus 로고    scopus 로고
    • Application and extension of the IFC standard in construction cost estimating for tendering in China
    • Ma Zhiliang, Wei Zhenhua, Wu. Song, and Lou Zhe Application and extension of the IFC standard in construction cost estimating for tendering in China Autom. Constr. 20 2011 196 204
    • (2011) Autom. Constr. , vol.20 , pp. 196-204
    • Zhiliang, M.1    Zhenhua, W.2    Song, Wu.3    Zhe, L.4
  • 48
    • 38649099349 scopus 로고    scopus 로고
    • Impact of three-dimensional parametric modeling of buildings on productivity in structural engineering practice
    • DOI 10.1016/j.autcon.2007.08.003, PII S0926580507001082
    • R. Sacks, and R. Barak Impact of three-dimensional parametric modeling of building on productivity in structural engineering practice Autom. Constr. 17 4 2008 439 449 (Pubitemid 351173669)
    • (2008) Automation in Construction , vol.17 , Issue.4 , pp. 439-449
    • Sacks, R.1    Barak, R.2
  • 49
    • 79551684087 scopus 로고    scopus 로고
    • BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 2. Development and site trials
    • Z.Z. Hu, and J.P. Zhang BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 2. Development and site trials Autom. Constr. 20 2 2011 167 180
    • (2011) Autom. Constr. , vol.20 , Issue.2 , pp. 167-180
    • Hu, Z.Z.1    Zhang, J.P.2
  • 50
    • 84907436356 scopus 로고    scopus 로고
    • Simulation for better building design
    • G. Augenbroe, and J. Hensen Simulation for better building design Build. Environ. 39 8-9 2004 865 871
    • (2004) Build. Environ. , vol.39 , Issue.89 , pp. 865-871
    • Augenbroe, G.1    Hensen, J.2
  • 51
    • 57749169961 scopus 로고    scopus 로고
    • Building information model based energy/exergy performance assessment in early design stages
    • Arno Schlueter, and Frank Thesseling Building information model based energy/exergy performance assessment in early design stages Autom. Constr. 18 2009 153 163
    • (2009) Autom. Constr. , vol.18 , pp. 153-163
    • Schlueter, A.1    Thesseling, F.2
  • 52
    • 84868232967 scopus 로고    scopus 로고
    • A knowledge-based BIM system for building maintenance
    • Ibrahim Motawa, and Abdulkareem Almarshad A knowledge-based BIM system for building maintenance Autom. Constr. 29 2013 173 182
    • (2013) Autom. Constr. , vol.29 , pp. 173-182
    • Motawa, I.1    Almarshad, A.2
  • 53
    • 81355138828 scopus 로고    scopus 로고
    • Building information modeling-based user activity simulation and evaluation method for improving designer-user communications
    • Weilin Shen, Qiping Shen, and Quanbin Sun Building information modeling-based user activity simulation and evaluation method for improving designer-user communications Autom. Constr. 21 2012 148 160
    • (2012) Autom. Constr. , vol.21 , pp. 148-160
    • Shen, W.1    Shen, Q.2    Sun, Q.3
  • 54
    • 84993029182 scopus 로고    scopus 로고
    • 4D CAD-safety: Visualizing project scheduling and safety planning
    • D. Chantawit, B.H.W. Hadicusumo, and C. Charoenngam 4D CAD-safety: visualizing project scheduling and safety planning Constr. Innov. 5 2005 99 114
    • (2005) Constr. Innov. , vol.5 , pp. 99-114
    • Chantawit, D.1    Hadicusumo, B.H.W.2    Charoenngam, C.3
  • 55
    • 84859567183 scopus 로고    scopus 로고
    • Semantics of model views for information exchanges using the industry foundation class schema
    • M. Venugopal, C.M. Eastman, R. Sacks, and J. Teizer Semantics of model views for information exchanges using the industry foundation class schema Adv. Eng. Inform. 26 2 April 2012 411 428
    • (2012) Adv. Eng. Inform. , vol.26 , Issue.2 , pp. 411-428
    • Venugopal, M.1    Eastman, C.M.2    Sacks, R.3    Teizer, J.4
  • 56
    • 46349110744 scopus 로고    scopus 로고
    • Interoperability in practice: Geometric data exchance using the IFC standard
    • (Special Issue Case studies of BIM use)
