메뉴 건너뛰기




Volumn 29, Issue 1, 2015, Pages

Automated progress monitoring using unordered daily construction photographs and IFC-based building information models

Author keywords

3D reconstruction; Automation; Computer vision; Industry foundation classes (IFC); Model based recognition; Multiple view geometry; Photogrammetry; Structure from motion

Indexed keywords

ARTIFICIAL INTELLIGENCE; AUTOMATION; BINDING SITES; COMPUTER VISION; CONSTRUCTION; DECISION MAKING; INFORMATION THEORY; LEARNING SYSTEMS; PHOTOGRAMMETRY; PHOTOGRAPHY; STEREO IMAGE PROCESSING; VISUALIZATION;

EID: 84920815816     PISSN: 08873801     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CP.1943-5487.0000205     Document Type: Article
Times cited : (325)

References (81)
  • 1
    • 0042273486 scopus 로고    scopus 로고
    • Time-lapse digital photography applied to project management
    • Abeid, J. N., and, Arditi, D. (2002). " Time-lapse digital photography applied to project management." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2002)128:6(530), 530-535. JCEMD4 0733-9364
    • (2002) J. Constr. Eng. Manage. , pp. 530-535
    • Abeid, J.N.1    Arditi, D.2
  • 2
    • 0041825827 scopus 로고    scopus 로고
    • PHOTO-NET II: A computer-based monitoring system applied to project management
    • Abeid, J., Allouche, E., Arditi, D., and, Hayman, M. (2003). " PHOTO-NET II: a computer-based monitoring system applied to project management." J. Autom. Constr., 12 (5), 603-616. 0926-5805 10.1016/S0926-5805(03)00042-6
    • (2003) J. Autom. Constr. , vol.12 , Issue.5 , pp. 603-616
    • Abeid, J.1    Allouche, E.2    Arditi, D.3    Hayman, M.4
  • 3
    • 0031102498 scopus 로고    scopus 로고
    • Audio/visual information in construction project control
    • Abudayyeh, O. Y. (1997). " Audio/visual information in construction project control." Adv. Eng. Software, 28 (2), 97-101. AESODT 0141-1195 10.1016/S0965-9978(96)00046-4
    • (1997) Adv. Eng. Software , vol.28 , Issue.2 , pp. 97-101
    • Abudayyeh, O.Y.1
  • 5
    • 29144432257 scopus 로고    scopus 로고
    • A formalism for utilization of sensor systems and integrated project models for active construction quality control
    • Akinci, B., Boukamp, F., Gordon, C., Huber, D., Lyons, C., and, Park, K. (2006). " A formalism for utilization of sensor systems and integrated project models for active construction quality control." J. Autom. Constr., 15 (2), 124-138. 0926-5805 10.1016/j.autcon.2005.01.008
    • (2006) J. Autom. Constr. , vol.15 , Issue.2 , pp. 124-138
    • Akinci, B.1    Boukamp, F.2    Gordon, C.3    Huber, D.4    Lyons, C.5    Park, K.6
  • 6
    • 33644672475 scopus 로고    scopus 로고
    • Integrated computational tools for virtual and physical automatic construction
    • Alves, N., and, Bartolo, P. (2006). " Integrated computational tools for virtual and physical automatic construction." J. Autom. Constr., 15 (3), 257-271. 0926-5805 10.1016/j.autcon.2005.05.007
    • (2006) J. Autom. Constr. , vol.15 , Issue.3 , pp. 257-271
    • Alves, N.1    Bartolo, P.2
  • 7
    • 0027555909 scopus 로고
    • Model-based object recognition in dense-range images: A review
    • Arman, F., and, Aggarwal, J. K. (1993). " Model-based object recognition in dense-range images: A review." Comput. Surv., 25 (1), 5-43. CMSVAN 0010-4892 10.1145/151254.151255
    • (1993) Comput. Surv. , vol.25 , Issue.1 , pp. 5-43
