Visualization of work flow to support lean construction

Author keywords

Computer aided design; Construction management; Imaging techniques; Interfaces; Lean construction; Safety

Indexed keywords

BUILDING INFORMATION MODELING; CONSTRUCTION MANAGEMENT; IN-PROCESS; LEAN CONSTRUCTION; PHYSICAL ENVIRONMENTS; PROCESS FLOWS; PROCESS STATE; PRODUCTION MANAGEMENT; SOFTWARE SYSTEMS; VISUALIZATION TOOLS; WORK PACKAGES; WORK-FLOWS;

EID: 70450209479     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000102     Document Type: Article
Times cited : (173)

References (38)
  • 1
    • 0041805006 scopus 로고    scopus 로고
    • Automated generation of work spaces required by construction activities
    • DOI 10.1061/(ASCE)0733-9364(2002)128:4(306)
    • Akinci, B., Fischer, M., and Kunz, J. (2002). " Automated generation of work spaces required by construction activities.." J. Constr. Eng. Manage. 0733-9364, 128 (4), 306-315. 10.1061/(ASCE)0733-9364(2002)128:4(306) (Pubitemid 40265535)
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.4 , pp. 306-315
    • Akinci, B.1    Fischer, M.2    Kunz, J.3
  • 2
    • 35348856860 scopus 로고    scopus 로고
    • Supporting collaboration, in colocated 3D visualization, through the use of remote personal interfaces
    • DOI 10.1061/(ASCE)0887-3801(2007)21:6(393)
    • Aspin, R. (2007). " Supporting collaboration, in colocated 3D visualization, through the use of remote personal interfaces.." J. Comput. Civ. Eng. 0887-3801, 21 (6), 393-401. 10.1061/(ASCE)0887-3801(2007)21:6(393) (Pubitemid 47587956)
    • (2007) Journal of Computing in Civil Engineering , vol.21 , Issue.6 , pp. 393-401
    • Aspin, R.1
  • 4
    • 69949101125 scopus 로고    scopus 로고
    • The lean project delivery system: An update
    • Ballard, G. (2008). " The lean project delivery system: An update.." Lean Construction J., 2008, 1-19.
    • (2008) Lean Construction J. , vol.2008 , pp. 1-19
    • Ballard, G.1
  • 5
    • 34250616754 scopus 로고    scopus 로고
    • Georeferenced registration of construction graphics in mobile outdoor augmented reality
    • DOI 10.1061/(ASCE)0887-3801(2007)21:4(247)
    • Behzadan, A. H., and Kamat, V. R. (2007). " Georeferenced registration of construction graphics in mobile outdoor augmented reality.." J. Comput. Civ. Eng. 0887-3801, 21 (4), 247-258. 10.1061/(ASCE)0887-3801(2007)21:4(247) (Pubitemid 46935006)
    • (2007) Journal of Computing in Civil Engineering , vol.21 , Issue.4 , pp. 247-258
    • Behzadan, A.H.1    Kamat, V.R.2
  • 6
    • 70450132872 scopus 로고    scopus 로고
    • Safety planning for projects
    • Society for Technical Communication, Seattle.
    • Berg, K. (2005). " Safety planning for projects.." Proc., Environmental, Safety, and Health Conf., Society for Technical Communication, Seattle.
    • (2005) Proc., Environmental, Safety, and Health Conf.
    • Berg, K.1
  • 7
    • 84993029182 scopus 로고    scopus 로고
    • 4DCAD-Safety: Visualizing project scheduling and safety planning
    • 1471-4175, (),. 10.1191/1471417505ci091oa
    • Chantawit, D., Hadikusumo, B. H. W., Charoenngam, C., and Rowlinson, S. (2005). " 4DCAD-Safety: Visualizing project scheduling and safety planning.." Constr. Innovation 1471-4175, 5 (2), 99-114. 10.1191/1471417505ci091oa
    • (2005) Constr. Innovation , vol.5 , Issue.2 , pp. 99-114
    • Chantawit, D.1    Hadikusumo, B.H.W.2    Charoenngam, C.3    Rowlinson, S.4
  • 8
    • 13944251393 scopus 로고    scopus 로고
    • Four-dimensional visualization of construction scheduling and site utilization
    • DOI 10.1061/(ASCE)0733-9364(2004)130:4(598)