    • T. Pazlar, and Z. Turk Interoperability in practice: geometric data exchance using the IFC standard ITcon 13 2008 362 380 (Special Issue Case studies of BIM use)
    • (2008) ITcon , vol.13 , pp. 362-380
    • Pazlar, T.1    Turk, Z.2
  • 57
    • 84862009953 scopus 로고    scopus 로고
    • The IFC standard - A review of history, development, and standardization
    • Mikael Laakso, and Arto Kiviniemi The IFC standard - a review of history, development, and standardization ITcon 17 2012 134 161
    • (2012) ITcon , vol.17 , pp. 134-161
    • Laakso, M.1    Kiviniemi, A.2
  • 58
    • 63749129585 scopus 로고    scopus 로고
    • Benchmark tests for BIM data exchanges of precast concrete
    • Y.-S. Jeong, C.M. Eastman, R. Sacks, and I. Kaner Benchmark tests for BIM data exchanges of precast concrete Autom. Constr. 18 4 July 2009 469 484
    • (2009) Autom. Constr. , vol.18 , Issue.4 , pp. 469-484
    • Jeong, Y.-S.1    Eastman, C.M.2    Sacks, R.3    Kaner, I.4
  • 59
    • 84860295399 scopus 로고    scopus 로고
    • Exploring how information exchanges can be enhanced through Cloud BIM
    • Alan Redmond, Alan Hore, Mustafa Alshawi, and Roger West Exploring how information exchanges can be enhanced through Cloud BIM Autom. Constr. 24 July 2012 175 183
    • (2012) Autom. Constr. , vol.24 , pp. 175-183
    • Redmond, A.1    Hore, A.2    Alshawi, M.3    West, R.4
  • 60
    • 84886505825 scopus 로고    scopus 로고
    • Ontology-based partial building information model extraction
    • L. Zhang, and R.R.A. Issa Ontology-based partial building information model extraction J. Comput. Civ. Eng. 27 6 2012 576 584
    • (2012) J. Comput. Civ. Eng. , vol.27 , Issue.6 , pp. 576-584
    • Zhang, L.1    Issa, R.R.A.2
  • 61
    • 84882412607 scopus 로고    scopus 로고
    • Ontology-based feature modeling for construction information extraction from a building information model
    • 10.1061/(ASCE)CP.1943-5487.0000230
    • M. Nepal, S. Staub-French, R. Pottinger, and J. Zhang Ontology-based feature modeling for construction information extraction from a building information model J. Comput. Civ. Eng. Aug. 14 2012 10.1061/(ASCE)CP.1943-5487. 0000230
    • (2012) J. Comput. Civ. Eng.
    • Nepal, M.1    Staub-French, S.2    Pottinger, R.3    Zhang, J.4
  • 62
    • 84867895946 scopus 로고    scopus 로고
    • Querying a building information model for construction-specific spatial information
    • 10.1016/j.aei.2012.08.003
    • Madhav Prasad Nepal, Sheryl Staub-French, Rachel Pottinger, and April Webster Querying a building information model for construction-specific spatial information Adv. Eng. Inform. 26 4 October 2012 904 923 10.1016/j.aei.2012.08. 003
    • (2012) Adv. Eng. Inform. , vol.26 , Issue.4 , pp. 904-923
    • Prasad Nepal, M.1    Staub-French, S.2    Pottinger, R.3    Webster, A.4
  • 63
    • 84876909628 scopus 로고    scopus 로고
    • Reviewing the evidence: Use of digital collaboration technologies in major building and infrastructure projects
    • N. Hassan Ibrahim Reviewing the evidence: use of digital collaboration technologies in major building and infrastructure projects ITcon 18 2013 40 63
    • (2013) ITcon , vol.18 , pp. 40-63
    • Hassan Ibrahim, N.1
  • 64
    • 80053601079 scopus 로고    scopus 로고
    • Digital buildings - Challenges and opportunities
    • Alastair Watson Digital buildings - challenges and opportunities Adv. Eng. Inform. 25 4 October 2011 573 581
    • (2011) Adv. Eng. Inform. , vol.25 , Issue.4 , pp. 573-581
    • Watson, A.1
  • 65
    • 79954424532 scopus 로고    scopus 로고
    • A review and outlook for a 'building information model' (BIM): A multi-standpoint framework for technological development
    • Tomo Cerovsek A review and outlook for a 'building information model' (BIM): a multi-standpoint framework for technological development Adv. Eng. Inform. 25 2 April 2011 224 244
    • (2011) Adv. Eng. Inform. , vol.25 , Issue.2 , pp. 224-244
    • Cerovsek, T.1
  • 66
    • 84872240863 scopus 로고    scopus 로고