    • Arman, F.1    Aggarwal, J.K.2
  • 8
    • 0026821209 scopus 로고
    • A method for registration of 3-d shapes
    • Besl, P., and, McKay, N. (1992). " A method for registration of 3-d shapes." IEEE Trans. Pattern Anal. Mach. Intell., 14 (2), 239-256. 0162-8828 10.1109/34.121791
    • (1992) IEEE Trans. Pattern Anal. Mach. Intell. , vol.14 , Issue.2 , pp. 239-256
    • Besl, P.1    McKay, N.2
  • 9
    • 72149104769 scopus 로고    scopus 로고
    • Automated recognition of 3D CAD model objects in laser scans and calculation of as-built dimensions for dimensional compliance control in construction
    • Bosché, F. (2010). " Automated recognition of 3D CAD model objects in laser scans and calculation of as-built dimensions for dimensional compliance control in construction." Adv. Eng. Inf., 24 (1), 107-118. 1474-0346 10.1016/j.aei.2009.08.006
    • (2010) Adv. Eng. Inf. , vol.24 , Issue.1 , pp. 107-118
    • Bosché, F.1
  • 10
    • 70350064472 scopus 로고    scopus 로고
    • Automated recognition of 3D CAD objects in site laser scans for project 3d status visualization and performance control
    • Bosché, F., Haas, C. T., and, Akinci, B. (2009). " Automated recognition of 3D CAD objects in site laser scans for project 3d status visualization and performance control." J. Comput. Civ. Eng., 10.1061/(ASCE)0887-3801(2009)23:6(311), 311-318. JCCEE5 0887-3801
    • (2009) J. Comput. Civ. Eng. , pp. 311-318
    • Bosché, F.1    Haas, C.T.2    Akinci, B.3
  • 13
    • 40949163544 scopus 로고    scopus 로고
    • 3D urban scene modeling integrating recognition and reconstruction
    • Cornelis, N., Leibe, B., Cornelis, K., and, Gool, L. V. (2008). " 3D urban scene modeling integrating recognition and reconstruction." Int. J. Comput. Vision, 78 (2-3), 121-141. 1573-1405 10.1007/s11263-007-0081-9
    • (2008) Int. J. Comput. Vision , vol.78 , Issue.23 , pp. 121-141
    • Cornelis, N.1    Leibe, B.2    Cornelis, K.3    Gool, L.V.4
  • 14
    • 60749126309 scopus 로고    scopus 로고
    • Photo-based 3D modeling of construction resources for visualization of operations Simulation: Case of modeling a precast façade
    • Washington, DC
    • Dai, F., and, Lu, M. (2008). " Photo-based 3D modeling of construction resources for visualization of operations Simulation: Case of modeling a precast façade." Proc., 2008 Winter Simulation Conf., Informs Simulation Society, Washington, DC, 2439-2446.
    • (2008) Proc. 2008 Winter Simulation Conf. Informs Simulation Society , pp. 2439-2446
    • Dai, F.1    Lu, M.2
  • 16
    • 48149098055 scopus 로고    scopus 로고
    • An extension of the ICP algorithm considering scale factor
    • IEEE, San Antonio, TX
    • Du, S., Zheng, N., Ying, S., You, Q., and, Wu, Y. (2007). " An extension of the ICP algorithm considering scale factor." Vol. 5, IEEE Int. Conf. on Image Processing, IEEE, San Antonio, TX, 193-196.
    • (2007) IEEE Int. Conf. on Image Processing , vol.5 , pp. 193-196
    • Du, S.1    Zheng, N.2    Ying, S.3    You, Q.4    Wu, Y.5
  • 17
    • 0030645102 scopus 로고    scopus 로고
    • Bar-code control of construction field personnel and construction materials
    • Philadelphia, PA, ASCE, Reston, VA
    • Echeverry, D., and, Beltran, A. (1997). " Bar-code control of construction field personnel and construction materials." Proc., 4th Congress in Computing in Civil Engineering, Philadelphia, PA, ASCE, Reston, VA, 341-347.