    • Chau, K. W., Anson, M., and Zhang, J. P. (2004). " Four-dimensional visualization of construction scheduling and site utilization.." J. Constr. Eng. Manage. 0733-9364, 130 (4), 598-606. 10.1061/(ASCE)0733-9364(2004)130: 4(598) (Pubitemid 40265357)
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.4 , pp. 598-606
    • Chau, K.W.1    Anson, M.2    Zhang, J.P.3
  • 9
    • 0032667279 scopus 로고    scopus 로고
    • WorkPlan: Constraint-based database for work package scheduling
    • 0733-9364, (),. 10.1061/(ASCE)0733-9364(1999)125:3(151)
    • Choo, H. J., Tommelein, I. D., Ballard, G., and Zabelle, T. R. (1999). " WorkPlan: Constraint-based database for work package scheduling.." J. Constr. Eng. Manage. 0733-9364, 125 (3), 151-160. 10.1061/(ASCE)0733- 9364(1999)125:3(151)
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.3 , pp. 151-160
    • Choo, H.J.1    Tommelein, I.D.2    Ballard, G.3    Zabelle, T.R.4
  • 12
    • 84891310850 scopus 로고    scopus 로고
    • Application of visualization techniques for construction progress monitoring
    • L. Soibelman and B. Akinci, eds., ASCE, Reston, Va..
    • Fard, M. G., and Pena-Mora, F. (2007). " Application of visualization techniques for construction progress monitoring.." Computing in civil engineering 2007, L. Soibelman, and, B. Akinci, eds., ASCE, Reston, Va., 27.
    • (2007) Computing in Civil Engineering 2007 , pp. 27
    • Fard, M.G.1    Pena-Mora, F.2
  • 13
    • 2342444152 scopus 로고    scopus 로고
    • An exploratory study on the applicability of process transparency in construction sites
    • 1609-9451, (),. 10.1142/S1609945102000102
    • Formoso, C. T., Santos, A. D., and Powell, J. A. (2002). " An exploratory study on the applicability of process transparency in construction sites.." J. Constr. Res. 1609-9451, 3 (1), 35-54. 10.1142/S1609945102000102
    • (2002) J. Constr. Res. , vol.3 , Issue.1 , pp. 35-54
    • Formoso, C.T.1    Santos, A.D.2    Powell, J.A.3
  • 16
    • 20544434000 scopus 로고    scopus 로고
    • ILO.. "." Re No. 061, International Labor Organization, Geneva.
    • ILO. (2003). " Safety in numbers.." Rep. No. 061, International Labor Organization, Geneva.
    • (2003) Safety in Numbers
  • 17
    • 41749088228 scopus 로고    scopus 로고
    • Quantitative analysis of workflow, temporary structure usage, and productivity using 4D models
    • 0926-5805, (),. 10.1016/j.autcon.2008.02.006
    • Jongeling, R., Kim, J., Fischer, M., Mourgues, C., and Olofsson, T. (2008). " Quantitative analysis of workflow, temporary structure usage, and productivity using 4D models.." Autom. Constr. 0926-5805, 17 (6), 780-791. 10.1016/j.autcon.2008.02.006
    • (2008) Autom. Constr. , vol.17 , Issue.6 , pp. 780-791
    • Jongeling, R.1    Kim, J.2    Fischer, M.3    Mourgues, C.4    Olofsson, T.5
  • 18
    • 0035482195 scopus 로고    scopus 로고
    • Visualizing simulated construction operations in 3D
    • DOI 10.1061/(ASCE)0887-3801(2001)15:4(329), Reportnr 22118
    • Kamat, V. R., and Martinez, J. C. (2001). " Visualizing simulated construction operations in 3D.." J. Comput. Civ. Eng. 0887-3801, 15 (4), 329-337. 10.1061/(ASCE)0887-3801(2001)15:4(329) (Pubitemid 33073892)
    • (2001) Journal of Computing in Civil Engineering , vol.15 , Issue.4 , pp. 329-327
    • Kamat, V.R.1    Martinez, J.C.2
  • 19
    • 34248575853 scopus 로고    scopus 로고
    • Empirical study on the merit of web-based 4D visualization in collaborative construction planning and scheduling
    • DOI 10.1061/(ASCE)0733-9364(2007)133:6(447)
    • Kang, J. H., Anderson, S. D., and Clayton, M. J. (2007). " Empirical study on the merit of web-based 4D visualization in collaborative construction planning and scheduling.." J. Constr. Eng. Manage. 0733-9364, 133 (6), 447-461. 10.1061/(ASCE)0733-9364(2007)133:6(447) (Pubitemid 46753484)