    • Building information modeling (BIM) partnering framework for public construction projects
    • Atul Porwal, and Kasun N. Hewage Building information modeling (BIM) partnering framework for public construction projects Autom. Constr. 31 May 2013 204 214
    • (2013) Autom. Constr. , vol.31 , pp. 204-214
    • Porwal, A.1    Hewage, K.N.2
  • 67
    • 84878418975 scopus 로고    scopus 로고
    • Towards cloud augmented reality for construction application by BIM and SNS integration
    • Yi Jiao, Shaohua Zhang, Yongkui Li, Yinghui Wang, and BaoMing Yang Towards cloud augmented reality for construction application by BIM and SNS integration Autom. Constr. 33 October 29 2013 37 47
    • (2013) Autom. Constr. , vol.33 , pp. 37-47
    • Jiao, Y.1    Zhang, S.2    Li, Y.3    Wang, Y.4    Yang, B.5
  • 68
    • 84878418504 scopus 로고    scopus 로고
    • A framework for proactive construction defect management using BIM, augmented reality and ontology-based data collection template
    • Chan-Sik Park, Do-Yeop Lee, Oh-Seong Kwon, and Xiangyu Wang A framework for proactive construction defect management using BIM, augmented reality and ontology-based data collection template Autom. Constr. 33 22 October 2013 61 71
    • (2013) Autom. Constr. , vol.33 , pp. 61-71
    • Park, C.-S.1    Lee, D.-Y.2    Kwon, O.-S.3    Wang, X.4
  • 69
    • 84861145569 scopus 로고    scopus 로고
    • On-site building information retrieval by using projection-based augmented reality
    • K. Yeh, M. Tsai, and S. Kang On-site building information retrieval by using projection-based augmented reality J. Comput. Civ. Eng. 26 3 2012 342 355
    • (2012) J. Comput. Civ. Eng. , vol.26 , Issue.3 , pp. 342-355
    • Yeh, K.1    Tsai, M.2    Kang, S.3
  • 70
    • 79954557707 scopus 로고    scopus 로고
    • Using RFID and real-time virtual reality simulation for optimization in steel construction
    • Haiyan Xie, Wei Shi, and Raja R.A. Issa Using RFID and real-time virtual reality simulation for optimization in steel construction ITcon 16 2011 291 308
    • (2011) ITcon , vol.16 , pp. 291-308
    • Xie, H.1    Shi, W.2    Issa, R.R.A.3
  • 71
    • 79960161211 scopus 로고    scopus 로고
    • Role-based access to facilities lifecycle information on RFID tags
    • Ali Motamedi, Rakesh Saini, Amin Hammad, and Bo Zhu Role-based access to facilities lifecycle information on RFID tags Adv. Eng. Inform. 25 3 August 2011 559 568
    • (2011) Adv. Eng. Inform. , vol.25 , Issue.3 , pp. 559-568
    • Motamedi, A.1    Saini, R.2    Hammad, A.3    Zhu, B.4
  • 72
    • 77956619234 scopus 로고    scopus 로고
    • Automatic reconstruction of as-built building information models from laser-scanned point clouds: A review of related techniques
    • Pingbo Tang, Daniel Huber, Burcu Akinci, Robert Lipman, and Alan Lytle Automatic reconstruction of as-built building information models from laser-scanned point clouds: a review of related techniques Autom. Constr. 19 7 November 2010 829 843
    • (2010) Autom. Constr. , vol.19 , Issue.7 , pp. 829-843
    • Tang, P.1    Huber, D.2    Akinci, B.3    Lipman, R.4    Lytle, A.5
  • 73
    • 83555160969 scopus 로고    scopus 로고
    • Plane-based registration of construction laser scans with 3D/4D building models
    • Frédéric Bosché Plane-based registration of construction laser scans with 3D/4D building models Adv. Eng. Inform. 26 1 January 2012 90 102
    • (2012) Adv. Eng. Inform. , vol.26 , Issue.1 , pp. 90-102
    • Bosché, F.1
  • 74
    • 84872313658 scopus 로고    scopus 로고
    • Integrating BIM and GIS to improve the visual monitoring of construction supply chain management
    • Javier Irizarry, Ebrahim P. Karan, and Farzad Jalaei Integrating BIM and GIS to improve the visual monitoring of construction supply chain management Autom. Constr. 31 May 2013 241 254
    • (2013) Autom. Constr. , vol.31 , pp. 241-254
    • Irizarry, J.1    Karan, E.P.2    Jalaei, F.3
  • 76
    • 84867859668 scopus 로고    scopus 로고