    • (1997) Proc. 4th Congress in Computing in Civil Engineering , pp. 341-347
    • Echeverry, D.1    Beltran, A.2
  • 18
    • 0026130973 scopus 로고
    • Sequence knowledge for construction scheduling
    • Echeverry, D., Ibbs, C. W., and, Kim, S. (1991). " Sequence knowledge for construction scheduling." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1991)117:1(118), 118-130. JCEMD4 0733-9364
    • (1991) J. Constr. Eng. Manage. , pp. 118-130
    • Echeverry, D.1    Ibbs, C.W.2    Kim, S.3
  • 19
    • 49349100565 scopus 로고    scopus 로고
    • Integrating 3D laser scanning and photogrammetry for progress measurement of construction work
    • El-Omari, S., and, Moselhi, O. (2008). " Integrating 3D laser scanning and photogrammetry for progress measurement of construction work." J. Autom. Constr., 18 (1), 1-9. 0926-5805 10.1016/j.autcon.2008.05.006
    • (2008) J. Autom. Constr. , vol.18 , Issue.1 , pp. 1-9
    • El-Omari, S.1    Moselhi, O.2
  • 20
    • 33845728532 scopus 로고    scopus 로고
    • Tracking components and maintenance history within a facility utilizing radio frequency identification technology
    • Ergen, E., Akinci, B., East, B., and, Kirby, J. (2007). " Tracking components and maintenance history within a facility utilizing radio frequency identification technology." J. Comput. Civ. Eng., 10.1061/(ASCE)0887-3801(2007)21:1(11), 11-20. JCCEE5 0887-3801
    • (2007) J. Comput. Civ. Eng. , pp. 11-20
    • Ergen, E.1    Akinci, B.2    East, B.3    Kirby, J.4
  • 21
    • 0043275938 scopus 로고    scopus 로고
    • Time-lapse video applications for construction project management
    • Everett, J., Halkali, H., and, Schlaff, T. (1998). " Time-lapse video applications for construction project management." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1998)124:3(204), 204-209. JCEMD4 0733-9364
    • (1998) J. Constr. Eng. Manage. , pp. 204-209
    • Everett, J.1    Halkali, H.2    Schlaff, T.3
  • 23
    • 0001963082 scopus 로고    scopus 로고
    • A short introduction to boosting
    • Freund, Y., and, Schapire, R. E. (1999). " A short introduction to boosting." J. Jpn. Soc. Artif. Intell., 14 (5), 771-780.
    • (1999) J. Jpn. Soc. Artif. Intell. , vol.14 , Issue.5 , pp. 771-780
    • Freund, Y.1    Schapire, R.E.2
  • 24
    • 33845567621 scopus 로고    scopus 로고
    • High-fidelity image based modeling
    • Univ. of Illinois, Urbana,IL
    • Furukawa, Y., and, Ponce, J. (2006). " High-fidelity image based modeling." Technical Rep. 2006-02, Univ. of Illinois, Urbana,IL.
    • (2006) Technical Rep. 2006-02
    • Furukawa, Y.1    Ponce, J.2
  • 25
    • 77953810904 scopus 로고    scopus 로고
    • Accurate, dense, and robust multi-view stereopsis
    • Furukawa, Y., and, Ponce, J. (2010). " Accurate, dense, and robust multi-view stereopsis." IEEE Trans. Pattern Anal. Mach. Intell., 32 (8), 1362-1376. ITPIDJ 0162-8828 10.1109/TPAMI.2009.161
    • (2010) IEEE Trans. Pattern Anal. Mach. Intell. , vol.32 , Issue.8 , pp. 1362-1376
    • Furukawa, Y.1    Ponce, J.2
  • 27
    • 51849161652 scopus 로고    scopus 로고
    • VDC use in 2007: Significant value, dramatic growth, and apparent business opportunity
    • Stanford University, Stanford, CA
    • Gilligan, B., and, Kunz, J. (2007). " VDC use in 2007: Significant value, dramatic growth, and apparent business opportunity." CIFE Technical Rep. #TR171, Stanford University, Stanford, CA.