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.6 , pp. 447-461
    • Kang, J.H.1    Anderson, S.D.2    Clayton, M.J.3
  • 20
    • 84866126106 scopus 로고    scopus 로고
    • Case study of the implementation of the lean project delivery system (LPDS) using virtual building technologies on a large healthcare project
    • ", R. Kenley, ed., UNSW, Sydney, Australia.
    • Khanzode, A., Fischer, M., and Reed, D. (2005). " Case study of the implementation of the lean project delivery system (LPDS) using virtual building technologies on a large healthcare project.." Proc., 13th Conf. of the Int. Group for Lean Construction, R. Kenley, ed., UNSW, Sydney, Australia, 153-160.
    • (2005) Proc., 13th Conf. of the Int. Group for Lean Construction , pp. 153-160
    • Khanzode, A.1    Fischer, M.2    Reed, D.3
  • 21
    • 84855826727 scopus 로고    scopus 로고
    • Return on investment in construction innovation-A lean construction case study
    • R. Kenley, ed., UNSW, Sydney, Australia.
    • Koerckel, A., and Ballard, G. (2005). " Return on investment in construction innovation-A lean construction case study.." Proc., 13th Annual Conf. on Lean Construction, R. Kenley, ed., UNSW, Sydney, Australia.
    • (2005) Proc., 13th Annual Conf. on Lean Construction
    • Koerckel, A.1    Ballard, G.2
  • 22
    • 0003656231 scopus 로고
    • Technical Re No. 72, Center for Integrated Facility Engineering, Dept. of Civil Engineering, Stanford Univ., Stanford, Calif.
    • Koskela, L. (1992). " Application of the new production philosophy to construction.." Technical Rep. No. 72, Center for Integrated Facility Engineering, Dept. of Civil Engineering, Stanford Univ., Stanford, Calif.
    • (1992) Application of the New Production Philosophy to Construction
    • Koskela, L.1
  • 25
    • 0032165225 scopus 로고    scopus 로고
    • Generating, evaluating, and visualizing construction schedules with CAD tools
    • 0926-5805, (),. 10.1016/S0926-5805(98)00053-3
    • McKinney, K., and Fischer, M. (1998). " Generating, evaluating, and visualizing construction schedules with CAD tools.." Autom. Constr. 0926-5805, 7 (6), 433-447. 10.1016/S0926-5805(98)00053-3
    • (1998) Autom. Constr. , vol.7 , Issue.6 , pp. 433-447
    • McKinney, K.1    Fischer, M.2
  • 26
    • 33847222202 scopus 로고    scopus 로고
    • Assessing research issues in Automated Project Performance Control (APPC)
    • DOI 10.1016/j.autcon.2006.08.001, PII S0926580506000768
    • Navon, R., and Sacks, R. (2007). " Assessing research issues in automated project performance control (APPC).." Autom. Constr. 0926-5805, 16 (4), 474-484. 10.1016/j.autcon.2006.08.001 (Pubitemid 46304214)
    • (2007) Automation in Construction , vol.16 , Issue.4 , pp. 474-484
    • Navon, R.1    Sacks, R.2
  • 27
    • 84876755687 scopus 로고    scopus 로고
    • Just in time and autonomation: Applying TPS in vertical housing
    • G. Ballard and G. Howell, eds., Lean Construction Institute, Park City, Utah.
    • Pereira, P. (1998). " Just in time and autonomation: Applying TPS in vertical housing.." Proc., 6th Annual LCI Congress, G. Ballard, and, G. Howell, eds., Lean Construction Institute, Park City, Utah.
    • (1998) Proc., 6th Annual LCI Congress
    • Pereira, P.1
  • 28
    • 0032593162 scopus 로고    scopus 로고
    • VR-based planning of construction site activities
    • 0926-5805, (),. 10.1016/S0926-5805(98)00113-7
    • Retik, A., and Shapira, A. (1999). " VR-based planning of construction site activities.." Autom. Constr. 0926-5805, 8 (6), 671-680. 10.1016/S0926-5805(98)00113-7