    • Optimizing location of tower cranes on construction sites through GIS and BIM integration
    • Javier Irizarry, and Ebrahim P. Karan Optimizing location of tower cranes on construction sites through GIS and BIM integration ITcon 17 2012 351 366
    • (2012) ITcon , vol.17 , pp. 351-366
    • Irizarry, J.1    Karan, E.P.2
  • 77
    • 84870822070 scopus 로고    scopus 로고
    • Implementing 'site BIM': A case study of ICT innovation on a large hospital project
    • Richard Davies, and Chris Harty Implementing 'site BIM': a case study of ICT innovation on a large hospital project Autom. Constr. 30 March 2013 15 24
    • (2013) Autom. Constr. , vol.30 , pp. 15-24
    • Davies, R.1    Harty, C.2
  • 78
    • 84861136495 scopus 로고    scopus 로고
    • Automated approach for developing integrated model-based project histories to support estimation of activity production rates
    • S. Ergan, and B. Akinci Automated approach for developing integrated model-based project histories to support estimation of activity production rates J. Comput. Civ. Eng. 26 3 2012 309 318
    • (2012) J. Comput. Civ. Eng. , vol.26 , Issue.3 , pp. 309-318
    • Ergan, S.1    Akinci, B.2
  • 80
    • 46349109442 scopus 로고    scopus 로고
    • 3D model-based collaboration in design development and construction of complex shaped buildings
    • (Special Issue Case studies of BIM use)
    • K. Ku, S. Pollalis, M. Fischer, and D. Shelden 3D model-based collaboration in design development and construction of complex shaped buildings ITcon 13 2008 258 285 (Special Issue Case studies of BIM use http://www.itcon.org/2008/19)
    • (2008) ITcon , vol.13 , pp. 258-285
    • Ku, K.1    Pollalis, S.2    Fischer, M.3    Shelden, D.4
  • 81
    • 77955710066 scopus 로고    scopus 로고
    • Integrating resource production and construction using BIM
    • Nenad Čuš Babič, Peter Podbreznik, and Danijel Rebolj Integrating resource production and construction using BIM Autom. Constr. 19 5 August 2010 539 543
    • (2010) Autom. Constr. , vol.19 , Issue.5 , pp. 539-543
    • Čuš Babič, N.1    Podbreznik, P.2    Rebolj, D.3
  • 82
    • 84920815816 scopus 로고    scopus 로고
    • Automated progress monitoring using unordered daily construction photographs and IFC-based building information models S
    • M. Golparvar-Fard, F. Pena-Mora, and Savarese, Automated progress monitoring using unordered daily construction photographs and IFC-based building information models S, Journal of Computing in Civil Engineering. http://dx.doi.org/10.1061/(ASCE)CP.1943-5487.0000205.
    • Journal of Computing in Civil Engineering
    • Golparvar-Fard, M.1    Pena-Mora, F.2    Savarese3
  • 83
    • 45749120776 scopus 로고    scopus 로고
    • Generating, evaluating, and visualizing construction schedule with geographic information systems
    • V. Bansal, and M. Pal Generating, evaluating, and visualizing construction schedule with geographic information systems J. Comput. Civ. Eng. 22 4 2008 233 242
    • (2008) J. Comput. Civ. Eng. , vol.22 , Issue.4 , pp. 233-242
    • Bansal, V.1    Pal, M.2
  • 84
    • 70350060197 scopus 로고    scopus 로고
    • Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs
    • M. Golparvar-Fard, F. Pena-Mora, C. Arboleda, and S. Lee Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs J. Comput. Civ. Eng. 23 6 2009 391 404
    • (2009) J. Comput. Civ. Eng. , vol.23 , Issue.6 , pp. 391-404
    • Golparvar-Fard, M.1    Pena-Mora, F.2    Arboleda, C.3    Lee, S.4
  • 85
    • 80052866929 scopus 로고    scopus 로고
    • Integrated visualized time control system for repetitive construction projects
    • Emad Elbeltagi, and Mahmoud Dawood Integrated visualized time control system for repetitive construction projects Autom. Constr. 20 7 November 2011 940 953
    • (2011) Autom. Constr. , vol.20 , Issue.7 , pp. 940-953
    • Elbeltagi, E.1    Dawood, M.2
  • 86
    • 79960638196 scopus 로고    scopus 로고