    • (2007) CIFE Technical Rep. #TR171
    • Gilligan, B.1    Kunz, J.2
  • 28
    • 84855950194 scopus 로고    scopus 로고
    • Integrated sequential as-built and as-planned representation with D4AR tools in support of decision-making tasks in the AEC/FM industry
    • Golparvar-Fard, M., Peña-Mora, F., and, Savarese, S. (2011). " Integrated sequential as-built and as-planned representation with D4AR tools in support of decision-making tasks in the AEC/FM industry." J. Constr. Eng. Manage., 137 (12), 1099-1116. JCEMD4 0733-9364
    • (2011) J. Constr. Eng. Manage. , vol.137 , Issue.12 , pp. 1099-1116
    • Golparvar-Fard, M.1    Peña-Mora, F.2    Savarese, S.3
  • 29
    • 70350154917 scopus 로고    scopus 로고
    • D4AR- A 4-dimensional augmented reality model for automating construction progress data collection, processing and communication
    • Golparvar-Fard, M., Peña-Mora, F., and, Savarese, S. (2009 a). " D4AR- A 4-dimensional augmented reality model for automating construction progress data collection, processing and communication." J. Inf. Technol. Constr., 14, 129-153. 1874-4753
    • (2009) J. Inf. Technol. Constr. , vol.14 , pp. 129-153
    • Golparvar-Fard, M.1    Peña-Mora, F.2    Savarese, S.3
  • 30
    • 70350060197 scopus 로고    scopus 로고
    • Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs
    • Golparvar-Fard, M., Peña-Mora, F., Arboleda, C. A., and, Lee, S. H. (2009 b). " Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs." J. Comput. Civ. Eng., 10.1061/(ASCE)0887-3801(2009)23:6(391), 391-404. JCCEE5 0887-3801
    • (2009) J. Comput. Civ. Eng. , pp. 391-404
    • Golparvar-Fard, M.1    Peña-Mora, F.2    Arboleda, C.A.3    Lee, S.H.4
  • 32
    • 27144545355 scopus 로고    scopus 로고
    • Combining reality capture technologies for construction defect detection: A case study
    • Istanbul, Turkey
    • Gordon, C., Boukamp, F., Huber, D., Latimer, E., Park, K., and, Akinci, B. (2003). " Combining reality capture technologies for construction defect detection: A case study." Proc., 9th EuropIA Int. Conf. (EIA9), Istanbul, Turkey, 99-108.
    • (2003) Proc. 9th EuropIA Int. Conf. (EIA9) , pp. 99-108
    • Gordon, C.1    Boukamp, F.2    Huber, D.3    Latimer, E.4    Park, K.5    Akinci, B.6
  • 34
    • 84975553202 scopus 로고
    • Closed-form solution of absolute orientation using unit quaternions
    • Horn, B. (1987). " Closed-form solution of absolute orientation using unit quaternions." J. Optic. Soc. A, 4 (4), 629-642.
    • (1987) J. Optic. Soc. A , vol.4 , Issue.4 , pp. 629-642
    • Horn, B.1
  • 36
    • 0033876987 scopus 로고    scopus 로고
    • Detecting changes in aerial views of man-made structures
    • Huertas, A., and, Nevatia, R. (2000). " Detecting changes in aerial views of man-made structures." Image Vision Comput., 18 (8), 583-596. 10.1016/S0262-8856(99)00063-3
    • (2000) Image Vision Comput. , vol.18 , Issue.8 , pp. 583-596
    • Huertas, A.1    Nevatia, R.2
  • 37
    • 84863739209 scopus 로고    scopus 로고
    • Review of photographic/imaging applications in construction
    • Ibrahim, Y. M., and, Kaka, A. P. (2008). " Review of photographic/imaging applications in construction." J. Built Human Environ. Rev., 1 (2008), 99-117.
