Volumn 26, Issue , 2012, Pages 1-10

A BIM- and sensor-based tower crane navigation system for blind lifts

Author keywords

Building information modeling (BIM); Navigation system; Sensor; Tower crane

Indexed keywords

ANTICOLLISION SYSTEM; BLIND SPOTS; BUILDING INFORMATION MODELING; CAMERA SYSTEMS; COLLISION-DETECTION; CONSTRUCTION SITES; EASE-OF-USE; ITERATIVE DESIGN; LOCATION INFORMATION; NUMERICAL DATA; PERCEIVED EASE OF USE; REAL TIME; SYSTEM QUALITY; TECHNOLOGY ACCEPTANCE MODEL; THREE-DIMENSIONAL INFORMATION;

EID: 84862125657     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2012.05.002     Document Type: Article
Times cited : (131)

References (29)
  • 2
    • 55249087535 scopus 로고
    • Perceived usefulness, perceived ease of use, and user acceptance of information technology
    • F.D. David Perceived usefulness, perceived ease of use, and user acceptance of information technology MIS Quarterly 13 3 1989 318 340
    • (1989) MIS Quarterly , vol.13 , Issue.3 , pp. 318-340
    • David, F.D.1
  • 4
    • 73349089019 scopus 로고    scopus 로고
    • Design and first development of an automated real-time safety management system for construction sites
    • A. Giretti, A. Carbonari, B. Naticchia, and M. De Grassi Design and first development of an automated real-time safety management system for construction sites Journal of Civil Engineering and Management 15 4 2009 325 336
    • (2009) Journal of Civil Engineering and Management , vol.15 , Issue.4 , pp. 325-336
    • Giretti, A.1    Carbonari, A.2    Naticchia, B.3    De Grassi, M.4
  • 7
    • 70350060196 scopus 로고    scopus 로고
    • Three-dimensional simulation and visualization of crane assisted construction erection processes
    • S.-C. Kang, H.-L. Chi, and E. Miranda Three-dimensional simulation and visualization of crane assisted construction erection processes Journal of Computing in Civil Engineering 23 6 2009 363 371
    • (2009) Journal of Computing in Civil Engineering , vol.23 , Issue.6 , pp. 363-371
    • Kang, S.-C.1    Chi, H.-L.2    Miranda, E.3
  • 8
    • 33744547057 scopus 로고    scopus 로고
    • Planning and visualization for automated robotic crane erection processes in construction
    • S. Kang, and E. Miranda Planning and visualization for automated robotic crane erection processes in construction Automation in Construction 15 4 2006 398 414
    • (2006) Automation in Construction , vol.15 , Issue.4 , pp. 398-414
    • Kang, S.1    Miranda, E.2
  • 9
    • 84862134318 scopus 로고    scopus 로고
    • OTKCRK500288 Korea Institute of Construction Technology Ilsan, Korea
    • B.H. Kim, and M.R. Song Semi-automation of Tower Cranes OTKCRK500288 1997 Korea Institute of Construction Technology Ilsan, Korea
    • (1997) Semi-automation of Tower Cranes
    • Kim, B.H.1    Song, M.R.2
  • 12
    • 58949083695 scopus 로고    scopus 로고
    • Development of a mobile safety monitoring system for construction sites
    • U.-K. Lee, J.-H. Kim, H. Cho, and K.-I. Kang Development of a mobile safety monitoring system for construction sites Automation in Construction 18 3 2009 258 264
    • (2009) Automation in Construction , vol.18 , Issue.3 , pp. 258-264
    • Lee, U.-K.1    Kim, J.-H.2    Cho, H.3    Kang, K.-I.4
  • 13
    • 34147106608 scopus 로고    scopus 로고
    • Positioning and tracking construction vehicles in highly dense urban areas and building construction sites
    • M. Lu, W. Chen, X. Shen, H.-C. Lam, and J. Liu Positioning and tracking construction vehicles in highly dense urban areas and building construction sites Automation in Construction 16 5 2007 647 656
    • (2007) Automation in Construction , vol.16 , Issue.5 , pp. 647-656
    • Lu, M.1    Chen, W.2    Shen, X.3    Lam, H.-C.4    Liu, J.5
  • 15
    • 0346150420 scopus 로고    scopus 로고
    • Adapting a teleoperated device for autonomous control using three-dimensional positioning sensors: Experiences with the NIST RoboCrane
    • A.M. Lytle, K.S. Saidi, R.V. Bostelman, W.C. Stone, and N.A. Scott Adapting a teleoperated device for autonomous control using three-dimensional positioning sensors: experiences with the NIST RoboCrane Automation in Construction 13 1 2004 101 118
    • (2004) Automation in Construction , vol.13 , Issue.1 , pp. 101-118
    • Lytle, A.M.1    Saidi, K.S.2    Bostelman, R.V.3    Stone, W.C.4    Scott, N.A.5
  • 16
    • 84862154908 scopus 로고    scopus 로고
    • NFB (accessed)
    • NFB Blind driver challenge http://www.blinddriverchallenge.org/bdcg/ default.asp 2010 (accessed)
    • (2010) Blind Driver Challenge
  • 19
    • 0029323168 scopus 로고
    • Automation of existing cranes: From concept to prototype
    • Y. Rosenfeld Automation of existing cranes: from concept to prototype Automation in Construction 4 2 1995 125 138
    • (1995) Automation in Construction , vol.4 , Issue.2 , pp. 125-138
    • Rosenfeld, Y.1
  • 20
    • 0032070691 scopus 로고    scopus 로고
    • Automation of existing tower cranes: Economic and technological feasibility
    • Y. Rosenfeld, and A. Shapira Automation of existing tower cranes: economic and technological feasibility Automation in Construction 7 4 1998 285 298
    • (1998) Automation in Construction , vol.7 , Issue.4 , pp. 285-298
    • Rosenfeld, Y.1    Shapira, A.2
  • 21
    • 32944467411 scopus 로고    scopus 로고
    • Interpretation of automatically monitored lifting equipment data for project control
    • R. Sacks, R. Navon, and I. Brodetskaia Interpretation of automatically monitored lifting equipment data for project control Journal of Computing in Civil Engineering 20 2 2006 111 120
    • (2006) Journal of Computing in Civil Engineering , vol.20 , Issue.2 , pp. 111-120
    • Sacks, R.1    Navon, R.2    Brodetskaia, I.3
  • 27
    • 84862134178 scopus 로고    scopus 로고
    • Development of a real-time lifting-path tracking system of a tower-crane for steel members based on an integrated wireless RF modem and GPS system
    • S.-H. Yun, and G. Lee Development of a real-time lifting-path tracking system of a tower-crane for steel members based on an integrated wireless RF modem and GPS system Journal of the Korean Institute of Building Construction 10 3 2010 65 70
    • (2010) Journal of the Korean Institute of Building Construction , vol.10 , Issue.3 , pp. 65-70
    • Yun, S.-H.1    Lee, G.2
  • 28
    • 67949098010 scopus 로고    scopus 로고
    • A study on a method for tracking lifting paths of a tower crane using GPS in the BIM environment
    • S.-H. Yun, C.-W. Park, G. Lee, and K. Bongkeun A study on a method for tracking lifting paths of a tower crane using GPS in the BIM environment Journal of the Architectural Institute of Korea 24 6 2008 163 170
    • (2008) Journal of the Architectural Institute of Korea , vol.24 , Issue.6 , pp. 163-170
    • Yun, S.-H.1    Park, C.-W.2    Lee, G.3    Bongkeun, K.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.