    • Integrating automated data acquisition technologies for progress reporting of construction projects
    • Samir El-Omari, and Osama Moselhi Integrating automated data acquisition technologies for progress reporting of construction projects Autom. Constr. 20 6 October 2011 699 705
    • (2011) Autom. Constr. , vol.20 , Issue.6 , pp. 699-705
    • El-Omari, S.1    Moselhi, O.2
  • 88
    • 78649333572 scopus 로고    scopus 로고
    • An object-based 3D walk-through model for interior construction progress monitoring
    • Seungjun Roh, Zeeshan Aziz, and Feniosky Pena-Mora An object-based 3D walk-through model for interior construction progress monitoring Autom. Constr. 20 1 January 2011 66 75
    • (2011) Autom. Constr. , vol.20 , Issue.1 , pp. 66-75
    • Roh, S.1    Aziz, Z.2    Pena-Mora, F.3
  • 89
    • 33751506669 scopus 로고    scopus 로고
    • Negotiating visualization in briefings and design
    • Mads Bendixen, and Christian Koch Negotiating visualization in briefings and design Build. Res. Inf. 35 1 2007 42 53
    • (2007) Build. Res. Inf. , vol.35 , Issue.1 , pp. 42-53
    • Bendixen, M.1    Koch, C.2
  • 90
    • 70349429622 scopus 로고    scopus 로고
    • Automatic rule-based checking of building designs
    • C. Eastman, Jae-min Lee, Yeon-suk Jeong, and Jin-kook Lee Automatic rule-based checking of building designs Autom. Constr. 18 2009 1011 1033
    • (2009) Autom. Constr. , vol.18 , pp. 1011-1033
    • Eastman, C.1    Lee, J.-M.2    Jeong, Y.-S.3    Lee, J.-K.4
  • 91
    • 77955687856 scopus 로고    scopus 로고
    • Requirements for building information modelling based lean production management systems for construction
    • R. Sacks, M. Radosavljevic, and R. Barak Requirements for building information modelling based lean production management systems for construction Autom. Constr. 19 2010 641 655
    • (2010) Autom. Constr. , vol.19 , pp. 641-655
    • Sacks, R.1    Radosavljevic, M.2    Barak, R.3
  • 92
    • 23744452042 scopus 로고    scopus 로고
    • Key performance indicators for measuring construction success
    • DOI 10.1108/14635770410532624
    • Albert P.C. Chan, and Ada P.L. Chan Key performance indicators for measuring construction success Benchmarking: Int. J. 11 2 2004 203 221 (Pubitemid 41137104)
    • (2004) Benchmarking , vol.11 , Issue.2 , pp. 203-221
    • Chan, A.P.C.1    Chan, A.P.L.2
  • 94
    • 13944253664 scopus 로고    scopus 로고
    • Quality, environmental, and health and safety management systems for construction engineering
    • DOI 10.1061/(ASCE)0733-9364(2003)129:5(562)
    • E. Koehn, and N. Datta Quality, environmental, and health and safety management systems for construction engineering J. Constr. Eng. Manag. 129 5 2003 562 569 (Pubitemid 40265444)
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.5 , pp. 562-569
    • Koehn, E.1    Datta, N.K.2
  • 96
    • 79952291359 scopus 로고    scopus 로고
    • Use of GIS and topology in the identification and resolution of space conflicts
    • V. Bansal Use of GIS and topology in the identification and resolution of space conflicts J. Comput. Civ. Eng. 25 2 2011 159 171
    • (2011) J. Comput. Civ. Eng. , vol.25 , Issue.2 , pp. 159-171
    • Bansal, V.1
  • 97
    • 79551688323 scopus 로고    scopus 로고
    • Building information modelling (BIM) framework for practical implementation
    • Youngsoo Jung, and Mihee Joo Building information modelling (BIM) framework for practical implementation Autom. Constr. 20 2011 126 133
    • (2011) Autom. Constr. , vol.20 , pp. 126-133
    • Jung, Y.1    Joo, M.2
  • 98
    • 67651055721 scopus 로고    scopus 로고
    • Characterization and search of construction inspection plan spaces developed using a component-based planning approach
    • Chris Gordon, Burcu Akinci, James H. Garrett, Characterization and search of construction inspection plan spaces developed using a component-based planning approach, Journal of Computing in Civil Engineering, ASCE, 23(4), 211-220.