    • (2008) J. Built Human Environ. Rev. , vol.1 , Issue.2008 , pp. 99-117
    • Ibrahim, Y.M.1    Kaka, A.P.2
  • 38
    • 57549093466 scopus 로고    scopus 로고
    • Towards automated progress assessment of workpackage components in construction projects using computer vision
    • Ibrahim, Y. M., Lukins, T. C., Zhang, X., Trucco, E., and, Kaka, A. P. (2009). " Towards automated progress assessment of workpackage components in construction projects using computer vision." Adv. Eng. Inf., 23 (1), 93-103. 1474-0346 10.1016/j.aei.2008.07.002
    • (2009) Adv. Eng. Inf. , vol.23 , Issue.1 , pp. 93-103
    • Ibrahim, Y.M.1    Lukins, T.C.2    Zhang, X.3    Trucco, E.4    Kaka, A.P.5
  • 39
    • 13944281379 scopus 로고    scopus 로고
    • Implementing radio frequency identification in the construction process
    • Jaselskis, E., and, El-Misalami, T. (2003). " Implementing radio frequency identification in the construction process." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2003)129:6(680), 680-688. JCEMD4 0733-9364
    • (2003) J. Constr. Eng. Manage. , pp. 680-688
    • Jaselskis, E.1    El-Misalami, T.2
  • 41
    • 34548858988 scopus 로고    scopus 로고
    • Comparison of construction photograph and VR image in construction progress
    • Kim, H., and, Kano, N. (2008). " Comparison of construction photograph and VR image in construction progress." J. Autom. Constr., 17 (2), 137-143. 0926-5805 10.1016/j.autcon.2006.12.005
    • (2008) J. Autom. Constr. , vol.17 , Issue.2 , pp. 137-143
    • Kim, H.1    Kano, N.2
  • 42
    • 42949120546 scopus 로고    scopus 로고
    • Technological assessment and process implications of field data capture technologies for construction and facility/infrastructure management
    • Kiziltas, S., Akinci, B., Ergen, E., and, Tang, P. (2008). " Technological assessment and process implications of field data capture technologies for construction and facility/infrastructure management." J. Inf. Technol. Constr., 13, 134-154. 1874-4753
    • (2008) J. Inf. Technol. Constr. , vol.13 , pp. 134-154
    • Kiziltas, S.1    Akinci, B.2    Ergen, E.3    Tang, P.4
  • 43
    • 0034227635 scopus 로고    scopus 로고
    • Feasibility study of 4D in commercial construction
    • Koo, B., and, Fischer, M. (2000). " Feasibility study of 4D in commercial construction." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2000)126:4(251), 251-260. JCEMD4 0733-9364
    • (2000) J. Constr. Eng. Manage. , pp. 251-260
    • Koo, B.1    Fischer, M.2
  • 44
    • 35348819914 scopus 로고    scopus 로고
    • Formalization of construction sequencing rationale and classification mechanism to support rapid generation of sequencing alternatives
    • Koo, B., Fischer, M., and, Kunz, J. (2007). " Formalization of construction sequencing rationale and classification mechanism to support rapid generation of sequencing alternatives." J. Comput. Civ. Eng., 10.1061/(ASCE)0887-3801(2007)21:6(423), 423-433. JCCEE5 0887-3801
    • (2007) J. Comput. Civ. Eng. , pp. 423-433
    • Koo, B.1    Fischer, M.2    Kunz, J.3
  • 45
    • 41749109303 scopus 로고    scopus 로고
    • Using a real-time integrated communication system to monitor the progress and quality of construction works
    • Leung, S., Mak, S., and, Lee, B. (2008). " Using a real-time integrated communication system to monitor the progress and quality of construction works." J. Autom. Constr., 17 (6), 749-757. 0926-5805 10.1016/j.autcon.2008.02.003
    • (2008) J. Autom. Constr. , vol.17 , Issue.6 , pp. 749-757
    • Leung, S.1    Mak, S.2    Lee, B.3
  • 46
    • 0034449909 scopus 로고    scopus 로고
    • The digital Michelangelo project: 3D scanning of large statues
    • New York
    • Levoy, M., et al. (2000). " The digital Michelangelo project: 3D scanning of large statues." Proc., ACM SIGGRAPH 2000, ACM, New York, 131-144.