    • (1999) Autom. Constr. , vol.8 , Issue.6 , pp. 671-680
    • Retik, A.1    Shapira, A.2
  • 29
    • 70450150556 scopus 로고    scopus 로고
    • WORKMANAGER-An online interface for lean flow control in apartment building construction
    • H. Rivard and E. Miresco, eds., ASCE, Reston, Va..
    • Sacks, R., and Derin, Z. (2006). " WORKMANAGER-An online interface for lean flow control in apartment building construction.." Proc., Joint Int. Conf. on Computing and Decision Making in Civil and Building Engineering, H. Rivard, and, E. Miresco, eds., ASCE, Reston, Va., 1176-1185.
    • (2006) Proc., Joint Int. Conf. on Computing and Decision Making in Civil and Building Engineering , pp. 1176-1185
    • Sacks, R.1    Derin, Z.2
  • 30
    • 34247279276 scopus 로고    scopus 로고
    • Lean management model for construction of high-rise apartment buildings
    • DOI 10.1061/(ASCE)0733-9364(2007)133:5(374)
    • Sacks, R., and Goldin, M. (2007). " Lean management model for construction of high-rise apartment buildings.." J. Constr. Eng. Manage. 0733-9364, 133 (5), 374-384. 10.1061/(ASCE)0733-9364(2007)133:5(374) (Pubitemid 46610041)
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.5 , pp. 374-384
    • Sacks, R.1    Goldin, M.2
  • 31
    • 33748157247 scopus 로고    scopus 로고
    • Pull-driven construction of high-rise apartment buildings
    • ", R. Kenley, ed., UNSW, Sydney, Australia.
    • Sacks, R., Goldin, M., and Derin, Z. (2005). " Pull-driven construction of high-rise apartment buildings.." Proc., 13th Conf. of the Int. Group for Lean Construction, R. Kenley, ed., UNSW, Sydney, Australia, 217-226.
    • (2005) Proc., 13th Conf. of the Int. Group for Lean Construction , pp. 217-226
    • Sacks, R.1    Goldin, M.2    Derin, Z.3
  • 32
    • 67651222422 scopus 로고    scopus 로고
    • Spatial and temporal exposure to safety hazards in construction
    • 0733-9364, (),. 10.1061/(ASCE)0733-9364(2009)135:8(726)
    • Sacks, R., Rozenfeld, O., and Rosenfeld, Y. (2009). " Spatial and temporal exposure to safety hazards in construction.." J. Constr. Eng. Manage. 0733-9364, 135 (8), 726-736. 10.1061/(ASCE)0733-9364(2009)135:8(726)
    • (2009) J. Constr. Eng. Manage. , vol.135 , Issue.8 , pp. 726-736
    • Sacks, R.1    Rozenfeld, O.2    Rosenfeld, Y.3
  • 34
    • 70450143438 scopus 로고    scopus 로고
    • Strategic Project Solutions (SPS).. "." Strategic Project Solutions, Inc., 〈〉 (Sept. 25, 2009).
    • Strategic Project Solutions (SPS). (2007). " Strategic projectsolutions.." Strategic Project Solutions, Inc., 〈 http://www.strategicprojectsolutions.com/ 〉 (Sept. 25, 2009).
    • (2007) Strategic Projectsolutions
  • 35
    • 70450158194 scopus 로고    scopus 로고
    • Synchro.. "." Synchro Ltd., 〈〉 (Sept. 25, 2009).
    • Synchro. (2007). " Synchro.." Synchro Ltd., 〈 www.synchroltd.com/ 〉 (Sept. 25, 2009).
    • (2007) Synchro
  • 36
    • 0342966280 scopus 로고    scopus 로고
    • Safety cost optimization of building projects in Hong Kong
    • 0144-6193, (),. 10.1080/01446199700000005
    • Tang, S. L., Lee, H. K., and Wong, K. (1997). " Safety cost optimization of building projects in Hong Kong.." Constr. Manage. Econom. 0144-6193, 15 (2), 177-186. 10.1080/01446199700000005
    • (1997) Constr. Manage. Econom. , vol.15 , Issue.2 , pp. 177-186
    • Tang, S.L.1    Lee, H.K.2    Wong, K.3
  • 37
    • 70450156139 scopus 로고    scopus 로고
    • VICO.. "." Vico Software, Inc., 〈〉 (Sept. 25, 2009).
    • VICO. (2007). " Virtual construction 2007.." Vico Software, Inc., 〈 http://www.vicosoftware.com/ 〉 (Sept. 25, 2009).
    • (2007) Virtual Construction 2007


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.