    • Journal of Computing in Civil Engineering, ASCE , vol.23 , Issue.4 , pp. 211-220
    • Gordon, C.1    Akinci, B.2    Garrett, J.H.3
  • 99
    • 42949099928 scopus 로고    scopus 로고
    • Why operatives engage in unsafe work behavior: Investigating factors on construction sites
    • DOI 10.1016/j.ssci.2007.06.027, PII S0925753507001087
    • R.M. Choudhry, and D. Fang Why operatives engage in unsafe work behavior: investigating factors on construction sites Saf. Sci. 46 4 April 2008 566 584 (Pubitemid 351609383)
    • (2008) Safety Science , vol.46 , Issue.4 , pp. 566-584
    • Choudhry, R.M.1    Fang, D.2
  • 101
    • 0348042163 scopus 로고    scopus 로고
    • Capitalizing on early project decision-making opportunities to improve facility design, construction, and life-cycle performance-POP, PM4D, and decision dashboard approaches
    • Calvin Kam, and Martin Fischer Capitalizing on early project decision-making opportunities to improve facility design, construction, and life-cycle performance-POP, PM4D, and decision dashboard approaches Autom. Constr. 13 1 2004 53 65
    • (2004) Autom. Constr. , vol.13 , Issue.1 , pp. 53-65
    • Kam, C.1    Fischer, M.2
  • 103
    • 37349028760 scopus 로고    scopus 로고
    • A review on buildings energy consumption information
    • DOI 10.1016/j.enbuild.2007.03.007, PII S0378778807001016
    • Luis Pérez-Lombard, José Ortiz, and Christine Pout A review on buildings energy consumption information Energy Build. 40 3 2008 394 398 (Pubitemid 350296680)
    • (2008) Energy and Buildings , vol.40 , Issue.3 , pp. 394-398
    • Perez-Lombard, L.1    Ortiz, J.2    Pout, C.3
  • 104
    • 84869030131 scopus 로고    scopus 로고
    • Circular economy and China construction waste management
    • Xiaolv Zhou "Circular economy and China construction waste management" Constr. Econ. 6 2005 14 16
    • (2005) Constr. Econ. , vol.6 , pp. 14-16
    • Zhou, X.1
  • 105
    • 84869061112 scopus 로고    scopus 로고
    • Research on the computational model for carbon emissions in building construction stage based on BIM
    • B. Li, F.F. Fu, H. Zhong, and H.B. Luo Research on the computational model for carbon emissions in building construction stage based on BIM Struct. Surv. 30 5 2012 411 425
    • (2012) Struct. Surv. , vol.30 , Issue.5 , pp. 411-425
    • Li, B.1    Fu, F.F.2    Zhong, H.3    Luo, H.B.4
  • 106
    • 79960269657 scopus 로고    scopus 로고
    • Building information modeling (BIM): Trends, benefits, risks, and challenges for the AEC industry
    • Salman Azhar, Building information modeling (BIM): trends, benefits, risks, and challenges for the AEC industry, Leadership Manage. Eng. 11(3), 241-252.
    • Leadership Manage. Eng. , vol.11 , Issue.3 , pp. 241-252
    • Azhar, S.1
  • 109
    • 29144432257 scopus 로고    scopus 로고
    • A formalism for utilization of sensor systems and integrated project models for active construction quality control
    • DOI 10.1016/j.autcon.2005.01.008, PII S092658050500052X
    • B. Akinci, F. Boukamp, C. Gordon, D. Huber, C. Lyons, and K. Park "A formalism for utilization of sensor systems and integrated project models for active construction quality control" Autom. Constr. 15 2006 124 138 (Pubitemid 41817142)
    • (2006) Automation in Construction , vol.15 , Issue.2 , pp. 124-138
    • Akinci, B.1    Boukamp, F.2    Gordon, C.3    Huber, D.4    Lyons, C.5    Park, K.6
  • 110
    • 33644674627 scopus 로고    scopus 로고
    • Compatibility issues in Augmented Reality systems for AEC: An experimental prototype study
    • DOI 10.1016/j.autcon.2005.06.002, PII S0926580505000671
    • Xiangyu Wanga, and Phillip S. Dunston Compatibility issues in Augmented Reality systems for AEC: an experimental prototype study Autom. Constr. 15 2006 314 326 (Pubitemid 43332715)
    • (2006) Automation in Construction , vol.15 , Issue.3 , pp. 314-326
    • Wang, X.1    Dunston, P.S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.