    • (2000) Proc. ACM SIGGRAPH 2000, ACM , pp. 131-144
    • Levoy, M.1
  • 47
    • 3042535216 scopus 로고    scopus 로고
    • Distinctive image features from scale-invariant keypoints
    • Lowe, D. (2004). " Distinctive image features from scale-invariant keypoints." Int. J. Comput. Vision, 60 (2), 91-110. 1573-1405 10.1023/B:VISI.0000029664.99615.94
    • (2004) Int. J. Comput. Vision , vol.60 , Issue.2 , pp. 91-110
    • Lowe, D.1
  • 49
    • 79957580713 scopus 로고    scopus 로고
    • McGraw-Hill Construction. (Oct. 7, 2009)
    • McGraw-Hill Construction. (2009). " The business value of BIM: Getting BIM to the bottom line."http://www.bim.construction.com/research/pdfs/2009-BIM-SmartMarket-Report.pdf (Oct. 7, 2009).
    • (2009) The Business Value of BIM: Getting BIM to the Bottom Line
  • 52
    • 33845966046 scopus 로고    scopus 로고
    • Research in automated measurement of project performance indicators
    • Navon, R. (2007). " Research in automated measurement of project performance indicators." J. Autom. Constr., 16 (2), 176-188. 0926-5805 10.1016/j.autcon.2006.03.003
    • (2007) J. Autom. Constr. , vol.16 , Issue.2 , pp. 176-188
    • Navon, R.1
  • 53
    • 33847222202 scopus 로고    scopus 로고
    • Assessing research in automated project performance control (APPC)
    • Navon, R., and, Sacks, R. (2007). " Assessing research in automated project performance control (APPC)." J. Autom. Constr., 16 (4), 474-484. 0926-5805 10.1016/j.autcon.2006.08.001
    • (2007) J. Autom. Constr. , vol.16 , Issue.4 , pp. 474-484
    • Navon, R.1    Sacks, R.2
  • 54
    • 3042622340 scopus 로고    scopus 로고
    • An efficient solution to the five-point relative pose problem
    • Nistér, D. (2004). " An efficient solution to the five-point relative pose problem." IEEE Trans. Pattern Anal. Mach. Intell., 26 (6), 756-770. ITPIDJ 0162-8828 10.1109/TPAMI.2004.17
    • (2004) IEEE Trans. Pattern Anal. Mach. Intell. , vol.26 , Issue.6 , pp. 756-770
    • Nistér, D.1
  • 56
    • 40649110233 scopus 로고    scopus 로고
    • Two photogrammetric methods for measuring flat elements in buildings under construction
    • Ordonez, C., Arias, P., Herraez, J., Rodriguez, J., and, Martin, M. (2008). " Two photogrammetric methods for measuring flat elements in buildings under construction." J. Autom. Constr., 17 (5), 517-525. 0926-5805 10.1016/j.autcon.2007.11.003
    • (2008) J. Autom. Constr. , vol.17 , Issue.5 , pp. 517-525
    • Ordonez, C.1    Arias, P.2    Herraez, J.3    Rodriguez, J.4    Martin, M.5
  • 57
    • 33750978713 scopus 로고    scopus 로고
    • A new approach for health monitoring of structures: Terrestrial laser scanning
    • Park, H. S., Lee, H. M., Adeli, H., and, Lee, I. (2007). " A new approach for health monitoring of structures: terrestrial laser scanning." Comput. Aided Civ. Infrastruct. Eng., 22 (1), 19-30. CCIEFR 1093-9687 10.1111/mice.2007.22.issue-1
    • (2007) Comput. Aided Civ. Infrastruct. Eng. , vol.22 , Issue.1 , pp. 19-30
    • Park, H.S.1    Lee, H.M.2    Adeli, H.3    Lee, I.4
  • 58
    • 70350148367 scopus 로고    scopus 로고
    • Project monitoring methods exploratory case analysis: Industry responses
    • ASCE, Reston, VA
    • Peterson, F., and, Fischer, M. (2009). " Project monitoring methods exploratory case analysis: industry responses." ASCE Int. Workshop on Computing in Civ. Eng., ASCE, Reston, VA.
    • (2009) ASCE Int. Workshop on Computing in Civ. Eng.
    • Peterson, F.1    Fischer, M.2
  • 60
    • 33747360709 scopus 로고    scopus 로고
    • Construction scheduling and progress control using geographical information systems
    • Poku, S., and, Arditi, D. (2006). " Construction scheduling and progress control using geographical information systems." J. Comput. Civ. Eng., 10.1061/(ASCE)0887-3801(2006)20:5(351), 351-360. JCCEE5 0887-3801
    • (2006) J. Comput. Civ. Eng. , pp. 351-360
    • Poku, S.1    Arditi, D.2
  • 61
    • 40949155911 scopus 로고    scopus 로고
    • Detailed real-time urban 3D reconstruction from video
    • Pollefeys, M., et al. (2008). " Detailed real-time urban 3D reconstruction from video." Int. J. Comput. Vision, 78 (2-3), 143-167. 1573-1405 10.1007/s11263-007-0086-4
    • (2008) Int. J. Comput. Vision , vol.78 , Issue.23 , pp. 143-167
    • Pollefeys, M.1
  • 62
    • 40649097337 scopus 로고    scopus 로고
    • Digital image reasoning for tracking excavation activities
    • Quiñones-Rozo, C., Hashash, Y., and, Liu, L. (2008). " Digital image reasoning for tracking excavation activities." J. Autom. Constr., 17 (5), 608-622. 0926-5805 10.1016/j.autcon.2007.10.008
    • (2008) J. Autom. Constr. , vol.17 , Issue.5 , pp. 608-622
    • Quiñones-Rozo, C.1    Hashash, Y.2    Liu, L.3
  • 65
    • 0033220985 scopus 로고    scopus 로고
    • Photorealistic scene reconstruction by voxel coloring
    • Seitz, S. M., and, Dyer, C. R. (1999). " Photorealistic scene reconstruction by voxel coloring." Int. J. Comput. Vision, 35 (2), 151-173. 1573-1405 10.1023/A:1008176507526
    • (1999) Int. J. Comput. Vision , vol.35 , Issue.2 , pp. 151-173
    • Seitz, S.M.1    Dyer, C.R.2
  • 66
    • 14744303360 scopus 로고    scopus 로고
    • Point cloud-based comparison between construction schedule and as-built progress: Long-range three-dimensional laser scanner's approach
    • Shih, N., and, Wang, P. (2004). " Point cloud-based comparison between construction schedule and as-built progress: Long-range three-dimensional laser scanner's approach." J. Archit. Eng., 10.1061/(ASCE)1076-0431(2004)10:3(98), 98-102. JAEIED 1076-0431
    • (2004) J. Archit. Eng. , pp. 98-102
    • Shih, N.1    Wang, P.2
  • 67
    • 33747866059 scopus 로고    scopus 로고
    • The application of a panorama image database management system (pidms) for information integration on construction sites
    • Shih, N., Lai, J., and, Tsai, Y. L. (2006). " The application of a panorama image database management system (pidms) for information integration on construction sites." ITcon, 11, 641-654. 1874-4753
    • (2006) ITcon , vol.11 , pp. 641-654
    • Shih, N.1    Lai, J.2    Tsai, Y.L.3
  • 70
    • 51849148010 scopus 로고    scopus 로고
    • Modeling the world from internet photo collections
    • Snavely, N., Seitz, S. M., and, Szeliski, R. (2008). " Modeling the world from internet photo collections." Int. J. Comput. Vision, 80 (2), 189-210. 1573-1405 10.1007/s11263-007-0107-3
    • (2008) Int. J. Comput. Vision , vol.80 , Issue.2 , pp. 189-210
    • Snavely, N.1    Seitz, S.M.2    Szeliski, R.3
  • 71
    • 39449095825 scopus 로고    scopus 로고
    • Management and analysis of unstructured construction data types
    • Soibelman, L., Wu, J., Caldas, C., Brilakis, I., and, Lin, K. Y. (2008). " Management and analysis of unstructured construction data types." J. Adv. Eng. Inf., 22 (1), 15-27. 10.1016/j.aei.2007.08.011
    • (2008) J. Adv. Eng. Inf. , vol.22 , Issue.1 , pp. 15-27
    • Soibelman, L.1    Wu, J.2    Caldas, C.3    Brilakis, I.4    Lin, K.Y.5
  • 73
    • 33751274763 scopus 로고    scopus 로고
    • Integration of construction as-built data via laser scanning with geotechnical monitoring of urban excavation
    • Su, Y., Hashash, Y., and, Liu, L. Y. (2006). " Integration of construction as-built data via laser scanning with geotechnical monitoring of urban excavation." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2006)132:12(1234), 1234-1241. JCEMD4 0733-9364
    • (2006) J. Constr. Eng. Manage. , pp. 1234-1241
    • Su, Y.1    Hashash, Y.2    Liu, L.Y.3
  • 74
    • 33644518998 scopus 로고    scopus 로고
    • Framework for real-time three-dimensional modelling of infrastructure
    • Transportation Research Board National Research Council, Washington, DC
    • Teizer, J., Kim, C., Haas, C., Liapi, K., and, Caldas, C. (2005). " Framework for real-time three-dimensional modelling of infrastructure." Geology and properties of earth materials 2005, Transportation Research Board National Research Council, Washington, DC, 177-186.
    • (2005) Geology and Properties of Earth Materials 2005 , pp. 177-186
    • Teizer, J.1    Kim, C.2    Haas, C.3    Liapi, K.4    Caldas, C.5
  • 77
    • 33745825006 scopus 로고
    • State of the art of high precision industrial photogrammetry
    • Springer, Berlin, Heidelberg
    • Uffenkamp, V. (1993). " State of the art of high precision industrial photogrammetry." Proc., 3rd Int. Workshop on Accelerator Alignment, Springer, Berlin, Heidelberg.
    • (1993) Proc. 3rd Int. Workshop on Accelerator Alignment
    • Uffenkamp, V.1
  • 80
    • 58949088479 scopus 로고    scopus 로고
    • Automating progress measurement of construction projects
    • Zhang, X., et al. (2009). " Automating progress measurement of construction projects." J. Autom. Constr., 18 (3), 294-301. 0926-5805 10.1016/j.autcon.2008.09.004
    • (2009) J. Autom. Constr. , vol.18 , Issue.3 , pp. 294-301
    • Zhang, X.1
  • 81
    • 56749155706 scopus 로고    scopus 로고
    • Fusion of feature- and area-based information for urban buildings modeling from aerial imagery
    • Zebedin, L., Bauer, J., Karner, K., and, Bischof, H. (2008). " Fusion of feature- and area-based information for urban buildings modeling from aerial imagery." Comput. Vision-ECCV, 5305, 873-886. 10.1007/978-3-540-88693-8-64
    • (2008) Comput. Vision-ECCV , vol.5305 , pp. 873-886
    • Zebedin, L.1    Bauer, J.2    Karner, K.3    Bischof, H.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.